  • 8/2/2019 Teamsters Const. Zone Maps

    1/10

    27thAve

    4th Street SE

    University ofMinnesotaTransitway

    25thAve

    Delaware Street

    UniversityAvenue SE

    29thAve

    SidneyPl

    26thAve

    30thAve

    MalcolmA

    ve

    Arth

    urAve

    4thSt SE

    3

    0thAve

    MalcolmA

    ve

    29thAve

    Ma

    lcolmSt

    . MarysA

    ve

    27thAve

    William

    sAve

    Delaware

    St

    ve

    OrlinAve

    SidneyPl

    Delaware St

    University of MN Transitway

    25thAve

    Lane/Road Closed

    Access Route to the TeamstersTeamsters

    Signalized Intersection

    Two-Way Trac Maintain

    University Avenue

    Teamsters

    3001 University Avenue SE

    The north lanes of University Avenue from Berry Street to 29th Avenue are closed for the construction of Central Corridor Light Rail through this June. Tmaintained in each direction on University Avenue. A closure of Malcolm Avenue just north of University Avenue is needed for about 3 weeks to work o

    underground utility. During this temporary closure, access Malcolm Avenue via 4th Street.

  • 8/2/2019 Teamsters Const. Zone Maps

    2/10

    UPDATED: February 16, 2012

    Construction Highlights for the Week of April 7-13

    North/south crosswalks at the intersection of Union Street and Washington Avenue closed; temporary

    crosswalk moves 20 feet to the west of its current location starting early in the week. - NEW

    Eastbound Washington Avenue between Walnut Street and Oak Street will have intermittent closures whileconcrete is poured for one day early in the week; watch for short term detours. - NEW

    Sidewalk scheduled to close for one week beginning Tuesday on the southeast corner of Oak Street andWashington Avenue; access to Punch Pizza and Chipotle will be maintained via the Washington Avenuesidewalk. Temporary north/south crosswalk east of the Oak Street intersection added for this closure. - NEW

    Nighttime construction activities begin April 9 on Washington Avenue between Oak Street and HuronBoulevard. Night work will occur from 6 PM to 2 AM and last for approximately four weeks. - NEW

    All traffic shifted to the south side of University Avenue between 23rd Avenue and 25th Avenue; two way traffmaintained.- NEW

    Sidewalk on the east side of 23rd Avenue between 4th Street and University Avenue closes; use westsidewalk. - NEW

    Sidewalk on the north side of University Avenue between 23rd Avenue and 25th Avenue closes; use southsidewalk. North sidewalk access maintained to Tea House. - NEW

    North sidewalk of University Avenue between 29th and Malcolm closed through the end of the week; access tbusinesses maintained via side streets and marked detour. South sidewalk remains open. - NEW

    April 7-13, 2012

    Getting Creative with Construction Area Marketing

    The business complex on the corner of 29th Avenue andUniversity Avenue create some creative way findingsignage to direct clients and customers to parking lotsduring the closure of 29th Avenue. 29th Avenue is thefuture location of Prospect Park Station.

    Photo Above: Signage posted in yellow

    along the detour route for 29th Avenue.The large sign states follow the yellowbrick road to parking lots for Anytime Fitness, Overflow Caf, and Childrens Vil-lage Montessori.

    Photo Left: Path through the constructionzone on 29th Avenue to parking lots.

  • 8/2/2019 Teamsters Const. Zone Maps

    3/10

    Minneapolis Construction Area Information

    Area BusesMetro Transit Bus Detours

    Metro Transit bus stops have changed locations throughout the construction area. For full information on bus stop locationsand route detours visit www.metrotransit.org/constructionor call the Transit Information Center at (612) 373-3333.

    University of Minnesota Campus Connector and Campus Circulator DetoursFor detailed information on route and stop locations visit www.umn.edu/pts/bus/shuttle.html

    Campus Connectors and Circulators are for use by all of the public, not just students or staff. To learn how to use acombination of Metro Transit buses and Campus Connectors and Circulators to reach your destination, visitwww.metrotransit.org/constructionor call the Transit Information Center at (612) 373-3333.

    Other Road Construction in the AreaI-94 Work in Minneapolis and St. Paul by Minnesota Department of Transportation (MnDOT)Eastbound I-94 between I-394 & HWY 55/Hiawatha Avenue CLOSED April 13th at 9pm to 5am April 16th for resurfacing.More information at www.511mn.org.NEW

    Cedar Riverside Neighborhood Work by City of MinneapolisThe City of Minneapolis will continue work on the Riverside Avenue Project this year. To learn more about this project, visitwww.minneapolismn.gov/cip/all/cip_riverside_index. Contact Chris Engelmann of the City of Minneapolis at (612) 673-3274for more information.

    I-35W and Washington Avenue Interchange Area

    Hiawatha Bicycle Path between West Bank and downtown Minneapolis over I-35W detoured through 2013Web Link (pdf)Ramp Closures:-Ramp from 4th Street to southbound I-35W closed 2AM to 5AM April 9th. Follow posted detour.NEW

    -Ramp from northbound I-35W to University of Minnesota East Bank closed until end of fall 2012.

