TETHYS OIL AB Extra bolagstämma 20 februari 2008
50

TETHYS OIL AB · Tethys 50% o Tethys will enter into 2nd exploration phase of EPSA (1st phase expiration date 15 December 2007) o 2nd phase minimum work commitment (3 years period):

Jul 28, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: TETHYS OIL AB · Tethys 50% o Tethys will enter into 2nd exploration phase of EPSA (1st phase expiration date 15 December 2007) o 2nd phase minimum work commitment (3 years period):

TETHYS OIL AB Extra bolagstämma 20 februari 2008

Page 2: TETHYS OIL AB · Tethys 50% o Tethys will enter into 2nd exploration phase of EPSA (1st phase expiration date 15 December 2007) o 2nd phase minimum work commitment (3 years period):

2

OMAN

Licens Tethys share

Block 15 40%

Block 3&4 50%

Page 3: TETHYS OIL AB · Tethys 50% o Tethys will enter into 2nd exploration phase of EPSA (1st phase expiration date 15 December 2007) o 2nd phase minimum work commitment (3 years period):

OMAN - BLOCK 15 LOCATION MAP

• Tethys Oil, Operator, 40%

• Odin Energi, Partner, 60%

• EPSA signed October 2005

Page 4: TETHYS OIL AB · Tethys 50% o Tethys will enter into 2nd exploration phase of EPSA (1st phase expiration date 15 December 2007) o 2nd phase minimum work commitment (3 years period):

4

- Started on 20 May 2007 for 4-5 days

- Encountered troubles with directional drilling equipment, could not build

the angle as much as required

- Let well flow and sampled gas and formation fluid

- Abandonned Shuaiba Fm

OMAN BLOCK 15 - JA-1 STK 1 (SHUAIBA) – BASIC DATA

Page 5: TETHYS OIL AB · Tethys 50% o Tethys will enter into 2nd exploration phase of EPSA (1st phase expiration date 15 December 2007) o 2nd phase minimum work commitment (3 years period):

5

• Natih Fm flowed:

• 11.03 mmscfpd of gas

• 793 bpd of 57°API condensate

• total of 2,626 boepd through a 1

inch choke

• Flow rates constrained due to

production tubing size restriction

• Black smoke indicates burning oil

OMAN BLOCK 15 - JA-1 STK 2 (NATIH) - TEST

Page 6: TETHYS OIL AB · Tethys 50% o Tethys will enter into 2nd exploration phase of EPSA (1st phase expiration date 15 December 2007) o 2nd phase minimum work commitment (3 years period):

Helix RDS (UK) Ltd.

OMAN - JEBEL ASWAD WELL

Low Mid High

Gas Cumulative (Bscf) 13.84 130.64 435.99

Condensate Cumulative(MMbbIs) 0.69 6.53 21.80

Recovery Factor (%) 70.35 77.45 88.02

Number of wells 5 10 16

Recovery per well 2.77 13.06 27.25

Plateau level (MMscf/d) 20 50 100

Time on Plateau (years) 1.1 4.8 8.5

Page 7: TETHYS OIL AB · Tethys 50% o Tethys will enter into 2nd exploration phase of EPSA (1st phase expiration date 15 December 2007) o 2nd phase minimum work commitment (3 years period):

7

Gas Rate plateau:

5 years

Condensate rate

declines at 20% per year

Jebel Aswad Only BOE

Rate

(BOEPD)

Gas Rate

(mmscfpd)

Cond.

Rate

(BOPD)

First Production 1 Jul 2009 (3 wells) 4,045 15,000 1,545

Full Field Production 1 Oct 2010 (10 wells) 12,750 50,000 4,417

JEBEL ASWAD NATIH A PRODUCTION TARGET

Page 8: TETHYS OIL AB · Tethys 50% o Tethys will enter into 2nd exploration phase of EPSA (1st phase expiration date 15 December 2007) o 2nd phase minimum work commitment (3 years period):

Jebel Aswad Only BOE Rate

(BOEPD)

Gas Rate

(mmscfpd)

Cond.

