Top Banner
M. Iwasaki RIKEN Nishina Center & TITech Staging strategy of E15 for J-PARC E15 Collaboration 2011115日土曜日
55

Staging strategy of E15 - KEKnuclpart.kek.jp/pac/1101/pdf/pac2011.pdf · E15 staging strategy E151st ~ 30kW*week 2) DISTO DATA T. Yamazaki, M. Maggiora, P. Kienle, et al, PRL 104,

Aug 21, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Staging strategy of E15 - KEKnuclpart.kek.jp/pac/1101/pdf/pac2011.pdf · E15 staging strategy E151st ~ 30kW*week 2) DISTO DATA T. Yamazaki, M. Maggiora, P. Kienle, et al, PRL 104,

M. IwasakiRIKEN Nishina Center & TITech

Staging strategy of E15

for J-PARC E15 Collaboration

2011年1月15日土曜日

Page 2: Staging strategy of E15 - KEKnuclpart.kek.jp/pac/1101/pdf/pac2011.pdf · E15 staging strategy E151st ~ 30kW*week 2) DISTO DATA T. Yamazaki, M. Maggiora, P. Kienle, et al, PRL 104,

K- 3He K-pp

Λ

neutron

proton

proton

π−

decay

formation

at 1 GeV/c by bothmissing & invariant mass

K- 3He -> “ pp K- ” + n

E15: KN interaction study by nuclear bound state-

2011年1月15日土曜日

Page 3: Staging strategy of E15 - KEKnuclpart.kek.jp/pac/1101/pdf/pac2011.pdf · E15 staging strategy E151st ~ 30kW*week 2) DISTO DATA T. Yamazaki, M. Maggiora, P. Kienle, et al, PRL 104,

E15 staging strategy E151st ~ 30kW*week

2011年1月15日土曜日

Page 4: Staging strategy of E15 - KEKnuclpart.kek.jp/pac/1101/pdf/pac2011.pdf · E15 staging strategy E151st ~ 30kW*week 2) DISTO DATA T. Yamazaki, M. Maggiora, P. Kienle, et al, PRL 104,

E15 staging strategy E151st ~ 30kW*week

motivated by

2011年1月15日土曜日

Page 5: Staging strategy of E15 - KEKnuclpart.kek.jp/pac/1101/pdf/pac2011.pdf · E15 staging strategy E151st ~ 30kW*week 2) DISTO DATA T. Yamazaki, M. Maggiora, P. Kienle, et al, PRL 104,

1) Production cross sectioncan be as large as

few mb/sr in bound region!

E15 staging strategy E151st ~ 30kW*week

motivated by

2011年1月15日土曜日

Page 6: Staging strategy of E15 - KEKnuclpart.kek.jp/pac/1101/pdf/pac2011.pdf · E15 staging strategy E151st ~ 30kW*week 2) DISTO DATA T. Yamazaki, M. Maggiora, P. Kienle, et al, PRL 104,

T. Koike, T. Harada, Phys. Rev. C80, 055208 (2009)

1) Production cross sectioncan be as large as

few mb/sr in bound region!

E15 staging strategy E151st ~ 30kW*week

motivated by

2011年1月15日土曜日

Page 7: Staging strategy of E15 - KEKnuclpart.kek.jp/pac/1101/pdf/pac2011.pdf · E15 staging strategy E151st ~ 30kW*week 2) DISTO DATA T. Yamazaki, M. Maggiora, P. Kienle, et al, PRL 104,

T. Koike, T. Harada, Phys. Rev. C80, 055208 (2009)

1) Production cross sectioncan be as large as

few mb/sr in bound region!

E15 staging strategy E151st ~ 30kW*week

2) DISTO DATA

motivated by

2011年1月15日土曜日

Page 8: Staging strategy of E15 - KEKnuclpart.kek.jp/pac/1101/pdf/pac2011.pdf · E15 staging strategy E151st ~ 30kW*week 2) DISTO DATA T. Yamazaki, M. Maggiora, P. Kienle, et al, PRL 104,

T. Koike, T. Harada, Phys. Rev. C80, 055208 (2009)

1) Production cross sectioncan be as large as

few mb/sr in bound region!

E15 staging strategy E151st ~ 30kW*week

2) DISTO DATAT. Yamazaki, M. Maggiora, P. Kienle, et al, PRL 104, 132502 (2010)

motivated by

2011年1月15日土曜日

Page 9: Staging strategy of E15 - KEKnuclpart.kek.jp/pac/1101/pdf/pac2011.pdf · E15 staging strategy E151st ~ 30kW*week 2) DISTO DATA T. Yamazaki, M. Maggiora, P. Kienle, et al, PRL 104,

T. Koike, T. Harada, Phys. Rev. C80, 055208 (2009)

1) Production cross sectioncan be as large as

few mb/sr in bound region!

E15 staging strategy E151st ~ 30kW*week

2) DISTO DATAT. Yamazaki, M. Maggiora, P. Kienle, et al, PRL 104, 132502 (2010)

3) Background Study

motivated by

2011年1月15日土曜日

Page 10: Staging strategy of E15 - KEKnuclpart.kek.jp/pac/1101/pdf/pac2011.pdf · E15 staging strategy E151st ~ 30kW*week 2) DISTO DATA T. Yamazaki, M. Maggiora, P. Kienle, et al, PRL 104,

Production cross section (KH)T. Koike, T. Harada, Phys. Rev. C80, 055208 (2009)

K-pp N,,,,

K-pp YN,,,,

K-pp total,,,,

V0 = -344 W0 = -203 MeV

K-pp N,,,,

(SGM)

K-pp total,,,,

B( N) = 0.7 B(YN) = 0.2

1B( N) = 0.11

2

V0 = -404 W0 = -213 MeV

-150 -100 -50 0 50E ( MeV )

K-pp N,,,,

B( N) = 0.7 B(YN) = 0.2

1B( N) = 0.11

2

-150 -100 -50 0 500

20

40

60

E ( MeV )

d2/d

ndE n

( µ

b/(s

r. MeV

) )

(FINUDA)

K-pp N,,,,K-pp N

,, ,,K-pp YN,,,,

K-pp total,,,,

V0 = -292 W0 = -107 MeV(YA)B( N) = 0.7

B(YN) = 0.2

1B( N) = 0.11

2

K-pp N,,,,

K-pp N,,,,K-pp YN,,,,

K-pp total,,,,

V0 = -237 W0 = -128 MeVB( N) = 0.7 B(YN) = 0.2

1B( N) = 0.11

2

0

20

40

60

d2/d

ndE n

( µ

b/(s

r. MeV

) )

(DHW)

DHW: A. Dote, T. Hyodo, and W. Weise, Nucl. Phys. A804, 197 (2008); Phys. Rev. C79, 014003 (2009).

