1.RMC is to be calculated by System, 2.For Calculation of RMC price should be g iven or for calculation of price RMC should provide by User 3.Unit Cost of Material should be taken by system from Standard price list based on Ram Mater ial 4.Unit Price of Ink is AED 0.40 per SQM 5.For UV/LAMI Cost, it calculated based on Varnish / Lamination requirement in Job. Price for L amination is 0.51 and Varnish is 0.15 6.Req Width field is validated from stock availability. Note– Standard Price List is editable list which can be modified as per revision of Price of Raw Material, Ink & Lamination or Varnish 7.Core ID is of three type so, please make drop down option for selection any of this three (76mm, 50mm, 44mm) 8.Also include Winding Option in Job Card like a.1 for Sleeping Clockwise Winding b.2 for Sleeping Anticlockwise Winding c.3 for Standing Clockwise Winding d.4 for Standing Anticlockwise Winding Note– for Label requirement in Set (Front & Back) then we required two winding in same t ime 9.Listing of Multiple Item in one job car d (for e.g. For Handwash Label we require multiple variants like apple, strawberry, orange etc ). 10.Printing of Job Card
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.