Stormwater Retrofit Planning Project for WRIA 9 a project funded by an USEPA Watershed Management Assistance Grant February 10, 2011 Jim Simmonds King County [email protected] 2/10/2011 1
21

Stormwater Retrofit Planning Project for WRIA 9 a project funded by an USEPA Watershed Management Assistance Grant February 10, 2011 Jim Simmonds King.

Dec 21, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Stormwater Retrofit Planning Project for WRIA 9 a project funded by an USEPA Watershed Management Assistance Grant February 10, 2011 Jim Simmonds King.

1

Stormwater Retrofit Planning Project for WRIA

9

a project funded by an

USEPA Watershed Management

Assistance Grant

February 10, 2011

Jim Simmonds

King County

[email protected]/10/2011

Page 2: Stormwater Retrofit Planning Project for WRIA 9 a project funded by an USEPA Watershed Management Assistance Grant February 10, 2011 Jim Simmonds King.

2

What Are Stormwater Retrofits

Construction projects to control stormwater

Locations that have previously been developed

Sited where existing stormwater controls are inadequate

Not part of redevelopment

2/10/2011

Page 3: Stormwater Retrofit Planning Project for WRIA 9 a project funded by an USEPA Watershed Management Assistance Grant February 10, 2011 Jim Simmonds King.

3

Why are Retrofits Important?

Stormwater causes major damage to streams

Improve fish habitat Recover Puget Sound ecosystem Large portions of developed areas have

no or inadequate controls Flow and water quality are important

2/10/2011

Page 4: Stormwater Retrofit Planning Project for WRIA 9 a project funded by an USEPA Watershed Management Assistance Grant February 10, 2011 Jim Simmonds King.

4

Expanded Ambaum stormwater detention

pond in BurienDecember 3, 2007

With funding support

from:

2/10/2011

Page 5: Stormwater Retrofit Planning Project for WRIA 9 a project funded by an USEPA Watershed Management Assistance Grant February 10, 2011 Jim Simmonds King.

5

More Stormwater

Ponds

2/10/2011

Page 6: Stormwater Retrofit Planning Project for WRIA 9 a project funded by an USEPA Watershed Management Assistance Grant February 10, 2011 Jim Simmonds King.

6

Bioswales

2/10/2011

Page 7: Stormwater Retrofit Planning Project for WRIA 9 a project funded by an USEPA Watershed Management Assistance Grant February 10, 2011 Jim Simmonds King.

7

Pervious Pavement

2/10/2011

Page 8: Stormwater Retrofit Planning Project for WRIA 9 a project funded by an USEPA Watershed Management Assistance Grant February 10, 2011 Jim Simmonds King.

8

Rain Barrels and Rain Gardens

2/10/2011

Page 9: Stormwater Retrofit Planning Project for WRIA 9 a project funded by an USEPA Watershed Management Assistance Grant February 10, 2011 Jim Simmonds King.

9

Check Dams

2/10/2011

Page 10: Stormwater Retrofit Planning Project for WRIA 9 a project funded by an USEPA Watershed Management Assistance Grant February 10, 2011 Jim Simmonds King.

10

Green Roofs

2/10/2011

Page 11: Stormwater Retrofit Planning Project for WRIA 9 a project funded by an USEPA Watershed Management Assistance Grant February 10, 2011 Jim Simmonds King.

11

Status of Stormwater Retrofit Programs

No comprehensive program exists Some projects under construction Can include Low-Impact-Development (LID) Increased requirements in future municipal

stormwater permits are likely No overall cost estimates, prioritization, etc

2/10/2011

Page 12: Stormwater Retrofit Planning Project for WRIA 9 a project funded by an USEPA Watershed Management Assistance Grant February 10, 2011 Jim Simmonds King.