YA: T. Yamazaki and Y. Akaishi, Phys. Lett. B535, 70 (2002); Proc. Jpn. Academy, Series B 83, 144 (2007)

SGM: N.V. Shevchenko, A. Gal, and J. Mares, Phys. Rev. Lett. 98, 082301 (2007);N.V. Shevchenko, A. Gal, J. Mares, and J. Revai, Phys. Rev. C76, 044004 (2007).

˘

˘

FINUDA: M. Agnello et al., Phys. Rev. Lett. 94, 212303 (2005).

3He (K-, n) X @ 1 GeV/c Excluding K- escape process

2011年1月15日土曜日

Page 11: Staging strategy of E15 - KEKnuclpart.kek.jp/pac/1101/pdf/pac2011.pdf · E15 staging strategy E151st ~ 30kW*week 2) DISTO DATA T. Yamazaki, M. Maggiora, P. Kienle, et al, PRL 104,

Production cross section (KH)T. Koike, T. Harada, Phys. Rev. C80, 055208 (2009)

K-pp N,,,,

K-pp YN,,,,

K-pp total,,,,

V0 = -344 W0 = -203 MeV

K-pp N,,,,

(SGM)

K-pp total,,,,

B( N) = 0.7 B(YN) = 0.2

1B( N) = 0.11

2

V0 = -404 W0 = -213 MeV

-150 -100 -50 0 50E ( MeV )

K-pp N,,,,

B( N) = 0.7 B(YN) = 0.2

1B( N) = 0.11

2

-150 -100 -50 0 500

20

40

60

E ( MeV )

d2/d

ndE n

( µ

b/(s

r. MeV

) )

(FINUDA)

K-pp N,,,,K-pp N

,, ,,K-pp YN,,,,

K-pp total,,,,

V0 = -292 W0 = -107 MeV(YA)B( N) = 0.7

B(YN) = 0.2

1B( N) = 0.11

2

K-pp N,,,,

K-pp N,,,,K-pp YN,,,,

K-pp total,,,,

V0 = -237 W0 = -128 MeVB( N) = 0.7 B(YN) = 0.2

1B( N) = 0.11

2

0

20

40

60

d2/d

ndE n

( µ

b/(s

r. MeV

) )

(DHW)

DHW: A. Dote, T. Hyodo, and W. Weise, Nucl. Phys. A804, 197 (2008); Phys. Rev. C79, 014003 (2009).

YA: T. Yamazaki and Y. Akaishi, Phys. Lett. B535, 70 (2002); Proc. Jpn. Academy, Series B 83, 144 (2007)

SGM: N.V. Shevchenko, A. Gal, and J. Mares, Phys. Rev. Lett. 98, 082301 (2007);N.V. Shevchenko, A. Gal, J. Mares, and J. Revai, Phys. Rev. C76, 044004 (2007).

˘

˘

FINUDA: M. Agnello et al., Phys. Rev. Lett. 94, 212303 (2005).

3He (K-, n) X @ 1 GeV/c Excluding K- escape process

few mb/sr in bound region!cf. 10 μb/sr assumed in prop.

2011年1月15日土曜日

Page 12: Staging strategy of E15 - KEKnuclpart.kek.jp/pac/1101/pdf/pac2011.pdf · E15 staging strategy E151st ~ 30kW*week 2) DISTO DATA T. Yamazaki, M. Maggiora, P. Kienle, et al, PRL 104,

Production cross section (KH)T. Koike, T. Harada, Phys. Rev. C80, 055208 (2009)

K-pp N,,,,

K-pp YN,,,,

K-pp total,,,,

V0 = -344 W0 = -203 MeV

K-pp N,,,,

(SGM)

K-pp total,,,,

B( N) = 0.7 B(YN) = 0.2

1B( N) = 0.11

2

V0 = -404 W0 = -213 MeV

-150 -100 -50 0 50E ( MeV )

K-pp N,,,,

B( N) = 0.7 B(YN) = 0.2

1B( N) = 0.11

2

-150 -100 -50 0 500

20

40

60

E ( MeV )

d2/d

ndE n

( µ

b/(s

r. MeV

) )

(FINUDA)

K-pp N,,,,K-pp N

,, ,,K-pp YN,,,,

K-pp total,,,,

V0 = -292 W0 = -107 MeV(YA)B( N) = 0.7

B(YN) = 0.2

1B( N) = 0.11

2

K-pp N,,,,

K-pp N,,,,K-pp YN,,,,

K-pp total,,,,

V0 = -237 W0 = -128 MeVB( N) = 0.7 B(YN) = 0.2

1B( N) = 0.11

2

0

20

40

60

d2/d

ndE n

( µ

b/(s

r. MeV

) )

(DHW)

3He (K-, n) X @ 1 GeV/c Excluding K- escape process

few mb/sr in bound region!cf. 10 μb/sr assumed in prop.

2011年1月15日土曜日

Page 13: Staging strategy of E15 - KEKnuclpart.kek.jp/pac/1101/pdf/pac2011.pdf · E15 staging strategy E151st ~ 30kW*week 2) DISTO DATA T. Yamazaki, M. Maggiora, P. Kienle, et al, PRL 104,

Production cross section (KH)T. Koike, T. Harada, Phys. Rev. C80, 055208 (2009)

K-pp N,,,,

K-pp YN,,,,

K-pp total,,,,

V0 = -344 W0 = -203 MeV

K-pp N,,,,

(SGM)

K-pp total,,,,

B( N) = 0.7 B(YN) = 0.2

1B( N) = 0.11

2

V0 = -404 W0 = -213 MeV

-150 -100 -50 0 50E ( MeV )

K-pp N,,,,

B( N) = 0.7 B(YN) = 0.2

1B( N) = 0.11

2

-150 -100 -50 0 500

20

40

60

E ( MeV )

d2/d

ndE n

( µ

b/(s

r. MeV

) )

(FINUDA)

K-pp N,,,,K-pp N

,, ,,K-pp YN,,,,

K-pp total,,,,

V0 = -292 W0 = -107 MeV(YA)B( N) = 0.7

B(YN) = 0.2

1B( N) = 0.11

2

K-pp N,,,,

K-pp N,,,,K-pp YN,,,,

K-pp total,,,,

V0 = -237 W0 = -128 MeVB( N) = 0.7 B(YN) = 0.2

1B( N) = 0.11

2

0

20

40

60

d2/d

ndE n

( µ

b/(s

r. MeV

) )

(DHW)

3He (K-, n) X @ 1 GeV/c Excluding K- escape process

few mb/sr in bound region!cf. 10 μb/sr assumed in prop.

