1 Texas Water Desalination Initiatives Presentation to the Coastal Plains GCD By Jorge A. Arroyo Texas Water Development Board Conclusions z Water desalination is a viable option for water supply in Texas z All signs point to continued improvement in water desalination technology, making it more efficient and cost competitive with other water supply options z Brackish groundwater desalination is becoming a mainstream application in Texas z A challenge to developing brackish groundwater desalination is the lack of detailed information about brackish groundwater availability z Initial development of seawater desalination supplies requires financial assistance to cover the cost vs. affordability gap
25

Texas Water Desalination Initiatives · 2010-03-29 · Texas Water Development Board Conclusions zWater desalination is a viable option for water supply in Texas zAll signs point

Aug 14, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Texas Water Desalination Initiatives · 2010-03-29 · Texas Water Development Board Conclusions zWater desalination is a viable option for water supply in Texas zAll signs point

1

Texas Water Desalination Initiatives

Presentation to the Coastal Plains GCD

ByJorge A. Arroyo

Texas Water Development Board

Conclusions

Water desalination is a viable option for water supply in TexasAll signs point to continued improvement in water desalination technology, making it more efficient and cost competitive with other water supply optionsBrackish groundwater desalination is becoming a mainstream application in TexasA challenge to developing brackish groundwater desalination is the lack of detailed information about brackish groundwater availabilityInitial development of seawater desalination supplies requires financial assistance to cover the cost vs. affordability gap

Page 2: Texas Water Desalination Initiatives · 2010-03-29 · Texas Water Development Board Conclusions zWater desalination is a viable option for water supply in Texas zAll signs point

2

Texas Water Development Board Desalination Activities

Section 16.060 of the Texas Water Code, directs the Texas Water Development Board to undertake or participate in research, feasibility and facility planning studies, investigations, and surveys as it considers necessary to further the development of cost-effective water supplies from seawater desalination in the state.

TWDB RoleGovernor’s Seawater Desalination InitiativeBrackish Groundwater Demonstration Initiative

The Texas Water Development Board’s (TWDB) mission is to provide leadership, planning, financial assistance, information, and education for the conservation and responsible development of water for Texas.

The questions about desalination

Too costlyIt uses too much energyWe really don’t need itThere is relatively little experience with seawater desalination

Page 3: Texas Water Desalination Initiatives · 2010-03-29 · Texas Water Development Board Conclusions zWater desalination is a viable option for water supply in Texas zAll signs point

3

Page 4: Texas Water Desalination Initiatives · 2010-03-29 · Texas Water Development Board Conclusions zWater desalination is a viable option for water supply in Texas zAll signs point

4

August 12, 2002

C. Sommariva-Desalination Management and Economics

Page 5: Texas Water Desalination Initiatives · 2010-03-29 · Texas Water Development Board Conclusions zWater desalination is a viable option for water supply in Texas zAll signs point

5

Shah Minesh, Addressing Water Scarcity through Energy and Water Integration-Presentation at the Energy Sustainability Summit-Texas Tech University, Sep 2006

Reverse-osmosis – Lead process

Layne Christensen Inc, Presentation to Texas Water Development Board-July 12, 2006

Page 6: Texas Water Desalination Initiatives · 2010-03-29 · Texas Water Development Board Conclusions zWater desalination is a viable option for water supply in Texas zAll signs point

6

Desalination Plant

Energy Use

Pre-treatment

Membrane system

Post-treatment

Desalination by reverse-osmosis

Source Water100 gal

2,000 mg/l Concentrate20-50 gal

3,000-10,000 mg/l

Drinking Water50-80 gal

100-500 mg/l

Page 7: Texas Water Desalination Initiatives · 2010-03-29 · Texas Water Development Board Conclusions zWater desalination is a viable option for water supply in Texas zAll signs point

7

Desalination Trends

1.40

1.00

0.80

0.500.4

0.2

'78 '89 '95 '00 '02 '06

CAPEX-Cents per 1,000 gal % Salt Passage $/cubic meter

$0.00

$0.20

$0.40

$0.60

$0.80

$1.00

$1.20

$1.40

$1.60

$1.80

'91 '96 '97 '99 '00 '01 '02 '06

63

1813

106.2 6.1

'78 '89 '95 '00 '02 '06

“It has been estimated that for the same capital investment spent on seawater reverse osmosis desalination in 1980, 27 times more water can be produced by today’s systems.”

