Green Drop Consultants (Pvt.) Ltd Green Drop Consultants (Pvt.) Ltd Environmental Impact Assessment (EIA) Study of Lahore Ring Road (Package 9) Interchange at Harbanspura canal
97

Technical Proposal

Nov 19, 2014

Download

Documents

karmakova

A hypothetical technical proposal for shortlisting; submitted for ring road Lahore package 9
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

Green Drop Consultants (Pvt.) Ltd

Environmental Impact Assessment (EIA) Study ofLahore Ring Road (Package 9) Interchange at Harbanspura canal crossing

TECHNICAL PROPOSAL

Page 2: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

Green GGreen Drop Consultants

Green Drop Consultants 449 X, Street 12, DHA Lahore, Pakistan Email: [email protected] Phone # 042-7002160 Fax # 042-700261

9th May, 2010

Project Manager, National Highway Authority(Procurement Contract Administration action)28-Mauve Area, Sector G -9/1l,Islamabad(Pakistan)Phone# 92-51-835172,Fax# 92-51-9260419

Subject: Proposal document in response to Request for Proposal.

Dear Sirs,

We, the undersigned, offer to provide the consulting services for Environmental Impact Assessment of Lahore Ring Road (Package 9) Interchange at Hurbanspura Canal Crossing Project in accordance with your Request for Proposal dated 20 th March 2010 and our Proposal. We are hereby submitting our Proposal, which includes this Technical Proposal, and a Financial Proposal sealed under a separate envelope.

We hereby declare that all the information and statements made in this Proposal are true and accept that any misinterpretation contained in it may lead to our disqualification.

If negotiations are held during the period of validity of the Proposal, i.e., 3 months or

90days, we undertake to negotiate on the basis of the Proposed Staff. Our Proposal is

binding upon us and subject to the modifications resulting from contract negotiations.

We undertake, if our Proposal is accepted, to initiate the consulting services related to the assignment not later than 09 August 2010.

We assure you of our best professional services.

Yours Sincerely,

Areej Riaz (Managing Director)

A Green drop towards a Greener Ocean

Page 3: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

Submitted to: Mr Kamran Kazi Environmental Consultancy

Submitted by: Group B Amina Mansoor Breera Mehmood Nazia Perveen Anila Rose Yousaf Areej Riaz MPhil Environmental Sciences 2009-2010 10th May 2010

Page 4: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

9th May, 2010

Project Manager, National Highway Authority(Procurement Contract Administration action)28-Mauve Area, Sector G -9/1l,Islamabad(Pakistan)Phone# 92-51-835172,Fax# 92-51-9260419

Subject: Proposal document in response to Request for Proposal.

Dear Sirs,

We, the undersigned, offer to provide the consulting services for Environmental Impact Assessment of Lahore Ring Road (Package 9) Interchange at Hurbanspura Canal Crossing Project in accordance with your Request for Proposal dated 20 th March 2010 and our Proposal. We are hereby submitting our Proposal, which includes this Technical Proposal.

We hereby declare that all the information and statements made in this Proposal are true and accept that any misinterpretation contained in it may lead to our disqualification.

If negotiations are held during the period of validity of the Proposal, i.e., 3 months or

90days, we undertake to negotiate on the basis of the Proposed Staff. Our Proposal is

binding upon us and subject to the modifications resulting from contract negotiations.

We undertake, if our Proposal is accepted, to initiate the consulting services related to the assignment not later than 09 August 2010.

We assure you of our best professional services.

Yours Sincerely,

Areej Riaz (Managing Director)

A Green drop towards a Greener Ocean

Green GGreen Drop Consultants

Green Drop Consultants 449 X, Street 12, DHA Lahore, Pakistan Email: [email protected] Phone # 042-7002160 Fax # 042-700261

Page 5: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

Environmental Impact Assessment of Lahore Ring Road (Package 9) Interchange at Harbanspura canal crossing

Technical Proposal

TABLE OF CONTENT

1 INTRODUCTION 2 ORGANIZATION’S DOMAIN KNOWLEDGE AND EXPERIENCE

3 COMMENTS ON TOR

4 APPROACH AND METHODOLOGY

5 PROPOSED TEAM COMPOSITION

6 CURRICULUM VITAE OF PROPOSED STAFF

7 STAFFING SCHEDULE

8 CHRONOGRAM OF ACTIVITIES

ANNEXURE:

ANNEXURE 1 ISO CERTIFICATION ANNEXURE 2 CERTIFICATIONS AND GUARANTEES ANNEXURE 3 COMPANY BROCHURE

Page 6: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

Firm Brief Background

Managing Director: Areej Riaz

Executive Director: Maria Hashmi

Operations Director: Phil Wallace

1. Introduction:

Green Drop Consultants (Pvt.) Limited (GD) has come a long way to denote commitment, distinction and professional Excellence by meeting the stringent, most demanding and extraordinary work requirements of the clients. We have undertaken prestigious projects of high engineering, Involving civil, electrical and mechanical works for the last decade with well-reputed National and International Organizations.We have a multidimensional approach towards business ventures and projects that we deal in. We at GD have enticed our efforts into a multitude of engineering disciplines. Now it is company’s privilege to be working in environment, infrastructure, housing, energy and transportation sectors. We boast and claim to have a stringent standing of delivering the projects ahead of schedule. This has consolidated trust and confidence with our clients.We have developed our own trend and been successful in making a mark in the international market. We prefer keeping a balance between quality of work and punctuality.Today we stand tall and proud over the strong foundation of reputation and trust with a highly valued relationship with our clients. Green drop Consultants take commitment to quality, health and safety and environmental management very seriously. The business is

company

Delete text and place photo here. Delete text and place photo here.

Place logo or logotype here,otherwisedelete this.

2008S M T W T F S

1 2 3 4 5 6 7

8 9 10 11 12 13 14

15 16 17 18 19 20 21

22 23 24 25 26 27 28

29 30

Place logo or logotype here,otherwisedelete this.

Delete text and place photo here. Delete text and place photo here.

Place logo or logotype here,otherwisedelete this.

2008S M T W T F S

1 2 3 4 5

6 7 8 9 10 11 12

13 14 15 16 17 18 19

20 21 22 23 24 25 26

27 28 29 30 31

Page 7: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

registered to ISO 9001-2000 and ISO 14001-2004. We are taking an integrated approach to 5this system which is critical to our internal and client project management processes.

MissionOur mission is to achieve high standing. So that we:

Remain undisputed leaders in engineering and project management. Provide professional services and solutions to our clients. Stay profitable in growth.

Our mission if to help our clients do businesses today and have the world they want tomorrow. Our vision is to build stability and success through sustainable growth and profit.

Quality Policy“To serve our clients and maintain our position as the leading consultant firm.”

We intend to achieve this goal by: Understanding that quality means complete conformance to the agreed customer requirements and

standards. Understanding that quality is everybody’s direct responsibility. Never compromising on quality and safety Putting our best effort every time for in time completion of jobs. Continuous improvement in skills and know–how through practical experience and regular training

and appraisal programs of the employees. Fulfilling our promises and commitments with every client.

Health & Safety Policy:Green Drop Consultants pledge to carry out all activities in a manner that ensures that safety, health and security of all employees are sheltered and to avoid damages to Company assets.We are committed on scoring zero for:

Injuries Accidents Damages

Environmental Policy:

We Vow to: Provide Greener and cleaner environment to all. Prevent pollution in all areas of our operation. Keep ourselves aware of and compliant with all applicable statutory regulations and

standards. Minimize environmental impacts by conserving natural resources & energy. Continually improve our implemented Environmental Management System. Minimize wastes and maximize recycling. Raise Awareness and let everybody have the chance to be green.

Page 8: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

GREEN DROP ADMINISTRATIVE SERVICES

STRUCTURE OF FIRM

Managing Director

Executive Director

Group Director Project Management

Group Director Engineering

Group Director Audits

Group Director Technical and GIS

GIS Specialists

Urban planners and Architects

Mechanical Engineers

Electrical Engineers

Environmental Engineer

Civil Engineers

Chemical Engineer

Page 9: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

Executive Credentials

Title Years Relevant of Experience

Years

Employed

By

Green Drop Consultants

Education

Farhan Nawaz

ChairmanPresident/Chief Executive Officer

33 29 Law Degree

Harvard School of Law,

USAreej RiazManaging Director 24 24 Mphil Degree

Stanford University, Uk

Major: Environment and Sustainable development

Maria HashmiExecutive Director 14 14 M.E Degree

Mc Gill University, Canada

Major: Environmental Engineering Waleed AbbasChief Financial Officer 9 9 Bachelors Degree

St. Francis University

Page 10: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

Loretto, PA

Major: AccountingPhil WallaceOperation Director 12 6 Law Degree and Bachelors Degree

Monash University, Melbourne , Australia

2. ORGANIZATION’S EXPERIENCE

Assignment Name:Environmental Impact Assessment (EIA) Study of Faizabad Interchange.

Approx. Value of Contract (in current US $ or Euro):US $ 13 million

Country: PakistanLocation within the country

Duration of assignment (months):24

Name of Client:Capital Development Authority, Islamabad,(CDA)

Total No. of Staff-months of the assignment:195

Address: G-7/1, Islamabad

  Phone# 9252842

Approx. value of the services provided by your firm under the contract (in current US$ or Euro):US $ 12 million

Start Date (Month / Year): June, 2003Completion Date (Month/Year): January, 2005

No. of Months of Professional Staff provided by Associated Consultants: N.A

Name of Associated Consultants, if any: N.A

Name of senior professional staff of your firm involved and functions performed indicate most significant profiles such as Project Director / Coordinator, Team Leader):

Mr. Ehtasham Hussain (Team Leader/ Environmentalist)

Mr. Abdul Rehman Yousaf (Environmentalist)

Mr. Mubarik Mehmood (Ecologist) Mr. Athar Zia (Hydrogeologist)Mr. Mehrab Awan (Socio-Economist) Mr. Aziz Ameer Ud Din (GIS Analyst) Mr. Daniel Ahmed ( Transport Engineer)

Narrative Description of the Project:Faizabad intersection is at the junction of Lahore-Islamabad and Murree-Rawalpindi Highway. Another leg joins the junction from Peshawar and Pirwadhai Road. There was a lot of confusion and dealy in the vehicle movement with interruptions in the traffic. Coverleaf is good solutions when two divided highways intersects.

Page 11: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

Description of actual services provided by your staff within the Project:Collected baseline data related to physical, ecological & socio-economic parameters. Carried out the Environmental Impact Assessment (EIA) study for the Project and prepared an EIA report containing mitigation and remedial measures for adverse impacts and Environmental Management Plan (EMP), Traffic Management Plan.

Firm’s Name: GREEN DROP ENVIRONMENTAL CONSULTING SERVICES (PVT.) LTD.