K-pp N,,,,

K-pp YN,,,,

K-pp total,,,,

V0 = -344 W0 = -203 MeV

K-pp N,,,,

(SGM)

K-pp total,,,,

B( N) = 0.7 B(YN) = 0.2

1B( N) = 0.11

2

V0 = -404 W0 = -213 MeV

-150 -100 -50 0 50E ( MeV )

K-pp N,,,,

B( N) = 0.7 B(YN) = 0.2

1B( N) = 0.11

2

-150 -100 -50 0 500

20

40

60

E ( MeV )

d2/d

ndE n

( µ

b/(s

r. MeV

) )

(FINUDA)

K-pp N,,,,K-pp N

,, ,,K-pp YN,,,,

K-pp total,,,,

V0 = -292 W0 = -107 MeV(YA)B( N) = 0.7

B(YN) = 0.2

1B( N) = 0.11

2

K-pp N,,,,

K-pp N,,,,K-pp YN,,,,

K-pp total,,,,

V0 = -237 W0 = -128 MeVB( N) = 0.7 B(YN) = 0.2

1B( N) = 0.11

2

0

20

40

60

d2/d

ndE n

( µ

b/(s

r. MeV

) )

(DHW)

limiting to nYN final states1mb/sr!~>

2011年1月15日土曜日

Page 14: Staging strategy of E15 - KEKnuclpart.kek.jp/pac/1101/pdf/pac2011.pdf · E15 staging strategy E151st ~ 30kW*week 2) DISTO DATA T. Yamazaki, M. Maggiora, P. Kienle, et al, PRL 104,

exclusive pp → K+Λp at Tp = 2.85 GeV

BK~100MeV and ΓK~100MeV

T. Yamazaki, M. Maggiora, P. Kienle, et al, PRL 104, 132502 (2010)

DISTO DATA

2011年1月15日土曜日

Page 15: Staging strategy of E15 - KEKnuclpart.kek.jp/pac/1101/pdf/pac2011.pdf · E15 staging strategy E151st ~ 30kW*week 2) DISTO DATA T. Yamazaki, M. Maggiora, P. Kienle, et al, PRL 104,

KH vs DISTO

K-pp N,,,,

K-pp YN,,,,

K-pp total,,,,

V0 = -344 W0 = -203 MeV

K-pp N,,,,

(SGM)

K-pp total,,,,

B( N) = 0.7 B(YN) = 0.2

1B( N) = 0.11

2

V0 = -404 W0 = -213 MeV

-150 -100 -50 0 50E ( MeV )

K-pp N,,,,

B( N) = 0.7 B(YN) = 0.2

1B( N) = 0.11

2

-150 -100 -50 0 500

20

40

60

E ( MeV )

d2/d

ndE n

( µ

b/(s

r. MeV

) )

(FINUDA)

K-pp N,,,,

K-pp N,, ,,K-pp YN,,,,

K-pp total,,,,

V0 = -292 W0 = -107 MeV(YA)B( N) = 0.7

B(YN) = 0.2

1B( N) = 0.11

2

K-pp N,,,,

K-pp N,,,,K-pp YN,,,,

K-pp total,,,,

V0 = -237 W0 = -128 MeVB( N) = 0.7 B(YN) = 0.2

1B( N) = 0.11

2

0

20

40

60

d2/d

ndE n

( µ

b/(s

r. MeV

) )

(DHW)

2011年1月15日土曜日

Page 16: Staging strategy of E15 - KEKnuclpart.kek.jp/pac/1101/pdf/pac2011.pdf · E15 staging strategy E151st ~ 30kW*week 2) DISTO DATA T. Yamazaki, M. Maggiora, P. Kienle, et al, PRL 104,

KH vs DISTO

K-pp N,,,,

K-pp YN,,,,

K-pp total,,,,

V0 = -344 W0 = -203 MeV

K-pp N,,,,

(SGM)

K-pp total,,,,

B( N) = 0.7 B(YN) = 0.2

1B( N) = 0.11

2

V0 = -404 W0 = -213 MeV

-150 -100 -50 0 50E ( MeV )

K-pp N,,,,

B( N) = 0.7 B(YN) = 0.2

1B( N) = 0.11

2

-150 -100 -50 0 500

20

40

60

E ( MeV )

d2/d

ndE n

( µ

b/(s

r. MeV

) )

(FINUDA)

K-pp N,,,,

K-pp N,, ,,K-pp YN,,,,

K-pp total,,,,

V0 = -292 W0 = -107 MeV(YA)B( N) = 0.7

B(YN) = 0.2

1B( N) = 0.11

2

K-pp N,,,,

K-pp N,,,,K-pp YN,,,,

K-pp total,,,,

V0 = -237 W0 = -128 MeVB( N) = 0.7 B(YN) = 0.2

1B( N) = 0.11

2

0

20

40

60

d2/d

ndE n

( µ

b/(s

r. MeV

) )

(DHW)

-150 -100 -50 0 50E ( MeV )

-150 -100 -50 0 500

20

40

60

E ( MeV )

d2/d

ndE n

( µ

b/(s

r. MeV

) )

(FINUDA)

K-pp total,,,,

V0 = -292 W0 = -107 MeV(YA)B( N) = 0.7

B(YN) = 0.2

1B( N) = 0.11

2

,,

K-pp total,,,,

V0 = -237 W0 = -128 MeVB( N) = 0.7 B(YN) = 0.2

1B( N) = 0.11

2

0

20

40

60

d2/d

ndE n

( µ

b/(s

r. MeV

) )

(DHW)

K-pp N,,,,DISTO K-pp N,,,,DISTO

K-pp N,,,,DISTOK-pp N,,,,DISTO

DISTO

2011年1月15日土曜日

Page 17: Staging strategy of E15 - KEKnuclpart.kek.jp/pac/1101/pdf/pac2011.pdf · E15 staging strategy E151st ~ 30kW*week 2) DISTO DATA T. Yamazaki, M. Maggiora, P. Kienle, et al, PRL 104,

KH vs DISTO

K-pp N,,,,

K-pp YN,,,,

K-pp total,,,,

V0 = -344 W0 = -203 MeV

K-pp N,,,,

(SGM)