Tom Pankratz, Desalination Technology Trends, 2004 TWDB Biennial Report on Desalination – Volume 2

Page 8: Texas Water Desalination Initiatives · 2010-03-29 · Texas Water Development Board Conclusions zWater desalination is a viable option for water supply in Texas zAll signs point

8

1.3

2.6

4.0

5.3

6.6

8.0

9.3

10.6

12.0

mill

ion

m3 /d

billi

on g

allo

ns/d

ay

Installed Desalination Capacity

Page 9: Texas Water Desalination Initiatives · 2010-03-29 · Texas Water Development Board Conclusions zWater desalination is a viable option for water supply in Texas zAll signs point

9

Page 10: Texas Water Desalination Initiatives · 2010-03-29 · Texas Water Development Board Conclusions zWater desalination is a viable option for water supply in Texas zAll signs point

10

Page 11: Texas Water Desalination Initiatives · 2010-03-29 · Texas Water Development Board Conclusions zWater desalination is a viable option for water supply in Texas zAll signs point

11

Continued improvements

Water Desalination in Texas

TWDB Research ProgramDesalination ResearchDesalination Database

University of Texas Bureau of Economic GeologyPrincipal Investigator : Dr. J. P. NicotTWDB Contract Manager: Dr. H. Krishna

Page 12: Texas Water Desalination Initiatives · 2010-03-29 · Texas Water Development Board Conclusions zWater desalination is a viable option for water supply in Texas zAll signs point

12

Desalination Facilities in Texas (2005)

Over 100 public water systems contactedMailed survey with phone follow-up

60-100 MGD100+Other desalination facilities

Less than .5 MGD50+PWS< .025 MGD

52 MGD38PWS≥ .025 MGD

Cumulative Design Capacity

Number Of Facilities

Type of Desalination Facility

Fig 1.2 – Design/Production over time

Page 13: Texas Water Desalination Initiatives · 2010-03-29 · Texas Water Development Board Conclusions zWater desalination is a viable option for water supply in Texas zAll signs point

13

Fig. 1.1- Largest facilities

Fig 4.3- Blending

Facilities with design capacity over .5 MGD

Page 14: Texas Water Desalination Initiatives · 2010-03-29 · Texas Water Development Board Conclusions zWater desalination is a viable option for water supply in Texas zAll signs point

14

Fig 4.5- Geographic Distribution

Sample of costs – Brackish Groundwater Desalination

$ 26,190,993.00 $ 0.85 7.56. SRWA

$ 8,000,000.00 $ 1.27 $ 0.47 $ 0.80 3.35. NAWSC DOOLITTLE SITE

$ 8,000,000.00 $ 1.27 $ 0.47 $ 0.80 3.34. NAWSC OWASSA SITE

$ 6,500,000.00 $ 1.35 $ 0.57 $ 0.78 2.22. NCRWA

$ 2,000,000.00 $ 1.12 $ 0.32 $ 0.80 1.21.NAWSC LASARA

TOTAL COSTDEBT SERVICEO&M CONSTRUCTION

COSTS

$/1,000 Gal

CAPACITY (MGD)

FACILITY

Courtesy of NRS Engineers –April 2007

Page 15: Texas Water Desalination Initiatives · 2010-03-29 · Texas Water Development Board Conclusions zWater desalination is a viable option for water supply in Texas zAll signs point

15

Strategies to meet water needs

2006 Regional Water PlansAdditional Water Supply (AFY ) From Desalination by 2060

Region Brackish Water (surface and groundwater) Seawater

A 0 0 B 26,550 0 E 50,000 0 F 16,221 0 G 200 0 H 0 28,000 K 29,568 0 L 5,562 84,012 M 69,832 7,902 N 0 18,200 O 3,360 0

Total 201,293 138,114

Page 16: Texas Water Desalination Initiatives · 2010-03-29 · Texas Water Development Board Conclusions zWater desalination is a viable option for water supply in Texas zAll signs point

16

78th Texas Legislature

HB 1370, directing TWDB to:“undertake or participate in research, feasibility and facility planning studies, investigations, and surveys as it considers necessary to further the development of cost-effective water supplies from seawater desalination in the state.”

