Summer ‘09 SAD Install “Inverted” HV chamber with capabilities for higher voltage, anticipating better transmission & photocathode lifetime Same good photocathode PREP and LOAD chambers Spin Flipper: Stage 1 • Remove unbaked girder region between valve & chopper • Install new “normal” Wien for Physics program, with quad correction • Thoroughly test & transfer functionality for setting pol. • No need to move laser room. Preserve baked region, continue R&D/BS during Fall H-Wien + Quads Harp/MFA0I03 “match poin
7

Summer ‘09 SAD

Feb 23, 2016

Download

Documents

MORE

Summer ‘09 SAD. Same good photocathode PREP and LOAD chambers. Spin Flipper: Stage 1 Remove unbaked girder region between valve & chopper Install new “normal” Wien for Physics program, with quad correction Thoroughly test & transfer functionality for setting pol. - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Summer ‘09 SAD

Summer ‘09 SADInstall “Inverted” HV

chamber with capabilities for higher voltage, anticipating

better transmission & photocathode lifetime

Same good photocathode PREP and LOAD chambers

Spin Flipper: Stage 1

• Remove unbaked girder region between valve & chopper• Install new “normal” Wien for Physics program, with quad correction• Thoroughly test & transfer functionality for setting pol.• No need to move laser room.

Preserve baked region, continue

R&D/BS during Fall

H-Wien + Quads

Harp/MFA0I03 “match point”

Page 2: Summer ‘09 SAD

Gun Status

e-

Present Ceramic• Exposed to field emission• Large area• Expensive (~$50k)

Medical x-ray technology

New design

New Ceramic• Compact• ~$5k

Want to move away from “conventional” insulator used on all GaAs photoguns today – expensive, months to build, prone to damage from field emission.

neg modules

Page 3: Summer ‘09 SAD

Mechanical Layout

Page 4: Summer ‘09 SAD

Optical Layout (Wien=0)

Page 5: Summer ‘09 SAD

Optical Layout (Wien=90, Quads=OFF)

Page 6: Summer ‘09 SAD

Optical Layout (Wien=90, Quads=ON)

Page 7: Summer ‘09 SAD

Optical Layout (Wien=90, Quads=ON)Max. B’L ~23 G

Will use QS (B’L ~ 13G/Amp)