Top Banner
BLDG. 1500 BLDG. 1400 BLDG. 1300 BLDG. 1200 BLDG. 1100 BLDG. 2500 BLDG. 2300 BLDG. 2200 BLDG. 2100 BLDG. 2400 BLDG. 5041 BLDG. 5051 BLDG. 5000 BLDG. 5010 BLDG. 5020 BLDG. 1801 SOCCER FIELD SOCCER FIELD SOFTBALL FIELD STATE BUILDING JOE B. RUSHING ROAD CIRCLE DRIVE CIRCLE DRIVE STELLA ROWAN PRAIRIE ENTRANCE NO. DESCRIPTION DATE DATE: SHEET STATUS: PROJECT NUMBER: DRAWN BY: CHECKED BY: DESIGN BY: SCALE: TARRANT COUNTY RESOURCE CONNECTION SWITCHBOARD REPLACEMENTS - PHASE 3 1100 CIRCLE DR, FORT WORTH, TX 76119 MARCH 8, 2019 CONSTRUCTION 2019.010.000 6300 Ridglea Place, Suite 700 Fort Worth, TX 76116 [email protected] 817.338.1277 bhbinc.com TBPE Firm #44 TBPLS FIRM #10011300 Engineering & Surveying Baird, Hampton & Brown N LOCATION MAP N.T.S. SWITCHBOARD REPLACEMENTS - PHASE 3 TARRANT COUNTY RESOURCE CONNECTION SHEET LIST E0.1 COVER SHEET & SPECIFICATIONS E1.1 BUILDING 1400 SITE PLAN E1.2 BUILDING 5051 SITE PLAN E2.1 ELECTRICAL DETAILS E2.2 ELECTRICAL DETAILS NONE PM CP KR 1. PERFORM ALL WORK IN ACCORDANCE WITH ALL APPLICABLE NATIONAL AND LOCAL CODES AND CODE AUTHORITIES. 2. SUBMIT SHOP DRAWINGS ELECTRONICALLY FOR ALL MATERIAL FURNISHED UNDER THIS DIVISION OF WORK. SHOP DRAWINGS SHALL INCLUDE LAYOUTS GIVING DIMENSION, ELEVATIONS, WIRING, MOUNTING PROVISIONS AND CONDUIT ENTRANCE LOCATIONS. 3. SECURE AND PAY FOR ALL NECESSARY PERMITS, LICENSES AND INSPECTIONS REQUIRED BY LAW FOR THE COMPLETION OF THE WORK. SECURE AND PAY FOR ALL CERTIFICATES OF APPROVAL THAT ARE REQUIRED AND DELIVER THEM TO THE ENGINEER BEFORE FINAL ACCEPTANCE OF THE WORK. INCLUDE CITY'S PREMIUM FOR ALL INSPECTIONS PERFORMED AFTER HOURS IN BID. 4. IDENTIFY ELECTRICAL EQUIPMENT USING LAMINATED THREE-PLY, ENGRAVED, PLASTIC NAMEPLATES WITH BLACK SURFACE AND WHITE INTERIOR CORE, AT LEAST 1/16 INCH THICK. ATTACH NAMEPLATES USING CHROMIUM PLATED SCREWS. PROVIDE NAMEPLATES FOR SWITCHBOARDS AND FUSIBLE SWITCHES. 5. EXAMINE THE PROJECT SITE AND MAKE ALLOWANCES IN THE BID TO ACCOMMODATE EXISTING CONDITIONS. 6. ALL MATERIAL SHALL BE NEW, UL LISTED, AND FREE FROM DEFECTS, UNLESS EXISTING MATERIAL IS SPECIFICALLY SHOWN TO BE REUSED. INSTALL ALL MATERIAL IN ACCORDANCE WITH GOOD WORKMANSHIP STANDARDS. 7. SUBSTITUTIONS OF SPECIFIED MATERIAL SHALL BE APPROVED IN WRITING BY THE ENGINEER PRIOR TO BIDDING. 8. PROVIDE FACTORY FINISH ON ALL MATERIAL FURNISHED TO THE JOBSITE AND TOUCH UP FINISHES WHICH HAVE BEEN DAMAGED. 9. PROVIDE A COPY OF AS-BUILT PLANS TO THE OWNER UPON COMPLETION OF PROJECT. 10. MAINTAIN OPERATIONS OF ALL BUILDING SYSTEMS DURING CONSTRUCTION. COORDINATE ALL SHUTDOWNS OR SYSTEM DISRUPTIONS WITH OWNER SEVEN DAYS IN ADVANCE. 11. USE RIGID GALVANIZED STEEL CONDUIT FOR EXPOSED WORK BELOW SWITCH HEIGHT. 12. USE COPPER CONDUCTORS, TYPE THHN INSULATION, OR APPROVED EQUAL. USE SOLID CONDUCTORS FOR #10 AWG AND SMALLER AND STRANDED CONDUCTORS FOR #8 AWG AND LARGER. ALUMINUM CONDUCTORS ARE NOT ACCEPTABLE. 