Izmır University of Economics Departure Terminal Passenger Bottleneck Analysis Group Members: Academic Advisor: Industrial Advisor: Ethem AKA Tunçdan BALTACIOĞLU Erkan BALCI Zeynep Hande GÖLLÜ Özgür ÖZPEYNİRCİ Murat PEYNİRCİ Tuğçe KIRIŞMAN Öznur YURT Murat ÖZKARA Urszula LUBICKA Merve İNKAYA Gülnur ŞEKER 1
27

Tav project ppten yeni

Jan 17, 2015

Download

Business

Cagatay Culha

 
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Tav project ppten yeni

Izmır University of Economics

Departure Terminal Passenger Bottleneck

AnalysisGroup Members: Academic Advisor: Industrial Advisor:Ethem AKA Tunçdan BALTACIOĞLU Erkan BALCI Zeynep Hande GÖLLÜ Özgür ÖZPEYNİRCİ Murat PEYNİRCİTuğçe KIRIŞMAN Öznur YURT Murat ÖZKARAUrszula LUBICKAMerve İNKAYAGülnur ŞEKER

1

Page 2: Tav project ppten yeni

ContentsTAV Airports Holding Co.

TAV Airports Holding Companies

Proposal

Work Breakdown Structure

Gantt Chart

Bottleneck

Crowd Management

Proposed Problem

Conclusion

2

Page 3: Tav project ppten yeni

TAV Airports Holding Co.Joint venture:Tepe&Akfen-1997Global company:new projects&stronger financial structure

Target:Regional strength:•North Africa•Middle East•Eastern Europe•The Caucasus

3

Page 4: Tav project ppten yeni

TAV Airports Holding Companies

4

Page 5: Tav project ppten yeni

TAV İzmir Adnan Menderes International Airport Terminal

In May 2007 TAV / İzmir’s tourism potential •New and modern airport •Greater capacity.

5

Page 6: Tav project ppten yeni

Izmir Adnan MenderesAirportOperation Period : 8 Years 4 Months Terminal Passenger Capacity : 5 Million Passengers / Year Total Area : 110.000 M2 Parking Lot Capacity : 2237 Vehicles Check-in Counter : 66 Duty Free Area : 2360 M2 Food and Beverage : In 20 points, a total 4334 M2

6

Page 7: Tav project ppten yeni

ProposalProject Goal Reducing waiting time by 10 % in order to

design the crowd flow smoother and faster and simultaneously increase quality for the customer

Project`s Agent Bottlenecks occurring at certain points of the international terminal system of Izmir`s Airport

Project Owner & Sponsor Erkan Balcı (highest level administrator)Murat Özkara,Murat Peynirci

Stakeholder TAV; sister companies as: ATÜ, Havaş, BTA; customers (flight passengers and visitors); DHMI; airport police; business partners as the flight providers (Turkish Airlines, Lufthansa,…)

Project Place Izmir Airport – International TerminalEntrance areaCheck inPassport controlGate control

Time Line 11.10.2010 – 01.06.2011 7

Page 8: Tav project ppten yeni

Resources Required Advisor, project Group, project Client Quantitative & qualitative data collection (field research)Internet Research (desk research)

Decision Maker Project Client (strategic level), DHMI and airport police

Deliverables Homepage, reports, measurements, power point presentations

Assumption Sensors…Separation of passengers…Light signals…

Risks in order to accomplish project goal DHMI/ airport police rejecting measurements Being not able to take measures at peak timesFalse parametersExpensive solution suggestionRecommendation of the project group will be not transformed into practice…

Business Procedure Changes To achieve the project`s goal the business procedure will have to be reconstructed

8

Page 9: Tav project ppten yeni

BottleneckThe performance or capacity of an entire system is limited by a single or limited number of components or resourcesTaken from the 'assets are water‘ metaphor the bottleneck' that is limiting production or giving service

9

Page 10: Tav project ppten yeni

BottleneckIn project management is one process in a supply chain of processes

10

Page 11: Tav project ppten yeni

Crowd Management Crowd management factors’ :

•Facility size of the crowd

•Methods of entrance

•Communications

•Crowd control

•Queuing…The roles of parties involved in an eventThe quality of the advance intelligenceThe effectiveness

11

Page 12: Tav project ppten yeni

Crowd ManagementCrowd modeling for transport interchanges and queuing/circulation modeling and designIn research into terminal and platforms, analysis of a queuing system, analysis of crowds in railway stations

12

Page 13: Tav project ppten yeni

Proposed problemHow to reduce the waiting times in queues?The bottlenecks in :

I. Entering security checkII. Check- in queueIII. Passport queueIV. Gate security check processes

13

Page 14: Tav project ppten yeni

Enterance

SecurityCheck

X-Ray

Check-InContuer

PassportCheck-In

Gate SecurityCheck

14

X-Ra

y

Page 15: Tav project ppten yeni

MotivationsSpend much more time in the terminalMake profitCustomers’ Satisfaction 2 hours Legal Time Requirement