Rate

(BOPD)

First Production 1 July 2009 1 618 6 000 618

Full Field Production 1 October 2010 5 100 20 000 1 767

*Based on in-house volumetrics and RDS Helix numbers

JEBEL ASWAD NATIH A PRODUCTION TARGET – TETHYS 40%

Gas Rate plateau:

5 years

Condensate rate

declines at 20% per

year

Page 9: TETHYS OIL AB · Tethys 50% o Tethys will enter into 2nd exploration phase of EPSA (1st phase expiration date 15 December 2007) o 2nd phase minimum work commitment (3 years period):

Activity Completion Date

PVT Analysis 28 February, 2008

Production Plan (reservoir eng.) 31 March, 2008

Process Design 31, March, 2008

Field Development Plan Submission 1 September, 2008

Field Development Plan Approval 1 December, 2008

EIA Approval 1 December, 2008

Gas Sales Agreement 1 January, 2009

Phase 1 Production Start (3 wells) 1 July 2009

JEBEL ASWAD PHASE 1 EARLY PRODUCTION SCHEDULE

Page 10: TETHYS OIL AB · Tethys 50% o Tethys will enter into 2nd exploration phase of EPSA (1st phase expiration date 15 December 2007) o 2nd phase minimum work commitment (3 years period):

10

JEBEL ASWAD CAPEX – TETHYS 40%

Wells Drilling

(MUSD)

Facilities

(MUSD)

Total

MUSD

Early Production

System (Phase 1)2 5 7 12

Full Field Development

(Phase 2)7 12 19 31

Base case

Rented / Own Production Facility

Page 11: TETHYS OIL AB · Tethys 50% o Tethys will enter into 2nd exploration phase of EPSA (1st phase expiration date 15 December 2007) o 2nd phase minimum work commitment (3 years period):

11

JEBEL ASWAD CAPEX – TETHYS 40%

Alternative case

3 phase flow export option (OPEX unknown)

Wells Drilling

(MUSD)

Facilities

(MUSD)

Total

MUSD

Early Production

System (Phase 1)2 5 10 15

Full Field Development

(Phase 2)7 12 5 17

Page 12: TETHYS OIL AB · Tethys 50% o Tethys will enter into 2nd exploration phase of EPSA (1st phase expiration date 15 December 2007) o 2nd phase minimum work commitment (3 years period):

SAUDI ARABIA

YEMEN

OMAN

BAHRAIN

QATAR

UN

ITE

D A

RA

B E

MIR

ATE

S

Hormuz Strait

OMAN - Mussandam

ZAKUM

SHAYBAH

SAFAH

YIBAL

AL HUWAISAH

SAIH RAWL

BARIK

MUKHAIZNA

NIMR

MARMUL

Sohar Industrial Cityplanned Petrochemicals Plant

Mina al Fahal

OMAN LNGQalhat

Raysutplanned GPP

Salalah

Rub Al Khali Desert

Empty Quarter

As Samah Desert

Al Harasis

Gravel Plain

Hajar

Mountains

Al B

atinah

Al D

hahirahAl Wahaybah

Desert

Manah

MUSCAT

32"

36",

20"

Saih Rawl to Qalhat-LNG Export plant

28"

10"

24"

RUNIB

16" Sahmah-Hubara

6"

16"

JebelKhuni

Tropic ofCancer

FAHUD

LEKHWAIR

SAIH NIHAYDAQARN ALAM

existing 48"

planned 48"

SO

GL

AL GHUBAR

16"32"

BUKHA

Khor Khwair

16"

10"

WADILATHAM

BVS-5

16"

HAFAR

Nahada

12"planned

GGP

CPP

Sur

Indian Ocean

Wadi JizziPower Plant

52°E

52°E

54°E

54°E

56°E

56°E

58°E

58°E

60°E

60°E

18

°N

18

°N

20

°N

20

°N

22

°N

22

°N

24

°N

24

°N

26

°N

26

°N

0 100 20050

Km

The Fahud-Sohar

gas pipeline is

crossing block 15

Modified after Wood MacKenzie

OMAN - BLOCK 15 AND GAS INFRASTRUCTURE MAP

Page 13: TETHYS OIL AB · Tethys 50% o Tethys will enter into 2nd exploration phase of EPSA (1st phase expiration date 15 December 2007) o 2nd phase minimum work commitment (3 years period):

