SUCCESSFUL GREAT LAKES DREDGING PROJECTS GOVERNMENT & PRIVATE SECTOR WORKING TOGETHER Joseph Heimbuch Robert Rule de maximis, inc. de maximis, inc. PIANC USA COPRI ASCE 2012 Dredging Conference October 22 – 25, San Diego, California Presented by: 1
17

SUCCESSFUL GREAT LAKES DREDGING PROJECTS GOVERNMENT & PRIVATE SECTOR WORKING TOGETHER Joseph HeimbuchRobert Rulede maximis, inc. PIANC USA COPRI ASCE 2012.

Jan 13, 2016

Download

Documents

Randall Fleming
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: SUCCESSFUL GREAT LAKES DREDGING PROJECTS GOVERNMENT & PRIVATE SECTOR WORKING TOGETHER Joseph HeimbuchRobert Rulede maximis, inc. PIANC USA COPRI ASCE 2012.

SUCCESSFUL GREAT LAKES DREDGING PROJECTSGOVERNMENT & PRIVATE SECTOR WORKING TOGETHER

Joseph Heimbuch Robert Rulede maximis, inc. de maximis, inc.

PIANC USA COPRI ASCE 2012 Dredging ConferenceOctober 22 – 25, San Diego, California

Presented by:

1

Page 2: SUCCESSFUL GREAT LAKES DREDGING PROJECTS GOVERNMENT & PRIVATE SECTOR WORKING TOGETHER Joseph HeimbuchRobert Rulede maximis, inc. PIANC USA COPRI ASCE 2012.

2012 Dredging Conference www.demaximis.com

PRESENTATION OVERVIEW

1. GREAT LAKES LEGACY ACT

2. ASHTABULA RIVER • HISTORY & PROJECT DESCRIPTION• PROJECT HIGHLIGHTS

3. OTTAWA RIVER • HISTORY & PROJECT DESCRIPTION• PROJECT HIGHLIGHTS

4. “TEAMING” BENEFITS

2

Page 3: SUCCESSFUL GREAT LAKES DREDGING PROJECTS GOVERNMENT & PRIVATE SECTOR WORKING TOGETHER Joseph HeimbuchRobert Rulede maximis, inc. PIANC USA COPRI ASCE 2012.

2012 Dredging Conference www.demaximis.com

GREAT LAKES LEGACY ACT

• 1978 - GREAT LAKES QUALITY WATER AGREEMENT SIGNED BY THE UNITED STATES AND CANADA

– PURPOSE: “RESTORE AND MAINTAIN THE CHEMICAL, PHYSICAL, AND BIOLOGICAL INTEGRITY OF THE WATERS OF THE GREAT LAKES BASIN ECOSYSTEM”

• THE UNITED STATES AND CANADA AGREED TO GIVE THE “WORST AREAS” PRIORITY ATTENTION

• 42 “AREAS OF CONCERN” IDENTIFIED BY A JOINT COMMISSION

– 25 IN THE UNITED STATES– 12 IN CANADA– 5 IN BINATIONAL WATERWAYS

3

Page 4: SUCCESSFUL GREAT LAKES DREDGING PROJECTS GOVERNMENT & PRIVATE SECTOR WORKING TOGETHER Joseph HeimbuchRobert Rulede maximis, inc. PIANC USA COPRI ASCE 2012.

2012 Dredging Conference www.demaximis.com

GREAT LAKES LEGACY ACT (Continued)

• 2002 - GREAT LAKES LEGACY ACT (GLLA)

– CONGRESS PROVIDES FUNDING FOR “AREAS OF CONCERN” IN THE UNITED STATES

– PROGRAM ADMINISTERED BY THE GREAT LAKES NATIONAL PROGRAM OFFICE (GLNPO)

– FOCUS ON “REMEDIAL ACTION FOR CONTAMINATED SEDIMENT”

• NON-FEDERAL SPONSOR WITH RESOURCES COMMITTED TO THE PROJECT

– APPLICATION PRESENTATION OF PROJECT REVIEW/ACCEPTANCE PARTNERSHIP AGREEMENT

• 2 SIGNIFICANT “AREAS OF CONCERN”:– ASHTABULA RIVER, NORTHEAST OHIO, LAKE ERIE– OTTAWA RIVER, NORTHWEST OHIO, LAKE ERIE

4

Page 5: SUCCESSFUL GREAT LAKES DREDGING PROJECTS GOVERNMENT & PRIVATE SECTOR WORKING TOGETHER Joseph HeimbuchRobert Rulede maximis, inc. PIANC USA COPRI ASCE 2012.

2012 Dredging Conference www.demaximis.com

ASHTABULA RIVER 5

Page 6: SUCCESSFUL GREAT LAKES DREDGING PROJECTS GOVERNMENT & PRIVATE SECTOR WORKING TOGETHER Joseph HeimbuchRobert Rulede maximis, inc. PIANC USA COPRI ASCE 2012.

2012 Dredging Conference www.demaximis.com

ASHTABULA RIVER 6

Page 7: SUCCESSFUL GREAT LAKES DREDGING PROJECTS GOVERNMENT & PRIVATE SECTOR WORKING TOGETHER Joseph HeimbuchRobert Rulede maximis, inc. PIANC USA COPRI ASCE 2012.

