Top Banner
Status Report on Top Priority Projects Listed in 2014 Building Condition Assessment Report October 16, 2018
7

Status Report on Top Priority Projects Listed in 2014 ... · 5/7/2018  · Status Report on top Priority Project List in Building Condition Assessment Report, November 2014 Status

Dec 17, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Status Report on Top Priority Projects Listed in 2014 ... · 5/7/2018  · Status Report on top Priority Project List in Building Condition Assessment Report, November 2014 Status

Status Report on Top Priority Projects Listed in 2014 Building Condition Assessment Report

October 16, 2018

Page 2: Status Report on Top Priority Projects Listed in 2014 ... · 5/7/2018  · Status Report on top Priority Project List in Building Condition Assessment Report, November 2014 Status

Origin of the Assessment

Parette Sojmen Architects (PSA) was retained to conduct a building condition assessment of all the Bloomfield Public Schools and Board of Education Office. The analysis was conducted through a visual survey and an analysis of the existing LRFP (Long Range Facility Plan) for every school during the 2014 summer recess. PSA was escorted by each school’s head custodian to highlight concerns throughout each facility.

Page 3: Status Report on Top Priority Projects Listed in 2014 ... · 5/7/2018  · Status Report on top Priority Project List in Building Condition Assessment Report, November 2014 Status

Top Priority Projects Listed

Page 4: Status Report on Top Priority Projects Listed in 2014 ... · 5/7/2018  · Status Report on top Priority Project List in Building Condition Assessment Report, November 2014 Status

Status Report

Page 5: Status Report on Top Priority Projects Listed in 2014 ... · 5/7/2018  · Status Report on top Priority Project List in Building Condition Assessment Report, November 2014 Status

Status Report

20

Page 6: Status Report on Top Priority Projects Listed in 2014 ... · 5/7/2018  · Status Report on top Priority Project List in Building Condition Assessment Report, November 2014 Status

Status Report

Page 7: Status Report on Top Priority Projects Listed in 2014 ... · 5/7/2018  · Status Report on top Priority Project List in Building Condition Assessment Report, November 2014 Status

“It’s A Great Day To Be A

Bloomfield Bengal!”