Technical Services Branch (TSB) Addendum Form 2019 07 11 Page 1 of 1 Addendum for: TECHNICAL DESIGN REQUIREMENTS FOR ALBERTA INFRASTRUCTURE FACILITIES, MARCH 2019 Addendum No.: 3 Contents: Update to include: “Appendix J” Contact: Troy Holloway [email protected] 780-422-7620 Issued Date: 2019-07-11 Appendix J – new appendix to the Technical Design Requirements (TDR), includes: 1 - “Design Review Deliverable Summary and Checklist” 2 – “Sample Design Report Table of Contents”
21

Technical Services Branch (TSB) Addendum Form...2019/07/03  · Technical Services Branch (TSB) Addendum Form 2019 07 11 Page 1 of 1 Addendum for: TECHNICAL DESIGN REQUIREMENTS FOR

Jun 01, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Technical Services Branch (TSB) Addendum Form...2019/07/03  · Technical Services Branch (TSB) Addendum Form 2019 07 11 Page 1 of 1 Addendum for: TECHNICAL DESIGN REQUIREMENTS FOR

Technical Services Branch (TSB) Addendum Form

2019 07 11 Page 1 of 1

Addendum for:

TECHNICAL DESIGN REQUIREMENTS FOR ALBERTA INFRASTRUCTURE FACILITIES, MARCH 2019

Addendum No.:

3

Contents:

Update to include: “Appendix J”

Contact:

Troy Holloway [email protected] 780-422-7620

Issued Date:

2019-07-11

Appendix J – new appendix to the Technical Design Requirements (TDR), includes:

1 - “Design Review Deliverable Summary and Checklist” 2 – “Sample Design Report Table of Contents”

Page 2: Technical Services Branch (TSB) Addendum Form...2019/07/03  · Technical Services Branch (TSB) Addendum Form 2019 07 11 Page 1 of 1 Addendum for: TECHNICAL DESIGN REQUIREMENTS FOR

1 Design Review Deliverable Summary and Checklist, July 2019

Deliverable Summary:

Please include details on project progress, major changes or decision etc…

Design Review Deliverable Summary and Checklist

This document is to be completed by the consultant for Alberta Infrastructure projects that require a Design

Review by the Technical Services Branch.

Date Workspace Size

Project Name

Project Manager

Prime Consultant

Design Phase

Page 3: Technical Services Branch (TSB) Addendum Form...2019/07/03  · Technical Services Branch (TSB) Addendum Form 2019 07 11 Page 1 of 1 Addendum for: TECHNICAL DESIGN REQUIREMENTS FOR

Design Review Deliverable Summary and Checklist, July 2019 2

Schematic Design Deliverable Checklist

Discipline Deliverable Included in

Submission?

Roofing

Description of proposed roofing composition ☐

Warranty requirements (ARCA, Manufacturer’s, etc.) ☐

PV attachment method (if applicable; affects warranty) ☐

Building

Envelope

Description of proposed building envelope assemblies ☐

Compliance with PERSIST requirements ☐

Design strategy for any unconventional or complex envelope

elements ☐

Sustainability

Confirmation of project Tier and LEED Silver target ☐

Sustainability/LEED strategy (narrative) ☐

Preliminary LEED checklist ☐

Hazmat

Information related to hazardous building materials, including

survey report

Preliminary detailed drawing of radon mitigation system ☐

Architecture

Refer to Canadian Handbook of Practice for Architects ☐

Refer to Sample Design Report Table of Contents and

Design Development Expectations (TDR Appendix J) for

additional guidance

Description of functional requirements of interior spaces ☐

Page 4: Technical Services Branch (TSB) Addendum Form...2019/07/03  · Technical Services Branch (TSB) Addendum Form 2019 07 11 Page 1 of 1 Addendum for: TECHNICAL DESIGN REQUIREMENTS FOR

3 Design Review Deliverable Summary and Checklist, July 2019

Interior

Design

Proposed interior finishes ☐

Life safety and universal design requirements ☐

Preliminary floor plans ☐

Mechanical See Item 5.1.3 of TDR ☐

Controls Not applicable. ☐

Electrical See Item 6.1.10 of TDR ☐

Structural Structural Schematic Design Report with a narrative

describing information per Item 4.8 of TDR ☐

Acoustics See Item 7.5 of TDR ☐

Civil

Provide a narrative outlining:

1. Referenced codes and standards ☐

2. Site investigation report ☐

3. Site services: water, sanitary sewer, and storm sewer ☐

4. Stormwater management and drainage design ☐

5. Site grading ☐

Page 5: Technical Services Branch (TSB) Addendum Form...2019/07/03  · Technical Services Branch (TSB) Addendum Form 2019 07 11 Page 1 of 1 Addendum for: TECHNICAL DESIGN REQUIREMENTS FOR

Design Review Deliverable Summary and Checklist, July 2019 4

Design Development Deliverable Checklist

Discipline Deliverable Included in

Submission?