K-pp total,,,,

B( N) = 0.7 B(YN) = 0.2

1B( N) = 0.11

2

V0 = -404 W0 = -213 MeV

-150 -100 -50 0 50E ( MeV )

K-pp N,,,,

B( N) = 0.7 B(YN) = 0.2

1B( N) = 0.11

2

-150 -100 -50 0 500

20

40

60

E ( MeV )

d2/d

ndE n

( µ

b/(s

r. MeV

) )

(FINUDA)

K-pp N,,,,

K-pp N,, ,,K-pp YN,,,,

K-pp total,,,,

V0 = -292 W0 = -107 MeV(YA)B( N) = 0.7

B(YN) = 0.2

1B( N) = 0.11

2

K-pp N,,,,

K-pp N,,,,K-pp YN,,,,

K-pp total,,,,

V0 = -237 W0 = -128 MeVB( N) = 0.7 B(YN) = 0.2

1B( N) = 0.11

2

0

20

40

60

d2/d

ndE n

( µ

b/(s

r. MeV

) )

(DHW)

-150 -100 -50 0 50E ( MeV )

-150 -100 -50 0 500

20

40

60

E ( MeV )

d2/d

ndE n

( µ

b/(s

r. MeV

) )

(FINUDA)

K-pp total,,,,

V0 = -292 W0 = -107 MeV(YA)B( N) = 0.7

B(YN) = 0.2

1B( N) = 0.11

2

,,

K-pp total,,,,

V0 = -237 W0 = -128 MeVB( N) = 0.7 B(YN) = 0.2

1B( N) = 0.11

2

0

20

40

60

d2/d

ndE n

( µ

b/(s

r. MeV

) )

(DHW)

K-pp N,,,,DISTO K-pp N,,,,DISTO

K-pp N,,,,DISTOK-pp N,,,,DISTO

DISTO

- does not fit in KH scheme

BK~100MeV and ΓK~100MeV

- only for Λp decay ch.private communication

2011年1月15日土曜日

Page 18: Staging strategy of E15 - KEKnuclpart.kek.jp/pac/1101/pdf/pac2011.pdf · E15 staging strategy E151st ~ 30kW*week 2) DISTO DATA T. Yamazaki, M. Maggiora, P. Kienle, et al, PRL 104,

KH vs DISTO

K-pp N,,,,

K-pp YN,,,,

K-pp total,,,,

V0 = -344 W0 = -203 MeV

K-pp N,,,,

(SGM)

K-pp total,,,,

B( N) = 0.7 B(YN) = 0.2

1B( N) = 0.11

2

V0 = -404 W0 = -213 MeV

-150 -100 -50 0 50E ( MeV )

K-pp N,,,,

B( N) = 0.7 B(YN) = 0.2

1B( N) = 0.11

2

-150 -100 -50 0 500

20

40

60

E ( MeV )

d2/d

ndE n

( µ

b/(s

r. MeV

) )

(FINUDA)

K-pp N,,,,

K-pp N,, ,,K-pp YN,,,,

K-pp total,,,,

V0 = -292 W0 = -107 MeV(YA)B( N) = 0.7

B(YN) = 0.2

1B( N) = 0.11

2

K-pp N,,,,

K-pp N,,,,K-pp YN,,,,

K-pp total,,,,

V0 = -237 W0 = -128 MeVB( N) = 0.7 B(YN) = 0.2

1B( N) = 0.11

2

0

20

40

60

d2/d

ndE n

( µ

b/(s

r. MeV

) )

(DHW)

-150 -100 -50 0 50E ( MeV )

-150 -100 -50 0 500

20

40

60

E ( MeV )

d2/d

ndE n

( µ

b/(s

r. MeV

) )

(FINUDA)

K-pp total,,,,

V0 = -292 W0 = -107 MeV(YA)B( N) = 0.7

B(YN) = 0.2

1B( N) = 0.11

2

,,

K-pp total,,,,

V0 = -237 W0 = -128 MeVB( N) = 0.7 B(YN) = 0.2

1B( N) = 0.11

2

0

20

40

60

d2/d

ndE n

( µ

b/(s

r. MeV

) )

(DHW)

K-pp N,,,,DISTO K-pp N,,,,DISTO

K-pp N,,,,DISTOK-pp N,,,,DISTO

DISTO

- does not fit in KH scheme

BK~100MeV and ΓK~100MeV

- only for Λp decay ch.private communication

easy to observe,if dσ/dΩ 1mb/sr~>and Λp decay channel

( n + Λp final state )

2011年1月15日土曜日

Page 19: Staging strategy of E15 - KEKnuclpart.kek.jp/pac/1101/pdf/pac2011.pdf · E15 staging strategy E151st ~ 30kW*week 2) DISTO DATA T. Yamazaki, M. Maggiora, P. Kienle, et al, PRL 104,

Neutron missing mass spectra @ 30kW*week

simulated by T. Hiraiwa

2000 2200 2400 2600 2800 3000]2c,n) [MeV/-He(K3missing mass of

0

100

200

300

400

500

coun

ts

Expected yield for 30 kW. week

incident beampp -K p (100%)

conv.2NR + N FSI2NR +

relative yields of background

components are unknown

equal yields assumed

3He(K-,n) p : fully reconstructed

acceptance

600

2011年1月15日土曜日

Page 20: Staging strategy of E15 - KEKnuclpart.kek.jp/pac/1101/pdf/pac2011.pdf · E15 staging strategy E151st ~ 30kW*week 2) DISTO DATA T. Yamazaki, M. Maggiora, P. Kienle, et al, PRL 104,

Neutron missing mass spectra @ 30kW*week

simulated by T. Hiraiwa

Assume DISTO like data, BK~100MeV and ΓK~100MeV

dσ/dΩθ=0 = 1 mb/srBR(Λp) = 100 %

for simplicity

p3He

nK-

CDS

NC

"Kpp"

signal

2000 2200 2400 2600 2800 3000]2c,n) [MeV/-He(K3missing mass of

0

100

200

300

400

500

coun

ts

Expected yield for 30 kW. week

incident beampp -K p (100%)

conv.2NR + N FSI2NR +

relative yields of background

components are unknown

equal yields assumed

3He(K-,n) p : fully reconstructed

acceptance

600

2011年1月15日土曜日

Page 21: Staging strategy of E15 - KEKnuclpart.kek.jp/pac/1101/pdf/pac2011.pdf · E15 staging strategy E151st ~ 30kW*week 2) DISTO DATA T. Yamazaki, M. Maggiora, P. Kienle, et al, PRL 104,