13

BLOCK 15

TETHYS OIL

BLOCK 44 PTTEP

BLOCK 43 BMOL

BLOCK 31 INDAGO

BLOCK 30

INDAGO

BLOCK 27OXY

BLOCK 9OXY

BLOCK 5DALEEL

SHAMS

BLOCK 47

INDAGO

Modified after Wood MacKenzie

OMAN BLOCK 15 – LOCATION MAPS

Page 14: TETHYS OIL AB · Tethys 50% o Tethys will enter into 2nd exploration phase of EPSA (1st phase expiration date 15 December 2007) o 2nd phase minimum work commitment (3 years period):

14

Prospects Natih Depth Map and JA-1 Re-entry Well Location

JA-1 re-entry location

OMAN BLOCK 15 – PROSPECTS

Page 15: TETHYS OIL AB · Tethys 50% o Tethys will enter into 2nd exploration phase of EPSA (1st phase expiration date 15 December 2007) o 2nd phase minimum work commitment (3 years period):

15

OMAN BLOCK 15 – WELL RESULTS

Page 16: TETHYS OIL AB · Tethys 50% o Tethys will enter into 2nd exploration phase of EPSA (1st phase expiration date 15 December 2007) o 2nd phase minimum work commitment (3 years period):

16

OMAN BLOCK 15 – JA-1 STK 2 (NATIH) – FINAL TRAJECTORY

Page 17: TETHYS OIL AB · Tethys 50% o Tethys will enter into 2nd exploration phase of EPSA (1st phase expiration date 15 December 2007) o 2nd phase minimum work commitment (3 years period):

17

*Tethys volumetrics and RDS Helix numbers

** Tethys estimate

Jebel Aswad OnlyLow Mid High

BCF mmbc BCF mmbc BCF mmbc

Natih “A”* 5.6 0.3 52 2.6 174.4 8.7

Natih “C”** 2.4 0.1 1.2 0.7 43.2 2.1

Shuaiba ** 4 0.2 44 2.2 140 7

Total Gas and

Condensate

12 0.6 110 5.5 357.6 17.8

Total oil equivalent

mmboe

2.6 24 77.6

JEBEL ASWAD RESOURCE POTENTIAL - TETHYS 40%

Page 18: TETHYS OIL AB · Tethys 50% o Tethys will enter into 2nd exploration phase of EPSA (1st phase expiration date 15 December 2007) o 2nd phase minimum work commitment (3 years period):

18

Run 3D seismic over Jebel Aswad field (166 km2)

OMAN BLOCK 15 - NEAR FUTURE SEISMIC WORK

Page 19: TETHYS OIL AB · Tethys 50% o Tethys will enter into 2nd exploration phase of EPSA (1st phase expiration date 15 December 2007) o 2nd phase minimum work commitment (3 years period):

19

o Prospects no 5 and 9 are on the same surface & geological trend as

Natih oil fields

OMAN BLOCK 15 - PROSPECTS NO 5 & 9

Page 20: TETHYS OIL AB · Tethys 50% o Tethys will enter into 2nd exploration phase of EPSA (1st phase expiration date 15 December 2007) o 2nd phase minimum work commitment (3 years period):

GRV Ratio

Poro-

sity Sg FVF RF MM m3 BCF

Lead 9 MM m3 Fraction

Frac-

tion

Frac-

tion

fractio

n rec. rec.

Minimum 1200 0.10 0.07 0.65 180 0.75 737.10 26

Likely 1600 0.25 0.1 0.75 300 0.85 7650.00 268

Maximum 1800 0.30 0.13 0.85 310 0.9

16647.9

3 583

7 Leads- Gas Resources

Most Likely BCFG

Lead 1 95

Lead 2 100

Lead 3 105

Lead 4 92

Lead 5 200

Lead 6 75

Lead 9 268P50 Total Gas 935 BCF

LEAD 9 (EXAMPLE) NATIH & SHUAIBA RESERVOIRS

25 m net pay combined

Page 21: TETHYS OIL AB · Tethys 50% o Tethys will enter into 2nd exploration phase of EPSA (1st phase expiration date 15 December 2007) o 2nd phase minimum work commitment (3 years period):

21

OMAN

Block 15

Block 3&4

Page 22: TETHYS OIL AB · Tethys 50% o Tethys will enter into 2nd exploration phase of EPSA (1st phase expiration date 15 December 2007) o 2nd phase minimum work commitment (3 years period):