Roofing

Roofing composition is determined and clearly listed ☐

Preliminary detail drawings including roof plans with drainage

plans (defined slopes, drain locations, etc.), section details

showing proposed roof to wall connections

Building

Envelope

All envelope assemblies determined and identified ☐

Major sections showing relevant conditions, plus sections

showing peculiar geometry (canopies, clerestories, projecting

elements)

Typical details identifying the lines of air barrier, thermal

barrier, and moisture barrier ☐

Preliminary details for coordination of structure and building

envelope ☐

Outline specifications for significant envelope elements ☐

Sustainability

Confirmation of project Tier and LEED Silver target ☐

Sustainability/LEED strategy (narrative) ☐

Preliminary LEED checklist ☐

Hazmat

Detailed specification for Hazmat removal ☐

Detailed specification for proposed radon mitigation system ☐

Architecture Refer to Canadian Handbook of Practice for Architects ☐

Page 6: Technical Services Branch (TSB) Addendum Form...2019/07/03  · Technical Services Branch (TSB) Addendum Form 2019 07 11 Page 1 of 1 Addendum for: TECHNICAL DESIGN REQUIREMENTS FOR

5 Design Review Deliverable Summary and Checklist, July 2019

Refer to Sample Design Report Table of Contents and

Design Development Expectations (TDR Appendix J) for

additional guidance

Interior

Design

All floor plans are required ☐

Functional relationships identified ☐

All rooms identified ☐

Moveable or operable partitions identified ☐

Interior partition construction identified ☐

Preliminary elevations, sections, and details ☐

Preliminary millwork identified ☐

Mechanical See Item 5.1.4 of TDR ☐

Controls See Item 5.1.4 of TDR ☐

Electrical See Item 6.1.10 of TDR ☐

Structural

Structural Design Development Report with contents as

described below ☐

A narrative describing updated information per Item 4.8 of

TDR ☐

Drawings per Item 4.9 of TDR ☐

Acoustics See Item 7.5 of TDR ☐

Civil The Design Development Report shall contain a civil section

and drawings that includes the information listed above and ☐

Page 7: Technical Services Branch (TSB) Addendum Form...2019/07/03  · Technical Services Branch (TSB) Addendum Form 2019 07 11 Page 1 of 1 Addendum for: TECHNICAL DESIGN REQUIREMENTS FOR

Design Review Deliverable Summary and Checklist, July 2019 6

provide details on the site services (existing locations and

capacities, the sizes of new utilities, and connections).

The drawings are expected to have:

a. Existing site grades ☐

b. Site Servicing Plan ☐

c. Stormwater management plan ☐

d. Site grading plan ☐

Page 8: Technical Services Branch (TSB) Addendum Form...2019/07/03  · Technical Services Branch (TSB) Addendum Form 2019 07 11 Page 1 of 1 Addendum for: TECHNICAL DESIGN REQUIREMENTS FOR

7 Design Review Deliverable Summary and Checklist, July 2019

Construction Documents 75% Complete Deliverable Checklist

Discipline Deliverable Included in

Submission?

Roofing

Completed roof plans with drainage plans and penetrations ☐

Sufficient section details clearly showing all components

within the assemblies. Provide clearly illustrated wall to roof

tie-ins at parapets and roof to high wall details

Specification to be at or near completion with all proposed

materials and approved manufacturers listed. Warranty and

inspection services should be clearly defined

Building

Envelope

A sufficient quantity of completed envelope plan and section

details to represent the approaches to be used for the

balance of the project

At least preliminary details for all penetrations, interfaces

between differing assemblies, and elements such as

canopies and louvers

Plans and sections sufficiently complete to identify all the

details needed for the balance of the project ☐

Preliminary specifications for significant envelope elements ☐

Sustainability LEED checklist ☐

Hazmat Consultant responses addressing previous hazmat and radon

related feedback from SD and DD stages

Architecture Refer to Canadian Handbook of Practice for Architects ☐

Page 9: Technical Services Branch (TSB) Addendum Form...2019/07/03  · Technical Services Branch (TSB) Addendum Form 2019 07 11 Page 1 of 1 Addendum for: TECHNICAL DESIGN REQUIREMENTS FOR

Design Review Deliverable Summary and Checklist, July 2019 8

Interior

Design

Coordinated floor plans with all Engineering disciplines (i.e.