Assignment Name:Environmental Impact Assessment (EIA) Study of Lahore-Islamabad Motorway Salem Chowk Interchange

Approx. Value of Contract (in current US $ or Euro):US $ 5 million

Country: PakistanLocation within the country

Duration of assignment (months):20

Name of Client: National Highways Authority (NHA), Islamabad

Total No. of Staff-months of the assignment:140

Address: I-8/4,Kashmir road, Islamabad

  Phone# 051-2997766

Approx. value of the services provided by your firm under the contract (in current US$ or Euro):US $ 3.5 million

Start Date (Month / Year): April, 2004Completion Date (Month/Year): January, 2006

No. of Months of Professional Staff provided by Associated Consultants: N.A

Name of Associated Consultants, if any: N.A

Name of senior professional staff of your firm involved and functions performed indicate most significant profiles such as Project Director / Coordinator, Team Leader):

Mr. Ehtasham Hussain (Team Leader/ Environmentalist)

Mr. Abdul Rehman Yousaf (Environmentalist)

Mr. Mubarik Mehmood (Ecologist) Mr. Athar Zia (Hydrogeologist)Mr. Mehrab Awan (Socio-Economist) Mr. Aziz Ameer Ud Din (GIS Analyst) Mr. Daniel Ahmed ( Transport Engineer) Mr. Ijaz Aslam (Civil Engineer)

Narrative Description of the Project: The interchange was constructed to have an uninterrupted flow of traffic so that no delays occur. The purpose of constructing the interchange was to provide a direct road to the city nearby. And the ongoing traffic is not disturbed when they don’t have to that particular point.

Description of actual services provided by your staff within the Project:

Page 12: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

Collected baseline data related to physical, ecological & socio-economic parameters. Carried out the Environmental Impact Assessment (EIA) study for the Project and prepared an EIA report containing mitigation and remedial measures for adverse impacts and Environmental Management Plan (EMP) and Traffic Management plan.

Firm’s Name: GREEN DROP ENVIRONMENTAL CONSULTING SERVICES (PVT.) LTD.

Assignment Name:Environmental Impact Assessment (EIA) Study of

Islamabad – Peshawar motorway, Church interchange

Approx. Value of Contract (in current US $ or Euro):US $ 2 Million

Country: PakistanLocation within the country

Duration of assignment (months):13

Name of Client:National Highways Authority (NHA), Islamabad

Total No. of Staff-months of the assignment:91

Address: F-11/2 Islamabad, Park Avenue,

  Phone# 051-2299567

Approx. value of the services provided by your firm under the contract (in current US$ or Euro):US $ 1 million

Start Date (Month / Year): May, 2007Completion Date (Month/Year): June, 2008

No. of Months of Professional Staff provided by Associated Consultants: N.A

Name of Associated Consultants, if any: N.A

Name of senior professional staff of your firm involved and functions performed indicate most significant profiles such as Project Director / Coordinator, Team Leader):

Mr. Ehtasham Hussain (Team Leader/ Environmentalist)

Mr. Abdul Rehman Yousaf (Environmentalist)

Mr. Mubarik Mehmood (Ecologist) Mr. Athar Zia (Hydrogeologist)Mr. Mehrab Awan (Socio-Economist) Mr. Aziz Ameer Ud Din (GIS Analyst) Mr. Daniel Ahmed ( Transport Engineer)

Narrative Description of the Project: The Peshawar to Islamabad highway was constructed but the church interchange that connect Hazro & Tarbela to M1 is still not open for traffic. interchange directly link Tarbela to motorway.

Description of actual services provided by your staff within the Project:Collected baseline data related to physical, ecological & socio-economic parameters. Carried out the Environmental Impact Assessment (EIA) study for the Project and prepared an EIA report containing

Page 13: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

mitigation and remedial measures for adverse impacts and Environmental Management Plan (EMP) and Traffic Management plan.

Firm’s Name: GREEN DROP ENVIRONMENTAL CONSULTING SERVICES (PVT.) LTD.

Assignment Name:Environmental Impact Assessment (EIA) Study of Zero point Interchange.

Approx. Value of Contract (in current US $ or Euro):US $ 3.89 million

Country: PakistanLocation within the country

Duration of assignment (months):24

Name of Client:Capital Development Authority, Islamabad,(CDA)

Total No. of Staff-months of the assignment:168

Address: G-7/1, Islamabad

  Phone# 9252842

Approx. value of the services provided by your firm under the contract (in current US$ or Euro):US $ 2.46 million

Start Date (Month / Year): September, 2008Completion Date (Month/Year): September, 2010

No. of Months of Professional Staff provided by Associated Consultants: N.A

Name of Associated Consultants, if any: N.A

Name of senior professional staff of your firm involved and functions performed indicate most significant profiles such as Project Director / Coordinator, Team Leader):

Mr. Ehtasham Hussain (Team Leader/ Environmentalist)

Mr. Abdul Rehman Yousaf (Environmentalist)

Mr. Mubarik Mehmood (Ecologist) Mr. Athar Zia (Hydrogeologist)Mr. Mehrab Awan (Socio-Economist) Mr. Aziz Ameer Ud Din (GIS Analyst) Mr. Daniel Ahmed ( Transport Engineer)

Narrative Description of the Project:Zero Point Interchange was a cover leaf type interchange; this is a mega project which would benefit the people of Islamabad. The said interchange consists of one flyover, three loop structures, three underpasses and four pedestrian bridges.

Description of actual services provided by your staff within the Project:Collected baseline data related to physical, ecological & socio-economic parameters. Carried out the Environmental Impact Assessment (EIA) study for the Project and prepared an EIA report containing mitigation and remedial measures for adverse impacts and Environmental Management Plan (EMP). The Traffic Management Plan was prepared.

Page 14: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

Firm’s Name: GREEN DROP ENVIRONMENTAL CONSULTING SERVICES (PVT.) LTD.

Assignment Name:Environmental Impact Assessment (EIA) Study of Lilla Interchange On M-2

Approx. Value of Contract (in current US $ or Euro):US $ 1 million

Country: PakistanLocation within the country

Duration of assignment (months):16

Name of Client:National Highways Authority (NHA), Islamabad

Total No. of Staff-months of the assignment:112

Address: 23, Abu Bakar block, New Garden Town, Lahore

  Phone# 042-35728876

Approx. value of the services provided by your firm under the contract (in current US$ or Euro):US $ 0.86 million

Start Date (Month / Year): June, 1998Completion Date (Month/Year): January, 1999

No. of Months of Professional Staff provided by Associated Consultants: N.A

Name of Associated Consultants, if any: N.A

Page 15: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

Name of senior professional staff of your firm involved and functions performed indicate most significant profiles such as Project Director / Coordinator, Team Leader):

Mr. Ehtasham Hussain (Team Leader/ Environmentalist)

Mr. Abdul Rehman Yousaf (Environmentalist)

Mr. Mubarik Mehmood (Ecologist) Mr. Athar Zia (Hydrogeologist)Mr. Mehrab Awan (Socio-Economist) Mr. Aziz Ameer Ud Din (GIS Analyst) Mr. Daniel Ahmed ( Transport Engineer)

Narrative Description of the Project:Lilla Interchange was constructed on the M2 Motorway to facillate a pathway to the nearby cities which would otherwise be so far from the other junctions.

Description of actual services provided by your staff within the Project:Collected baseline data related to physical, ecological & socio-economic parameters. Carried out the Environmental Impact Assessment (EIA) study for the Project and prepared an EIA report containing mitigation and remedial measures for adverse impacts and Environmental Management Plan (EMP). The Traffic Management Plan was prepared.

Firm’s Name: GREEN DROP ENVIRONMENTAL CONSULTING SERVICES (PVT.) LTD.

Assignment Name:Environmental Impact Assessment (EIA) Study of Makkah Interchange Bridge

Approx. Value of Contract (in current US $ or Euro):US $ 20 million

Country: Saudi Arabia Duration of assignment (months):6

Name of Client:Saudi BASF

Total No. of Staff-months of the assignment:42

Address:SulaimaniyahP O Box - 5364,Riyadh - 11422Saudi Arabia.Tel.: +966 (01) 464 1611Fax: +966 (01) 464 8853

Approx. value of the services provided by your firm under the contract (in current US$ or Euro):US $ 18.6 million

Start Date (Month / Year):December, 2009Completion Date (Month/Year): May, 2010

No. of Months of Professional Staff provided by Associated Consultants: N.A

Name of Associated Consultants, if any: N.A

Page 16: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

Name of senior professional staff of your firm involved and functions performed indicate most significant profiles such as Project Director / Coordinator, Team Leader):

Mr. Ehtasham Hussain (Team Leader/ Environmentalist)

Mr. Sohail Aslam Khawja ( Senior Environmentalist)

Mr. Syed Muhamad Ali ( Senior Ecologist) Mr. Athar Zia (Hydrogeologist)Mr. Mehrab Awan (Socio-Economist) Mr. Aziz Ameer Ud Din (GIS Analyst) Mr. Daniel Ahmed ( Transport Engineer) Mr. Ijaz Aslam (Civil Engineer)

Narrative Description of the Project:The interchange was required to meet the increasing traffic demands so that there are no further delays and jam packs. This would provide a shorter route to the city.

Description of actual services provided by your staff within the Project:Collected baseline data related to physical, ecological & socio-economic parameters. Carried out the Environmental Impact Assessment (EIA) study for the Project and prepared an EIA report containing mitigation and remedial measures for adverse impacts and Environmental Management Plan (EMP), Traffic Management Plan was prepared.

Firm’s Name: GREEN DROP ENVIRONMENTAL CONSULTING SERVICES (PVT.) LTD.

Assignment Name:Environmental Impact Assessment (EIA) Study of East Los Angeles Interchange

Approx. Value of Contract (in current US $ or Euro):US $ 30 million

Country: USA, Los Angeles. Duration of assignment (months):13

Name of Client:Capital Development Authority, Islamabad,(CDA)

Total No. of Staff-months of the assignment:91

Address:IEEE   Los Angeles   Area   Consultants   Network (LAACN)

Approx. value of the services provided by your firm under the contract (in current US$ or Euro):US $ 19 million

Start Date (Month / Year): June, 2006Completion Date (Month/Year): July, 2007

No. of Months of Professional Staff provided by Associated Consultants: N.A

Name of Associated Consultants, if any:N.A

Page 17: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

Name of senior professional staff of your firm involved and functions performed indicate most significant profiles such as Project Director / Coordinator, Team Leader):

Mr. Ehtasham Hussain (Team Leader/ Environmentalist)

Mr. Abdul Rehman Yousaf (Environmentalist)

Mr. Mubarik Mehmood (Ecologist) Mr. Athar Zia (Hydrogeologist)Mr. Mehrab Awan (Socio-Economist) Mr. Aziz Ameer Ud Din (GIS Analyst)Mr. Daniel Ahmed ( Transport Engineer) Mr. Ijaz Aslam (Civil Engineer)

Narrative Description of the Project:The East Los Angeles Interchange complex is the busiest freeway interchange in the world, with its southern portion handling over 550,000 vehicles per day (2008 AADT). At the time of its construction in the early 1960s it was considered a civil engineering marvel. Located about one mile (1.6 km) east of downtown Los Angeles, California along the east bank of the Los Angeles River, the interchange

comprises six freeway segments.