Longer this time period

Departure Time

15

Page 16: Tav project ppten yeni

What we do … ?Analysis of processesSimulation software programsMake simple innovations to make big differences

16

Page 17: Tav project ppten yeni

Work Breakdown StructureImprove Passengers Flow

Exploration

Meetings with TAV

Terminal Overall

Tour

Internet Research

Planning

Task Separatio

n

Measuring Methodol

ogy

Time Schedule

Measuring

Quantitative

Qualitative

Analysis

Simulation

Scenario Analysis

Evaluation of

Results

Findings &Conclusion

General Evaluatio

n

Recommendation

to Company

Suggestions

17

Page 18: Tav project ppten yeni

Gantt Chart

Exploration/ Preparation

Internet Research

Kickoff with TAV

Establishing Project`s homepage

International Terminal Visitation

29/09/2010

04/10/2010

09/10/2010

14/10/2010

19/10/2010

24/10/2010

29/10/2010

03/11/2010

18

7

1

15

1

Exploration/ Preparation

Series1

18

Page 19: Tav project ppten yeni

 

19

  Start End Duration Exploration/ Preparation 11.10.2010 29.10.2010 18 Internet Research 12.10.2010 19.10.2010 7 Kickoff with TAV 13.10.2010 13.10.2010 1 Establishing Project`s homepage 14.10.2010 29.10.2010 15 International Terminal Visitation 19.10.2010 19.10.2010 1 Planning 13.10.2010 01.11.2010 19 Proposal 25.10.2010 29.10.2010 4 Task Breakdown 25.10.2010 29.10.2010 4 Measurment Method 25.10.2010 05.11.2010 11 Time Schedule 25.10.2010 29.10.2010 4 Taking Measures 21.10.2010 17.12.2010 57 Qunatitative 21.10.2010 17.12.2010 57 Qualitative 02.11.2010 17.12.2010 45 Analysis 29.11.2010 24.12.2010 25 Simulation 06.12.2010 13.12.2010 7 Scenario Analysis 13.12.2010 24.12.2010 11 Presentations       Design Semester’s Final Reports 06.12.2010 28.12.2010 22

30-min Semester Report Presentations to Faculty 03.01.2011 03.01.2011 1 Final Report to all Stakeholders 01.06.2011 01.06.2011 1

Page 20: Tav project ppten yeni

20

Exploration/ Preparation

Internet Research

Kickoff with TAV

Establishing Project`s homepage

International Terminal Visitation

Planning

Proposal

Task Breakdown

Measurment Method

Time Schedule

Taking Measures

Qunatitative

Qualitative

Analysis

Simulation

Scenario Analysis

Presentations

Design Semester’s Final Reports

30-min Semester Report Presentations to Faculty

Final Report to all Stakeholders

29/09/2010

18/11/2010

07/01/2011

26/02/2011

17/04/2011

06/06/2011

18

7

1

15

1

19

4

4

11

4

57

57

45

25

7

11

22

1

1

Series1

Page 21: Tav project ppten yeni

Conclusion

Departure Terminal Passenger Bottleneck Analysis

Thanks For Your Attention !Group Members: Academic Advisor: Industrial Advisor:Ethem AKA Tunçdan BALTACIOĞLU Erkan BALCI Zeynp Hande GÖLLÜ Özgür ÖZPEYNİRCİ Murat PEYNİRCİTuğçe KIRIŞMAN Öznur YURT Murat ÖZKARAUrszula LUBICKAMerve İNKAYAGülnur ŞEKER

Izmır U

niv

ersity

Of E

conom

ics

21

Page 22: Tav project ppten yeni

TAV İstanbulAtatürk Airport

Gateway to the worldThe TAV completed the new International Terminal in January 2000In 2004/Passenger capacity increase from 14 million to 20 millionIn 2005/Take the operation of the Domestic TerminalThe Domestic Terminal extends to a total area of 62,500 square metersGet serve 7.5 million passengers per year

22

Page 23: Tav project ppten yeni

TAV AnatoliaEsenboğa Airport

It was completed the AirportDomestic ve International Terminal on October 16, 2006

Passenger capacity increased from 2 million to 10 million

23

Page 24: Tav project ppten yeni

TAV GeorgiaTbilisi Airport

Existing international airport andthe new international airportAirport will be opened for service on February 7, 2007The Batumi International Airport is expected to be opened in the first half of 2007.

24

Page 25: Tav project ppten yeni

HAVAŞ In July 2005, TAV acquired 60%of the stock of HAVAŞServices in passengerLuggage handlingLoading vehicles inspectionRamps, aircraft cleaningLoad inspection, communicationCargoFlight operationsHaulageRepresentationSurveillance.

25

Page 26: Tav project ppten yeni

BTA CateringThe food and beverage service

Partnership among the Bilintur,Tepe, and Akfen groups in 1999

In a day they are serving in a total of 100 cafés, bars, and restaurants

operating the Istanbul International Airport Hotel since 22 May 2004

26

Page 27: Tav project ppten yeni

ATÜATÜ (Tepe - Akfen - Unifree) Operates a total of 24 different stores in the worldBest-known brands

27