13. PROVIDE CONNECTIONS TO ALL EQUIPMENT FURNISHED UNDER THIS CONTRACT AND BY OTHER DIVISIONS OF THE WORK. MAKE ALL CONNECTIONS AS RECOMMENDED BY THE MANUFACTURER AND AS REQUIRED BY APPLICABLE CODES. 14. MAKE SPLICES AND PROVIDE WORK AS REQUIRED TO MAINTAIN CIRCUIT CONTINUITY TO EXISTING DEVICES AND EQUIPMENT TO REMAIN IN SERVICE. 15. REMOVE ALL EXISTING CONDUCTORS, CABLES AND EXPOSED CONDUIT RENDERED UNUSED BY THE SCOPE OF THIS PROJECT BACK TO THE SOURCE OF SUPPLY. 16. FUSES SHALL BE CURRENT LIMITING, WITH 200,000 R.M.S. SYMMETRICAL AMPERES INTERRUPTING RATING AND SHALL BE UL LISTED. ALL FUSES SHALL BE OF THE SAME MANUFACTURER. FUSES 600 AMPERES AND SMALLER SHALL BE CLASS RK1, DUAL ELEMENT EQUAL TO BUSSMANN LPS-RK. 17. COORDINATE WITH CITY OF FORT WORTH TO HAVE INTERIM INSPECTIONS UPON RECEIVING SWITCHBOARDS AND DURING REPLACEMENT OF SWITCHBOARDS. 1. PROVIDE A SWITCHBOARD CONSISTING OF THE REQUIRED NUMBER OF VERTICAL SECTIONS BOLTED TOGETHER TO FORM ONE METAL ENCLOSED, RIGID SWITCHBOARD WITH THE FOLLOWING FEATURES: A. THE SIDES, TOP AND REAR COVERED WITH REMOVABLE SCREW-ON CODE GAUGE STEEL PLATES. B. INCLUDE ALL PROTECTIVE DEVICES AND EQUIPMENT AS LISTED ON DRAWINGS WITH NECESSARY INTERCONNECTIONS. C. TIN-PLATED ALUMINUM BUS. D. BUS BARS MOUNTED ON SUPPORTS OF HIGH IMPACT NON-TRACKING INSULATION MATERIAL BRACED TO WITHSTAND MECHANICAL FORCES EXERTED DURING 100,000 AMP RMS SYMMETRICAL SHORT CIRCUIT CONDITIONS. E. WEATHERPROOF, NON-WALK-IN, ENCLOSURE 2. CHEMICALLY CLEAN STEEL SURFACES AND TREAT TO AID BONDING BETWEEN PAINT AND METAL SURFACES. PROVIDE HIGH TENSILE STRENGTH HARDWARE ON CONDUCTORS AND A SUITABLE PROTECTIVE FINISH. 3. SECURE A GROUND BUS TO EACH VERTICAL SECTION OF STRUCTURES AND EXTEND IT THE ENTIRE LENGTH OF THE SWITCHBOARD. 4. USE A-B-C TYPE BUS ARRANGEMENT - LEFT-TO-RIGHT, TOP-TO-BOTTOM AND FRONT-TO-REAR THROUGHOUT. SWITCHBOARD SHALL BE ENTIRELY ACCESSIBLE FROM THE FRONT, INCLUDING CABLE AND BUS CONNECTIONS, UNLESS SPECIFICALLY NOTED OTHERWISE. 5. PROVIDE GROUP MOUNTED, QUICK-MAKE, AND QUICK-BREAK PROTECTIVE DEVICES WITH BAR CONNECTION STRAPS, WITH DEVICE LINE AND LOAD CONNECTIONS ACCESSIBLE FROM THE FRONT. WHERE "SPACES" ARE SCHEDULED FURNISH ENTIRE BUS EXCEPT DEVICE CONNECTING STRAPS. PROVIDE FULL HEIGHT WIRING GUTTER COVERS FOR QUICK ACCESS TO WIRING TERMINALS. 6. PROVIDE SWITCHBOARDS MEETING UL STANDARD #UL891 AND NEMA STANDARD PB-2. THE UL LABEL SHALL APPEAR ON ALL SWITCHBOARD SECTIONS THAT CONTAIN UL LISTED DEVICES. ELECTRICAL SPECIFICATIONS: SWITCHBOARD SPECIFICATION NOTES: E0.1 of 5 E ALTERNATE 1: PROVIDE SPARE SPECTRA ADS SWITCH MODULES AS FOLLOWS: QTY 2 - 30A 3P DOUBLE SWITCH MODULES QTY 2 - 60A 3P DOUBLE SWITCH MODULES QTY 2 - 100A 3P DOUBLE SWITCH MODULES QTY 2 - 200A 3P DOUBLE SWITCH MODULES QTY 2 - 400A 3P DOUBLE SWITCH MODULES QTY 2 - 600A 3P DOUBLE SWITCH MODULES 3/8/2019
5