Neutron missing mass spectra @ 30kW*week

simulated by T. Hiraiwa

Assume DISTO like data, BK~100MeV and ΓK~100MeV

dσ/dΩθ=0 = 1 mb/srBR(Λp) = 100 %

for simplicity

p3He

nK-

CDS

NC

"Kpp"

signal

2000 2200 2400 2600 2800 3000]2c,n) [MeV/-He(K3missing mass of

0

100

200

300

400

500

coun

ts

Expected yield for 30 kW. week

incident beampp -K p (100%)

conv.2NR + N FSI2NR +

relative yields of background

components are unknown

equal yields assumed

3He(K-,n) p : fully reconstructed

acceptance

600

2NR initiated reactions

p3He

n

K-CDS

NCσ ~ 10 mb each

backgrounds

2011年1月15日土曜日

Page 22: Staging strategy of E15 - KEKnuclpart.kek.jp/pac/1101/pdf/pac2011.pdf · E15 staging strategy E151st ~ 30kW*week 2) DISTO DATA T. Yamazaki, M. Maggiora, P. Kienle, et al, PRL 104,

-0.6 -0.4 -0.2 0 0.2 0.4 0.60

0.2

0.4

0.6

0.8

1

T /

Q

(Tp - Tn ) / 3Q

In-flight Kinematics

p3HenK-

kinematical boundary

3-body Phase Space (Dalitz's plot) at CM

Λpn event distribution on Phase Space

simulated by T. Hiraiwa2011年1月15日土曜日

Page 23: Staging strategy of E15 - KEKnuclpart.kek.jp/pac/1101/pdf/pac2011.pdf · E15 staging strategy E151st ~ 30kW*week 2) DISTO DATA T. Yamazaki, M. Maggiora, P. Kienle, et al, PRL 104,

-0.6 -0.4 -0.2 0 0.2 0.4 0.60

0.2

0.4

0.6

0.8

1

T /

Q

(Tp - Tn ) / 3Q

CDS Acceptance

p3HenK-

3-body Phase Space (Dalitz's plot) at CM

CDSp in CDS(p )

CDS Acceptance

simulated by T. Hiraiwa2011年1月15日土曜日

Page 24: Staging strategy of E15 - KEKnuclpart.kek.jp/pac/1101/pdf/pac2011.pdf · E15 staging strategy E151st ~ 30kW*week 2) DISTO DATA T. Yamazaki, M. Maggiora, P. Kienle, et al, PRL 104,

p in CDSn in NC

-0.6 -0.4 -0.2 0 0.2 0.4 0.60

0.2

0.4

0.6

0.8

1

T /

Q

(Tp - Tn ) / 3Q

CDS & NC Acceptance

p3HenK-

3-body Phase Space (Dalitz's plot) at CM

CDS

NC

CDS & NC Acceptance

simulated by T. Hiraiwa2011年1月15日土曜日

Page 25: Staging strategy of E15 - KEKnuclpart.kek.jp/pac/1101/pdf/pac2011.pdf · E15 staging strategy E151st ~ 30kW*week 2) DISTO DATA T. Yamazaki, M. Maggiora, P. Kienle, et al, PRL 104,

on 3-body Phase Space (Dalitz's plot) at CM

p in CDSn in NC

-0.6 -0.4 -0.2 0 0.2 0.4 0.60

0.2

0.4

0.6

0.8

1

(Tp - Tn ) / 3Q

T /

Q

CDS & NC Acceptance

Background? Two Nucleon Reaction and FSI (Σ-Λ conversion)

simulated by T. Hiraiwa2011年1月15日土曜日

Page 26: Staging strategy of E15 - KEKnuclpart.kek.jp/pac/1101/pdf/pac2011.pdf · E15 staging strategy E151st ~ 30kW*week 2) DISTO DATA T. Yamazaki, M. Maggiora, P. Kienle, et al, PRL 104,

p3He

nK-

or

p3He

n

K-

-0.6 -0.4 -0.2 0 0.2 0.4 0.60

0.2

0.4

0.6

0.8

1

T /

Q

(Tp - Tn ) / 3Q

on 3-body Phase Space (Dalitz's plot) at CM2NR and conversion

Background? Two Nucleon Reaction and FSI (Σ-Λ conversion)

simulated by T. Hiraiwa

multi-step PWIA

2011年1月15日土曜日

Page 27: Staging strategy of E15 - KEKnuclpart.kek.jp/pac/1101/pdf/pac2011.pdf · E15 staging strategy E151st ~ 30kW*week 2) DISTO DATA T. Yamazaki, M. Maggiora, P. Kienle, et al, PRL 104,

p3He

nK-

or

p3He

n

K-

-0.6 -0.4 -0.2 0 0.2 0.4 0.60

0.2

0.4

0.6

0.8

1

T /

Q

(Tp - Tn ) / 3Q

on 3-body Phase Space (Dalitz's plot) at CM2NR and conversion

Background? Two Nucleon Reaction and FSI (Σ-Λ conversion)

simulated by T. Hiraiwa

multi-step PWIA

1st step

2011年1月15日土曜日

Page 28: Staging strategy of E15 - KEKnuclpart.kek.jp/pac/1101/pdf/pac2011.pdf · E15 staging strategy E151st ~ 30kW*week 2) DISTO DATA T. Yamazaki, M. Maggiora, P. Kienle, et al, PRL 104,

p3He

nK-

or

p3He

n

K-

-0.6 -0.4 -0.2 0 0.2 0.4 0.60

0.2

0.4

0.6

0.8

1

T /

Q

(Tp - Tn ) / 3Q

on 3-body Phase Space (Dalitz's plot) at CM2NR and conversion

Background? Two Nucleon Reaction and FSI (Σ-Λ conversion)

simulated by T. Hiraiwa

multi-step PWIA

1st step

2nd step

2011年1月15日土曜日

Page 29: Staging strategy of E15 - KEKnuclpart.kek.jp/pac/1101/pdf/pac2011.pdf · E15 staging strategy E151st ~ 30kW*week 2) DISTO DATA T. Yamazaki, M. Maggiora, P. Kienle, et al, PRL 104,

p3He

nK-

or

p3He

n

K-

n

-0.6 -0.4 -0.2 0 0.2 0.4 0.60

0.2

0.4

0.6

0.8

1

T /

Q

(Tp - Tn ) / 3Q

on 3-body Phase Space (Dalitz's plot) at CM2NR and conversion

CDS

CDS

p3He

nK-

or

p3He

n

K-

n

p in CDS(p )