Description of actual services provided by your staff within the Project:Collected baseline data related to physical, ecological & socio-economic parameters. Carried out the Environmental Impact Assessment (EIA) study for the Project and prepared an EIA report containing mitigation and remedial measures for adverse impacts and Environmental Management Plan (EMP), Traffic Management Plan was prepared.

Firm’s Name: GREEN DROP ENVIRONMENTAL CONSULTING SERVICES (PVT.) LTD.

Assignment Name: Environmental Impact

Assessment (EIA) Study of Jalan Bahagia Interchange on Central Expressway.

Approx. Value of Contract (in current US $ or Euro):US $ 9 million

Country: SingaporeLocation within the country

Duration of assignment (months):6

Name of Client:Infocomm Development Authority of Singapore (IDA) 

Total No. of Staff-months of the assignment:42

Address: 16A Bali Lane, Singapore 189852Tel: (65) 6293 6952 ; Fax: (65) 6299 3732

Approx. value of the services provided by your firm under the contract (in current US$ or Euro):US $ 7.5 million

Page 18: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

Start Date (Month / Year): June, 2004Completion Date (Month/Year): December, 2004

No. of Months of Professional Staff provided by Associated Consultants: N.A

Name of Associated Consultants, if any: N.A

Name of senior professional staff of your firm involved and functions performed indicate most significant profiles such as Project Director / Coordinator, Team Leader):

Mr. Ehtasham Hussain (Team Leader/ Environmentalist)

Mr. Abdul Rehman Yousaf (Environmentalist)

Mr. Mubarik Mehmood (Ecologist) Mr. Athar Zia (Hydrogeologist)Mr. Mehrab Awan (Socio-Economist) Mr. Aziz Ameer Ud Din (GIS Analyst) Mr. Daniel Ahmed ( Transport Engineer)

Narrative Description of the Project:The interchange was required to meet the increasing traffic demands so that there are no further delays and jam packs. This would provide a shorter route to the city resulting in saving time and cost of fuel.

Description of actual services provided by your staff within the Project:Collected baseline data related to physical, ecological & socio-economic parameters. Carried out the Environmental Impact Assessment (EIA) study for the Project and prepared an EIA report containing mitigation and remedial measures for adverse impacts and Environmental Management Plan (EMP), Traffic Management Plan.

Assignment Name:Environmental Impact Assessment (EIA) Study of Interchange National Highway222

Approx. Value of Contract (in current US $ or Euro):US $ 8 million

Country: India Duration of assignment (months):15

Name of Client:National Highway Authority of India (NHA)

Total No. of Staff-months of the assignment:105

Address:

Approx. value of the services provided by your firm under the contract (in current US$ or Euro):US $ 7.5 million

871/B/3, Near Himalaya Machinery, GIDC Makarpura, Vadodara - 10.Phone : +91-265-2644909 / 263721/2631851Facimile : +91-265-2638411

Page 19: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

Start Date (Month / Year): November, 2002Completion Date (Month/Year): January, 2004

No. of Months of Professional Staff provided by Associated Consultants: 45

Name of Associated Consultants, if any: STN Environmentalists

Name of senior professional staff of your firm involved and functions performed indicate most significant profiles such as Project Director / Coordinator, Team Leader):

Mr. Ehtasham Hussain (Team Leader/ Environmentalist)

Mr. Abdul Rehman Yousaf (Environmentalist)

Mr. Mubarik Mehmood (Ecologist) Mr. Athar Zia (Hydrogeologist)Mr. Mehrab Awan (Socio-Economist) Mr. Aziz Ameer Ud Din (GIS Analyst) Mr. Daniel Ahmed ( Transport Engineer)

Narrative Description of the Project:The national Highway was constructed National Highway 222 is an Indian National Highway running within the states of Maharashtra and Andhra Pradesh connecting the city of Kalyan near Mumbai in Maharashtra to Nirmal near Adilabad in Andhra Pradesh.

Description of actual services provided by your staff within the Project:Collected baseline data related to physical, ecological & socio-economic parameters. Carried out the Environmental Impact Assessment (EIA) study for the Project and prepared an EIA report containing mitigation and remedial measures for adverse impacts and Environmental Management Plan (EMP), Traffic Management Plan.STN Environmentalist was the lead company in the JV and its share was 60%.

Firm’s Name: GREEN DROP ENVIRONMENTAL CONSULTING SERVICES (PVT.) LTD.

Assignment Name:Environmental Impact Assessment (EIA) Study of Jumeriah lake Towers Interchange.

Approx. Value of Contract (in current US $ or Euro):US $ 8 million

Country: DubaiDubai Sheikh Zayed Road.

Duration of assignment (months):8

Name of Client:Government Of Dubai-Roads and Transport Authority.

Total No. of Staff-months of the assignment:56

Address:Mailing Address:Roads & Transport Authority

Approx. value of the services provided by your firm under the contract (in current US$ or Euro):

Page 20: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

P. O. Box: 118899Dubai, United Arab Emirates.

Telephones: Tel. :+971 4 2844444 (working hours from 7.30 to 14.30 only)Fax :+971 4 2065555

US $ 7 million

Start Date (Month / Year): June, 2008Completion Date (Month/Year): Februray, 2009

No. of Months of Professional Staff provided by Associated Consultants: N.A

Name of Associated Consultants, if any: N.A

Name of senior professional staff of your firm involved and functions performed indicate most significant profiles such as Project Director / Coordinator, Team Leader):

Mr. Ehtasham Hussain (Team Leader/ Environmentalist)

Mr. Abdul Rehman Yousaf (Environmentalist)

Mr. Mubarik Mehmood (Ecologist) Mr. Athar Zia (Hydrogeologist)Mr. Mehrab Awan (Socio-Economist) Mr. Aziz Ameer Ud Din (GIS Analyst) Mr. Daniel Ahmed ( Transport Engineer)

Narrative Description of the Project:This interchange is located between a number of new, major urban developments including Dubai Marina, Jumeirah Beach Islands and Canal point.

Description of actual services provided by your staff within the Project:Collected baseline data related to physical, ecological & socio-economic parameters. Carried out the Environmental Impact Assessment (EIA) study for the Project and prepared an EIA report containing mitigation and remedial measures for adverse impacts and Environmental Management Plan (EMP), Traffic Management Plan was prepared.

Firm’s Name: GREEN DROP ENVIRONMENTAL CONSULTING SERVICES (PVT.) LTD

Page 21: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

3. COMMENTS AND SUGGESTION ON THE TERMS OF REFERENCE

3.1 - On the Terms of Reference

3.1 a). in terms of reference provided by the client lack mention of guidelines which are to be followed

while developing environmental monitoring plan.

3.1 b). It would have been more helpful if terms of reference contained the list of staff that client thought

suitable for the proposed project.

Page 22: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

3.1 c). We understand there is no need of any contractor, consultant will complete the assignment

independently.

3.2 - On Counterpart Staff and Facilities

3.2 a). The client did not mention the provision of any complementary staff or resource in the datasheet that

could have facilitated the consultants in any manner during the course of the proposed project. Any inputs

and facilities provided by the client would be highly appreciated by the consultants and would also save

time and unnecessary effort put in by the consultants.

4 . APPROACH, METHODOLOGY & WORK PLAN

4.0General

This section contains the methodology of proposed EIA study of Lahore ring road (package-9) interchange at Harbanspura canal crossing, which will be carried out by our consultants for the Feasibility Phase of the proposed project of Harbanspura Interchange, in accordance with the requirements of Pakistan Environmental Protection Act (PEPA), 1997. At EIA stage of the project, each aspect of the impacts will be studied in all three components of Harbanspura Interchange Project (mentioned in TOR) in detail.

The project includes Construction of 3-Lane dual carriageway along with 7.3 meter wide service road, drains and footpath on either side.

Page 23: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

Keeping in view the quantum of work and international practice, to ensure better utilization of public investment and to ensure the quality of work as per international standards the agency tends to hire most capable people with national and international experience.

Understanding of the Objectives of the Project

Broadly, the project focuses on five major areas which needs to be covered by project management Consultants (PMC).As per Terms of Reference (TOR), following environmental studies are required to be carried out:

1. Environmental Impact Assessment (EIA)2. Environmental Management Plan (EMP)3. Resettlement Action Plan (RAP)4. Waste and Traffic management plan

The EIA processes results in a detailed study of potential environmental effects their significance identification of procedures that may be used to mitigate them.

4.1 Work Methodology

The Consultant’s methodology for effective and efficient implementation and management of the project, contracting and procurement, financial management, compliance of environmental and social safeguards and monitoring and evaluation of project activities, Consultants general approach to undertake the work shall be based on detailed review and perusal of the TOR objectives provided by the client National Highway Authority and Government of Punjab (GOP) for the environmental Impact Assessment of Harbanspura Interchange Project, the consultants formulated their approach and methodology for achieving the study objectives and fulfilling the TOR as under:

The following considerations will be taken for approach for the work:

Clear understanding of Term of reference (TOR) and of the requirements of the project with a critical appreciation of local conditions and problems based on current experience of working in Pakistan.

Devising an appropriate and well considered work plan based on the collective experience gained on similar projects and on the awareness of constraints that can affect implementation, and the time frames applicable for deliverables, ensuring a sequential finalization of review.

Establishing proficient monitoring and control systems for ensuring completion of work within the required time frame, without delays and disputes and in the most cost effective manner.

4.1.1 Environmental Impact Assessment (EIA)

Page 24: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

The methodology for EIA study is mentioned below:

4.1.1.1 Collection and collation of Secondary Information

Prior to the start of field activities, available secondary data and reports will be reviewed in detail.

4.1.1.2 Reconnaissance of the Project Area

After review of the available project documents, a reconnaissance of the project area will be carried out. It will be helpful to plan the project activities during field surveys and investigations required for environmental assessment. During this visit, sensitive environmental issues will also be identified which may require further investigations. Relevant maps provided by the client will be used during the site visit.

4.1.1.2.1 Analysis of Alternative

Suitable site alternative will be suggested, if required, by the review of relevant maps, available secondary data and legal review.

4.1.1.2.2 Location Alternative

Alternative site will be suggested, if required, by using relevant maps and GPS during area visits.

4.1.1.2.3 No built Alternative

4.1.1.2.4 Management and Operational Alternatives

Management and operational alternatives will be suggested, if required, by the review of institutional set-ups of departments relevant to the project.

4.1.1.2.5 Design Alternatives Design alternatives will be suggested, if required, by the review of current design layout.

4.1.1.4 Legal review compliance

All relevant local and international guidelines laws, and regulations applicable to the project . i.e. PEPA 1997, Antiquities Act 1975, Telegraphy Act 1010, Land Acquisition Act 1975, will be reviewed in order to ensure their compliance in project activities.

4.1.1.5 Collection of existing Environmental setting/data-baseline study

Based on the desk study and reconnaissance survey, checklist and questionnaires / Performa’s will be prepared for the baseline surveys. Consultants will proceed to the site and the collection of primary data / database on the environmental aspects will be done, which includes the following:

Page 25: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

1 Physical resources (physiographic, topography and soils, atmosphere, climate, hydrology, surface water, ground water, geology, seismology etc) including environmental monitoring and testing.