2012 Dredging Conference www.demaximis.com

ASHTABULA RIVER: History & Project Description• NORTHEAST OHIO – 50 MILES EAST OF CLEVELAND – FLOWS INTO LAKE ERIE AT

ASHTABULA, OHIO

• OPERABLE UNIT OF THE FIELDS BROOK SUPERFUND SITE

• 1993 - ASHTABULA RIVER PARTNERSHIP FORMED AS AN ALTERNATIVE TO THE SUPERFUND PROCESS

• PARTNERSHIP COMPOSED OF USEPA, USFWS, OHIO EPA, USACE, CORPORATIONS, PRIVATE CITIZENS & THE ASHTABULA RIVER COOPERATION GROUP (ARCG)

• 2004 - USEPA/GLNPO ACCEPTED APPLICATION FROM THE ASHTABULA PORT AUTHORITY FOR SHARED FUNDING FOR THE CLEANUP OF THE ASHTABULA RIVER

• RESOURCES FOR THE ASHTABULA PORT AUTHORITY (THE NON-FEDERAL SPONSOR) WERE PROVIDED BY THE ARCG AND THE STATE OF OHIO

7

Page 8: SUCCESSFUL GREAT LAKES DREDGING PROJECTS GOVERNMENT & PRIVATE SECTOR WORKING TOGETHER Joseph HeimbuchRobert Rulede maximis, inc. PIANC USA COPRI ASCE 2012.

2012 Dredging Conference www.demaximis.com

ASHTABULA RIVER:History & Project Description (Continued)

• PROJECT DESIGNED FOR THE REMOVAL OF 500,000 CUBIC YARDS OF PCB-CONTAMINATED SEDIMENT

• HYDRAULIC DREDGING EMPLOYED WITH THE SPOILS BEING TRANSPORTED VIA PIPLINE TO AN UPLAND DE-WATERING AND DISPOSAL AREA

• ADDITIONAL 150,000 CUBIC YARDS OF CONTAMINATED SEDIMENTS REMOVED DOWNSTREAM BY THE USACE UNDER THE WATER RESOURCES DEVELOPMENT ACT (WRDA)

• CONTAMINATED SEDIMENTS PLACED INTO A TSCA-PERMITTED LANDFILL OWNED BY DE MAXIMIS

• PROJECT CO-MANAGED BY DE MAXIMIS & USEPA/GLNPO

8

Page 9: SUCCESSFUL GREAT LAKES DREDGING PROJECTS GOVERNMENT & PRIVATE SECTOR WORKING TOGETHER Joseph HeimbuchRobert Rulede maximis, inc. PIANC USA COPRI ASCE 2012.

2012 Dredging Conference www.demaximis.com

ASHTABULA RIVER – PROJECT HIGHLIGHTS

• CONSTUCTED TSCA LANDFILL IN 112 DAYS

– 396,000 CUBIC YARDS OF SOIL EXCAVATED & TRANSPORTED OFF-SITE– 25,000 TONS OF CONCRETE BROKEN, EXCAVATED, TRANSPORTED & CRUSHED – 3,275,000 SQUARE FEET OF LINER (75 ACRES) INSTALLED – 5.3 MILES OF PIPELINE PLACED

• 3 MILES OF FLOODPLAIN GRADED & MAINTAINED

• 630,000 CUBIC YARDS OF SEDIMENT DREDGED, TRANSPORTED & DEWATERED IN 336 OPERATING DAYS (9/9/2006 TO 6/18/2008)

• 1,250,000,000 GALLONS OF WATER TRANSPORTED, TREATED & DISCHARGED BACK INTO THE ASHTABULA RIVER (NO EXCURSIONS FROM NPDES PERMIT REQUIREMENTS)

• 595 GEO-TEXTILE TUBES UTILIZED

9

Page 10: SUCCESSFUL GREAT LAKES DREDGING PROJECTS GOVERNMENT & PRIVATE SECTOR WORKING TOGETHER Joseph HeimbuchRobert Rulede maximis, inc. PIANC USA COPRI ASCE 2012.

2012 Dredging Conference www.demaximis.com

ASHTABULA RIVER – PROJECT HIGHLIGHTS (CONTINUED)• OPERATED 24/7 IN 2006/2007 & 24/6 IN 2008• 85 PERSON OPERATING STAFF (45 ON DAYS & 40 ON NIGHTS)• 360,000 MANHOURS WITH NO REPORTABLE INJURY

10

Page 11: SUCCESSFUL GREAT LAKES DREDGING PROJECTS GOVERNMENT & PRIVATE SECTOR WORKING TOGETHER Joseph HeimbuchRobert Rulede maximis, inc. PIANC USA COPRI ASCE 2012.

2012 Dredging Conference www.demaximis.com

OTTAWA RIVER 11

Page 12: SUCCESSFUL GREAT LAKES DREDGING PROJECTS GOVERNMENT & PRIVATE SECTOR WORKING TOGETHER Joseph HeimbuchRobert Rulede maximis, inc. PIANC USA COPRI ASCE 2012.