Page 17: Texas Water Desalination Initiatives · 2010-03-29 · Texas Water Development Board Conclusions zWater desalination is a viable option for water supply in Texas zAll signs point

17

Dec 2002Statement of InterestSelected Sites

Dec 2004Completed feasibility Studies 78th Session

2010-2012New drought-proof water supply

2010-2012New drought-proof water supply

79th Session

Design, construction, commissioning

Design, construction, commissioning

EIR, Discharge Permits & Others

EIR, Discharge Permits & Others

Pilot Plant StudiesPilot Plant Studies

Seawater Desalination

Page 18: Texas Water Desalination Initiatives · 2010-03-29 · Texas Water Development Board Conclusions zWater desalination is a viable option for water supply in Texas zAll signs point

18

Brownsville

Pilot Plant at the Brownsville Ship Channel

Page 19: Texas Water Desalination Initiatives · 2010-03-29 · Texas Water Development Board Conclusions zWater desalination is a viable option for water supply in Texas zAll signs point

19

Page 20: Texas Water Desalination Initiatives · 2010-03-29 · Texas Water Development Board Conclusions zWater desalination is a viable option for water supply in Texas zAll signs point

20

Next steps

Complete the pilot plant studyDetermine pre-design specifications for the full-scale projectDetermine costs, funding and project procurement strategySeek fundingDesalinate by 2010

Brackish groundwater availability

Texas has an estimated 2.7 billion acre-feet of brackish groundwater(*)

(*) LBG-Guyton, Brackish Groundwater Manual for Regional Water Planning Groups, February 2003

Page 21: Texas Water Desalination Initiatives · 2010-03-29 · Texas Water Development Board Conclusions zWater desalination is a viable option for water supply in Texas zAll signs point

21

Brackish Groundwater Desalination Demonstration Projects

Goal: to continue facilitating the development of brackish groundwater desalination supplies by creating replicable models of projects that may be effectively transferred to other communities with similar profiles.

Engineering facility roadmapsCharacterizing source waterImplementing desalination technologiesManaging desalination concentrate

BGW Demonstration Projects North Cameron Regional WSC

2.3 mgdStart-up: fall 2006$150,000 TWDB grantEngineering facility roadmapWeb-based virtual toursEducational focus

Page 22: Texas Water Desalination Initiatives · 2010-03-29 · Texas Water Development Board Conclusions zWater desalination is a viable option for water supply in Texas zAll signs point

22

BGW Demonstration ProjectsCity of Kenedy

1.36 mgd$150,000 TWDB grantAssess performance of current operationAssess cost/benefit of upgrading to modern desalination technology

BGW Demonstration ProjectsCity of San Angelo

$300,000 TWDB grantExploratory drilling to characterize the suitability of the Whitehorse aquifer in Irion County as a brackish groundwater source for future water supply purposes Guidance manual for characterizing brackish groundwater resources

Page 23: Texas Water Desalination Initiatives · 2010-03-29 · Texas Water Development Board Conclusions zWater desalination is a viable option for water supply in Texas zAll signs point

23

BGW Demonstration ProjectsCity of San Antonio

BGW Demonstration ProjectsSandy Land UWCD

Page 24: Texas Water Desalination Initiatives · 2010-03-29 · Texas Water Development Board Conclusions zWater desalination is a viable option for water supply in Texas zAll signs point

24

BGW Demonstration ProjectsSandy Land UWCD

Other research and planning studies on desalination issues

Please Pass the SaltDevelopment of Permitting and Decision Model for Desalination Projects in TexasPerformance Verification of Capacitive Deionization TechnologyDesalination Facilities DatabaseSelf-sealing Evaporation Ponds for Small-scale Concentrate Disposal

Page 25: Texas Water Desalination Initiatives · 2010-03-29 · Texas Water Development Board Conclusions zWater desalination is a viable option for water supply in Texas zAll signs point

25

http://www.twdb.state.tx.us/Desalination/Desal/Index.asp

Access to reports:

http://www.twdb.state.tx.us/customer_service/feedback/input.aspx

Carla Daws, Public Information, 512-463-8176