Background? Two Nucleon Reaction and FSI (Σ-Λ conversion)

simulated by T. Hiraiwa

multi-step PWIA

2011年1月15日土曜日

Page 30: Staging strategy of E15 - KEKnuclpart.kek.jp/pac/1101/pdf/pac2011.pdf · E15 staging strategy E151st ~ 30kW*week 2) DISTO DATA T. Yamazaki, M. Maggiora, P. Kienle, et al, PRL 104,

p3He

nK-

CDS

NC

p3He

n

K-CDS

NCor

p in CDSn in NC

-0.6 -0.4 -0.2 0 0.2 0.4 0.60

0.2

0.4

0.6

0.8

1

T /

Q

(Tp - Tn ) / 3Q

on 3-body Phase Space (Dalitz's plot) at CM2NR and conversion

Background? Two Nucleon Reaction and FSI (Σ-Λ conversion)

simulated by T. Hiraiwa

multi-step PWIA

2011年1月15日土曜日

Page 31: Staging strategy of E15 - KEKnuclpart.kek.jp/pac/1101/pdf/pac2011.pdf · E15 staging strategy E151st ~ 30kW*week 2) DISTO DATA T. Yamazaki, M. Maggiora, P. Kienle, et al, PRL 104,

p3He

nK-

CDS

NCon 3-body Phase Space (Dalitz's plot) at CM2NR and conversion

0

0.2

0.4

0.6

0.8

1

p in CDSn in NC

-0.6 -0.4 -0.2 0 0.2 0.4 0.6

(Tp - Tn ) / 3Q

T /

Q

p3He

n

K-CDS

NCor

p3He

nK-

CDS

NC

"Kpp"

signal

Background? vs signal (ratio arbitrary)Two Nucleon Reaction and FSI (Σ-Λ conversion)

simulated by T. Hiraiwa

multi-step PWIA

2011年1月15日土曜日

Page 32: Staging strategy of E15 - KEKnuclpart.kek.jp/pac/1101/pdf/pac2011.pdf · E15 staging strategy E151st ~ 30kW*week 2) DISTO DATA T. Yamazaki, M. Maggiora, P. Kienle, et al, PRL 104,

Is two nucleon reaction possible?in in-flight kinematics @ 1GeV/c

De Broglie wave length @ 1 GeV/c ~ 1.2 fm<

Nucleon distance ~ 1.5 fm

Not very likely...

although 2NR process should be examined on

cf.

1) nucleon or hyperon scattering2) Σ→Λ conversion

Two successive reaction after KNN

Note: Simple KNN channel excluded: Because it is easy to discriminate

T. Kishimoto et al., Prog. Theor. Phys. 118 (2007) 181

2NR not

seen!

by reducing the trigger level.

2011年1月15日土曜日

Page 33: Staging strategy of E15 - KEKnuclpart.kek.jp/pac/1101/pdf/pac2011.pdf · E15 staging strategy E151st ~ 30kW*week 2) DISTO DATA T. Yamazaki, M. Maggiora, P. Kienle, et al, PRL 104,

π+p

π−

preliminary

~2800 Λ σmass =3.5MeV/c2

preliminary

Present?

missing: transportation ofSW Magnet and NC

2011年1月15日土曜日

Page 34: Staging strategy of E15 - KEKnuclpart.kek.jp/pac/1101/pdf/pac2011.pdf · E15 staging strategy E151st ~ 30kW*week 2) DISTO DATA T. Yamazaki, M. Maggiora, P. Kienle, et al, PRL 104,

E151st ~ 30kW*week (2% in terms of proton on target)

E15 staging strategy

E15 approved = 1500kW*week (@ Pt equiv.)apparatus preparation is ready

not easy to realize

1) to know the background processes 2) to evaluate the realistic beam time for E15full

3) present an information of the KN interaction 3He(K-, n) spectrum below KN threshold4) a hint of signal in Λ + p + n final states

--

E151st realize before long shutdown in 2012

2011年1月15日土曜日

Page 35: Staging strategy of E15 - KEKnuclpart.kek.jp/pac/1101/pdf/pac2011.pdf · E15 staging strategy E151st ~ 30kW*week 2) DISTO DATA T. Yamazaki, M. Maggiora, P. Kienle, et al, PRL 104,

E151st ~ 30kW*week (2% in terms of proton on target)

E15 staging strategy

divide into 3 periods

E15 approved = 1500kW*week (@ Pt equiv.)apparatus preparation is ready

not easy to realize

1) to know the background processes 2) to evaluate the realistic beam time for E15full

3) present an information of the KN interaction 3He(K-, n) spectrum below KN threshold4) a hint of signal in Λ + p + n final states

--

E151st realize before long shutdown in 2012

2011年1月15日土曜日

Page 36: Staging strategy of E15 - KEKnuclpart.kek.jp/pac/1101/pdf/pac2011.pdf · E15 staging strategy E151st ~ 30kW*week 2) DISTO DATA T. Yamazaki, M. Maggiora, P. Kienle, et al, PRL 104,

J-PARC E15 Collaborationhttp://ag.riken.jp/J-PARC/collaboration/

2011年1月15日土曜日

Page 37: Staging strategy of E15 - KEKnuclpart.kek.jp/pac/1101/pdf/pac2011.pdf · E15 staging strategy E151st ~ 30kW*week 2) DISTO DATA T. Yamazaki, M. Maggiora, P. Kienle, et al, PRL 104,

Thank you for attention!

2011年1月15日土曜日

Page 38: Staging strategy of E15 - KEKnuclpart.kek.jp/pac/1101/pdf/pac2011.pdf · E15 staging strategy E151st ~ 30kW*week 2) DISTO DATA T. Yamazaki, M. Maggiora, P. Kienle, et al, PRL 104,

spare

2011年1月15日土曜日

Page 39: Staging strategy of E15 - KEKnuclpart.kek.jp/pac/1101/pdf/pac2011.pdf · E15 staging strategy E151st ~ 30kW*week 2) DISTO DATA T. Yamazaki, M. Maggiora, P. Kienle, et al, PRL 104,

K1.8BR with Pt (@50% loss)

E17 ~ 10kW*week

E151st ~ 30kW*week (first stage)cf. 1500kW*week (E15 full @ Pt equiv.)

E31 ~ 180kW*week

KN by x-ray via K- 3He

KN by bound state via K- 3He

Λ(1405) via K- d

> 2kW?

> 10kW?> 100kW?