2 Ecological resources (flora, fauna, livestock, reserved forest, if any etc): Identification of the number of tree species present in the project area, as well as, determination of tree density and area covered by them. Tree counting and their identification along with other vegetation and crops, if any, will be done by making field visits, and by the review of the available literature relevant to the study. Information about the fauna of the area will be collected to derive ecological these species with other organisms. Information of the type of the livestock in the area will be noted along with their density.

3 Socio-economic survey: Data on social and cultural conditions of the study area will be collected. Determination of the population density in the study area will be done by the review of district census report. Socio-economic survey includes:

I. Land status survey: land acquisition survey will be made to the revenue department.

II. Identification of Project Affected Persons (PAPs): Identification of vulnerable people/groups i.e. Project Affected People, if any, (in project area as well as in study area and in alternative site area, if suggested by our consultants) will be done by field surveys. Data about their population density, Infrastructure (electricity, sanitation/ drainage facilities, mode of transportation), health and education status will be collected. Data collection about number of schools and hospitals in the area, if any; no. of graveyards in the area, if any; no. of recreational and commercial areas, if any; availability of utilities; and strata of socio-economic group of people dominant in the area will be kept in focus during baseline study. All the information will be gathered by making field visits as well as by review of available literature.

4.1.1.6 Evaluation / identification of potential impacts

Prediction and assessment of the proposed Project’s likely negative impacts during the construction and operational stages will be carried out by conducting the field visits of project and study area. The impacts need to be discussed in three sectors with reference to the following parameters:

1) Physical environment Under physical environment, impacts on following areas will be measured.

I. Land resources: evolution of the environmental effects of the project on land use in the immediate vicinity of the project (i.e. within the identified boundaries of the project) will be done, e.g. Agriculture, Archaeological, Historical and Cultural monuments,

II. Water resources (precipitation, surface water resources, ground water resources).III. Amount of Rainfall Received and Flood attenuation.IV. Sedimentation.

Page 26: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

V. Air quality: levels of particulate matter and other parameters and their adverse impacts, if any, on the surrounding environment will be determined to evaluate its effects.

VI. Noise levels will be evaluated for the construction and operational phase of the dam.

2) Ecological environment Impacts on ecological environment may include:

I. Impacts on fauna of area, livestock and migratory birds ( if any)II. Reserved forests, if any.

III. Relocation/resettlement issues etc.IV. Impacts on flora

3) Socio-economic Impacts

I. Impacts on livelihood of Project Affected Persons (PAPs): Questionnaires will be developed and prepared and filled during the field visits to know about the public perception of the study area.

II. Impacts on social settings of the project area.III. Relocation/ resettlement issues etc.IV. Impacts of the project on local property values and insurance rates will be taken in to

consideration.V. Disruption archaeological, historic, religious, and unique natural values in the project area if

any.

Review of Traffic Studies and Pavement Design

Traffic survey of counts, speed tests, traffic growth parameters, diverted traffic and generated traffic will be reviewed. The economic analysis already carried out will be evaluated and updated again.

Methodology for Hydraulic Studies

Based on the design discharge from hydrological studies the design capacity of each cross discharge structure and its design depth will be worked out. Related features such as erosion and sedimentation characteristics and recommendations will also be considered. Especial note will be taken here as an improper design may lead to disruption of irrigation water supplies, rural water drainage etc.

4.1.1.7 Mitigation/contingency Measures

The main objective of this activity is to ensure the proper implementation of mitigation measures, compliance of applicable legislations and standards, and to provide the feedback on effectiveness of mitigation measures.To supervise the implementation and monitoring of EMP, checklist will be developed based on clear environmental indicators.

Page 27: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

Based on the findings of the environmental and social surveys / investigations and impacts identified, viable mitigation measures will be worked out to minimize the negative impacts and to enhance the positive impacts both on construction and operational stages of the project.

Implementation of these measures is aimed at making the Project more environmental friendly. Mitigation measures will be recommended for the parameters covered in following sectors:

I. PhysicalII. Ecological

III. Socio-economic

A checklist will be developed for monitoring of environmental indicators. In case of the location of the Contractor’s Camp, e.g. following are the main indicators.

Camp should be located preferably at barren or non-productive land.

If it is unavoidable, minimum vegetation should be cleared.

Camp should be located at least 500 m from settlement, community water sources, ecological sensitive area.

Arrangement of potable water without affecting available community water sources.

Arrangement for disposal of waste water i.e. provision of septic tank, treatment.

Location of machinery, Pit sites, and Waste Materials Site

Quarry area and plants (if required) in particular, will be located at least 1000m downwind from population areas and Contractor’s camp to minimize the hazards of gaseous emissions, smoke and the dust pollution. The Contractor is also responsible fo preparing a sampling analysis plan for monitoring air quantity, noise levels, and water and soil contamination as a result of project facility operation. Consultant will ensure that all these activities are being carried out by the Contractor.

Protection of Cultural and Community-Owned Assets

Consultants will ensure that Contractors will locate project facilities at a minimum distance of 500m from and cultural monuments (if any)

Borrow Pit management and Topsoil Conservation

Page 28: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

Consultant will also devise checklist which will cover the environmental indicators at construction stage. The checklist will cover that the Contractor will; be responsible for protecting topsoil from erosion by carrying out the following measures.

The excavation of the earth fills to be limited to a specific depth

Ditches or borrowed pits 5that cant be fully rehabilitated will be landscaped to minimize erosion and to avoid creating hazards for people and livestock.

Landowners will be compensated accordintg to the terms of the lease agreements negotiated with the landowners, and the restoration actions agreed upon by the Contractor will be duly carried out.

4.1.1.8 Environmental Management Plan (EMP)

The main objective of this activity is to ensure the proper implementation of mitigation measures, compliance of applicable legislations and standards, and to provide the feedback on effectiveness of mitigation measures. This will also be helpful to take corrective measures in case mitigation measures being taken during the project implementation have not been proven fruitful and project is unable to achieve desired environmental and social objectives.

An Environmental Management Plan (EMP) both for the construction and operational phases of the project will be proposed/ developed. EMP will propose an effective plan of action to indicate responsibilities and required measures to minimize the negative environmental effects both during the construction and operational stages and assurance of the perusal of environmental protection regulations will be made by suggesting the monitoring frequencies for different parameters called in mentioned sectors. Monitoring frequencies (might be one time, on quarterly basis or in 24 hours etc) will be suggested according to the intensities of the identified impacts of different parameters as per National Environmental Standards (NEQs), World Bank guidelines and in the perusal of Pakistan Environmental Protection Act (PEPA), 1997, as no guidelines are given about monitoring frequencies by the client in TOR. EMP will include institutional analysis and brief cost estimation. To supervise the implementation and monitoring of EMP, checklist will be developed based on clear environmental indicarors. Mitigation Management Matrix (MMM) and directed graphs will be prepared.

Following two segments will be discussed in the proposed EMP:1. Physical resources.2. Ecological resources.

4.1.1.8.1 Institutional Arrangements & Capacity Building

Page 29: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

A strong institutional arrangement will be suggested, if required for the implementation and monitoring of environment related actions. This would include the review of existing institutional set-up and to fill up the gaps for the proper implementation of the required environmental tasks. To enhance the capacity of implementing agency, a training program will be evolved, if required. It is clarified that the company will provide only technical assistance (as required in TOR), no managerial or administrative assistance will be provided by the company to the client.

4.1.1.8.2 Estimation / Preparation of Environmental Costs

The consultants would prepare cost estimates for the actions recommended for environmental mitigation and monitoring. These cost estimation will include institutional, training, mitigation and auditing costs.

4.1.1.9 Preparation of EIA report / documentation:

EIA report will be given in three steps i.e. inception report, then technical report and then a final detailed EIA report after receiving comments form the client. All of the three reports will be submitted according to the schedule given in TOR by the client. The EIA consultant team will be lead by team leader who will be responsible for the EIA report.

4.2 Social Monitoring and Implementation of Resettlement Action Plan (RAP)

The social monitoring will be undertaken to ensure the implementation of RAP at different stages of the project. It will be a continuous activity and will be managed by the consultants. Consultants will ensure that the project functionaries carry out the social monitoring transparently.

Based on the findings of EIA report, if required, RAP will be carried out by the consultant. To conduct the RAP, following activities will be carried out:

4.2.1 Review of Available Data

Review of all the available documents, drawings and environmental report will be made by the consultants. To prepare the RAP, high resolution satellite imageries of the project area etc, will be used to plan and assess the relocation of infrastructure and resettlement of effected population.

4.2.2 Inventory of Houses, Populace and other Assets

For preparation of inventory of houses and other infrastructure, Inventory Performa will be developed and will be filled through door to door survey by the assessment team.

On the basis of above data, preliminary assessment / evaluation will be made and at the same time, detailed assessment survey will be planned for collection of data regarding the affected population and impacts. Data collection will include the following:

1. Focused census of the affected population

Page 30: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

2. Household income and living standard survey for assessment of lost and affected household, enterprises and community’s living standard level.

3. Building / houses valuation survey to assess the value of the houses and other infrastructural facilities.

4. Women status survey to establish the baseline data for ascertaining the women status.5. Consultation with affected population for effective mitigation measures and planning.6. Number of water irrigated land and the annual turnover from the agricultural lands.7. Number of livestock along with the availability of grazing land.8. Number of public facilities and utilities to be relocated.9. Number of mosques/shrines/graves to be relocated (if any)

4.2.3 Identification of Alternate Land

In order to resettle the affected population, alternate land for their resettlement will be identified through reconnaissance and field surveys, in consultation with concerned authorities. During these surveys affected people will be consulted in order to know their priorities for resettlement. Number of grievances will be recorded and redressed.

4.2.4 Identification of Resettlement Measures

In the light of data collected through field surveys, resettlement impacts will be studied and proper mitigation measures will be suggested in order to minimize negative impacts and to enhance positive impacts.

4.2.5 Resettlement Policy and compensation Framework

Resettlement policy framework will be developed on the basis of all above collected data and for compensation, resettlement and institution responsible for implementation of RAP.

4.2.6 Institutional Arrangement

For effective implementation of RAP, along with review of existing institutional set-up within the project proponent, further arrangements required for implementation and monitoring of RAP will be identified. To enhance the capacity of the client to handle the resettlement issues, role of non-governmental organizations (NGOs) or community based organizations (CBOs) will also be sorted out to ensure the prompt and fair compensation and resettlement of PAPs.

4.2.7 Compensation Payment Procedure and Resettlement Process

A compensation procedure and resettlement process will be evolved for an efficient and smooth implementation of RAP. A grievances readdressed mechanism will also be evolved to handle the concerns

Page 31: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

related with compensation and resettlement at local level e.g. (downstream groups of farmer, shopkeepers, livestock owners, and pastoralists) without delaying the resettlement activities.

4.2.8 Cost Estimates

Tentative cost estimates will be made for compensation and estimated resettlement works. Additionally tentative cost of proposed institutional frame work, mitigation measures, monitoring, evaluation and reporting will also be estimated. However, such these will not include any detailed design or its related costs and tender documents.