SWITCHBOARD REPLACEMENTS - PHASE 3 - Tarrant County, Texas

May 14, 2022

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: SWITCHBOARD REPLACEMENTS - PHASE 3 - Tarrant County, Texas

BLDG. 1500

BLDG. 1400

BLDG. 1300

BLDG. 1200

BLDG1100

BLDG.1100

BLDG. 2500

BLDG.2300

BLDG.2200

BLDG.2100

BLDG.2400

BLDG.5041

BLDG.5051

BLDG.5000

BLDG.5010

BLDG.5020

BLDG.1801

SOCCER FIELD

SOCCER FIELD

SOFTBALL FIELD

STATE BUILDING

JOE B. RUSHING ROAD

CIRCLE DRIVE

CIRCLE DRIVE

STELLA ROWANPRAIRIE ENTRANCE

NO. DESCRIPTION DATE

DATE:

SHEET

STATUS:PROJECT NUMBER:

DRAWN BY:CHECKED BY:

DESIGN BY:SCALE:

TAR

RA

NT

CO

UN

TY R

ES

OU

RC

E C

ON

NE

CTI

ON

SW

ITC

HB

OA

RD

RE

PLA

CE

ME

NTS

- P

HA

SE

3

1100

CIR

CLE

DR

, FO

RT

WO

RTH

, TX

761

19

MARCH 8, 2019CONSTRUCTION

2019.010.000

6300

Rid

glea

Pla

ce, S

uite

700

Fort

Wor

th, T

X 7

6116

mai

l@bh

binc

.com

8

17.3

38.1

277

b

hbin

c.co

mTB

PE

Firm

#44

TB

PLS

FIR

M #

1001

1300

Engi

neer

ing

& S

urve

ying

Bai

rd,

Ham

pton

& B

rown

NLOCATION MAPN.T.S.

SWITCHBOARD REPLACEMENTS - PHASE 3

TARRANT COUNTY RESOURCE CONNECTION

SHEET LIST

E0.1 COVER SHEET & SPECIFICATIONS

E1.1 BUILDING 1400 SITE PLAN

E1.2 BUILDING 5051 SITE PLAN

E2.1 ELECTRICAL DETAILS

E2.2 ELECTRICAL DETAILS

NONEPMCPKR

1. PERFORM ALL WORK IN ACCORDANCE WITH ALL APPLICABLE NATIONAL AND LOCAL CODES AND CODE AUTHORITIES.

2. SUBMIT SHOP DRAWINGS ELECTRONICALLY FOR ALL MATERIAL FURNISHED UNDER THIS DIVISION OF WORK. SHOP DRAWINGSSHALL INCLUDE LAYOUTS GIVING DIMENSION, ELEVATIONS, WIRING, MOUNTING PROVISIONS AND CONDUIT ENTRANCELOCATIONS.

3. SECURE AND PAY FOR ALL NECESSARY PERMITS, LICENSES AND INSPECTIONS REQUIRED BY LAW FOR THE COMPLETION OFTHE WORK. SECURE AND PAY FOR ALL CERTIFICATES OF APPROVAL THAT ARE REQUIRED AND DELIVER THEM TO THEENGINEER BEFORE FINAL ACCEPTANCE OF THE WORK. INCLUDE CITY'S PREMIUM FOR ALL INSPECTIONS PERFORMED AFTERHOURS IN BID.

4. IDENTIFY ELECTRICAL EQUIPMENT USING LAMINATED THREE-PLY, ENGRAVED, PLASTIC NAMEPLATES WITH BLACK SURFACEAND WHITE INTERIOR CORE, AT LEAST 1/16 INCH THICK. ATTACH NAMEPLATES USING CHROMIUM PLATED SCREWS. PROVIDENAMEPLATES FOR SWITCHBOARDS AND FUSIBLE SWITCHES.

5. EXAMINE THE PROJECT SITE AND MAKE ALLOWANCES IN THE BID TO ACCOMMODATE EXISTING CONDITIONS.

6. ALL MATERIAL SHALL BE NEW, UL LISTED, AND FREE FROM DEFECTS, UNLESS EXISTING MATERIAL IS SPECIFICALLY SHOWN TOBE REUSED. INSTALL ALL MATERIAL IN ACCORDANCE WITH GOOD WORKMANSHIP STANDARDS.