Structural, Mechanical, Electrical, etc.)

Potential conflicts with function of adjacent spaces identified

and mitigation strategies identified

All rooms identified and coordinated with door and hardware

schedule

Moveable or operable partitions identified and details

provided

Interior partition construction identified and details provided ☐

Further developed elevations, sections, and details ☐

Specifications for all interior finishes ☐

Mechanical See Item 5.1.5 of TDR ☐

Controls See Item 5.1.5 of TDR ☐

Electrical See Item 6.1.10 of TDR ☐

Structural

75% complete Contract Drawings with Design Information

per Item 4.10 of TDR ☐

75% complete Book Specification Sections for all structural

items in the scope of work for the project per Item 4.11 of

TDR

Acoustics See Item 7.5 of TDR ☐

Civil

Civil drawings shall include the following:

a. Existing site grades ☐

b. Site Servicing Plan ☐

Page 10: Technical Services Branch (TSB) Addendum Form...2019/07/03  · Technical Services Branch (TSB) Addendum Form 2019 07 11 Page 1 of 1 Addendum for: TECHNICAL DESIGN REQUIREMENTS FOR

9 Design Review Deliverable Summary and Checklist, July 2019

c. Stormwater management plan ☐

d. Site grading plan ☐

e. Pavement Plan ☐

f. Fire emergence movement plan ☐

g. Detail drawings ☐

h. Erosion and sediment control plan ☐

Prepare contract document specifications using the Alberta Infrastructure

Technical Specifications as a basis to include, but not to be limited by:

a. Local municipality’s design standards ☐

b. Standards and Guidelines for Municipal

waterworks, wastewater and storm drainage

systems (Alberta Environmental Guidelines)

c. Barrier-Free Design Guidelines ☐

All applicable Master Specifications in Alberta Infrastructure

Technical Specifications ☐

Page 11: Technical Services Branch (TSB) Addendum Form...2019/07/03  · Technical Services Branch (TSB) Addendum Form 2019 07 11 Page 1 of 1 Addendum for: TECHNICAL DESIGN REQUIREMENTS FOR

Design Review Deliverable Summary and Checklist, July 2019 10

Pre-Tender Deliverable Checklist

Discipline Deliverable Included in

Submission?

Roofing

Complete and coordinated detail drawings and specification

documents

75% (and prior) requirements are complete ☐

Building

Envelope

Complete all the 75% requirements ☐

Clear coordination between specialties (e.g. envelope,

structural, mechanical, electrical details at canopies for

support, roof drainage, lighting)

Complete specification using terms consistent with drawings ☐

Sustainability LEED checklist ☐

Hazmat All comments previously identified must be reflected and

included at this stage with no further comments from our unit

Architecture Refer to Canadian Handbook of Practice for Architects ☐

Interior

Design

Final floor plans, elevations, sections, and details fully

coordinated with all disciplines

Final specifications ☐

Mechanical See Item 5.1.5 of TDR ☐

Controls See Item 5.1.5 of TDR ☐

Page 12: Technical Services Branch (TSB) Addendum Form...2019/07/03  · Technical Services Branch (TSB) Addendum Form 2019 07 11 Page 1 of 1 Addendum for: TECHNICAL DESIGN REQUIREMENTS FOR

