Page 1: Summer Plan: 2013 (1 st  March – 31 st  May)

Summer Plan: 2013Summer Plan: 2013(1st March – 31st May)

Prepared by

Mr. Mahadev, Chief General Manager, Operations

Approved by

Managing Director

21st, February, 2013.

Bangalore Electricity Supply Company Limited

Page 2: Summer Plan: 2013 (1 st  March – 31 st  May)

BESCOM ProfileBESCOM Profile Bangalore Electricity Supply Company Limited (BESCOM) is Power

Distribution Utility distributing electricity across 8 districts viz.,

Population Base : 2.07 Cr

Consumer Base : 79 Lakhs

Districts

Peak Load

Requirement (MW)

Energy

Requirement (MU )

Bangalore Urban 2100 41

Bangalore Rural 365 7.13

Ramanagar 100 1.95

Kolar 275 5.37

Chikkaballapura 245 4.78

Tumkur 495 9.66

Chitradurga 230 4.49

Davanagere 290 5.66

Page 3: Summer Plan: 2013 (1 st  March – 31 st  May)

Demand & Supply (2011-2013)

Page 4: Summer Plan: 2013 (1 st  March – 31 st  May)

Energy Consumption(2011-2013)

Page 5: Summer Plan: 2013 (1 st  March – 31 st  May)

Energy Consumption (2011-2013)

For 2012-13 : Initially proposed by BESCOM: 32,193 MUs.

Approved by KERC: 31,305 MUs.

Consumption till date(17th Feb-2013) : 24,576 MUs.

Balance Upto end of March-2013 : 6,729 Mus(Adequate).

Page 6: Summer Plan: 2013 (1 st  March – 31 st  May)

Reasons for Shortages / Gap

1.Low Wind Energy Generation : means no ‘reserve’ available

2. Unforeseen shut downs of thermal generating units at RTPS (Raichur) : 150 MW

3.10 % Unforeseen shutdowns in CGS (Central Generating Station) share to the state : 150 MW

Total Shortage of Load Expected : 300 MW

Page 7: Summer Plan: 2013 (1 st  March – 31 st  May)

How BESCOM will close the GAP ?

1. Strict measures to stop illegal conversion of Single Phase to 3 Phase

by IP Set owners and excess consumption [Open Delta] : 210 MW

2. Vigilance Activities : 60 MW

3. Shifting of Peak Load : 30 MW ( From 6 PM to 9 PM to beyond 9 PM)

Page 8: Summer Plan: 2013 (1 st  March – 31 st  May)

Open Delta System

1. Open Delta System is a scheme which avoids illegal use of power

supply to IP Sets. Thus there won’t be overloads or excess drawl

from the network.

2. Effective Implementation saves 210 MW

Page 9: Summer Plan: 2013 (1 st  March – 31 st  May)

Open Delta Configuration

Page 10: Summer Plan: 2013 (1 st  March – 31 st  May)

Vigilance Activities : 60 MW

1. Strengthening of BESCOM Vigilance network by providing 30

additional vehicles & staff .

2. Extra Vigilance during peak hours and at night : to have check

on illegal welding, lights, theft etc.,

3. Both Special Vigilance Team & BESCOM Officers will be on

strict vigil. Expected to do : 1500 inspections / Everyday.

Page 11: Summer Plan: 2013 (1 st  March – 31 st  May)

Load Shifting : 30 MW

1. BESCOM would request consumers to shift the use of major

loads like Water pumps, Geysers etc., from peak to non- peak

hours ( after 10 PM)

2. BESCOMs brand ambassador will promote

Conservation, and load shifting activities like above

Page 12: Summer Plan: 2013 (1 st  March – 31 st  May)

Rural Power Supply Schedule during summer8 SLOTS of 3 HRS DURATION

Batches 6 am - 9 am

9 am - 12 noon

12 noon - 3 pm

3 pm - 6 pm

6 pm - 9 pm

9 pm - 12 am

12 am - 3 am

3 am - 6 am

B1 Single Phase

3 Phase OFF OFF Open

Delta 3

PhaseSingle Phase

Single Phase

B2 Single Phase OFF 3

Phase OFF Open Delta

Single Phase

3 Phase

Single Phase

B3 Single Phase OFF OFF 3

Phase Open Delta

Single Phase

Single Phase

3 Phase

3 Phase : 3 Phase Power Supply Batches B1,B2, B3 will not have same timings,

the batches will be intimated by issuing

pamphlets.

Single Phase: Single Phase Power Supply

Open Delta: Open Delta Power supplyOFF : No Power Supply

Page 13: Summer Plan: 2013 (1 st  March – 31 st  May)

Reduction in Power Outages in past 5 years

Page 14: Summer Plan: 2013 (1 st  March – 31 st  May)

In Case of any grievances ! Reach us

1. Online Complaint Registration

Log onto www.bescomhelpline.com to register your complaint

2. 24×7 SMS Facility

Just type BESCOM <Space> Subdivision code<space> nature of

complaint and send it to 92431 50000

3. 24×7 Helpline

Call to BESCOMs 24X7 Customer Helpline (080-22873333)-(25 lines are

there)

Page 15: Summer Plan: 2013 (1 st  March – 31 st  May)