7. SUBSTITUTIONS OF SPECIFIED MATERIAL SHALL BE APPROVED IN WRITING BY THE ENGINEER PRIOR TO BIDDING.

8. PROVIDE FACTORY FINISH ON ALL MATERIAL FURNISHED TO THE JOBSITE AND TOUCH UP FINISHES WHICH HAVE BEENDAMAGED.

9. PROVIDE A COPY OF AS-BUILT PLANS TO THE OWNER UPON COMPLETION OF PROJECT.

10. MAINTAIN OPERATIONS OF ALL BUILDING SYSTEMS DURING CONSTRUCTION. COORDINATE ALL SHUTDOWNS OR SYSTEMDISRUPTIONS WITH OWNER SEVEN DAYS IN ADVANCE.

11. USE RIGID GALVANIZED STEEL CONDUIT FOR EXPOSED WORK BELOW SWITCH HEIGHT.

12. USE COPPER CONDUCTORS, TYPE THHN INSULATION, OR APPROVED EQUAL. USE SOLID CONDUCTORS FOR #10 AWG ANDSMALLER AND STRANDED CONDUCTORS FOR #8 AWG AND LARGER. ALUMINUM CONDUCTORS ARE NOT ACCEPTABLE.

13. PROVIDE CONNECTIONS TO ALL EQUIPMENT FURNISHED UNDER THIS CONTRACT AND BY OTHER DIVISIONS OF THE WORK.MAKE ALL CONNECTIONS AS RECOMMENDED BY THE MANUFACTURER AND AS REQUIRED BY APPLICABLE CODES.

14. MAKE SPLICES AND PROVIDE WORK AS REQUIRED TO MAINTAIN CIRCUIT CONTINUITY TO EXISTING DEVICES AND EQUIPMENTTO REMAIN IN SERVICE.

15. REMOVE ALL EXISTING CONDUCTORS, CABLES AND EXPOSED CONDUIT RENDERED UNUSED BY THE SCOPE OF THIS PROJECTBACK TO THE SOURCE OF SUPPLY.

16. FUSES SHALL BE CURRENT LIMITING, WITH 200,000 R.M.S. SYMMETRICAL AMPERES INTERRUPTING RATING AND SHALL BE ULLISTED. ALL FUSES SHALL BE OF THE SAME MANUFACTURER. FUSES 600 AMPERES AND SMALLER SHALL BE CLASS RK1, DUALELEMENT EQUAL TO BUSSMANN LPS-RK.

17. COORDINATE WITH CITY OF FORT WORTH TO HAVE INTERIM INSPECTIONS UPON RECEIVING SWITCHBOARDS AND DURINGREPLACEMENT OF SWITCHBOARDS.

1. PROVIDE A SWITCHBOARD CONSISTING OF THE REQUIRED NUMBER OF VERTICAL SECTIONS BOLTED TOGETHER TO FORMONE METAL ENCLOSED, RIGID SWITCHBOARD WITH THE FOLLOWING FEATURES:

A. THE SIDES, TOP AND REAR COVERED WITH REMOVABLE SCREW-ON CODE GAUGE STEEL PLATES.

B. INCLUDE ALL PROTECTIVE DEVICES AND EQUIPMENT AS LISTED ON DRAWINGS WITH NECESSARY INTERCONNECTIONS.

C. TIN-PLATED ALUMINUM BUS.

D. BUS BARS MOUNTED ON SUPPORTS OF HIGH IMPACT NON-TRACKING INSULATION MATERIAL BRACED TO WITHSTANDMECHANICAL FORCES EXERTED DURING 100,000 AMP RMS SYMMETRICAL SHORT CIRCUIT CONDITIONS.

E. WEATHERPROOF, NON-WALK-IN, ENCLOSURE

2. CHEMICALLY CLEAN STEEL SURFACES AND TREAT TO AID BONDING BETWEEN PAINT AND METAL SURFACES. PROVIDE HIGHTENSILE STRENGTH HARDWARE ON CONDUCTORS AND A SUITABLE PROTECTIVE FINISH.

3. SECURE A GROUND BUS TO EACH VERTICAL SECTION OF STRUCTURES AND EXTEND IT THE ENTIRE LENGTH OF THESWITCHBOARD.

4. USE A-B-C TYPE BUS ARRANGEMENT - LEFT-TO-RIGHT, TOP-TO-BOTTOM AND FRONT-TO-REAR THROUGHOUT. SWITCHBOARDSHALL BE ENTIRELY ACCESSIBLE FROM THE FRONT, INCLUDING CABLE AND BUS CONNECTIONS, UNLESS SPECIFICALLYNOTED OTHERWISE.

5. PROVIDE GROUP MOUNTED, QUICK-MAKE, AND QUICK-BREAK PROTECTIVE DEVICES WITH BAR CONNECTION STRAPS, WITHDEVICE LINE AND LOAD CONNECTIONS ACCESSIBLE FROM THE FRONT. WHERE "SPACES" ARE SCHEDULED FURNISH ENTIREBUS EXCEPT DEVICE CONNECTING STRAPS. PROVIDE FULL HEIGHT WIRING GUTTER COVERS FOR QUICK ACCESS TO WIRINGTERMINALS.