12

Project Objectives

To assess stormwater retrofit needs To establish approaches that minimizes

costs while meeting needs To develop prioritization approach To present plan to WRIA 9 Watershed

Ecosystem Forum for consideration To extrapolate costs to rest of Puget

Sound to establish sound-wide retrofit cost estimate

2/10/2011

Page 13: Stormwater Retrofit Planning Project for WRIA 9 a project funded by an USEPA Watershed Management Assistance Grant February 10, 2011 Jim Simmonds King.

13

Project Area

• WRIA 9; Green-Duwamish Watershed and direct drainages to Puget Sound

• Excluding headwaters upstream of Howard Hanson Dam (forested) and the City of Seattle (combined system)

2/10/2011

Page 14: Stormwater Retrofit Planning Project for WRIA 9 a project funded by an USEPA Watershed Management Assistance Grant February 10, 2011 Jim Simmonds King.

14

Primary Streams Addressed Newaukum Creek Soos Creek Crisp Creek Mill Creek – Auburn Mill Creek – Kent Springbrook Creek Des Moines Creek Miller / Walker Creeks Joes Creek Plus other small streams2/10/2011

Page 15: Stormwater Retrofit Planning Project for WRIA 9 a project funded by an USEPA Watershed Management Assistance Grant February 10, 2011 Jim Simmonds King.

15

Project Team and FundingOrganization EPA Funding Local Match

USEPA*

King County $707k $300k

University of Washington $243k $20k

Department of Ecology**

City of Auburn 0 $5k

City of Covington 0 $5k

City of SeaTac 0 $5k

Kellogg Consulting $50k 0

* USEPA contributing $1M in grant funding, and staff time to project management team** Ecology contributing staff time to project management team and updating retrofit database

2/10/2011

Page 16: Stormwater Retrofit Planning Project for WRIA 9 a project funded by an USEPA Watershed Management Assistance Grant February 10, 2011 Jim Simmonds King.

16

Project Benefits

Knowledge is power Understand trade offs

Cost of retrofits vs. amount of improvement in stream flow and water quality

Basis for estimating future funding needs and requests

Basis for future capital projects Influence future permit requirements

2/10/2011

Page 17: Stormwater Retrofit Planning Project for WRIA 9 a project funded by an USEPA Watershed Management Assistance Grant February 10, 2011 Jim Simmonds King.

17

Relationship toSalmon Habitat Plan

Address Policy WQ4 Local governments should assess current

surface water management standards, facilities, and programs and strengthen them where necessary to reduce entry of sediment and other pollutants to salmon streams

2/10/2011

Page 18: Stormwater Retrofit Planning Project for WRIA 9 a project funded by an USEPA Watershed Management Assistance Grant February 10, 2011 Jim Simmonds King.

18

Project Approach

Measurements weather, streamflow, water quality

Watershed modeling streamflow and water quality under past, current,

and future scenarios In-stream goal setting Modeling and optimization of retrofit needs and

costs to meet goals Prioritization and plan development Extrapolation of costs to rest of Puget Sound2/10/2011

Page 19: Stormwater Retrofit Planning Project for WRIA 9 a project funded by an USEPA Watershed Management Assistance Grant February 10, 2011 Jim Simmonds King.

19

Schedule

2010 begin data

collection 2011

finish data collection

set in-stream goals watershed

modeling

2012 retrofit modeling

2013 prioritization plan development extrapolation to

rest of Puget Sound

2/10/2011

Page 20: Stormwater Retrofit Planning Project for WRIA 9 a project funded by an USEPA Watershed Management Assistance Grant February 10, 2011 Jim Simmonds King.

20

Opportunities for Participation

Annual stakeholder meetings Annual briefings at WRIA 9 Watershed

Ecosystem Forum One-on-one outreach Quarterly e-mail updates and requests for

feedback Review and comment on draft reports and

results

2/10/2011

Page 21: Stormwater Retrofit Planning Project for WRIA 9 a project funded by an USEPA Watershed Management Assistance Grant February 10, 2011 Jim Simmonds King.

21

Questions?

Key issues to address? Climate change Population growth Funding Public vs. private Stormwater permits