Summer Plan: 2013 Summer Plan: 2013 (1 st March – 31 st May) Prepared by Mr. Mahadev, Chief General Manager, Operations Approved by Managing Director 21 st , February, 2013. Bangalore Electricity Supply Company Limited
Jan 21, 2016
Summer Plan: 2013Summer Plan: 2013(1st March – 31st May)
Prepared by
Mr. Mahadev, Chief General Manager, Operations
Approved by
Managing Director
21st, February, 2013.
Bangalore Electricity Supply Company Limited
BESCOM ProfileBESCOM Profile Bangalore Electricity Supply Company Limited (BESCOM) is Power
Distribution Utility distributing electricity across 8 districts viz.,
Population Base : 2.07 Cr
Consumer Base : 79 Lakhs
Districts
Peak Load
Requirement (MW)
Energy
Requirement (MU )
Bangalore Urban 2100 41
Bangalore Rural 365 7.13
Ramanagar 100 1.95
Kolar 275 5.37
Chikkaballapura 245 4.78
Tumkur 495 9.66
Chitradurga 230 4.49
Davanagere 290 5.66
Demand & Supply (2011-2013)
Energy Consumption(2011-2013)
Energy Consumption (2011-2013)
For 2012-13 : Initially proposed by BESCOM: 32,193 MUs.
Approved by KERC: 31,305 MUs.
Consumption till date(17th Feb-2013) : 24,576 MUs.
Balance Upto end of March-2013 : 6,729 Mus(Adequate).
Reasons for Shortages / Gap
1.Low Wind Energy Generation : means no ‘reserve’ available
2. Unforeseen shut downs of thermal generating units at RTPS (Raichur) : 150 MW
3.10 % Unforeseen shutdowns in CGS (Central Generating Station) share to the state : 150 MW
Total Shortage of Load Expected : 300 MW
How BESCOM will close the GAP ?
1. Strict measures to stop illegal conversion of Single Phase to 3 Phase
by IP Set owners and excess consumption [Open Delta] : 210 MW
2. Vigilance Activities : 60 MW
3. Shifting of Peak Load : 30 MW ( From 6 PM to 9 PM to beyond 9 PM)
Open Delta System
1. Open Delta System is a scheme which avoids illegal use of power
supply to IP Sets. Thus there won’t be overloads or excess drawl
from the network.
2. Effective Implementation saves 210 MW
Open Delta Configuration
Vigilance Activities : 60 MW
1. Strengthening of BESCOM Vigilance network by providing 30
additional vehicles & staff .
2. Extra Vigilance during peak hours and at night : to have check
on illegal welding, lights, theft etc.,
3. Both Special Vigilance Team & BESCOM Officers will be on
strict vigil. Expected to do : 1500 inspections / Everyday.
Load Shifting : 30 MW
1. BESCOM would request consumers to shift the use of major
loads like Water pumps, Geysers etc., from peak to non- peak
hours ( after 10 PM)
2. BESCOMs brand ambassador will promote
Conservation, and load shifting activities like above
Rural Power Supply Schedule during summer8 SLOTS of 3 HRS DURATION
Batches 6 am - 9 am
9 am - 12 noon
12 noon - 3 pm
3 pm - 6 pm
6 pm - 9 pm
9 pm - 12 am
12 am - 3 am
3 am - 6 am
B1 Single Phase
3 Phase OFF OFF Open
Delta 3
PhaseSingle Phase
Single Phase
B2 Single Phase OFF 3
Phase OFF Open Delta
Single Phase
3 Phase
Single Phase
B3 Single Phase OFF OFF 3
Phase Open Delta
Single Phase
Single Phase
3 Phase
3 Phase : 3 Phase Power Supply Batches B1,B2, B3 will not have same timings,
the batches will be intimated by issuing
pamphlets.
Single Phase: Single Phase Power Supply
Open Delta: Open Delta Power supplyOFF : No Power Supply
Reduction in Power Outages in past 5 years
In Case of any grievances ! Reach us
1. Online Complaint Registration
Log onto www.bescomhelpline.com to register your complaint
2. 24×7 SMS Facility
Just type BESCOM <Space> Subdivision code<space> nature of
complaint and send it to 92431 50000
3. 24×7 Helpline
Call to BESCOMs 24X7 Customer Helpline (080-22873333)-(25 lines are
there)
Thank You