6. PROVIDE SWITCHBOARDS MEETING UL STANDARD #UL891 AND NEMA STANDARD PB-2. THE UL LABEL SHALL APPEAR ON ALLSWITCHBOARD SECTIONS THAT CONTAIN UL LISTED DEVICES.

ELECTRICAL SPECIFICATIONS:

SWITCHBOARD SPECIFICATION NOTES:

E0.1of 5 E

ALTERNATE 1:

PROVIDE SPARE SPECTRA ADS SWITCH MODULES AS FOLLOWS:QTY 2 - 30A 3P DOUBLE SWITCH MODULESQTY 2 - 60A 3P DOUBLE SWITCH MODULESQTY 2 - 100A 3P DOUBLE SWITCH MODULESQTY 2 - 200A 3P DOUBLE SWITCH MODULESQTY 2 - 400A 3P DOUBLE SWITCH MODULESQTY 2 - 600A 3P DOUBLE SWITCH MODULES

3/8/2019

Page 2: SWITCHBOARD REPLACEMENTS - PHASE 3 - Tarrant County, Texas

BLDG. 1400

BLDG. 1300

1

2

EXISTING SWITCHBOARD 4100

EXISTING TRANSFORMER 4100

EXISTING IRRIGATION CONTROLS

3

CAMPUS KEY PLAN

BLDG. 1500

BLDG. 1400

BLDG. 1300

BLDG. 1200

BLDG1100

BLDG.1100

BLDG. 2500

BLDG.2300

BLDG.2200

BLDG.2100

BLDG.2400

BLDG.5041

BLDG.5051

BLDG.5000

BLDG.5010

BLDG.5020

BLDG.1801

SOCCER FIELD

SOCCER FIELD

SOFTBALL FIELD

STATE BUILDING

JOE B. RUSHING ROAD

CIRCLE DRIVE

CIRCLE DRIVE

STELLA ROWANPRAIRIE ENTRANCE

NO. DESCRIPTION DATE

DATE:

SHEET

STATUS:PROJECT NUMBER:

DRAWN BY:CHECKED BY:

DESIGN BY:SCALE:

TAR

RA

NT

CO

UN

TY R

ES

OU

RC

E C

ON

NE

CTI

ON

SW

ITC

HB

OA

RD

RE

PLA

CE

ME

NTS

- P

HA

SE

3

1100

CIR

CLE

DR

, FO

RT

WO

RTH

, TX

761

19

MARCH 8, 2019CONSTRUCTION

2019.010.000

6300

Rid

glea

Pla

ce, S

uite

700

Fort

Wor

th, T

X 7

6116

mai

l@bh

binc

.com

8

17.3

38.1

277

b

hbin

c.co

mTB

PE

Firm

#44

TB

PLS

FIR

M #

1001

1300

Engi

neer

ing

& S

urve

ying

Bai

rd,

Ham

pton

& B

rown

0

GRAPHIC SCALE

20 10 20 40

N

1. RE-USE AND LEVEL EXISTING CONCRETE PAD AND EXTEND NORTH ASREQUIRED TO ACCOMMODATE NEW SWITCHBOARD SIZE. RELOCATEEXISTING METER LOCATED ON SIDE OF SWITCHBOARD TO NEW UNISTRUTSTAND LOCATED NEXT TO SWITCHBOARD. REPLACE SWITCHBOARD 1400WITH BOARD AS SHOWN IN DETAIL 1, SHEET E2.1. PLACE NEWSWITCHBOARD OPENINGS OVER EXISTING CONDUIT PENETRATIONS TOBEST EXTENT POSSIBLE. MAKE SPLICES AND EXTEND CONDUCTORS TONEW SWITCH LOCATIONS PER NEW SWITCHBOARD CONFIGURATION.RETURN OLD SWITCHBOARD PARTS AND FUSES TO OWNER AT 5051RESOURCE DRIVE FOR ATTIC STOCK.

2. PROVIDE UNISTRUT STAND WITH CONCRETE PAD AT THIS LOCATION FORRELOCATED METER AND ELECTRICAL EQUIPMENT. EXTEND ASSOCIATEDCONDUITS AND CONDUCTORS TO NEW LOCATION.

3. REPLACE EXISTING #3/0 NEUTRAL CONDUCTORS BETWEEN TRANSFORMERAND NEW SWITCHBOARD WITH #500KCMIL NEUTRAL CONDUCTORS.

NOTES BY SYMBOL: " " #

BUILDING 1400 SITE PLAN1

BUILDING 1400 SITE PLAN

E1.1SEE PLAN

PMCPKR of 5 E

1. AVOID DRIVING AND/OR MOVING HEAVY EQUIPMENT ON GRASS. REPLACEOR REPAIR ANY GRASS AND IRRIGATION DAMAGED DURINGCONSTRUCTION.