11 Design Review Deliverable Summary and Checklist, July 2019

Electrical See Item 6.1.10 of TDR ☐

Structural

100% complete Contract Drawings with Design Information

per Item 4.10 of TDR ☐

100% complete Book Specification Sections for all structural

items in the scope of work for the project per Item 4.11 of

TDR

100% complete Book Specification Sections for construction

inspection and materials testing per Item 4.12 of TDR ☐

Acoustics See Item 7.5 of TDR ☐

Civil

Civil drawings shall include the following:

a. Existing site grades ☐

b. Site Servicing Plan ☐

c. Stormwater management plan ☐

d. Site grading plan ☐

e. Pavement Plan ☐

f. Fire emergence movement plan ☐

g. Detail drawings ☐

h. Erosion and sediment control plan ☐

Prepare contract document specifications using the Alberta Infrastructure

Technical Specifications as a basis to include, but not to be limited by:

a. Local municipality’s design standards ☐

b. Standards and Guidelines for Municipal

waterworks, wastewater and storm drainage

systems (Alberta Environmental Guidelines)

c. Barrier-Free Design Guidelines ☐

All applicable Master Specifications in Alberta Infrastructure

Technical Specifications ☐

Page 13: Technical Services Branch (TSB) Addendum Form...2019/07/03  · Technical Services Branch (TSB) Addendum Form 2019 07 11 Page 1 of 1 Addendum for: TECHNICAL DESIGN REQUIREMENTS FOR

1 July 2019

Sample Design Report Table of Contents

Purpose

This document consolidates the major elements that comprise a typical Schematic Design and

Design Development report. The Schematic Design report summarizes and synthesizes background

information and client requirements into architectural design options, and proposes a recommended

design solution based on an analysis of the pros and cons of each. During Design Development,

architectural, engineering, and specialist consultants apply their skills to refine the design concept so

that it can progress to the Construction Documents phase.

While the sample described below is intended for a school project, it can be adapted to suit any other

building typology. Following the Sample Table of Contents, a list of Design Development Drawing

Expectations is provided. This document presents the information typically expected in the Design

Development drawing submission (although it cannot capture every element of every project).

The Sample Table of Contents and Design Development Drawing Expectations are offered as a

reference for the information of Project Managers, Design Teams, and other stakeholders, and do not

replace the requirements or obligations in the Owner’s Consultant Agreement, documents such as

the Canadian Handbook of Practice for Architects, or those found elsewhere in the Technical Design

Requirements for Alberta Infrastructure Projects (TDR).

0.0 Executive Summary ................................................................................................. -

1.1 Areas Summary ..................................................................................................... -

1.2 Cost Summary ....................................................................................................... -

1.3 Schedule Summary ................................................................................................ -

2.0 Response to Functional Program ................................................................................ -

2.1 Instructional Areas ..................................................................................................... -

Classrooms ............................................................................................................................. -

Ancillary Rooms (Art, Music, Band) ........................................................................................ -

Gymnasium & Gymnasium Storage ....................................................................................... -

Library/Resource Centre ......................................................................................................... -

Science Rooms ....................................................................................................................... -

Fine Arts .................................................................................................................................. -

Career & Technology Studies (CTS) ...................................................................................... -

Page 14: Technical Services Branch (TSB) Addendum Form...2019/07/03  · Technical Services Branch (TSB) Addendum Form 2019 07 11 Page 1 of 1 Addendum for: TECHNICAL DESIGN REQUIREMENTS FOR

2 July 2019

Wrap-Around Services ............................................................................................................ -

Technology ............................................................................................................................. -

Special Education ................................................................................................................... -

Instructional Flex Space ......................................................................................................... -

2.2 Non – Instructional Areas ........................................................................................... -

Administration & Staff ............................................................................................................. -

Physical Education Flex Space .............................................................................................. -

Non-Instructional Flex Space .................................................................................................. -

Circulation ............................................................................................................................... -

Storage ................................................................................................................................... -

Washrooms ............................................................................................................................. -

Wiring Network & Server ........................................................................................................ -

Mechanical & Electrical ........................................................................................................... -

Cafeteria & Food Services ...................................................................................................... -

2.3 Functional Relationships ............................................................................................ -

Circulation ............................................................................................................................... -

Zoning ..................................................................................................................................... -

Site Planning ........................................................................................................................... -

Area Redevelopment Plan, Urban Design Review Panel, Overlays, Integration of Sports

Fields & Other Neighbourhood Amenities .............................................................................. -

Land Use Analysis .................................................................................................................. -

Civil Design (Watershed Controls, Riparian Developments/Ponds) ..... Error! Bookmark not

defined.

Expansion (Classrooms, Parking) .......................................................................................... -

Parking & Vehicular Circulation (cars/buses, bicycles, loading, shipping, handling, waste)

Error! Bookmark not defined.