4.2.9 Preparation of RAP

All above studies will be documented in a proper format as per local and international guidelines in the form of Resettlement Action Plan (RAP). Initially, the RAP document shall be submitted in the form of a draft. Subsequently, the final RAP will be prepared after incorporating the necessary comments from the client.

Work Plan

The consultants have proposed a well coordinated, sensible, workable and practicable work plan to conduct the project activities proposed under approach and methodology. Consultants have been proposed work plan in a way that any unforeseen delay may be accommodated in a way that these should not delay the overall project. To ensure this, in addition to effective and efficient planning of the project as whole, each and every activity to be performed will be minutely reviewed, discussed and a plan will be prepared for all activities. These plans will be periodically reviewed and analyzed and proper measures will be devised to ensure quality, quantity and timely completion of the activities.

5. TEAM COMPOSITION AND TASK ASSIGNMENTSr.No. Name of

StaffFirm Area of Expertise Position

AssignedTask Assigned

Technical Staff

1 Mr. Syed Ehtasham Hussain

Green Drop Consultants (Pvt.) Ltd

EIA, IEE, Project Planning and overall management, Environmental Economics, Environmental policy making and Strategic Urban Development.

Team Leader/ Senior Environmentalist

Overall guidance and supervision of EIA and RAP field activities, coordination between staff members, review of EIA and RAP work plans, reports and to ensure the quality and in time delivery of EIA and RAP reports. To attend meetings with clients and make presentations, if required.

Page 32: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

2 Mr. Abdul Rehman Yousaf

Green Drop Consultants (Pvt.) Ltd

Environmental Monitoring Plan, EIA, IEE, Environment specialist in .

Environmental-list Reconnaissance, delineation of study area, collection of baseline data, environmental monitoring. Selection of environmental monitoring locations. Assessment of environmental impacts on air, noise, water, and vibrations etc. To propose Environmental Monitoring Criteria during Construction and Operation Stages of the Project. Identification and evaluation of mitigation measures. Estimation of available resources for environmental monitoring.

3 Mr. Mehrab Awan

Green Drop Consultants (Pvt.) Ltd

Consultant, EIA Economist, Principle Economic investigator, socio-economist

Socio-Economist Collection of socio-economic information related to the study area from the concerned local departments, to carryout the socio-economic survey. Placing monetary values on environmental impacts and combining these values into overall project analysis work. Analysis and compilation of collected data. Assist Social Expert in socio-economic activities. Economic assessment of the environment impacts of the project and proposed mitigation measures accordingly with sufficient quantitative and qualitative explanation.

4 Mr. Aziz Ameer Ud Din

Green Drop Consultants (Pvt.) Ltd

Information System Developer, GIS Expert

GIS Specialist GIS specialist gather, integrate, manipulate, edit and analyze baseline data from various sources including satellite imagery, topographic sheets, aerial photographs and

Page 33: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

secondary map data to produce the necessary information layers, help in site selection, site remediation, rehabilitation and infrastructure location. Spatial analysis and map formation by using ARC/Info and ARC View and ERDAS. Generating overlays and help in making site-specific decisions. Overall management of database.

5 Mr. Daniel Ahmed

Green Drop Consultants (Pvt.) Ltd

Automotive specialist,Mechanics specialist

Transport Engineer

Traffic management plan. The sizing of transportation facilities (how many lanes or how much capacity the facility has), determining the materials and thickness used in pavement, designing the geometry (vertical and horizontal alignment) of the roadway (or track).Estimate the transportation needs of the public and then secure the funding for the project. Analyze locations of high traffic volumes and high collisions for safety and capacity.

6 Mr. Mubarik Mehmood

Green Drop Consultants (Pvt.) Ltd

Aquatic life Expert, Environmental Conservation Specialist

Ecologist Baseline survey related to biological environment, identification of issues related to flora and fauna, identification of endangered and vulnerable species. Identification of ecological important areas to identify

Page 34: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

ecological impacts of the project like loss of forest and wildlife habitat, impacts on fisheries and aquatic life Preparation of ecological baseline maps. Estimation of the likely positive and negative impacts on the flora and fauna of the study area. Identification of mitigation measures to minimize the impacts.

7 Mr. Athar Zia

Green Drop Consultants (Pvt.) Ltd

Aquifer Specialist, Hydrologist

Hydro-geologist Baseline survey related to water quality, surface water and ground water level and problems caused by floods etc. evaluating the relationship between groundwater and surface water. Assessing effect of environment changes on groundwater and surface water. Carryout water quality studies related to the river and its tributaries along with the impact of sedimentation, change in drainage pattern etc. Monitoring and testing to determine aquifer properties, hydraulic heads, groundwater velocities and flow patterns and help in site remediation, if required. Help to access how land use affects the water quality and help to develop strategies to mitigate or reduce the impact of land use and land use change on water quality. Identification of mitigation measures and analysis and compilation of data collected.

Page 35: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

Support Staff

8 TBN Green Drop Consultants (Pvt.) Ltd

Specialist in taking and recording census.

Enumerators To collect social data including filling of socio-economic Performa’s, scoping sessions and focused group discussions

9 Green Drop Consultants (Pvt.) Ltd

Administrative and office support activities, specialist in word processing, spreadsheets and presentation software.

Clerical Staff To keep proper record of data collected in a sequential manner followed by filing of the data and some other administrative tasks.

10 Green Drop Consultants (Pvt.) Ltd

D’Man(Mech.), N.C.V.T. Exam,Piping D’man, CAD Operator

Draftsmen Technical drawing of the interchange, Road Design layouts (maps) and other drafts to be designed as per requirement of the technical staff.

Page 36: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

6. CURRICULUM VITAE

1. Proposed Position Team Leader/ Senior Environmentalist

2. Name of firm Green Drop Consultants (Pvt.) Ltd

3. Name of staff Mr. Syed Ehtasham Hussain4. Date of Birth February 25, 1960 Nationality Pakistani5. Education

Degree Institution Year

MS (Environment) Asian Institute of Technology, Bangkok, Thailand

1983-1985

BE (Env). University of Engineering & Technology, Lahore, Pakistan

1979-1983

6. Membership of Professional Associates Member Pakistan Engineer Council, Pakistan (Env / 14038) International Environmental Science Association South Asian Network for Development and Environmental Economics American Sciences

Association Pakistan Council of Architects & Town Planners. Pakistan Institute of City & Regional Planning.

Member of the National Society for Clean Air and Environmental Protection (NSCA) Member Association for Environmental Studies and Sciences

7. Other training Attended Workshop on “AutoCAD”, organized by LUMS, Lahore, 1993

Page 37: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

Attended “MathCAD”, organized by LUMS , Lahore, 1999 Attended conference on “Environmental Economics”, organized by Sustainable Development Policy

Institute (SDPI), 2001 Attended course on presentation Environment and policy making, organized by, 2005 Attended “National Seminar and Expo on Health, Safety and Environment in Industry”, organized by

NUST, 2005 Attended course on “Strategic Urban Development”, organized by University of Engineering &

Technology, Lahore, 2008 Attended workshop on “Conservation of Forests in Asia ". CEDI, Singapore, 2008 Complete hands on experience on Windows NT/XP, Microsoft office 2000 & internet

professional packages such as: Cyber net & storm cad

8. Papers Presented paper on “Agricultural and Resource Economics", Annual seminar of Agricultural

University Faisalabad, 2009 Presented paper on " Environmental Management in Malaysia", to visiting delegation from

American Universities, Department of Environmental Science, Asian Institute of Technology, Malaysia, 2006

Presentation of Masters Research work "Water Resources Research (WRR)", at research seminar, British Institute of Technology, UK, January 2002.

9. Country of Work ExperiencePakistan, Saudi Arabia Amman, Afghanistan, Iran, China, Egypt10. Languages

language Speaking Reading WritingEnglish Fair Good GoodUrdu Good Good PoorPunjabi Good Fair Fair

11. Employment RecordEmployer Position FromGreen Drop Consultants (Pvt.) Ltd

Senior Environmentalist 1992

Green Drop Consultants (Pvt.) Ltd

Junior Environmentalist/Engineer

1986

12. Detailed Tasks Assigned

Activities assigned while working with Green Drop Consultants Ltd.: Auditing / Sector Specialization Assignments with special reference to ISO 9000-14001- OHASA

18000 - SA 8000 standards Consultancy / Training assignments with special reference to ISO 9000-14001- OHASA18000 - SA

8000 standardsResponsibilities include:

Page 38: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

Project & Engineering Evaluation / Testing as a professional Engineer (PE), Product Marks Total Quality Management

Performance Evaluations and Improvements (PERT), Teaching / Instructional Assignments Employee training

13. Works Undertaken That Best Illustrate Capability to Handle the Tasks Assigned1. Name of assignment or project: EIA Study of Construction/Renovation of Balochistan

University of I.T & M.S - QuettaYear: January 2006 to December 2007Location: PakistanClient: Balochistan University of Information Technology &

Management Sciences - Quetta Main project features: EIA of Project

Position held: (Team Leader/ Environmentalist)Activities performed: Undertake the scoping exercise for the proposed study,

coordinate and assign tasks to team members Collection of baseline data, environmental monitoring Water Quality Waste water Air Quality Risk Assessment coordination with field staff and to assist head environmental in preparation of presentation and meeting with client regarding environmental, evaluation, compensation and resettlement matters.

2. Name of assignment or project: EIA Study of Medical College of Saudi – GermanHospital, Jeddah

Year March 2009 to February 2010Location: Saudi ArabiaClient: M/s BGK Consulting GmbH, Germany Main project features: EIA of Project.Position held: (Team Leader/ Environmentalist)Activities performed: Select team members ,coordinate and assign tasks to team

members, Site selection for Environmental Monitoring based on provided criteria, Air pollution and noise level Monitoring, sampling of water resources, Environmental Impacts assessment of air, noise, water and vibrations & Mitigation Measures, estimation of available resources for Environmental Monitoring control the quality aspects of the report, particularly in terms of information coordination and report presentation

14. Certification

I, the undersigned, certify that to the best of my knowledge and belief, these data correctly describe me, my qualifications and my experience. I understand that any wilful misstatement described herein may lead to my disqualification or dismissal, if engaged.