2. PERFORM BUILDING SHUTDOWN ON A SUNDAY. POWER MUST BEOPERATIONAL BY SIX HOURS BEFORE BUILDING OPENING ON MONDAY.PERFORM SHUTDOWN SO THAT BUILDING 1400 OUTAGE IS ISOLATED ANDREMAINDER OF CAMPUS REMAINS ENERGIZED.

3. REFER TO DETAILS 2 AND 3, SHEET E2.1 FOR EXISTING CONCRETE PAD ANDSWITCHBOARD DIMENSIONS AND SWITCHBOARD FRONT ELEVATION.

SHEET NOTES:

3/8/2019

Page 3: SWITCHBOARD REPLACEMENTS - PHASE 3 - Tarrant County, Texas

NO. DESCRIPTION DATE

DATE:

SHEET

STATUS:PROJECT NUMBER:

DRAWN BY:CHECKED BY:

DESIGN BY:SCALE:

TAR

RA

NT

CO

UN

TY R

ES

OU

RC

E C

ON

NE

CTI

ON

SW

ITC

HB

OA

RD

RE

PLA

CE

ME

NTS

- P

HA

SE

3

1100

CIR

CLE

DR

, FO

RT

WO

RTH

, TX

761

19

MARCH 8, 2019CONSTRUCTION

2019.010.000

6300

Rid

glea

Pla

ce, S

uite

700

Fort

Wor

th, T

X 7

6116

mai

l@bh

binc

.com

8

17.3

38.1

277

b

hbin

c.co

mTB

PE

Firm

#44

TB

PLS

FIR

M #

1001

1300

Engi

neer

ing

& S

urve

ying

Bai

rd,

Ham

pton

& B

rown

ELECTRICAL DETAILS

E2.2SEE PLAN

PMCPLJ of 5 E

200A2P

200A2P

SERVICE POLE

ADAPTER

MAINSWITCHGEAR

BUILDING 1801

SPARE

4" RIGID GALV.CONDUIT

CONE. BUSHINGBOLT-ON CONNECTIONSALL TRANSFORMERS

XFMR 5051300 KVA SWBD 5051

JUNCTIONENCLOSURE

JUNCTIONENCLOSURE

JUNCTIONENCLOSURE

FEED THRU BUSHINGS WITHLOAD BREAK ELBOWSALL JUNCTION ENCLOSURES

PULLING BELLS-TYPICAL

XFMR 5041225 KVA TX.

SWBD 1801XFMR 1801150 KVA

BUILDING 5051JUNCTION

ENCLOSURE BUILDING 5041

JUNCTIONENCLOSURE

BUILDING 1200 BUILDING 1300 BUILDING 1400 BUILDING 1500

SWBD 1400SWBD 1300SWBD 1200 SWBD 1500

SWBD 2300 SWBD 2100/2200SWBD 2400SWBD 2500SWBD 1100

XFMR 1200500 KVA TX.

XFMR 1300500 KVA TX.

XFMR 1400500 KVA TX.

XFMR 1500500 KVA TX.

BUILDINGS 2100 & 2200BUILDING 2300JUNCTIONENCLOSURE

BUILDING 2400BUILDING 2500

BUILDING 1100

JUNCTIONENCLOSURE

XFMR 1100225 KVA TX.

XFMR 2500500 KVA TX.

XFMR 2400300 KVA TX.

XFMR 2300300 KVA TX.

XFMR 2100/2200500 KVA TX.

2-4" P.V.C. DUCTSONE WITH 3# 4/015KV INSUL. COPPER -1 #2 600V INSUL. COPPER

2-4"C. FORFUTURE EXTENSIONOF LOOP.

2-4"C. FORFUTURE EXTENSIONOF LOOP.

THIS COND. TOBE ABANDONEDWHEN LOOP ISEXTENDED.

SEE NOTE 1

XFMR 5000500KVA

BUILDING 5000JUNCTION

ENCLOSUREJUNCTION

ENCLOSUREJUNCTION

ENCLOSUREJUNCTION

ENCLOSURE

SWBD 5041

JUNCTIONENCLOSURE

JUNCTIONENCLOSURE

JUNCTIONENCLOSURE

SWBD 5000

200A2P

600A3P

CAMPUS ONE LINE DIAGRAM1NOT TO SCALE

2 SPARE 4" C.

80KW GENERATORAUTOMATIC

TRANSFER SWITCH PANEL P1

LNE

80KW GENERATORAUTOMATICTRANSFER SWITCH

ENL

PANEL A

350A3P

60KW GENERATOR AUTOMATICTRANSFER SWITCH

LNE

PANEL

250KW GENERATORAUTOMATIC

TRANSFER SWITCH

1600ADISCONNECT

SWITCH

LNE

NOTE: NORMALLY OPEN POINT INLOOP IS LOCATED AT THISBUILDING 2500.

