Top Banner
RESERVE SOCIETE SUMARE PAYLOAD TM S SA S 00/S/ED A /N C/088 -M P
15

SUMARE PAYLOAD

Feb 25, 2016

Download

Documents

mervin

SUMARE PAYLOAD. CONTENTS Objectives. Sensors choice. Sensors performances. Implant possibilities. Sensors conditioning. Schedule. Sensors integration drawings. Fins navigation trials. Fresh water tank measurement sensors. 2. OBJECTIVES - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: SUMARE PAYLOAD

RESERVE SOCIETE

SUMARE PAYLOAD

TMS SAS 00/S/EDA/NC/088 - MP

Page 2: SUMARE PAYLOAD

RESERVE SOCIETE

CONTENTS

• Objectives.• Sensors choice.• Sensors performances.• Implant possibilities.• Sensors conditioning.• Schedule.• Sensors integration drawings.• Fins navigation trials.• Fresh water tank measurement sensors.

2

TMS SAS 00/S/EDA/NC/088 - MP

Page 3: SUMARE PAYLOAD

RESERVE SOCIETE

OBJECTIVES

The “Payload” will assume two main operational functions.

• Monitoring of the volumetric evolution of sand banks.• Obstacles avoidance.

3

TMS SAS 00/S/EDA/NC/088 - MP

Page 4: SUMARE PAYLOAD

RESERVE SOCIETE

SENSORS CHOICE

Altimeter.

Acoustic high frequency transducer ( Resolution)

Obstacles avoidance.

The inner Mauve transducer is not available (Software limits / Discrimination).

The transducer is the same than for altimeter.

4

TMS SAS 00/S/EDA/NC/088 - MP

Page 5: SUMARE PAYLOAD

RESERVE SOCIETE

5

TMS SAS 00/S/EDA/NC/088 - MP

SENSORS PERFORMANCES

Measurement limit : 50 mMeasurement mode : Free runMeasurement speed : 10 HzPower supply : 12 or 24 VDCInterface : RS 232 or RS 485Frequency : 500 kHzConical beam : 6°

Page 6: SUMARE PAYLOAD

RESERVE SOCIETE

TMS SAS 00/S/EDA/NC/088 - MP

IMPLANT POSSIBILITIES

1 : Risk on Payload structure (depth)Obstacle avoidance sensor not possible.

2 : Risk on launching.

3 : chosen solution

6

1

2

3

Page 7: SUMARE PAYLOAD

RESERVE SOCIETE

SENSORS CONDITIONING

Conditioning electronic : two output

Two output are available on MMNS

1 RS 2321 RS 485

The two electronic signal conditioning units will be connected on these outputs

7

TMS SAS 00/S/EDA/NC/088 - MP

Page 8: SUMARE PAYLOAD

RESERVE SOCIETE

SCHEDULE

8

TMS SAS 00/S/EDA/NC/088 - MP

2000 20015 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12

fins dummy productionVillefranche Fins dummy navigation sea trials Measurement system specificationPayload implant proposalfins prototype productionVillefranche Fins prototype navigation sea trials Software / Payload validatePayload productionFresh water tank Payload measurementVillefranche sea trials

Page 9: SUMARE PAYLOAD

RESERVE SOCIETE

SENSORS INTEGRATION.

4 configurations will be tested at sea.

• 1 :Fins 60 mm long in front of the payload.• 2 :Fins 60 mm long in back of the payload.• 3 :Fins 120 mm long in front of the payload.• 4 :Fins 120 mm long in back of the payload.

9

TMS SAS 00/S/EDA/NC/088 - MP

Page 10: SUMARE PAYLOAD

RESERVE SOCIETE

1 :Fins 60 mm long in front of the payload.10

TMS SAS 00/S/EDA/NC/088 - MP

FRONT VIEWSIDE VIEW

TOP VIEW

Page 11: SUMARE PAYLOAD

RESERVE SOCIETE

1 :Fins 60 mm long in back of the payload.11

TMS SAS 00/S/EDA/NC/088 - MP

FRONT VIEWSIDE VIEW

TOP VIEW

Page 12: SUMARE PAYLOAD

RESERVE SOCIETE

3 :Fins 120 mm long in front of the payload.12

TMS SAS 00/S/EDA/NC/088 - MP

FRONT VIEWSIDE VIEW

TOP VIEW

Page 13: SUMARE PAYLOAD

RESERVE SOCIETE

4 :Fins 120 mm long in back of the payload.13

TMS SAS 00/S/EDA/NC/088 - MP

FRONT VIEWSIDE VIEW

TOP VIEW

Page 14: SUMARE PAYLOAD

RESERVE SOCIETE

fins with their moulds14

TMS SAS 00/S/EDA/NC/088 - MP

Page 15: SUMARE PAYLOAD

RESERVE SOCIETE

FRESH WATER TANK MEASUREMENT SENSORS

15

TMS SAS 00/S/EDA/NC/088 - MP

Computer

Signal generatorPower amplifier

Amplifier

Oscilloscope

Rotating unit

Reference hydrophone