    - Southeast Cedar Ave ramp to eastbound Washington Avenue closed until end of summer 2012.

    http://www.metrotransit.org/constructionhttp://www1.umn.edu/pts/bus/shuttle.htmlhttp://www.metrotransit.org/constructionhttp://r20.rs6.net/tn.jsp?llr=pehis8bab&et=1105697971338&s=17065&e=001RuOlh9swp8pBcKy8Jv33mUuBxSVoufZ28pHXLcjdziN713TaeXQ84krbcTQ8tbZPYdXiQrnsQ5BKNb5VaKrU7RvlSllea_35hQYTRR8kpAmHKa1A2Roqsw==http://www.minneapolismn.gov/cip/all/cip_riverside_indexhttp://www.metrocouncil.org/transportation/ccorridor/newsAlerts/HiawathaBikePathDetour.pdfhttp://www.metrocouncil.org/transportation/ccorridor/newsAlerts/HiawathaBikePathDetour.pdfhttp://www.minneapolismn.gov/cip/all/cip_riverside_indexhttp://r20.rs6.net/tn.jsp?llr=pehis8bab&et=1105697971338&s=17065&e=001RuOlh9swp8pBcKy8Jv33mUuBxSVoufZ28pHXLcjdziN713TaeXQ84krbcTQ8tbZPYdXiQrnsQ5BKNb5VaKrU7RvlSllea_35hQYTRR8kpAmHKa1A2Roqsw==http://www.metrotransit.org/constructionhttp://www1.umn.edu/pts/bus/shuttle.htmlhttp://www.metrotransit.org/construction
  • 8/2/2019 Teamsters Const. Zone Maps

    4/10

    West Bank Area No Change

    Traffic Details Eastbound traffic from downtown to Cedar Avenue/West Bank turns left onto Northwest Cedar Avenue

    Ramp. Southeast Cedar Avenue Ramp closed to vehicle traffic; detour via Northwest Cedar Avenue Ramp.

    Sidewalk Details

    Sidewalk on east side of Cedar Avenue Bridge closed.

    Bus Stop Details

    Metro Transit bus stops are located at Willey Hall for westbound buses and at Blegen Hall foreastbound buses.

    There is one bus stop for all University of Minnesota Campus Connectors and Campus Circulators onthe north side of Washington Avenue near Willey Hall just south of the bus shelter. East andwestbound University of Minnesota buses will use this single stop location.

  • 8/2/2019 Teamsters Const. Zone Maps

    5/10

    Traffic and Bicycle Details Washington Avenue closed from Pleasant Street to Walnut Street; all eastbound traffic from

    Washington Avenue Bridge exit on Weisman Museum loop road.

    Sidewalk Details North/south crosswalks at the intersection of Union Street and Washington Avenue closed;

    temporary crosswalk moves 20 feet to the west of its current location starting early in the week.-NEW

    Washington Avenue north/south crossing at Church Street closed; use pedestrian bridges nearCoffman Memorial Union. ADA access available via the west pedestrian bridge.

    North sidewalk of Washington Avenue between Pleasant Street and east pedestrian bridgeclosed.

    South sidewalk of Washington Avenue between Pleasant Street and Church Street closed. North sidewalk of Washington Avenue in front of Amundson Hall closed; use south sidewalk. Washington Avenue pedestrian entrance to University of Minnesota Transportation and Safety

    Building available only from Harvard Street or Union Street.

    East Bank Mississippi River to Harvard Street

  • 8/2/2019 Teamsters Const. Zone Maps

    6/10

    Stadium Village- Harvard Street to University Avenue

    Traffic and Bicycle Details Washington Avenue closed between Oak Street and Huron Boulevard through August; local access remains o

    for businesses on the north side of Washington Avenue between Ontario Street and Huron Boulevard. Ontario Street closed at Washington Avenue to through traffic; local access on Ontario remains open north and

    south of Washington Avenue. Northbound Oak Street closed at Washington Avenue through mid-May; local access on Oak remains open no

    and south of Washington Avenue. Southbound lane on Oak Street maintained through Washington Avenue. Eastbound Washington Avenue between Walnut Street and Oak Street will have intermittent closures while

    concrete is poured for one day early in the week; watch for short term detours. - NEW

    Sidewalk Details Sidewalk scheduled to close for one week beginning Tuesday on the southeast corner of the Oak Street and

    Washington Avenue; access to Punch Pizza and Chipotle will be maintained via the Washington Avenue sidewTemporary north/south crosswalk east of the Oak Street intersection added for this closure. - NEW

    Crosswalks at intersection of Oak Street and Washington Avenue modified; east/west crosswalks pushed backfrom the intersection about 30 feet.

    North/south crosswalks at intersection of Washington and Ontario closed; use crosswalks at Oak Street andHuron Boulevard.

    North sidewalk of Washington Avenue between Harvard Street and Walnut Street closed; use south sidewalk o

    Washington Avenue.