> 20~40kW?

required power

All K incident experiments: Present Duty Factor will be OK up to few 10th of kW

2011年1月15日土曜日

Page 40: Staging strategy of E15 - KEKnuclpart.kek.jp/pac/1101/pdf/pac2011.pdf · E15 staging strategy E151st ~ 30kW*week 2) DISTO DATA T. Yamazaki, M. Maggiora, P. Kienle, et al, PRL 104,

Signal can be easily discriminated from signal in both FSI cases !

1) nucleon or hyperon scattering2) Σ→Λ conversion

Two successive reaction after KNN

Note: Simple KNN channel excluded: Because it is easy to discriminate

2011年1月15日土曜日

Page 41: Staging strategy of E15 - KEKnuclpart.kek.jp/pac/1101/pdf/pac2011.pdf · E15 staging strategy E151st ~ 30kW*week 2) DISTO DATA T. Yamazaki, M. Maggiora, P. Kienle, et al, PRL 104,

p in CDSn in NC

-0.6 -0.4 -0.2 0 0.2 0.4 0.60

0.2

0.4

0.6

0.8

1

T /

Q

(Tp - Tn ) / 3Q

CDS & NC Acceptance

p3HenK-

3-body Phase Space (Dalitz's plot) at CM

CDS

NC

Can we extend the detection capability?

simulated by T. Hiraiwa2011年1月15日土曜日

Page 42: Staging strategy of E15 - KEKnuclpart.kek.jp/pac/1101/pdf/pac2011.pdf · E15 staging strategy E151st ~ 30kW*week 2) DISTO DATA T. Yamazaki, M. Maggiora, P. Kienle, et al, PRL 104,

p in CDSn in NC

-0.6 -0.4 -0.2 0 0.2 0.4 0.60

0.2

0.4

0.6

0.8

1

T /

Q

(Tp - Tn ) / 3Q

CDS & NC Acceptance with one proton missing

p3HenK-

3-body Phase Space (Dalitz's plot) at CM

CDS

NC

p missing from CDS

Can we extend the detection capability?

simulated by T. Hiraiwa2011年1月15日土曜日

Page 43: Staging strategy of E15 - KEKnuclpart.kek.jp/pac/1101/pdf/pac2011.pdf · E15 staging strategy E151st ~ 30kW*week 2) DISTO DATA T. Yamazaki, M. Maggiora, P. Kienle, et al, PRL 104,

p3HenK-

CDS

NC

p missing from CDS

p3He

nK-

CDS

NC

"Kpp"

-0.6 -0.4 -0.2 0 0.2 0.4 0.60

0.2

0.4

0.6

0.8

1

T /

Q

(Tp - Tn ) / 3Q

"Kpp" 3-body Phase Space (Dalitz's plot) at CM

Can we extend the detection capability?

BK~100MeV, ΓK~100MeV(like DISTO data)

simulated by T. Hiraiwa2011年1月15日土曜日

Page 44: Staging strategy of E15 - KEKnuclpart.kek.jp/pac/1101/pdf/pac2011.pdf · E15 staging strategy E151st ~ 30kW*week 2) DISTO DATA T. Yamazaki, M. Maggiora, P. Kienle, et al, PRL 104,

-0.6 -0.4 -0.2 0 0.2 0.4 0.60

0.2

0.4

0.6

0.8

1

T /

Q

(Tp - Tn ) / 3Q

"Kpp" with one proton missing3-body Phase Space (Dalitz's plot) at CM

p3HenK-

CDS

NC

p missing from CDS

p3He

nK-

CDS

NC

"Kpp"

p missing from CDS

Can we extend the detection capability?

BK~100MeV, ΓK~100MeV(like DISTO data)

simulated by T. Hiraiwa2011年1月15日土曜日

Page 45: Staging strategy of E15 - KEKnuclpart.kek.jp/pac/1101/pdf/pac2011.pdf · E15 staging strategy E151st ~ 30kW*week 2) DISTO DATA T. Yamazaki, M. Maggiora, P. Kienle, et al, PRL 104,

Λpn final state selection by CDS & NCWhat happens if we miss other particles?

Other processes can be clearly

separated!

simulated by T. Hiraiwa

other than Λpn

Missing Energy [MeV]0 200 400 600 8000

50

100

150

200

250

coun

ts (a

.u.)

relative yields of each components

are unknown

missingmissing

QF-

pn final state

0pn final state

+

2011年1月15日土曜日

Page 46: Staging strategy of E15 - KEKnuclpart.kek.jp/pac/1101/pdf/pac2011.pdf · E15 staging strategy E151st ~ 30kW*week 2) DISTO DATA T. Yamazaki, M. Maggiora, P. Kienle, et al, PRL 104,

•Efficiency  (NC  eff.  Is  not  included.)-­‐3body  phase  space  0.079  %  (all  detected)

“Kpp”(B=100MeV  Γ=100MeV)  0.042  %  (all  detected)0.098  %  (one  proton  missing)

0.12%  (one  proton  missing)

Improvement by one proton missing

Λpn / Σ0pn still be separated

x 2 improvement

Are they perfect?

QF-Y production also separated

simulated by T. Hiraiwa

•Missing  proton  resoluOon:  28.4  ±0.3  MeV/c2

but partial overlap with pπ missing

=X = N

NX = NX = NX =

]2cpn) [MeV/-, -Missing Mass of 3He(K600 800 1000 1200 1400 1600 1800

coun

ts (a

.u.)

0

1000

2000

3000

4000

5000

6000relative yields of each

components are unknown

missingp

p missing

p missing p missing

2011年1月15日土曜日

Page 47: Staging strategy of E15 - KEKnuclpart.kek.jp/pac/1101/pdf/pac2011.pdf · E15 staging strategy E151st ~ 30kW*week 2) DISTO DATA T. Yamazaki, M. Maggiora, P. Kienle, et al, PRL 104,