Page 39: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

________________

Signature of expert or authorized representative of the firm Date: Day/Month/Year

Full Name of authorized representative:

____________________________________________

CURRICULUM VITAE

1. Proposed Position Environmentalist

2. Name of firm Green Drop Consultants (Pvt.) Ltd

3. Name of staff Mr. Abdul Rehman Yousaf4. Date of Birth December 17, 1960 Nationality Pakistani5. Education

Degree Institution Year

PhD (Structural Engineering)

University of ILLINOIS, USA 1993 – 1996

M.Sc. Environmental Sciences

University of ILLINOIS, USA 1991-1993

B.Sc. City & Regional Planning

University of Engineering & Technology, Lahore, Pakistan

1985

6. Membership of Professional Associates Member Pakistan Engineering Council (ENV. 5031) Member Institute of Engineers Pakistan Pakistan Council of Architects & Town Planners. Pakistan Institute of City & Regional Planning. Pakistan Engineering Council Member Association for Environmental Studies and Sciences

7. Other training

Page 40: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

Attended Workshop on “Human Resource Management”, organized by IBA, Punjab University, Lahore, 2009

Attended “Computer skill Enhancement” US Consulate, Lahore, 2008

Attended conference on “Environmental monitoring and mitigation Skills”, organized by Institute of Environment, Budapest, Sweden, 2006

Attended course on Global Changes, organized by University of Manchester, 2005 Attended “National Seminar and Expo on Health, Safety and Environment in Industry”, organized by

Human Resource Center, 2000 Attended course on “Environmental Self -Monitoring, and Reporting for dams & Industry”, organized

by Sustainable Development Policy Institute (SDPI), 2002

8. Papers Presented paper on “The National Environmental Health Strategy 2007 - 2012 ", Annual seminar of

Australian Health Protection Committee (AHPC), October 2007 Presented paper on "Human Health and Climate Change in Oceania: At Risk Assessment Seminar,

Canadian Department of Health and Ageing April 2005 ". Presentation of Masters Research work "Environmental Impact Assessment for Water Resources

Development for Developing Countries", at research seminar, Asian Institute of Technology, Singapore, May 2002

Presented paper on “Environmental Hazards", Annual seminar of Thailand Environmental Protection Committee, October 2001.

Presented paper on “Land Use and Environmental Planning", Annual workshop of British Forest Protection Department, October 1999

9. Country of Work ExperiencePakistan, England, Malaysia, Turkey, Qatar

10. Languageslanguage Speaking Reading WritingEnglish Good Good GoodUrdu Good Good GoodPunjabi Good Good Fair

11. Employment Record

Employer Position FromGreen Drop Consultants Ltd. Environmentalist/Engineer 2010Pepsico International Director of Health, Safety and

Environment Department2006

SKM Enviros Environmental Engineer 1997

12. Detailed Tasks Assigned Responsible for executing environmental assessment of development projects, conducting

Environmental Impact Assessments(EIA) and Initial Environmental Examination (IEE) reports

Page 41: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

for various roads and bridge projects, managing and collating intensive data collection gathered at field work, policy & strategic analysis notably in environmental management, land degradation, community participation/life improvement and solid waste management.

As Environmentalist responsibilities includes

Selection of Environmental Monitoring Locations. Ambient Air Quality Monitoring Laboratory Testing and Analysis Assessment of Environmental Impacts on air, noise, water and vibrations Evaluation of Mitigation Measures To propose Environmental Monitoring Criteria during Construction and Operation Stages of the

Project.

13. Works Undertaken That Best Illustrate Capability to Handle the Tasks Assigned1. Name of assignment or project: EIA Study of TEVTA Campuses at North, South and Central

Zones all Over PunjabYear: May 2008 to January 2009Location: PakistanClient: Technical Education & Vocational Training Authority

(TEVTA) Main project features: EIA of ProjectPosition held: EnvironmentalistActivities performed: Reconnaissance, delineation of study area, collection of

baseline data, environmental monitoring. Selection of environmental monitoring locations. Assessment of environmental impacts on air, noise, water, and vibrations etc. To propose Environmental Monitoring Criteria during Construction and Operation Stages of the Project. Identification and evaluation of mitigation measures. Estimation of available resources for environmental monitoring.

2. Name of assignment or project: EIA Study of ABM Military College Package No.1Year: June 2006 to January 2007Location: QatarClient: Private Engineering Office Main project features: EIA of Project.Position held: EnvironmentalistActivities performed: Selection of Environmental Monitoring Locations based on

prescribed criteria, ambient Air Quality and noise level Monitoring, sampling of ground water and surface water resources, assessment of Environmental Impacts on air, noise, water and vibrations & evaluation of Mitigation Measures, estimation of available resources for Environmental Monitoring

Page 42: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

14. Certification

I, the undersigned, certify that to the best of my knowledge and belief, these data correctly describe me, my qualifications and my experience. I understand that any wilful misstatement described herein may lead to my disqualification or dismissal, if engaged.

________________

Signature of expert or authorized representative of the firm Date: Day/Month/Year

Full Name of authorized representative:

____________________________________________

CURRICULUM VITAE

1. Proposed Position Socio-Economist2. Name of firm Green Drop Consultants (Pvt.) Ltd3. Name of Expert Mr. Mehrab Awan4. Date of Birth 21st June 1960 Nationality Pakistani5. Education

Degree Institution Year

Ph.D. Sociology Mc Gill University, Canada

1992

M.A. Sociology University of Toronto, Canada

1988

M.A. Anthropology University of Baluchistan, Pakistan

1984

B.A. (Psychology, Economics, Social anthropology)

University of Punjab, Pakistan

1981

6. Membership of Professional Associates Member Pakistan Sociological Association Member Institute of Socio-Economist Pakistan Fellow of Socio-Economist Canadian and American Collaboration American Socio-Economist Association The Australian Sociological Association The British Sociological Association

7. Other training

Page 43: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

Attended the “International Masters in Economy, State and Society”, Seminar held by London’s research and teaching powerhouse, 2010

Attended the “economic and ecological impacts,” Seminar held by University of Munich, Germany, 2006

Organized the national community-based research network planning conference by IFPRI, Washington DC, 1999.

Attended Socio-Economic and Developmental Needs Research Workshop, by Institute of Economics, Hungarian Academy of Sciences 1996

Attended the community-based Research Planning Workshop, Pakistan SociologicalAssociation annual meetings, Karachi, 1994.

Attended the “Significance of community-based research in EIA of large Power stations”, Seminar held by University of Karachi, 1990

8. Papers Presented paper “Environmental Management & Planning”, on 15thMarch 2009 in National

Conference organized by University of Punjab. Presented paper in seminar on EIA of Underpass held on 9 September 2008. in International

Conference organized by University of Cambridge USA. Author of the article “Environmental Economics and Development”, Published in Michigan Journal

of Community Service Learning, 2007. Presented paper in seminar on ‘Socio-Economic Future of Developing Countries’ held on 2 August

2005 in International Conference organized by University of Toronto, Canada.

9. Country of Work ExperiencePakistan, Africa, England, USA, China, Egypt, Yemen,10. Languages

Language Speaking Reading WritingEnglish Good Good GoodUrdu Good Good Good

11. Employment RecordEmployer Position Time DurationGreen Drop Consultants (Pvt.) Ltd

Socio-Economist From 2004 To present

Central Environmental Consulting Services (pvt.) Ltd

Senior Economist From 1999 To 2003

University of London Socio-Economic Research Manager

From 1993 To 1998

12. Detailed Tasks Assigned To estimate socio-economic effects such as changes in employment, transportation or recreation,

or changes in the aesthetic value of a landscape;

Page 44: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

To estimate the impacts on society not only of these socio-economic changes but also of the various biophysical effects caused by the proposed action.

The key responsibility of economist would be placing monetary values (economic and financial analysis) on environmental impacts and combining these values into overall project analysis work.

Use of economics for “benefit-cost analysis” as an integral part of project selection Analysis, recommendations and mitigation measures regarding the project. Arrangement and submission of the collected data.

13. Works Undertaken That Best Illustrate Capability to Handle the Tasks Assigned

1. Name of assignment or project: EIA Study of 4 Cadet Colleges in PunjabYear: March 2008 to January 2009Location: PakistanClient: Education Deptt., Govt. of the Punjab & Pakistan

Public Works Deptt.Main project features: EIA of Project.Position held: Socio-EconomistActivities performed: Identification of major social issues, responsible for the

whole income generation component of the project, and will be responsible for the income generation components of all activities cross cutting with other complementary sectors. Collection of data regarding those issues and mitigation measures to handle them.

2. Name of assignment or project: EIA Study of Terbala DamYear: December 2007 to February 2008Location: Terbala, PakistanClient: Water and Power Development Authority (WAPDA)Main project features: EIA of Project.Position held: Senior Sociologist Activities performed: Gathering of socio-economic data related to the study area

from the concerned local departments, to carryout the socio-economic survey. Ensuring the quality, of socio-economic analyses of policy undertaken within the project.

14. Certification

I, the undersigned, certify that to the best of my knowledge and belief, these data correctly describe me, my qualifications and my experience. I understand that any wilful misstatement described herein may lead to my disqualification or dismissal, if engaged.

________________Signature of expert or authorized representative of the firm Date: Day/Month/Year

Full Name of authorized representative:

____________________________________________

Page 45: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

CURRICULUM VITAE

1. Proposed Position GIS specialist2. Name of firm Green Drop Consultants (Pvt.) Ltd 3. Name of staff Mr. Aziz Ameer Ud Din4. Date of Birth 25th April 1976 Nationality Pakistani5. Education

Degree Institution Year

M.Sc. GIS University of Cambridge USA

1999

B.Sc. Environmental Sciences

University of the Punjab, Lahore, Pakistan

1996

6. Membership of Professional Associates Member of Illinois GIS Association Member Pakistan Society of Geographic Information systems (PSGIS) Member Indiana Geographic Information Council (IGIC) Member of Hong Kong GIS Association

7. Other training Attended course on “Application of Satellite Images in EIA of power stations” organized by

International Committee on power stations, held from August 20-23, 2009. Attended seminar on “Remote Sensing in development projects” organized by University of

Toronto, Canada held on 3rd January 2008. Attended conference on “User-friendly GIS system supporting management capacity and needs &

Environmental monitoring methodology and technology transfer to American Ecological Institute using NOAA AVHRR satellite imagery”, organized by American Ecological Institute held on July 2007.

Courses Attended: "Arc Map Applications in Water Resources Management". Sindh University, 2006

Page 46: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

Trained to use:o MS Office Suite (Office 2007), Visio, Acrobat, Dreamweaver, Fireworks, Photoshop,

Paintshop, MapInfo, Idrisi, Vertical Mapper, Surfer, ArcView, Spatial Analyst, Mind Mapping, Concept Mapping. Documents in Word, PDF, html, and LaTeX, including preparation of graphics and artwork.

8. Papers Presented paper on “Surveying and Land Information Science” at National conference organized by

University of the Punjab, 2010 Presented paper on, “Geo-spatial Information Science”, at International conference organized by

University of Bucharest Romania, 2009. Presented paper on " Remote Sensing satellite". at International conference organized by University

of Cambridge USA 2007.

9. Country of Work ExperiencePakistan, USA, Canada, Iraq, Oman10. Languages

Speaking Reading WritingEnglish Good Good GoodUrdu Good Good Good

11. Employment RecordEmployer Position Time DurationGreen Drop Consultants (Pvt.) Ltd

GIS specialist From 2007 To present

Central Environmental Consulting Services (pvt.) Ltd

GIS specialist From 2004 – 2006

University of London GIS and Land use reach manager

From 2000 - 2003

12. Detailed Tasks Assigned Design, develop, implement, document and maintain GIS server product production systems for

mapping of project area. Analyze functional requirements and recommend adoption of new technologies, and services for

analysis of the input data from all of the diverse sources. Spatial analysis and the data translation into maps will employ the GIS software Arc/Info and Arc

View and the remote sensing software ERDAS. Works with Group Leaders to make projects and products as profitable as possible and and help in

making site-specific decisions. Overall management of the database.

