Top Banner
Summary of Draft Findings from Councilmember Lee Leffingwell’s Barton Springs Zone Advisory Group August 17, 2007 Potential Redevelopment Ordinance Changes
18

Summary of Draft Findings from Councilmember Lee Leffingwells Barton Springs Zone Advisory Group August 17, 2007 Potential Redevelopment Ordinance Changes.

Mar 28, 2015

Download

Documents

Shawna Bumpas
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Summary of Draft Findings from Councilmember Lee Leffingwells Barton Springs Zone Advisory Group August 17, 2007 Potential Redevelopment Ordinance Changes.

Summary of Draft Findings fromCouncilmember Lee Leffingwell’s

Barton Springs ZoneAdvisory Group

August 17, 2007

Potential Redevelopment Ordinance Changes

Page 2: Summary of Draft Findings from Councilmember Lee Leffingwells Barton Springs Zone Advisory Group August 17, 2007 Potential Redevelopment Ordinance Changes.

Current Redevelopment Requirements

a) Redevelop only 25% of existing IC; on-site SOS controls required for redeveloped portion; or

b) Site reduced to SOS-level impervious cover.

Page 3: Summary of Draft Findings from Councilmember Lee Leffingwells Barton Springs Zone Advisory Group August 17, 2007 Potential Redevelopment Ordinance Changes.

Goal

Achieve better environmental controls and enhanced water quality by providing an opportunity for high-quality redevelopment.

Page 4: Summary of Draft Findings from Councilmember Lee Leffingwells Barton Springs Zone Advisory Group August 17, 2007 Potential Redevelopment Ordinance Changes.

Strategies

a) Retrofit water quality structural controls where no or poor controls existed before.

b) Offset highly impervious sites with off-site land mitigation.

Page 5: Summary of Draft Findings from Councilmember Lee Leffingwells Barton Springs Zone Advisory Group August 17, 2007 Potential Redevelopment Ordinance Changes.

Advisory Group Proposal• May maintain but not exceed existing IC.

Sites with <40% IC (NSA)

Sites with > 40% IC (NSA)

Must use non-degradation controls.

Minimum of sedimentation/ filtration required on-site.

No mitigation land required.

Must be mitigated by the purchase of off-site land to reach an overall impervious cover (IC) target of 20%.

• Sites must meet all other current requirements (e.g., Zoning, Landscape Ordinance) and may not increase existing non-compliance (e.g., CWQZ).

Page 6: Summary of Draft Findings from Councilmember Lee Leffingwells Barton Springs Zone Advisory Group August 17, 2007 Potential Redevelopment Ordinance Changes.

1. Tracts with <40 % IC:Non-Degradation Controls

Existing Mitigation

None

40% IC

40% IC

Redeveloped

Page 7: Summary of Draft Findings from Councilmember Lee Leffingwells Barton Springs Zone Advisory Group August 17, 2007 Potential Redevelopment Ordinance Changes.

2. Tracts with >40 % IC: Sed/Filter Controls

75% IC

Existing Redeveloped Mitigation

20% Overall IC

+

75% IC

Sand Filter

Page 8: Summary of Draft Findings from Councilmember Lee Leffingwells Barton Springs Zone Advisory Group August 17, 2007 Potential Redevelopment Ordinance Changes.

3. Combination

Existing Mitigation

75% IC

20% Overall IC

+

Redeveloped

Page 9: Summary of Draft Findings from Councilmember Lee Leffingwells Barton Springs Zone Advisory Group August 17, 2007 Potential Redevelopment Ordinance Changes.

Existing Commercial & Office BSZ Existing Commercial & Office BSZ tractstracts

SOS Equivalent (Retention-Irrigation)CWO (Sediment/Sand Filtration or Wet Pond)

Old WQ (Sediment or Sand Filter Only)No WQ Controls

Page 10: Summary of Draft Findings from Councilmember Lee Leffingwells Barton Springs Zone Advisory Group August 17, 2007 Potential Redevelopment Ordinance Changes.