3/8/2019

Page 4: SWITCHBOARD REPLACEMENTS - PHASE 3 - Tarrant County, Texas

BLDG.5051

1 EXISTING SWITCHBOARD 5051

EXISTING TRANSFORMER 50512

3

CAMPUS KEY PLAN

BLDG. 1500

BLDG. 1400

BLDG. 1300

BLDG. 1200

BLDG1100

BLDG.1100

BLDG. 2500

BLDG.2300

BLDG.2200

BLDG.2100

BLDG.2400

BLDG.5041

BLDG.5051

BLDG.5000

BLDG.5010

BLDG.5020

BLDG.1801

SOCCER FIELD

SOCCER FIELD

SOFTBALL FIELD

STATE BUILDING

JOE B. RUSHING ROAD

CIRCLE DRIVE

CIRCLE DRIVE

STELLA ROWANPRAIRIE ENTRANCE

NO. DESCRIPTION DATE

DATE:

SHEET

STATUS:PROJECT NUMBER:

DRAWN BY:CHECKED BY:

DESIGN BY:SCALE:

TAR

RA

NT

CO

UN

TY R

ES

OU

RC

E C

ON

NE

CTI

ON

SW

ITC

HB

OA

RD

RE

PLA

CE

ME

NTS

- P

HA

SE

3

1100

CIR

CLE

DR

, FO

RT

WO

RTH

, TX

761

19

MARCH 8, 2019CONSTRUCTION

2019.010.000

6300

Rid

glea

Pla

ce, S

uite

700

Fort

Wor

th, T

X 7

6116

mai

l@bh

binc

.com

8

17.3

38.1

277

b

hbin

c.co

mTB

PE

Firm

#44

TB

PLS

FIR

M #

1001

1300

Engi

neer

ing

& S

urve

ying

Bai

rd,

Ham

pton

& B

rown

0

GRAPHIC SCALE

20 10 20 40

N

BUILDING 5051 SITE PLAN1

BUILDING 5051 SITE PLAN

E1.2SEE PLAN

PMCPKR of 5 E

1. RE-USE AND LEVEL EXISTING CONCRETE PAD AND EXTEND TOWARDSBUILDING 5051 AS REQUIRED TO ACCOMMODATE NEW SWITCHBOARD SIZE.RELOCATE EXISTING METER LOCATED ON SIDE OF SWITCHBOARD TO NEWUNISTRUT STAND LOCATED NEXT TO SWITCHBOARD. REPLACESWITCHBOARD 5051 WITH BOARD AS SHOWN IN DETAIL 4, SHEET E2.1.PLACE NEW SWITCHBOARD OPENINGS OVER EXISTING CONDUITPENETRATIONS TO BEST EXTENT POSSIBLE. MAKE SPLICES AND EXTENDCONDUCTORS TO NEW SWITCH LOCATIONS PER NEW SWITCHBOARDCONFIGURATION. RETURN OLD SWITCHBOARD PARTS AND FUSES TOOWNER AT 5051 RESOURCE DRIVE FOR ATTIC STOCK.

2. PROVIDE UNISTRUT STAND WITH CONCRETE PAD AT THIS LOCATION FORRELOCATED METER AND ELECTRICAL EQUIPMENT. EXTEND ASSOCIATEDCONDUITS AND CONDUCTORS TO NEW LOCATION.

3. REPLACE EXISTING #3/0 NEUTRAL CONDUCTORS BETWEEN TRANSFORMERAND NEW SWITCHBOARD WITH #500KCMIL NEUTRAL CONDUCTORS.

NOTES BY SYMBOL: " " #

1. AVOID DRIVING AND/OR MOVING HEAVY EQUIPMENT ON GRASS. REPLACEOR REPAIR ANY GRASS AND IRRIGATION DAMAGED DURINGCONSTRUCTION.

2. PERFORM BUILDING SHUTDOWN ON A SUNDAY. POWER MUST BEOPERATIONAL BY SIX HOURS BEFORE BUILDING OPENING ON MONDAY.PERFORM SHUTDOWN SO THAT BUILDING 5051 OUTAGE IS ISOLATED ANDREMAINDER OF CAMPUS REMAINS ENERGIZED.

3. REFER TO DETAILS 5 AND 6, SHEET E2.1 FOR EXISTING CONCRETE PAD ANDSWITCHBOARD DIMENSIONS AND SWITCHBOARD FRONT ELEVATION.