22

o Agreement signed with Noreco Norway (affiliate Altinex) in

November 2007 to take over its 50% interest in Blocks 3 and 4

o Consolidated Contractors (operator) 50%

Tethys 50%

o Tethys will enter into 2nd exploration phase of EPSA (1st phase

expiration date 15 December 2007)

o 2nd phase minimum work commitment (3 years period):

- Acquiring 800 km of 2D seimic

- Drilling 3 exploration wells

- Acquiring 400 km2 of 3D seismic OR drilling a 4th

exploration well

OMAN BLOCKS 3 & 4 - TETHYS OIL FARMIN

Page 23: TETHYS OIL AB · Tethys 50% o Tethys will enter into 2nd exploration phase of EPSA (1st phase expiration date 15 December 2007) o 2nd phase minimum work commitment (3 years period):

23

ISLAMIC

REPUBLIC

OF IRAN

KINGDOM OF

SAUDI ARABIA

SULTANATE

OF OMAN

UNITED ARAB

EMIRATES

Muscat

4

3

OMAN BLOCKS 3 & 4

Page 24: TETHYS OIL AB · Tethys 50% o Tethys will enter into 2nd exploration phase of EPSA (1st phase expiration date 15 December 2007) o 2nd phase minimum work commitment (3 years period):

24

Contingent

Resource

(i.e. tested or

w/ good

shows)

Contingent

Resource

(i.e. tested or

w/ good

shows)

Huwayr Deep`

Abu Zeinah

Deep

North Saiwan

Saih Hajmah

Farha South

East Saiwan

Potential

Resource

(i.e.

prospect)

Al Saad –

Qulam North

Maeen -

Qarn Sahmah

Flank

Huwayr Deep`

Abu Zeinah

Deep

North Saiwan

Saih Hajmah

Farha South

East Saiwan

Potential

Resource

(i.e.

prospect)

Al Saad –

Qulam North

Maeen -

Qarn Sahmah

Flank

BLOCKS 3 & 4 – RESOURCE POTENTIAL

Page 25: TETHYS OIL AB · Tethys 50% o Tethys will enter into 2nd exploration phase of EPSA (1st phase expiration date 15 December 2007) o 2nd phase minimum work commitment (3 years period):

25

o > 30„000 km of 2D seismic

o 27 wells drilled, of which 18 had HC shows and 1 oil discovery

o South Farha - 1 oil discovery

o In Block 3

o Drilled in 1986 by JPDC

o Delineated by 3 wells

o Estimated 4-6 million bbls of recoverable oil from thin

sandstone layers

o Flowed 260 bbl of 40°API oil

BLOCKS 3 & 4 – INFORMATION

Page 26: TETHYS OIL AB · Tethys 50% o Tethys will enter into 2nd exploration phase of EPSA (1st phase expiration date 15 December 2007) o 2nd phase minimum work commitment (3 years period):

26

Block 4

Block 3

BLOCKS 3 & 4 – DATABASE ON WORKSTATION

Page 27: TETHYS OIL AB · Tethys 50% o Tethys will enter into 2nd exploration phase of EPSA (1st phase expiration date 15 December 2007) o 2nd phase minimum work commitment (3 years period):

27

TETHYS OCEAN

Page 28: TETHYS OIL AB · Tethys 50% o Tethys will enter into 2nd exploration phase of EPSA (1st phase expiration date 15 December 2007) o 2nd phase minimum work commitment (3 years period):

License acquisition

Exploration

Exploratory drilling

Appraisal

Development

Production

TETHYS OIL’S APPRAISAL PROJECT

France

Page 29: TETHYS OIL AB · Tethys 50% o Tethys will enter into 2nd exploration phase of EPSA (1st phase expiration date 15 December 2007) o 2nd phase minimum work commitment (3 years period):

FRANCE – ATTILA LICENSE

Many oil fields

One gas field

License

Page 30: TETHYS OIL AB · Tethys 50% o Tethys will enter into 2nd exploration phase of EPSA (1st phase expiration date 15 December 2007) o 2nd phase minimum work commitment (3 years period):

FRANCE

Licens Tethys share

Attila 40%

Page 31: TETHYS OIL AB · Tethys 50% o Tethys will enter into 2nd exploration phase of EPSA (1st phase expiration date 15 December 2007) o 2nd phase minimum work commitment (3 years period):

FRANCE – ATTILA LICENSE

• Vieux Chamot prospect mapped with seismic, surface geochemistry and temperature

