Binghamton, NY Client: SUCF SUNY Binghamton Value: $4,900,000 Size: 16,000 SF Completion: January 2012 - Ph I December 2012 - Ph II April 2013 - Ph III Contact: Robert Langhans BU Project Coordinator (607) 777.4321 SUNY BINGHAMTON SCIENCE III PROGRAM & RENOVATION FE FE FE FE FE FE FE FE FE DN RAMP DN RAMP DN RAMP DN UP FVC Cage Wash Bottle Wash (NIC) Autoclave (NIC) Cage Wash 1SB Stair 1 BE1 Elev 1 BE2 Elev 2 B45 Elev Mach Room BE1 Receiving Storage B47 Mechanical B46 Receiving Loading Dock Specialty Animal Holding 023 Procedure / Animal Holding 024 Procedure / Animal Holding 025 Animal Treatment 027 Lab 030 Control Room 032A Radiology 032 Dark Room 032B Necropsy 029 Animal Receiving / Exam 026 Food / Bedding Storage 020 Corridor C002 Storage 019 Dirty Cage Wash 017 Euthanasia 018 Quarantine/ Animal Holding 021 Quarantine/ Animal Holding 022 Clean Cage Storage 028 Changing Room 031A Surgeon Prep 031B Clean Cage Wash 016 Clean Cage Storage 016A Wood Shop 034 Wood Shop Storage 033 Operating Room 031D Animal Prep 031C Recovery 031E LAR Office 015 Men's Locker Room 014 Women's Locker Room 013 Vet Tech Office 012 Laundry 011A Breakroom / Kitchenette 011 Elevator Machine Rm 010 Elevator Lobby 009 Corridor C001 Metal Shop 008 Shop Office / Clean Room 002 Metal Shop Storage 003 Janitorial 004 Building Operations Office / Shop 005 Med Waste Storage 006 Med Waste Office 007 Loading Dock Corridor C002 Corridor C002 Mort. Refrid. NIC Grossing Station NIC F.E.C. F.E.C. F.E.C. F.E.C. B01 Corridor EXISTING CAGEWASH MECHANICAL ANIMAL CARE OFFICE DIAGNOSTICS RESTROOM RADIOLOGY SHOP HOLDING SOCIAL CAGEPREP STORAGE SUPPORT CIRCULATION SURGERY PHASE III PHASE I & II • Multi-phase programming and renovation of Science III Laboratory Animal Resources Facility at Binghamton University • Extensive existing conditions assessment & space analysis • Development of various design layouts based on input from user group meetings and program requirements • Specialty spaces including surgery and radiology suites, holding rooms, exam rooms, labs and research spaces, cage wash operations, offices and support spaces • Project includes three construction phases to ensure the uninterrupted operation of the cage wash facilities and accommodate strict research schedule