3.0 Project Principles ..................................................................................................... -

3.1 Methodology .......................................................................................................... -

Structure of Meetings .............................................................................................................. -

Key Stakeholders .................................................................................................................... -

Public Process ........................................................................................................................ -

3.2 Implementation ...................................................................................................... -

Procurement & Tendering Strategy ........................................................................................ -

Page 15: Technical Services Branch (TSB) Addendum Form...2019/07/03  · Technical Services Branch (TSB) Addendum Form 2019 07 11 Page 1 of 1 Addendum for: TECHNICAL DESIGN REQUIREMENTS FOR

3 July 2019

3.3 Research ............................................................................................................... -

Benchmarking Analysis .......................................................................................................... -

Typologies ............................................................................................................................... -

Systems & Materials ............................................................................................................... -

3.4 Concepts ................................................................................................................ -

Approach & Parti ..................................................................................................................... -

Analysis of Options (Circulation, Zoning, Functional Relationships) ...................................... -

Materiality ................................................................................................................................ -

Organizational Principles .........................................................................................................

Building Envelope Approach (Roof, Fenestration/Clerestory, Wall Systems)………..……….-

3.5 Mature Buildings (>40 years) ................................................................................. -

Modernism .............................................................................................................................. -

3.6 Historic Places ........................................................................................................ -

Designation & Character Defining Elements .......................................................................... -

Scope & Standards ................................................................................................................. -

Guidelines for Conservation ................................................................................................... -

3.7 Sustainability .......................................................................................................... -

District Planning & Integration ................................................................................................ -

Social Sustainability: Purposeful/Meaningful & Adaptable/Flexible ........................................ -

Green Building Standards…………………………………………………………………………..-

Commissioning……………………………………………………………………………………….-

4.0 Architecture, Planning, & Interior Design ............................................................... -

4.1 Principles of Urban Design: A: Urbanism ................................................................... -

A1: The City ............................................................................................................................ -

A2: The Neighbourhood, District, & Corridor .......................................................................... -

A3: The Block, Street, & Building ............................................................................................ -

4.2 Principles of Urban design: B: Design Excellence ...................................................... -

B1: Sustainability .................................................................................................................... -

B2: Public Arts & Culture ........................................................................................................ -

B3: Celebrate the Weather & Climate..................................................................................... -

B4: Durable, Permanent & Timeless Materials ....................................................................... -

B5: Appropriate Use of Innovation .......................................................................................... -

Page 16: Technical Services Branch (TSB) Addendum Form...2019/07/03  · Technical Services Branch (TSB) Addendum Form 2019 07 11 Page 1 of 1 Addendum for: TECHNICAL DESIGN REQUIREMENTS FOR

4 July 2019

4.3 Principles of Universal Design ................................................................................... -

Equitable Use .......................................................................................................................... -

Flexibility in Use ...................................................................................................................... -

Simple & Intuitive Use ............................................................................................................. -

Perceptible Information ........................................................................................................... -

Tolerance for Error .................................................................................................................. -

Low Physical Effort ................................................................................................................. -

Size & Space for Approach & Use .......................................................................................... -

5.0 Landscape Architecture ........................................................................................... -

Landscape Design Overview .................................................................................................. -

Soft & Hard Landscaping ........................................................................................................ -

LEED ....................................................................................................................................... -

Special Considerations ........................................................................................................... -

6.0 Geotechnical ................................................................................................................. -

7.0 Civil ................................................................................................................................ -

8.0 Structural ....................................................................................................................... -

Structural Overview................................................................................................................. -

Foundations ............................................................................................................................ -

Structural Systems & Framing ................................................................................................ -

Special Considerations ........................................................................................................... -

9.0 Mechanical ..................................................................................................................... -

Mechanical Overview .............................................................................................................. -

Site Service Distribution .......................................................................................................... -

Heating Systems ..................................................................................................................... -

Cooling Systems ..................................................................................................................... -

Ventilation Systems ................................................................................................................ -

Plumbing Systems .................................................................................................................. -

Fire Protection ......................................................................................................................... -

Pipe & Duct Insulation ............................................................................................................ -

Acoustics (Active & Passive Attenuation) ............................................................................... -

Energy Management Control Systems ................................................................................... -

Building Start-up & System Verification .................................................................................. -

LEED ....................................................................................................................................... -