Likely Redevelopment Candidates

BSZ Commercial & Office with no or outdated water quality controls

Approx. Number of Tracts 199

Total Area (acres) 681

Average Existing IC 58%

Maximum Site Size (acres) 119.3

Average Site Size (acres) 3.4

Page 11: Summary of Draft Findings from Councilmember Lee Leffingwells Barton Springs Zone Advisory Group August 17, 2007 Potential Redevelopment Ordinance Changes.

Large vs. Small Tracts

Tract Acreage

Number of Properties

Percent of Total

Area

Cumulative Percent of Total

Area

> 20 Acres 6 38% 38%

10 - 20 Acres

7 14% 52%

5 - 10 Acres 14 15% 67%

< 5 Acres 172 33% 100%

Page 12: Summary of Draft Findings from Councilmember Lee Leffingwells Barton Springs Zone Advisory Group August 17, 2007 Potential Redevelopment Ordinance Changes.

Possible Outcomes of Policy

BSZ Commercial & Office with no or outdated water quality controls

Sed-Sand Only (over

40% IC)

Max.On-Site

Irrigation

Final Overall IC(started at 58%)

21% 29%

Mitigation Land Obtained(acres)

1,327 816

Mitigation Money Accrued (at $15,000/acre)

$19.9 M $12.2 M

TN Reduction/Avoidance 50% 61%

Page 13: Summary of Draft Findings from Councilmember Lee Leffingwells Barton Springs Zone Advisory Group August 17, 2007 Potential Redevelopment Ordinance Changes.

Primary Stakeholder Concerns

• Economic viability– Incentive vs. Opportunity

• Cumulative impacts– Density, traffic, growth acceleration

• Land bank details– Cost per acre, administrator, etc.

Page 14: Summary of Draft Findings from Councilmember Lee Leffingwells Barton Springs Zone Advisory Group August 17, 2007 Potential Redevelopment Ordinance Changes.

Proposed Thresholds for Council Consideration*

• Greater than 5 acres.• Generates more than 2,000

additional vehicle trips per day.• Greater than 25% increase in units

for multifamily residential.• Inconsistent with an approved

neighborhood plan.

* Not previously presented to the Advisory Group

Page 15: Summary of Draft Findings from Councilmember Lee Leffingwells Barton Springs Zone Advisory Group August 17, 2007 Potential Redevelopment Ordinance Changes.

Results of Acreage Trigger (Commercial & Office Only)

Tract Acreage

Number of Properties

Percent of Total

Area

Cumulative Percent of Total

Area

> 20 Acres 6 38% 38%

10 - 20 Acres

7 14% 52%

5 - 10 Acres 14 15% 67% Trigger for Council Approval

< 5 Acres 172 33% 100%

Page 16: Summary of Draft Findings from Councilmember Lee Leffingwells Barton Springs Zone Advisory Group August 17, 2007 Potential Redevelopment Ordinance Changes.

Findings of Fact

City Council shall consider the following factors in determining whether to approve a proposed redevelopment:1. Benefits of the redevelopment to the

community;

2. Whether the proposed mitigation or manner of development offsets the potential environmental impact of the redevelopment;

3. The effects of offsite infrastructure requirements of the redevelopment; and

4. Compatibility with the city’s long-range planning goals.

Page 17: Summary of Draft Findings from Councilmember Lee Leffingwells Barton Springs Zone Advisory Group August 17, 2007 Potential Redevelopment Ordinance Changes.

Consensus Check

0% 20% 40% 60% 80% 100%

Overall, is Staff Moving inthe Right Direction?

Maintain ExistingImpervious Cover

Minimum ofSediment/Filtration

Retention-Irrigation forless than 40% IC

Mitigate to Overall 20%IC for Sediment/Filtration

No Mitigation forRetention-Irrigation

Percentage of Votes (12 Total)

Do Not Support Neutral Support

Page 18: Summary of Draft Findings from Councilmember Lee Leffingwells Barton Springs Zone Advisory Group August 17, 2007 Potential Redevelopment Ordinance Changes.

Next Steps

Draft ordinance July 24

CMO briefing August 1

Department Director review August 15

Advisory Group review August 17

EB preliminary briefing September 5

PC Codes and Ordinances September 18

Zoning And Platting Commission (ZAP)

September 18

EB hearing September 19

Planning Commission September 25

Set Council hearing September 27

Council hearing October 11