  • 8/2/2019 Teamsters Const. Zone Maps

    7/10

    Details of Overnight Work

    Duration Nighttime construction activities will occur nightly, Monday-Saturday, from 6 PM to 2 AM

    beginning on April 9 through early May. - NEW

    Nighttime Construction Activities Crews will remove the underground utilities and replace them with upgraded systems. - NEW Construction vehicles will have an audible beep for when vehicles back up; this beeping

    must remain on for safety reasons. - NEW Additional lighting will be added to the work zone to assist in a safe and efficient work

    environment. - NEW

    Nighttime Construction ActivitiesWashington Avenue between Oak Street and Huron Boulevard

    April 9 through early May 2012

    Construction activities to complete underground utility work on Washington Avenue between OakStreet and Huron Boulevard will occur nightly, Monday-Saturday, beginning on April 9. Night workwill continue through early May. Crews understand there are residential buildings adjacent and nearthe work site and will work as efficiently as possible to minimize impact.

  • 8/2/2019 Teamsters Const. Zone Maps

    8/10

    Traffic and Bicycle Details All traffic shifted to the south side of University Avenue between 23rd Avenue and 25th Avenue; two way

    traffic maintained.- NEW 4th Street now dead ends at 23rd Avenue; this is a permanent change.Sidewalk Details Sidewalk on the east side of 23rd Avenue between 4th Street and University Avenue closes; use west

    sidewalk. - NEW Sidewalk on the north side of University Avenue between 23rd Avenue and 25th Avenue closes; use

    south sidewalk. Sidewalk access maintained to Tea House. - NEW

    Stadium Village- University Avenue, Huron Boulevard, and 23rd Avenue

  • 8/2/2019 Teamsters Const. Zone Maps

    9/10

    Traffic and Bicycle Details Malcolm Avenue closed just north of University Avenue; access Malcolm Avenue businesses and residences

    via 27th Avenue to 4th Street. 29th Avenue between University of Minnesota Transitway and University Avenue closed; access remains

    open to local businesses on 29th and through the intersection of 29th Avenue and 4th Street. 30th Avenue closed at University Avenue; local access maintained to parking lots and businesses on 30th

    Avenue via 27th Avenue to 4th Street. All traffic shifted to the south side of University Avenue between 29th Avenue and Emerald Street; two way

    traffic maintained.

    Sidewalk Details University Avenue south sidewalk closed from 27th Avenue to the 29th Avenue pedestrian crossing for pri-

    vate utility work by Center Point Energy. Closure is projected to begin mid-week and remain closed for abouta week. - NEW

    North sidewalk of University Avenue between 29th and Malcolm closed through the end of the week; accessto businesses maintained via side streets and marked detour. - NEW

    West crosswalk at the intersection of Malcolm and University closed; use crosswalk on east side of theintersection to cross University Avenue.

    Prospect Park

  • 8/2/2019 Teamsters Const. Zone Maps

    10/10

    Questions, Comments, or Concerns?Call the 24 hour Construction Hotline so we know there is an issue!

    (651) 602-1404

    Do not bring questions or concerns to crews in the construction field. Crews work on specific tasks and will noknow details on schedule and the most current information on plans and priorities. Call the construction hotline

    leave a message and you will receive a call back to answer your question or learn more about the concern. Aconcerns and questions need to be received at the project management level to ensure issues are addressed

    Private Utility Company Contacts

    Xcel EnergyDave MadiganPhone: (651) 229-2384Email: [email protected] Emergency/Power Outage: 1-800-895-1999

    CenterPoint EnergyAlla DenisovaPhone: (612) 321-5077Email: [email protected] Customer Service: 1-800-245-2377

    CenturyLinkBrian DayPhone: (612) 381-5564Email: [email protected]

    Construction Activity Look AheadMore information will be posted on these items in future updates:

    East sidewalk of Cedar Avenue bridge reopens mid-April. -NEW

    South side of the Walnut Street and Washington Avenue intersection closes in late April for approximately twoweeks. -NEW

    The intersection of 4th Street and 29th Avenue closes in mid-April through mid-September 2012; the 4th Stree

    intersection will not close until Malcolm has reopened north of University Avenue. -NEW

    North side of Bedford Street and University Avenue intersection closes in late April for approximately threeweeks; a temporary detour will be built for businesses and residence to use during this closure. -NEW

    Construction Area Construction Hours

    I-35W Area and West Bank 7AM - 6PM Monday - Saturday

    East Bank: Church Street to Harvard Street 5AM - 2PM Monday - Friday; 5AM - 1PM Saturday

    East Bank: Harvard Street to Oak Street 5AM - 2PM Monday - Friday; 5AM - 1PM Saturday

    University Avenue: 29th Avenue to Bedford Street 7AM - 8PM Monday - Saturday

    Permits may be granted for the contractor to work outside the hours outlined above. Night work will occur on Washington Anue between Oak Street and Huron Boulevard for the next month on Monday-Saturday, from 6 PM to 2 AM.

    Upcoming Public Meetings:Construction Information Meeting

    Wednesday, April 25th 3:00 - 4:00 PMHeld at Grace University Lutheran Church, 324 Harvard Street SE