Page 17: Technical Services Branch (TSB) Addendum Form...2019/07/03  · Technical Services Branch (TSB) Addendum Form 2019 07 11 Page 1 of 1 Addendum for: TECHNICAL DESIGN REQUIREMENTS FOR

5 July 2019

Operating Costs & Energy Consumption ................................................................................ -

10.0 Electrical ...................................................................................................................... -

Electrical Overview ................................................................................................................. -

Exterior & Site Electrical Systems .......................................................................................... -

Building Interior Systems ........................................................................................................ -

Lighting (Artificial & Natural: skylights, clerestory, windows) .................................................. -

Special Considerations ........................................................................................................... -

LEED ....................................................................................................................................... -

Controls ................................................................................................................................... -

Security System ...................................................................................................................... -

11.0 Acoustics ..................................................................................................................... -

Active & Passive Strategies .................................................................................................... -

12.0 Food Services & Kitchen Design ............................................................................... -

13.0 Mechanized Circulation .............................................................................................. -

Elevators, escalators, moving walkways, etc. ........................................................................ -

14.0 Active Design .............................................................................................................. -

15.0 Flexibility and Futureproofing .................................................................................... -

16.0 Code Review ................................................................................................................ -

17.0 Budget/costing ............................................................................................................ -

18.0 Schedule ...................................................................................................................... -

19.0 Safety, Security & CPTED ........................................................................................... -

Exterior & Site Security Technical Description ...................................................................... -

Interior & Occupant Security Technical Description ............................................................. -

Miscellaneous Systems & Special Considerations ............................................................... -

Crime Prevention Through Environmental Design (CPTED) ................................................ -

20.0 Signage & Wayfinding ................................................................................................ -

Heraldry: naming, flagging, etc. ............................................................................................ -

Appendix ............................................................................................................................. -

Page 18: Technical Services Branch (TSB) Addendum Form...2019/07/03  · Technical Services Branch (TSB) Addendum Form 2019 07 11 Page 1 of 1 Addendum for: TECHNICAL DESIGN REQUIREMENTS FOR

6 July 2019

Design Development Drawing Expectations

Site Plan

Paving, hard landscaping elements, sidewalks, loading, and parking types (e.g. Barrier-Free,

electric vehicle, loading, etc.) indicated

Identify vehicular and pedestrian circulation and drop-off areas; identify strategies to mitigate

concerns with safety at areas of potential conflict (i.e., increased visibility/no parking areas,

signage, crosswalks, etc.)

Site accessories indicated (bike racks, garbage enclosures, signs, flag poles, etc.)

Provisions for firefighting access shown and dimensioned

Landscape design strategies (not only shown “as per bylaw”)

Grades and grading requirements outlined; establish geodetic elevation

Areas of future expansion

All service connection locations and sizes, gas meter and fire department connection locations

Roof Plan

Roof drainage plan/roof slopes/preliminary roof structure strategy indicated (sloped structure or

sloping insulation on flat roofs, other roof materials, access, slopes, etc.), rainwater collection

(gutters, drains, etc.)

Mechanical equipment, air intake, and exhaust locations

Proposed photovoltaic locations (if applicable)

Floor Plans

All floor plans required, with all rooms identified

Building Code Review completed – all exiting/life safety requirements shown, washroom count,

barrier-free requirements, fire protection requirements, etc. summarized in the report and

integrated into the design drawings

All windows and doors shown

Page 19: Technical Services Branch (TSB) Addendum Form...2019/07/03  · Technical Services Branch (TSB) Addendum Form 2019 07 11 Page 1 of 1 Addendum for: TECHNICAL DESIGN REQUIREMENTS FOR

7 July 2019

Area comparison to original program requirements, with explanation of variances (can be on

drawings/model or separately in report)

Moveable walls and/or operable partitions identified

STC ratings for critical spaces and operable walls (identify on drawings and/or in report)

Acoustical wall/ceiling treatment clearly identified with NRC value

Functional relationships integrated into design, with descriptions indicating areas of concern and

mitigation strategies (i.e., noise from adjacent areas, control points, multi-functional spaces, etc.

and the strategies/techniques used to reduce impact to adjacent areas)

Mechanical Plumbing plan - fixtures, floor drains, plumbing and drainage mains.

Fire Protection Plan: fire mains, zones and hazards.

Heating Plan: distribution system and layout of terminal units.

Cooling Plan: distribution system and layout of terminal units.