13. Works Undertaken That Best Illustrate Capability to Handle the Tasks Assigned

Page 47: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

1. Name of assignment or project: EIA of Tunsa Barrage Year: April 2009 to January 2010Location: Punjab, PakistanClient: Irrigation and Power Department, Govt. of Punjab Main project features: EIA of Project.Position held: GIS specialist Activities performed: GIS data collection, GIS data management and

coordination and map production for the study area.

2. Name of assignment or project: EIA Study of Development of New and Old Campuses at Faisalabad.

Year: October 2007 to January 2008Location: PakistanClient: Government College University Main project features: EIA of Project.Position held: GIS specialist Activities performed: Mapping of project area by combining the features of remote

sensing, topographic sheets and secondary maps data to produce the necessary information layers. Design, develop, implement, document and maintain functional requirements, and project plans.

3. Name of assignment or project: EIA Study of Dhok Ubaki DamYear: May 2006 to March 2007Location: Near Talagang, PakistanClient: Water and Power Development AuthorityMain project features: EIA of Project.Position held: GIS expert Activities performed: Analyze input and output data, translation GIS

specifications and product specifications. GIS data development, GIS data management map production for the study area management of database system.

14. CertificationI, the undersigned, certify that to the best of my knowledge and belief, these data correctly describe me, my qualifications and my experience. I understand that any wilful misstatement described herein may lead to my disqualification or dismissal, if engaged.

________________Signature of expert or authorized representative of the firm Date: Day/Month/Year

Full Name of authorized representative:

____________________________________________

Page 48: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

CURRICULUM VITAE

1. Proposed Position Transport Engineer

2. Name of firm Green Drop Consultants (Pvt.) Ltd

3. Name of staff Mr. Daniel Ahmed4. Date of Birth July 25, 1960 Nationality Pakistani5. Education

Degree Institution Year

MSc(Eng) in Transport Planning and Engineering

Asian Institute of Technology, Bangkok, Thailand

1983-1985

BSc(Eng) in Transport Planning and Engineering.

University of Engineering & Technology, Lahore, Pakistan

1979-1983

6. Membership of Professional Associates Member Pakistan Engineer Council, Pakistan (Env / 14038) International Transport Planning and Engineering Association South Asian Network for Development and Environmental Economics American Sciences

Association Pakistan Council of Transport Planning and Engineering. Pakistan Institute of City & Regional Planning.

Member of the National Society for Clean Air and Environmental Protection (NSCA)

7. Other training Attended Workshop on “AutoCAD”, organized by LUMS, Lahore, 2009 Attended “MUNICIPAL SERVICES DEVELOPMENT PROJECT”, organized by LUMS , Lahore,

2007 Attended conference on “Transportation and Environmental Economics”, organized by Sustainable

Development Policy Institute (SDPI), 2006 Attended course on presentation Environment and Transportation policy making, organized by,

2005 Attended course on “Strategic Urban Development”, organized by University of Engineering &

Technology, Lahore, 2004

Page 49: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

8. Papers Presentation on “Urban Development and Traffic", Annual seminar of Engineering University

Lahore, 2009 Presentation on " Environment and Traffic Management in Malaysia", to visiting delegation from

American Universities, Department of Environmental Science, Asian Institute of Technology, Malaysia, 2006

Presentation of Masters Research work "Cntaminant transposrt problems. ", at research seminar, British Institute of Technology, UK, January 2002.

9. Country of Work ExperiencePakistan, Amman, Afghanistan, Iran, China, Egypt10. Languages

language Speaking Reading WritingEnglish Fair Good GoodUrdu Good Good PoorPunjabi Good Fair Fair

11. Employment RecordEmployer Position FromGreen Drop Consultants (Pvt.) Ltd

Transport Engineer 1992 To Present

Save Environment Consulting Services (pvt.) Ltd

Transport Engineer 1986 – 1991

12. Detailed Tasks Assigned

Activities assigned while working with Green Drop Consultants Ltd.: Conduct feasibility studies, economic analysis, municipal and regional traffic studies,

environmental impact studies or other investigations. Specialization Assignments with special reference to ISO 9000-14001- OHASA 18000 - SA 8000 standards

Responsible of transportation planning, parking management, transportation business supervision, management of public buses, boats, and roads, improvement and maintenance of traffic related facilities, traffic incident adjudication, vehicle accident inspection and conclusion. assignments with special reference to ISO 9000-14001- OHASA 18000 - SA 8000 standards

13. Works Undertaken That Best Illustrate Capability to Handle the Tasks Assigned1. Name of assignment or project: EIA Study of International Islamic University Islamabad

Year: January 2006 to December 2007Location: Lahore, PakistanClient: International Islamic University Islamabad

Main project features: EIA of Project Position held: Transport EngineerActivities performed: Varying types of traffic related assignments, consisting of

field surveying, AutoCAD work completing exhibit drawings, parking lot layouts, completing and updating

Page 50: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

traffic counts, inputting data into traffic collision system software and updating inventory of pavement markings and traffic signal infrastructure.

2. Name of assignment or project: EIA Study of Allama Iqbal Faculty of Arts at KabulUniversity

Year: March 2009 to February 2010Location: AfghanistanClient: Planning Commission, Govt. of Pakistan Main project features: EIA of Project.Position held: Transport EngineerActivities performed: Conduct traffic impact analyses, operational analyses for

freeway, arterial improvement, General Plan and Specific Plan circulation

14. Certification

I, the undersigned, certify that to the best of my knowledge and belief, these data correctly describe me, my qualifications and my experience. I understand that any wilful misstatement described herein may lead to my disqualification or dismissal, if engaged.

________________

Signature of expert or authorized representative of the firm Date: Day/Month/Year

Full Name of authorized representative:

____________________________________________

Page 51: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

CURRICULUM VITAE

1. Proposed Position Ecologist2. Name of firm Green Drop Consultants (Pvt.) Ltd3. Name of staff Mr.Mubarik Mehmood4. Date of Birth 2nd September 1975 Nationality Pakistani5. Education

Degree Institution Year

M.Sc. Ecology Asian Institute of Technology, Bangkok, Thailand

1998

B.Sc. Botany University of the Punjab, Lahore, Pakistan

1995

6. Membership of Professional Associates Pakistan Ecologist Society Canadian Society of Naturalists Ecological Society of America Society for Conservation Biodiversity International Association for Landscape Ecology (IALE) American Ecologist Association

7. Other training Attended course on “Spatial Ecology Research Programme. ... Workshop:” organized by University

of Helsinki, Finland held from March 20th - 23rd, 2010. Attended workshop on “Integrated environmental modeling and spatial data” organized by Eleanor

Blyth, CEH – Centre for Ecology Canada held on 3rd July 2009. Attended seminar on “conservation of environment “organized by University of Punjab Pakistan

May 2007 Attended conference on “Protection of Ecosystem” organized by University of the Punjab, Lahore,

2006. Attended conference on “User-friendly GIS system supporting management capacity and needs &

Environmental monitoring methodology and technology transfer to American Ecological Institute using NOAA AVHRR satellite imagery”, organized by American Ecological Institute held on July 2005.

8. Papers

Page 52: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

Presented paper on “how environmental exposures affect our health” at National conference organized by National Institute of Environmental Health Sciences USA, 2010

Presented paper on, “wetland vegetation and environment”, at International conference organized by University of Bucharest Romania, 2009.

Presented paper on “Urban Development and environment". at International conference organized by Deakin University Australia 2006.

9. Country of Work ExperiencePakistan, Turkey, Afghanistan USA, Yemen, Saudi Arabia, Canada, Iraq, Oman

10. Languages

Speaking Reading WritingEnglish Good Good GoodUrdu Good Good Good

11. Employment RecordEmployer Position Time DurationGreen Drop Consultants (Pvt.) Ltd

Ecologist From 2007 To present

Central Environmental Consulting Services (pvt.) Ltd

Ecologist From 2004 – 2006

University of London Ecologist From 2000 - 2003

12. Detailed Tasks Assigned Analyze potential effects of toxic air pollutants on ecosystems and wildlife species,. develop

methods to assess the interaction between stressors and the services ecosystems provide as well as develop environmental models to predict impacts of pollutants.

Collect biological, physical and chemical samples to support site characterization and policy decisions; enter, validate, manage and analyze various environmental data. Data validation done according to USEPA guidelines.

test the water quality and keep an eye on changes to its chemical composition, conduct population studies of local rivers and streams. Observe different kinds of creatures occupying study area sugesst methods to protect endangered plants and animals species

13. Works Undertaken That Best Illustrate Capability to Handle the Tasks Assigned

1. Name of assignment or project: EIA of Hadramount University of Engineering andTechnology Mukallah

Year: April 2009 to January 2010Location: YemenClient: Hadramount University Main project features: EIA of Project.

Page 53: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

Position held: Ecologist Activities performed: perform critical natural resource assessments,

environmental analyses, habitat and ecological restoration, and develop complex advocacy and compliance strategies..

2. Name of assignment or project: EIA Study of Medical College of Saudi - German Hospital, Jeddah

Year: October 2007 to January 2008Location: Saudi ArabiaClient: M/s BGK Consulting GmbH, Germany Main project features: EIA of Project.Position held: Ecologist Activities performed: work within a team empowered to manage environmental and

conservation policy in the local area. responsible for establishing close working relationships with relevant government organizations, non-government organizations (NGOs) such as charities and action groups, the private sector, community groups, farmers, landowners, to ensure the conservation of the county’s wildlife and natural habitats by promoting good conservation practice and projects.

3. Name of assignment or project: EIA Study of Dhok Ubaki DamYear: May 2006 to March 2007Location: Near Talagang, PakistanClient: Water and Power Development AuthorityMain project features: EIA of Project.Position held: Ecologist Activities performed: Field survey and assessment, work practical countryside

and site management advising government, land managers or the general public providing advice on civil engineering projects, or land restoration and water use developing computer models of ecosystems, to formulate predictions.

14. Certification

I, the undersigned, certify that to the best of my knowledge and belief, these data correctly describe me, my qualifications and my experience. I understand that any wilful misstatement described herein may lead to my disqualification or dismissal, if engaged.