• Pierre Maubeuge-1 (PLM-1) well drilling location identified and contracted

• Pierre Maubeuge-2 (PLM-2) well drilling location identified and contracted

• PLM-2 spudded on 25 September 2007

• Drilling duration: < 20 days

Page 32: TETHYS OIL AB · Tethys 50% o Tethys will enter into 2nd exploration phase of EPSA (1st phase expiration date 15 December 2007) o 2nd phase minimum work commitment (3 years period):

License acquisition

Exploration

Exploratory drilling

Appraisal

Development

Production

TETHYS OIL’S EXPLORATIONS PROJECTS

Turkey

Morocco

Spain

Page 33: TETHYS OIL AB · Tethys 50% o Tethys will enter into 2nd exploration phase of EPSA (1st phase expiration date 15 December 2007) o 2nd phase minimum work commitment (3 years period):

MOROCCO

Map with gas pipeline

Licens Tethys share

Bouanan License 12.5%

Page 34: TETHYS OIL AB · Tethys 50% o Tethys will enter into 2nd exploration phase of EPSA (1st phase expiration date 15 December 2007) o 2nd phase minimum work commitment (3 years period):

MOROCCO – BOUANANE LICENSE

Line BB-07

• Dana 50%, ONHYM 25%, Tethys 12.5% and Eastern 12.5%

• Entered the 8-year exploration permit in June 2007

• Drilling expected in 2008

Page 35: TETHYS OIL AB · Tethys 50% o Tethys will enter into 2nd exploration phase of EPSA (1st phase expiration date 15 December 2007) o 2nd phase minimum work commitment (3 years period):

TURKEY

Licens Tethys

share

The Trace Project

Licenses

3998, 3999 & 4187

25%

The Ispandika Project

Licenses 3794 & 3795 10%

Page 36: TETHYS OIL AB · Tethys 50% o Tethys will enter into 2nd exploration phase of EPSA (1st phase expiration date 15 December 2007) o 2nd phase minimum work commitment (3 years period):

TURKEY

The Trace Project

• Aladdin 50%, Tethys 25% and JKX 25%

• Old seismic reprocessing done

• New seismic acquired and reprocessed

• Drilling of first exploration well expected first quarter 2008

Page 37: TETHYS OIL AB · Tethys 50% o Tethys will enter into 2nd exploration phase of EPSA (1st phase expiration date 15 December 2007) o 2nd phase minimum work commitment (3 years period):

TURKEY

The Ispandika Project

• A shallow stratigraphic(geological research) well was drilled around the year 06/07

• Geological information gained from this well did not increase the knowledge of the area substantially.

• The security situation in the region has deteriorated, and no ground work is currently carried out.

Page 38: TETHYS OIL AB · Tethys 50% o Tethys will enter into 2nd exploration phase of EPSA (1st phase expiration date 15 December 2007) o 2nd phase minimum work commitment (3 years period):

SPAIN

Licens Tethys share

The Sedano Project

Valderredible 50%

Huermeces 50%

Basconcillos-H 50%

The Cameros Project

Cameros-2 26%

Ebro-A 26%

Page 39: TETHYS OIL AB · Tethys 50% o Tethys will enter into 2nd exploration phase of EPSA (1st phase expiration date 15 December 2007) o 2nd phase minimum work commitment (3 years period):

SPAIN

The Sedano Project

The Cameros Project

• The Huermeces licence - With Ascent Resources as Operator, the

Hontomin-4 well on the was drilled in the spring of 2007. No oil encountered.

• Basconcillos-H - planned re-entry of the Tozo-1 postponed for operational

reasons.

• Valderredible

• A large natural gas prospect that has been identified

• A revision and analysis of prior well logs

• An environmental impact study

Page 40: TETHYS OIL AB · Tethys 50% o Tethys will enter into 2nd exploration phase of EPSA (1st phase expiration date 15 December 2007) o 2nd phase minimum work commitment (3 years period):

GOTLAND ONSHORE

Licens Tethys share

Gotland Större 100%

Page 41: TETHYS OIL AB · Tethys 50% o Tethys will enter into 2nd exploration phase of EPSA (1st phase expiration date 15 December 2007) o 2nd phase minimum work commitment (3 years period):