SHEET NOTES:

3/8/2019

Page 5: SWITCHBOARD REPLACEMENTS - PHASE 3 - Tarrant County, Texas

131"

105.5"

62"

30"

114.5"

100.5"

62"

30"

NO. DESCRIPTION DATE

DATE:

SHEET

STATUS:PROJECT NUMBER:

DRAWN BY:CHECKED BY:

DESIGN BY:SCALE:

TAR

RA

NT

CO

UN

TY R

ES

OU

RC

E C

ON

NE

CTI

ON

SW

ITC

HB

OA

RD

RE

PLA

CE

ME

NTS

- P

HA

SE

3

1100

CIR

CLE

DR

, FO

RT

WO

RTH

, TX

761

19

MARCH 8, 2019CONSTRUCTION

2019.010.000

6300

Rid

glea

Pla

ce, S

uite

700

Fort

Wor

th, T

X 7

6116

mai

l@bh

binc

.com

8

17.3

38.1

277

b

hbin

c.co

mTB

PE

Firm

#44

TB

PLS

FIR

M #

1001

1300

Engi

neer

ing

& S

urve

ying

Bai

rd,

Ham

pton

& B

rown

ELECTRICAL DETAILS

E2.1SEE PLAN

PMCPKR of 5 E

FIRE ALARM30 AF

PANEL A/C F400 AF1600 A

MAIN

PANEL P1200 AF

30" 45" 40"30.5"

3 EXISTING SWITCHBOARD 1400 FRONT ELEVATIONNOT TO SCALE

2 EXISTING PAD AND SWITCHBOARD 1400 DIMENSIONSSCALE: 1/2" = 1'-0"

1 NEW SWITCHBOARD 1400 FRONT ELEVATIONNOT TO SCALE

1. FIELD VERIFY CONDUCTOR SIZE & QUANTITY REQUIRED BEFOREORDERING SWITCHBOARD.

2. FILL ANY SWITCHBOARD PAD PENETRATIONS LEFT EXPOSED AS RESULTOF SMALLER SWITCHBOARD.

3. VERIFY PHASE ROTATION AT BUILDING BEFORE DE-ENERGIZING EXISTINGSWITCHBOARD. MAINTAIN EXISTING PHASE ROTATION WHEN INSTALLINGNEW SWITCHBOARD AND CONNECTING EXISTING CONDUCTORS.

NOTE:

GE SPECTRA SERIES ADSFUSIBLE SWITCHBOARDSERVICE ENTRANCE LABEL3P/4W, 208/120V1600A, 65KAIC FULLY RATEDBOTTOM FED, NEMA 3R

EM. LTG30 AF

PANEL A/C DE400 AF

PANEL A/C C400 AF

PANEL A/C AB400 AF

PANEL P2200 AF

PANEL L8200 AF

PANEL L7100 AF

A/C F400 AF

1600AMAIN

A/C DE400 AF

A/C C400 AF

A/C AB400 AF

2X SPACE

1X SPACE

2X SPACE

1X SPACE

30 AFFIRE ALARM

30 AFEM. LTG

100 AFPANEL 'L7' BLANK

30 AF600 AF BLANK

6X SPACE

PANEL L8200 AF

PANEL P2200 AF

PANEL P1200 AF

FIRE ALARM30 AF

PANEL P4400 AF1200 A

MAIN

30" 45" 40"30.5"

6 EXISTING SWITCHBOARD 5051 FRONT ELEVATIONNOT TO SCALE

5 EXISTING PAD AND SWITCHBOARD 5051 DIMENSIONSSCALE: 1/2" = 1'-0"

4 NEW SWITCHBOARD 5051 FRONT ELEVATIONNOT TO SCALE

1. FIELD VERIFY CONDUCTOR SIZE & QUANTITY REQUIRED BEFOREORDERING SWITCHBOARD.

2. FILL ANY SWITCHBOARD PAD PENETRATIONS LEFT EXPOSED AS RESULTOF SMALLER SWITCHBOARD.

3. VERIFY PHASE ROTATION AT BUILDING BEFORE DE-ENERGIZING EXISTINGSWITCHBOARD. MAINTAIN EXISTING PHASE ROTATION WHEN INSTALLINGNEW SWITCHBOARD AND CONNECTING EXISTING CONDUCTORS.

NOTE:

GE SPECTRA SERIES ADSFUSIBLE SWITCHBOARDSERVICE ENTRANCE LABEL3P/4W, 208/120V1600A, 65KAIC FULLY RATEDBOTTOM FED, NEMA 3R

EM. LTG30 AF

PANEL P3400 AF

PANEL P2400 AF

PANEL L1100 AF

1200AMAIN

PANEL P4400 AF

PANEL P3400 AF

PANEL P2400 AF

2X SPACE

2X SPACE

1X SPACE

30 AFMETER

30 AFMETER

60 AFPANEL 'L3' BLANK

100 AFPANEL 'L1

6X SPACE

PANEL P1200 AF

PANEL L2100 AF

PANEL L360 AF

PANEL P1200 AF

METER

1X SPACE

6X SPACE

30 AFFIRE ALARM

30 AFEM. LTG

6X SPACE

6X SPACE

3X SPACE

100 AFPANEL 'L2'

3/8/2019