Ventilation Plan: single line distribution mains and layout of terminal units.

Mechanical Room Plan: equipment layout.

Mechanical Systems Schematics: domestic water, heating, cooling, and ventilation.

Building Sections and Typical Details

Structural, mechanical, and electrical systems determined with preliminary coordination of major

elements (i.e., type of structure, columns/loadbearing walls/cross-bracing coordinated, rooftop

units/mechanical rooms, crawlspaces, roof access, etc.)

Wall, roof, and floor assemblies determined and identified

Acoustical seal details where STC rated walls intersect the base building (exterior walls/windows,

underside of structure/ceiling, heating cabinets) to ensure flanking paths are sealed.

Areas of complex interior spaces (i.e., clerestories, open stairs, interconnected floor spaces)

and/or significant design features should be indicated in section.

Typical details shown (the lines of air barrier, thermal barrier, and moisture barrier graphically

represented and should be able to be “traced” and reviewed for intent) – need to be able to

identify the barriers through the details. Can be three-dimensional or two dimensional – as long

as components can be identified and “traced” for review.

Alberta Infrastructure Technical Requirements shall be incorporated into the drawings. Use of

PERSIST technique clearly shown on drawings.

Building Elevations All exterior elevations required

Page 20: Technical Services Branch (TSB) Addendum Form...2019/07/03  · Technical Services Branch (TSB) Addendum Form 2019 07 11 Page 1 of 1 Addendum for: TECHNICAL DESIGN REQUIREMENTS FOR

8 July 2019

All building heights indicated

Grade line clearly shown and identified

All exterior materials shown and identified

All window and doors shown and coordinated with the floor plans

Other penetrations and/or elements shown (louvres, shades, canopies, lighting, building signage,

etc.) if known

Building integrated photovoltaic locations (if applicable)

Other Elements

Three-dimensional Renderings (may be part of Drawing Set or included

in Report)

Building renderings showing materials and colours

Include light/shadow studies

Include acoustic modeling and site studies

Structural

1. General Notes:

o Detailed design criteria for the building

o Key geotechnical design parameters

o Material specifications in abridged form

2. Three Dimensional Renderings - minimum two (2) views from orthogonal directions

3. Typical Structural Details proposed for use in the building

4. Foundation Plan:

o Structural grid with labels and dimensions (applies to all plans and sections)

o Foundation layout including location of spread/strip footings, concrete/steel piles, screw

piles for modular units, grade beams, basement walls and inclined ramps in parkades

o Location of braced bays (LLRS / SFRS)

o Legend and schedules as appropriate

5. Floor Plans:

o Top of floor elevation

o Floor system including slab thickness

o Layout of beams, columns, vertical cores and braced bays

o Major openings in the floor slab

6. Legend and schedules as appropriate

7. Roof Plans:

Page 21: Technical Services Branch (TSB) Addendum Form...2019/07/03  · Technical Services Branch (TSB) Addendum Form 2019 07 11 Page 1 of 1 Addendum for: TECHNICAL DESIGN REQUIREMENTS FOR

9 July 2019

o Roof elevation

o Layout of roof framing including metal deck

o Roof slopes and drain locations

8. Building Sections:

o Major sections showing relevant conditions

o Sections showing peculiar geometry (canopies, clerestories, gymnasium)

o Elevation of each level and finished grade

Mechanical Information

Referenced Codes and Standards

Mechanical system detail descriptions

Energy analysis and modeling

System and equipment redundancies and connections to essential electrical system

Major equipment selections with capacities

Vibration and noise control

Energy Management Control System, communication protocol and any interface to subsystems

such as security, fire alarm and lighting

Preliminary plumbing fixtures selections (product data sheets)

Electrical Information

The anticipated electrical load and allowances for future expansion;

Requirements of incoming electrical services and any space requirements for a vault, sub-station,

or main electrical room

The distribution of power and utilization voltages;

Locations for electrical closets, communications rooms, bus-duct risers;

Requirements for embedding conduits;

Light fixture selection and requirements for ceiling systems and ceiling space;

Target illumination levels and power densities for all interior and exterior lit space;

Switching and controls for energy efficiency;

Telecommunications and data systems, fire alarm systems, public address systems, intercom,

security;

Determination of lightning protection system

Outline Specification (at minimum) included in Report

Shall have all relevant sections (that are known at Design Development) in at least “outline” form.