2012 Dredging Conference www.demaximis.com

OTTAWA RIVER 12

Page 13: SUCCESSFUL GREAT LAKES DREDGING PROJECTS GOVERNMENT & PRIVATE SECTOR WORKING TOGETHER Joseph HeimbuchRobert Rulede maximis, inc. PIANC USA COPRI ASCE 2012.

2012 Dredging Conference www.demaximis.com

OTTAWA RIVER:History & Project Description• NORTHWEST OHIO – TOLEDO AREA – FLOWS INTO LAKE ERIE AT MAUMEE, OHIO

• 2007 - OTTAWA RIVER GROUP (ORG) FORMED TO CLEANUP PCB-CONTAMINATED SEDIMENTS OUTSIDE CERCLA

• PROJECT STAKEHOLDERS INCLUDE: USEPA, OHIO EPA, USFWS, USACE & THE ORG

• 2008 - USEPA/GLNPO ACCEPTED APPLICATION FROM THE ORG FOR SHARED FUNDING FOR THE CLEANUP OF THE OTTAWA RIVER

• 241,671 CUBIC YARDS OF CONTAMINATED SEDIMENTS DREDGED IN 146 OPERATING DAYS (5/3/2010 TO 10/21/2010)

• SPOILS TRANSPORTED VIA PIPELINE, DEWATERED IN GEO-TEXTILE TUBES & PERMANENTLY DISPOSED IN A SEPARATORY LINER CELL SYSTEM WITHIN THE CITY OF TOLEDO’S LANDFILL

• PROJECT CO-MANAGED BY DE MAXIMIS & USEPA/GLNPO

13

Page 14: SUCCESSFUL GREAT LAKES DREDGING PROJECTS GOVERNMENT & PRIVATE SECTOR WORKING TOGETHER Joseph HeimbuchRobert Rulede maximis, inc. PIANC USA COPRI ASCE 2012.

2012 Dredging Conference www.demaximis.com

OTTAWA RIVER – PROJECT HIGHLIGHTS

• RE-UTILIZATION OF MATERIALS FROM ASHTABULA PROJECT (PIPELINE & WATER TREATMENT SYSTEM) RESULTED IN SIGNIFICANT COST SAVINGS

• 1,655 CUBIC YARDS DREDGED PER DAY (ON AVERAGE)

– CREATIVE CONTRACTING PRODUCED TEAM APPROACH & NO “FINGER-POINTING”

• 96% TOTAL PROJECT UP-TIME

– “LESSONS LEARNED” FROM ASHTABULA INCREASED EFFICIENCY

• 509,000,000 GALLONS OF WATER SUCCESSFULLY TREATED & DISCHARGED BACK INTO THE OTTAWA RIVER

• 162,500 MANHOURS WITH 1 SUBCONTRACTOR LOST-TIME ACCIDENT

14

Page 15: SUCCESSFUL GREAT LAKES DREDGING PROJECTS GOVERNMENT & PRIVATE SECTOR WORKING TOGETHER Joseph HeimbuchRobert Rulede maximis, inc. PIANC USA COPRI ASCE 2012.

2012 Dredging Conference www.demaximis.com

OTTAWA RIVER 15

Page 16: SUCCESSFUL GREAT LAKES DREDGING PROJECTS GOVERNMENT & PRIVATE SECTOR WORKING TOGETHER Joseph HeimbuchRobert Rulede maximis, inc. PIANC USA COPRI ASCE 2012.

2012 Dredging Conference www.demaximis.com

“TEAMING” BENEFITS• CONTRACT/AGREEMENT BINDS THE “PARTNERS” (NON-FEDERAL

SPONSOR & USEPA/GLNPO)

• OTHER GOVERNMENT AGENCIES HAVE INPUT (USEPA/CERCLA, STATE REGULATORS, USACE & POTENTIAL FEDERAL/STATE NATURAL RESOURCE TRUSTEES)

– EMPHASIS ON CLEANUP & RESTORING BENEFICIAL USES – NO PUNITIVE UNDERCURRENT

• BOTH PARTNERS HAVING A FINANCIAL STAKE FOCUSES THE PROJECT ON SCHEDULE & PERFORMANCE

– “STREAMLINING, EFFICIENCY & COST-EFFECTIVENESS” ARE NOT JUST MEANINGLESS WORDS

• CLEANUPS ACCOMPLISHED SOONER RATHER THAN LATER

16

Page 17: SUCCESSFUL GREAT LAKES DREDGING PROJECTS GOVERNMENT & PRIVATE SECTOR WORKING TOGETHER Joseph HeimbuchRobert Rulede maximis, inc. PIANC USA COPRI ASCE 2012.

THANK YOUQUESTIONS/COMMENTS

JOSEPH HEIMBUCH ROBERT RULEde maximis, inc. de maximis, inc. Sarasota, Florida Knoxville, Tennessee941-926-7929 [email protected] [email protected]

MIKE PALMERde maximis, inc. San Diego, [email protected] www.demaximis.com

17