2011年1月15日土曜日

Page 48: Staging strategy of E15 - KEKnuclpart.kek.jp/pac/1101/pdf/pac2011.pdf · E15 staging strategy E151st ~ 30kW*week 2) DISTO DATA T. Yamazaki, M. Maggiora, P. Kienle, et al, PRL 104,

on 3-body Phase Space (Dalitz's plot) at CM

p in CDSn in NC

-0.6 -0.4 -0.2 0 0.2 0.4 0.60

0.2

0.4

0.6

0.8

1

(Tp - Tn ) / 3Q

T /

Q

CDS & NC Acceptance

Background? Two Nucleon Reaction and FSI (Σ-Λ conversion)

simulated by T. Hiraiwa2011年1月15日土曜日

Page 49: Staging strategy of E15 - KEKnuclpart.kek.jp/pac/1101/pdf/pac2011.pdf · E15 staging strategy E151st ~ 30kW*week 2) DISTO DATA T. Yamazaki, M. Maggiora, P. Kienle, et al, PRL 104,

p3He

nK-

CDS

NCon 3-body Phase Space (Dalitz's plot) at CM

p in CDSn in NC

-0.6 -0.4 -0.2 0 0.2 0.4 0.60

0.2

0.4

0.6

0.8

1

T /

Q

(Tp - Tn ) / 3Q

2NR and conversion

s

or

p3He

n

K-CDS

NCs

s

s

Background? Two Nucleon Reaction and FSI (Σ-Λ conversion)

simulated by T. Hiraiwa

multi-step PWIA

2011年1月15日土曜日

Page 50: Staging strategy of E15 - KEKnuclpart.kek.jp/pac/1101/pdf/pac2011.pdf · E15 staging strategy E151st ~ 30kW*week 2) DISTO DATA T. Yamazaki, M. Maggiora, P. Kienle, et al, PRL 104,

p3He

nK-

CDS

NCon 3-body Phase Space (Dalitz's plot) at CM

p in CDSn in NC

-0.6 -0.4 -0.2 0 0.2 0.4 0.60

0.2

0.4

0.6

0.8

1

T /

Q

(Tp - Tn ) / 3Q

2NR and conversion

s

or

p3He

n

K-CDS

NCs

s

s

Background? Two Nucleon Reaction and FSI (Σ-Λ conversion)

simulated by T. Hiraiwa

multi-step PWIA

1st step

2011年1月15日土曜日

Page 51: Staging strategy of E15 - KEKnuclpart.kek.jp/pac/1101/pdf/pac2011.pdf · E15 staging strategy E151st ~ 30kW*week 2) DISTO DATA T. Yamazaki, M. Maggiora, P. Kienle, et al, PRL 104,

p3He

nK-

CDS

NCon 3-body Phase Space (Dalitz's plot) at CM

p in CDSn in NC

-0.6 -0.4 -0.2 0 0.2 0.4 0.60

0.2

0.4

0.6

0.8

1

T /

Q

(Tp - Tn ) / 3Q

2NR and conversion

s

or

p3He

n

K-CDS

NCs

s

s

Background? Two Nucleon Reaction and FSI (Σ-Λ conversion)

simulated by T. Hiraiwa

multi-step PWIA

1st step

2nd step

2011年1月15日土曜日

Page 52: Staging strategy of E15 - KEKnuclpart.kek.jp/pac/1101/pdf/pac2011.pdf · E15 staging strategy E151st ~ 30kW*week 2) DISTO DATA T. Yamazaki, M. Maggiora, P. Kienle, et al, PRL 104,

p3He

nK-

CDS

NCon 3-body Phase Space (Dalitz's plot) at CM

p in CDSn in NC

-0.6 -0.4 -0.2 0 0.2 0.4 0.60

0.2

0.4

0.6

0.8

1

T /

Q

(Tp - Tn ) / 3Q

2NR and conversion

s

or

p3He

n

K-CDS

NCs

s

s

Background? Two Nucleon Reaction and FSI (Σ-Λ conversion)

simulated by T. Hiraiwa

multi-step PWIA

2011年1月15日土曜日

Page 53: Staging strategy of E15 - KEKnuclpart.kek.jp/pac/1101/pdf/pac2011.pdf · E15 staging strategy E151st ~ 30kW*week 2) DISTO DATA T. Yamazaki, M. Maggiora, P. Kienle, et al, PRL 104,

p3He

nK-

CDS

NCon 3-body Phase Space (Dalitz's plot) at CM

p in CDSn in NC

-0.6 -0.4 -0.2 0 0.2 0.4 0.60

0.2

0.4

0.6

0.8

1

T /

Q

(Tp - Tn ) / 3Q

2NR and conversion

s

or

p3He

n

K-CDS

NCs

s

s

Background? Two Nucleon Reaction and FSI (Σ-Λ conversion)

simulated by T. Hiraiwa

multi-step PWIA

2011年1月15日土曜日

Page 54: Staging strategy of E15 - KEKnuclpart.kek.jp/pac/1101/pdf/pac2011.pdf · E15 staging strategy E151st ~ 30kW*week 2) DISTO DATA T. Yamazaki, M. Maggiora, P. Kienle, et al, PRL 104,

p3He

nK-

CDS

NCon 3-body Phase Space (Dalitz's plot) at CM

p in CDSn in NC

-0.6 -0.4 -0.2 0 0.2 0.4 0.6

(Tp - Tn ) / 3Q

0

0.2

0.4

0.6

0.8

1

T /

Q

2NR and conversion

s

or

p3He

n

K-CDS

NCs

s

s

p3He

nK-

CDS

NC

"Kpp"

signal signal

Background? vs signal (ratio arbitrary)Two Nucleon Reaction and FSI (Σ-Λ conversion)

simulated by T. Hiraiwa

multi-step PWIA

2011年1月15日土曜日

Page 55: Staging strategy of E15 - KEKnuclpart.kek.jp/pac/1101/pdf/pac2011.pdf · E15 staging strategy E151st ~ 30kW*week 2) DISTO DATA T. Yamazaki, M. Maggiora, P. Kienle, et al, PRL 104,

• Yield  =  Nkaon  x  t  x  dσ/dΩ(θ=0)  x  r  x  R  x  A  x  e  x  ε

–Nkaon  :  kaon  per  spill  →  300k/spill  (30  kW  operaOon)

–t  :  target  →  0.08  [g/cm3]  /    3  [g/mol]  x  6.02  x  1023  [mol-­‐1]                                            x  9.3  [cm]  ~      1.4  x  1023  [cm-­‐2]  –dσ/dΩ   (@  θ = 0)  →  3  [mb/sr]  –r  :  branching  raOo  (Λ  →  π-­‐p)  →  0.63–R  :  “Kpp”  decay  branch  →  Br(Λp)  +  Br(Σ0p)  ~  1–A  :  NC  acceptance  →  12  [msr]    –e  :  NC  efficiency  →  0.3

–ε  :  overall  efficiency  (trigger,  detector,  ana.,  etc)  →  0.7• 2.1  x  104  signals  on  missing  mass  spectrum  (by  1  week  run)

Estimated yield by one proton missing

PLB 652(2007)262-268PR C 80,055208(2009)

(Λp + Σ0p branch)

2011年1月15日土曜日