GOTLAND SURFACE OVERLAY

Page 42: TETHYS OIL AB · Tethys 50% o Tethys will enter into 2nd exploration phase of EPSA (1st phase expiration date 15 December 2007) o 2nd phase minimum work commitment (3 years period):

Styrelsens förslag till dagens

stämma

FINANSIERING

Page 43: TETHYS OIL AB · Tethys 50% o Tethys will enter into 2nd exploration phase of EPSA (1st phase expiration date 15 December 2007) o 2nd phase minimum work commitment (3 years period):

43

Cost Own

EPF

3 phase

export*

Estimated Capex I MUSD 12 15

Estimated CAPEX II MUSD 31 12

EPS Contribution MUSD

(Brent 80)

11 11

Warrant Exercise MUSD x x

Bank Loan y y

From Jul 1, 2009 to Oct 1, 2010

JEBEL ASWAD FULL FIELD FINANCING OPTIONS – TETHYS 40%

* OPEX unknown

Page 44: TETHYS OIL AB · Tethys 50% o Tethys will enter into 2nd exploration phase of EPSA (1st phase expiration date 15 December 2007) o 2nd phase minimum work commitment (3 years period):

TETHYS OIL IN BRIEF

Daily turnover

Ticker

6 000 shares/day

TETY

MSEK 384Market Cap

MUSD 60

SEK 60Price 20 February

Shares Issued 6 392 760

Market Cap

Shares for issue

Shares for issue 175 000

374 000

Page 45: TETHYS OIL AB · Tethys 50% o Tethys will enter into 2nd exploration phase of EPSA (1st phase expiration date 15 December 2007) o 2nd phase minimum work commitment (3 years period):

CASH AND BANK

Cash and bank & short

term recievables

12,1 MSEK

Short term recievables 15,8 MSEK

Short term payables 2,1 MSEK

SUM25.8 MSEK

4.0 MUSD

31 December 2007

Page 46: TETHYS OIL AB · Tethys 50% o Tethys will enter into 2nd exploration phase of EPSA (1st phase expiration date 15 December 2007) o 2nd phase minimum work commitment (3 years period):

• Split 3 på 1

• Mandat ge ut 1 600 000 nya aktier I riktad emission

huvudsakligen till investerare I Mellanöstern och

Asien -MacCapital från Dubai lead agent

• Mandat ge ut 1 600 000 teckningsoptioner (”t.o.”)

till nuvarande och nya aktieägare 1 t.o. för fem

aktier

STYRELSENS FÖRSLAG

Page 47: TETHYS OIL AB · Tethys 50% o Tethys will enter into 2nd exploration phase of EPSA (1st phase expiration date 15 December 2007) o 2nd phase minimum work commitment (3 years period):

• Onsdag 20 feb Stämma

• Fredag 29 feb Sista dag för handel med

osplittad aktie

• Måndag 3 mar Avstämningsdag för

splitdeltagande

• Onsdag 5 mar Datum för Split av aktie

• Torsdag 6 mar Distribution av aktier

erhållna genom split

SPLIT

Page 48: TETHYS OIL AB · Tethys 50% o Tethys will enter into 2nd exploration phase of EPSA (1st phase expiration date 15 December 2007) o 2nd phase minimum work commitment (3 years period):

48

Cost Own

EPF

3 phase

export

Wo Opex

Estimated Capex I MUSD 12 15

Private Placement x

Estimated CAPEX II MUSD 31 12

EPS Contribution MUSD

(Brent 80)

11 11

Left to finance MUSD 20 1

Warrant Exercise MUSD x x

Bank Loan y y

From Jul 1, 2009 to Oct 1, 2010

JEBEL ASWAD FULL FIELD FINANCING OPTIONS – TETHYS 40%

Page 49: TETHYS OIL AB · Tethys 50% o Tethys will enter into 2nd exploration phase of EPSA (1st phase expiration date 15 December 2007) o 2nd phase minimum work commitment (3 years period):

TETHYS OIL IN BRIEF AFTER SPLIT

Shares Issued 19 178 280

Private Placement 4 800 000

Warrants 4 795 656

Shares for issue 374 000

Shares for issue 175 000

Page 50: TETHYS OIL AB · Tethys 50% o Tethys will enter into 2nd exploration phase of EPSA (1st phase expiration date 15 December 2007) o 2nd phase minimum work commitment (3 years period):