STATUS OF THE GAS SYSTEM C. Garabatos, GSI • Schedule • Supermodule infrastructure • Back-up system • Bubblers
9

STATUS OF THE GAS SYSTEM C. Garabatos, GSI

Jan 01, 2016

Download

Documents

Blaze Davis

STATUS OF THE GAS SYSTEM C. Garabatos, GSI. Schedule Supermodule infrastructure Back-up system Bubblers. Schedule. 09-10.06 Partial commissioning with Ar and 4-5 supermodules 11.06 Purifier and Membrane modules Closed-loop operation with Ar possible from 12.06 - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: STATUS OF THE  GAS SYSTEM C. Garabatos, GSI

STATUS OF THE GAS SYSTEM

C. Garabatos, GSI

• Schedule

• Supermodule infrastructure

• Back-up system

• Bubblers

Page 2: STATUS OF THE  GAS SYSTEM C. Garabatos, GSI

TRD C.M. Cheile Gradistei 26.09.05 C. Garabatos, GSI 2

Schedule

• 09-10.06 Partial commissioning with Ar and 4-5 supermodules

• 11.06 Purifier and Membrane modules Closed-loop operation with Ar possible

from 12.06

• 04.07 Full commissioning with Xe, analysis, recovery

Recovery plant lost!

Page 3: STATUS OF THE  GAS SYSTEM C. Garabatos, GSI

TRD C.M. Cheile Gradistei 26.09.05 C. Garabatos, GSI 3

On-detector hardware

1234PT

To distributionrack on the Plug

Exhaust line surroundingthe full detectorpermanently flushedwith CO2.

Two or three detector modules are connected to the same return line.

The gas supply is individual.Three capillary lines per module.

Height zone ~1.2 mp = 0.4 mbar

On the detetcor:1) The pressure sensor for the active pressurecontrol of each height zone.2) A bubbler (two ways) connects each module to the exhaust line.

14 times

CO Flushing2

PDT

Total height ~7.6 mp = 2.6 mbar

xBUB xy43

xy25

xy25

Page 4: STATUS OF THE  GAS SYSTEM C. Garabatos, GSI

TRD C.M. Cheile Gradistei 26.09.05 C. Garabatos, GSI 4

First ideas (B.W.)

Working on it...

Page 5: STATUS OF THE  GAS SYSTEM C. Garabatos, GSI

TRD C.M. Cheile Gradistei 26.09.05 C. Garabatos, GSI 5

The CO2 back-up system

• Cumbersome, fires rarely, not écolo

(~100 l/h continuous CO2 flow)

• Decided to keep it anyway (O2)

• Replace CO2 by N2 ?

• ...

Page 6: STATUS OF THE  GAS SYSTEM C. Garabatos, GSI

TRD C.M. Cheile Gradistei 26.09.05 C. Garabatos, GSI 6

Concerns with bubblers

1. Bubblers produce pressure fluctuations of several mbar

2. Bubblers may produce an increasing overpressure with increasing flow (~10 l/h)

3. Bubblers may spill oil into the detector

Design our own!

Page 7: STATUS OF THE  GAS SYSTEM C. Garabatos, GSI

TRD C.M. Cheile Gradistei 26.09.05 C. Garabatos, GSI 7

Dynamics of pressure waves

Page 8: STATUS OF THE  GAS SYSTEM C. Garabatos, GSI

TRD C.M. Cheile Gradistei 26.09.05 C. Garabatos, GSI 8

2nd prototype: many small holes

• 1.5 mm holes• Should be perfectly aligned• Thin holes• Extra horizontal grid• Small and simple

Thanks to Aramark!

Page 9: STATUS OF THE  GAS SYSTEM C. Garabatos, GSI

TRD C.M. Cheile Gradistei 26.09.05 C. Garabatos, GSI 9

Performance

0 100 200 300 400 5000

1

2

3

4

5

6

7

8

9

10

Ove

rpre

ssur

e (m

bar)

Flow (l/h)

Expect improvements with 3rd, professional prototype