________________Signature of expert or authorized representative of the firm Date: Day/Month/Year

Full Name of authorized representative:

____________________________________________

Page 54: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

CURRICULUM VITAE

1. Proposed Position Hydro geologist2. Name of firm Green Drop Consultants (Pvt.) Ltd3. Name of staff Mr. Athar Zia4. Date of Birth 12nd July1967 Nationality Pakistani

5. Education Degree Institution Year

M.Phil in Hydrology Cambridge University UK

1992

MSc in Geo hydrology and Engineering Geology

Cambridge University UK

1989

BSc in Geology University of the Punjab 1987

6. Membership of Professional Associations Association of Local Government Ecologists UK Pakistan Association of hydrologist Mexican Hydrogeology Association Society of Economic Geologists (SEG) Korea Ground Water Association Geological Society of Pakistan (PSA-Fellow) Association of Geoscientists for International Development (AGID) American Association of Water Conservation Association of Environmental & Engineering Geologists (AEEG) International Association Hydro geologists (AIH) Punjab Association Professional Geoscientists (PAPG)

7. Other Training Certificate in Hydrologic Analysis For Ecosystem Restoration from, UET, Lahore 2009 Certificate in Flood Warning Preparedness from Oxford University UK 2008 Attended seminar on “Hydrologic Analysis For Ecosystem Restoration ”, The Norwegian University

of Technology, Spitzbergen 2006 Attended seminar on “Risk Analysis For Flood Damage Reduction Projects ”, at the Institute of

Technology, Norway 2004 Attended seminar “Resources and the environment in developing countries” at the University of

Oslo, 2003. Project Management, training course, Norconsult A.S.2002. Course in computer assisted project planning and management, Oslo 2001. Certificate in’ Water and the Watershed’ from, UET, Lahore1999.

Page 55: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

8. Papers Presented paper on “Development and Water Resource ", Annual seminar of Agricultural University

Faisalabad, 2010. Presented paper on " Environmental Management in Malaysia", to visiting delegation from

American Universities, Department of Environmental Science, Asian Institute of Technology, Malaysia, 2009.

Presentation of Masters Research work "Water Resources Research (WRR)", at research seminar, British Institute of Technology, UK, January 2008.

Presented paper on “Resource Conservation and Recovery” at National conference organized by National Institute of Environmental Health Sciences USA, 2007.

Presented paper on, “Safe Drinking Water and Pollution Prevention”, at International conference organized by University of Bucharest Romania, 2006.

Presented paper on “Urban Development and Water". at International conference organized by Sindh University Pakistan.2005.

9. Country of Work Experience Pakistan, Turkey, Afghanistan USA, Yemen, Saudi Arabia, Canada, Iraq, Oman

10. LanguagesSpeaking Reading Writing

English Good Good GoodUrdu Good Good Good

11. Employment Record

Employer Position Time DurationGreen Drop Consultants (Pvt.) Ltd

Hydro- geologist From 2007 To present

Central Environmental Consulting Services (pvt.) Ltd

Hydro- geologist From 2004 – 2006

Cambridge University UK Dean of Hydro- geology Department

From 1993- 2003

12. Detailed Tasks AssignedEvaluation of groundwater resources including assessment of groundwater quality and yield associated with the Water Agency’s water supply facilities and general water supply issues and performs related duties as required.

Analyze water demand and availability in study area. Prepares, recommends, and monitors water resources related budgets and staffing needs. 

Page 56: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

Collect water samples to support site characterization and policy decisions; enter, validate, manage and analyze various environmental data. Data validation done according to USEPA guidelines.

Test the water quality and keep an eye on changes to its chemical composition, conduct population studies of local rivers and streams. Observe different kinds of changes in water sources in study area suggest methods to protect them.

13. Works Undertaken That Best Illustrate Capability to Handle the Tasks Assigned

1. Name of assignment or project: EIA of Faculty of Engineering Aden University Year: June 2009 to May 2010Location: PakistanClient: Punjab Workers Welfare Board Govt. of the PunjabMain project features: EIA of Project.Position held: Hydro- geologist Activities performed: Directs and coordinates highly complex and technical

investigations and evaluations of surface and ground water resources. Work includes research investigations in specialized fields of hydrology that support state-wide water resources. Proceeds with independence in developing and implementing assigned tasks, subject to policy guidance and an evaluation of results from an administrative superior, who reviews work through conferences and reports

2. Name of assignment or project: EIA Punjab Workers Welfare Development Schemes in PunjabYear: October 2007 to January 2008Location: Saudi ArabiaClient: M/s BGK Consulting GmbH, GermanyMain project features: EIA of Project.Position held: Hydro- geologistActivities performed: Hydro-geological and Geological survey and mapping,

Geophysical Investigation of groundwater investigation, Groundwater survey, Supervision and monitoring of well drilling site, Lithological sampling, electrical logging and design of the well, Pumping test and its data analysis for calculation of hydro-geological parameters of the aquifers, Preparation of proposal for project, and Report preparation

3. Name of assignment or project: EIA Study of Dhok Ubaki DamYear: May 2006 to March 2007Location: Near Talagang, PakistanClient: Water and Power Development AuthorityMain project features: EIA of Project.Position held: Hydro- geologist Activities performed: conduct environmental impact assessments of resource

project and study the effects of natural disturbances on water quantity, water quality and aquatic ecology gather geographic information system (GIS), remote sensing

Page 57: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

and other data, perform statistical analyses and develop hydrologic models prepare technical reports co-ordinate and supervise the work of technologists and technicians.

14. Certification

I, the undersigned, certify that to the best of my knowledge and belief, these data correctly describe me, my qualifications and my experience. I understand that any wilful misstatement described herein may lead to my disqualification or dismissal, if engaged.

________________Signature of expert or authorized representative of the firm Date: Day/Month/Year

Full Name of authorized representative:

____________________________________________

Page 58: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

7. STAFFING SCHEDULE

Name of StaffStaff input

Total staff-month input

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16Hom

eFiel

dTota

l

1

Mr. Syed Ehtasham Hussain(Team Leader/ Senior Environmentalist)

2.1 4.15

2.05

2

Mr. Abdul Rehman Yousaf(Environmentalist)

2. 55 3.05

1.5

3

Mr. Mehrab Awan(Socio-Economist)

1.45 3

1.75

4Mr. Aziz Ameer Ud Din(GIS Specialist )

1.52.150.7

5

Mr. Daniel Ahmed(Transport Engineer )

1.51.750.5

6Mr. Mubarik Mehmood(Ecologist)

1. 5 2.5

1.3

7Mr. Athar Zia(Hydro-geologist)

2.5 3.251

8TBN(Enumerators)

0.82.05

1.5

9Draftsmen 2.2

2.50.75

10Clerical Staff 1.9

1.20

11

Subtotal

Total Full time input Part time input Full time input (if required) Part time input (if required)

Page 59: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

8. CHRONOGRAM OF ACTIVITIES

N° Activity

Weeks

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1Kick off meeting

...

2Review of desk studies

.... .....

3Reconnaissance Survey

....

4Legal Review ....

5

Baseline AnalysisPhysical

Hydrological Study

Geological & Seismological Study

Meteorological Study

........

.......

........

........

.......

.......

......

..

......

.

......

..

...

...

...

6Ecological ...... ......

..........

......

..

7

Socio Economic

Land Acquisition & Property Value

Affectees Analysis

......

..

......

..

......

..

......

..

......

..

......

..

......

..

......

..

Page 60: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

8

Identifying alternatives

Site alternatives

Design alternatives

Management and Operational Alternatives

......

..

......

.

......

.

....

.....

.....

9

Impact prediction and Assessment

......

.........

......

.........

......

..

10

Physical Noise

level Air and

Water Quality Change

Land use Assessment

......

..

......

..

......

..

......

..

......

.

......

.

......

..

......

..

......

..

......

..

......

.

......

.

11

Ecological ........

......

........

......

..12

Socio Economic

Resettlement and Social Settings

Economic Settings

Archeological Sites

......

..

......

..

......

..

......

..

......

..

......

..

......

.

......

..

......

.

......

.

......

..

......

.

......

..

......

.

......

.

......

..

......

..

......

..

Page 61: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

13

Mitigation Measures

Environmental Monitoring Plan

Environmental Management Plan

Environmental Training Plan

Waste And Traffic

Management Plan

Resettlement Action Plan

......

..

......

..

......

..

......

..

......

..

......

..

......

.

......

.

......

.

......

..

......

.

......

..

......

..

......

..

......

..

......

..

......

..

......

..

......

..

......

.

......

..

......

..

......

..

......

..

DeliverablesInitial ReportInterim ReportDraft ReportMeeting with ClientFinal Report

: Represents the delivery of reports

Certificate of Registration

Page 62: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

This is to certify that the Quality management system of

Green Drop Consultants (PVT) LTDLahore-Pakistan

Has been assessed and found compliant with the requirements of

ISO 9001: 2000

Certification Scope:

Project Management, Engineering, Procurement, Civil Construction, Mechanical Fabrication and Erection And E&I Installation Services, Plant Commissioning, Maintenance and Operation.

Certification No.: 6061421 Issue Date: March 21st, 2008 Expiry Date: March 20th, 2011

Moody International Certification Ltd. www.moodyint.com

Certificate of Registration

Page 63: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

This is to certify that the Environmental management system of

Green Drop Consultants (PVT) LTDLahore-Pakistan

Has been assessed and found compliant with the requirements of

ISO 14001: 2004

Certification Scope:

Project Management, Engineering, Procurement, Civil Construction, Mechanical Fabrication and Erection And E&I Installation Services, Plant Commissioning, Maintenance and Operation.

Certification No.: 6061422 Issue Date: March 21st, 2008 Expiry Date: March 20th, 2011

Moody International Certification Ltd. www.moodyint.com

Page 64: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

AUTHORIZATION TO RELEASE INFORMATION

Green Drop Consultants, Ltd. Hereby authorizes any person or entity, public or private, having any

information concerning the bidder’s background, including but not limited to its performance history

regarding its prior rendering of services similar to those detailed in this RFP, to release such information to

the Department.

The bidder acknowledges that it may not agree with the information and opinions given by such person or

entity in response to a reference request. The bidder acknowledges that the information and opinions given

by such person or entity may hurt its chances to receive contract awards from the Department or may

otherwise hurt its reputation or operations. The bidder is willing to take that risk. The bidder agrees to

release all persons, entities, the Department from any liability whatsoever that may be incurred in releasing

this information or using this information.

May 9, 2010

Signature of Authorized Representative DateAreej RiazManaging DirectorGreen Drop Consultants, Ltd.

Page 65: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

PROPOSAL CERTIFICATION

I certify that I have the authority to bind the bidder indicated below to the specific terms, conditions and

technical specifications required in the Client’s Request for Proposals (RFP) and offered in the proposal. I

understand that by submitting this technical and financial proposal, the bidder indicated below agrees to

provide Environmental Impact Assessment Services which meet or exceed the requirements of the client’s

RFP unless noted in the bid proposal and at the prices quoted by the consultant.

I certify that the contents of the bid proposal are true and accurate and that the undersigned has not made

any knowingly false statements in the bid proposal.

May 9, 2010

Signature of Authorized Representative DateAreej RiazManaging DirectorGreen Drop Consultants, Ltd.

ACCEPTANCE OF TERMS AND CONDITIONS

Page 66: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

I certify that Green Drop Consultants Ltd acknowledges the acceptance of all

terms and conditions stated in the RFP.

May 9, 2010

Signature of Authorized Representative DateAreej RiazManaging DirectorGreen Drop Consultants, Ltd.

Page 67: Technical Proposal

Green Drop Consultants (Pvt.) Ltd

Green Drop Consultants (Pvt.)

LtdOffice: 449X, Street 12, Defense Housing Authority, Lahore-54700, Pakistan.Phone # 042-7002160Fax # 0427002161Email: [email protected]