Page 1 of 138 Any Issues with PDF version refer to below Excel version Updated Quarterly - January, April, July, October http://www2.pratt-whitney.com/procurement/specrev/current/srl_current.xls Specification Revision List Pratt & Whitney January 25, 2018 Excel version of this document: This document contains no technical data subject to the EAR or the ITAR.
138
Embed
Specification Revision List Pratt & Whitney October 28, 2016
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1 of 138
Any Issues with PDF version refer to below Excel version
This document contains no technical data subject to the EAR or the ITAR.
THE SPECIFICATION REQUISITION FORM
ATTENTION: QUALITY ASSURANCE MANAGER
** PRATT & WHITNEY SPECIFICATION REVISION LIST **
The Pratt & Whitney (P&W) "Specification Revision List" (SRL) documents the latest revision status of P&W specifications and Materials Control Laboratory (MCL) Manual Sections in effect as of the publication date. Purchase orders/Schedule Agreements establish the required issue of the P&W SRL. Industry Standards, Military Specifications, Aerospace Material Specifications (AS, MS, AMS, etc.) and other non-P&W documents in effect at the date of the Purchase Order/Schedule Agreement apply.
Suppliers are required by P&W Specification ASQR-01, "Aerospace Supplier Quality Requirements," to establish and maintain a system for the control of specifications and other applicable data as stipulated on the P&W Purchase Order/Schedule Agreement, to ensure that articles for P&W are processed in accordance with P&W requirements.
Suppliers are not required to comply with subsequently published new or revised specifications (i.e. P&W, AMS etc.) or MCL Manual Sections except as reflected by a change in the purchase order/schedule agreement. Suppliers may, at their option, work to later specification or MCL Manual Section revisions, provided there are no increases to the purchase order price.
DIRECT ANY REQUESTS FOR DOCUMENTS TO YOUR RESPONSIBLE PROCUREMENT AGENT, USING
MTU (Motoren-Und Turbinen-Union) & Techspace Aero .......... MTU & Techspace AeroPackaging Engineering Instruction Specifications Pkg Eng Instruction Specs (P)Packaging Engineering Material Specifications .......... Pkg Eng Material Specs (P); Process Operation Procedures (see Homepage for more info) .......... POP
https://portal.pw.utc.com/portal/server.pt/community/home_-_supplier/621Below is the link of which you will need to be setup with access to the Supplier Portal:
Below is the form that some use in conjunction with the eSRI system while waiting for access to the Supplier Portal.
P&W specifications are available to our suppliers based on VALID REQUIREMENTS. Those requirements consist of specifications imposed at the PURCHASE ORDER/SCHEDULE AGREEMENTS and/or QUOTATION level. In order to help us expedite your request for specifications, you must provide the specific specifications required, with associated Material/Part Number(s) and/or Schedule Agreement/Purchase Orders(s), Quote Number(s).
REQUESTS MUST BE FORWARDED DIRECTLY TO COGNIZANT PROCUREMENT BUYER WHO WILL FILL REQUEST OR COORDINATE WITH APPROPRIATE AREA.
Specification requests are made through using the eSRI system in the Pratt & Whitney Supplier Portal. For additional information on Supplier Access to Pratt & Whitney Online Services, please contact your Pratt & Whitney Buyer.
Revision Date 01/2018Updated Quarterly - January, April, July, OctoberThis document contains no technical data subject to the EAR or the ITAR.
+ Added Since Previous Edition of 10/26/17
MCL Manual Sections
Page 13 of 138
* Revised Since Previous Edition of 10/26/17
Revision Date 01/2018Updated Quarterly - January, April, July, OctoberUpdated Quarterly - See pg. 4 of SRL for MCL Manual Section Request InstructionsAll requests for export MCL Manual Sections are to be forwarded to Procurement/Purchasing/Buyer
SECTION REV. DATEPreface 10/22/2014
* Source Qualification List Cover 10/13/17 (AC)
* APU SQ List Cover 12/05/17 (D)Volume IV Contents Cancelled 9/15/11Volume IV-D Contents Cancelled 9/15/11
Source Qualification List 2/19/2016P&W Rocketdyne Source Qualification List-(updated monthly=&)
10/28/2011- document has been cancelled
Sensitive Index4/1/2011- document has been cancelled
All Purchased Parts Suppliers (cancelled & incorporated into F-17) Removed
Laboratory Control Space ShuttleMain Engine (SSME)Turbopump Parts & Materials
Current Revisions for SSME F-54 Addenda Residein the"Rocket Engineering Instruction (REI)" section of the Homepage.
2/13/13 - Transferred Out - Resides in Florida not MCL(QSL)
A-4 Supp 4 4/4/2011A-5 8/11/2011A-6 05/30/17 (A)A-6 Supp A 4/9/2013A-6 Supp B 11/10/2011A-6 Supp C 11/15/2012A-6 Supp D 4/9/2013A-6 Supp E 2/24/2015A-6 Supp F 4/9/2013A-6 Supp G 11/10/2011A-6 Supp H 2/19/2013A-6 Supp I 11/17/16 (F)A-6 Supp K 1/22/2013
MISCELLANEOUSMCL MANUAL SECTIONS
A - SECTIONS
Product and Product-Related MaterialLaboratory Controls for
Revision Date 01/2018Updated Quarterly - January, April, July, OctoberUpdated Quarterly - See pg. 4 of SRL for MCL Manual Section Request InstructionsAll requests for export MCL Manual Sections are to be forwarded to Procurement/Purchasing/Buyer
MISCELLANEOUSMCL MANUAL SECTIONS
+ Added Since Previous Edition of 10/26/17
A-7 04/25/16 (B)A-8 2/2/2016A-9 12/22/16 (B)A-10 Cancelled Cancelled 3/7/2012 A-10 Supp A 2/12/2016A-10 Supp B 8/27/2013A-10 Supp C 8/27/2013A-13 Cancelled Cancelled 8/26/2009A-13 Supp A Cancelled Cancelled 8/26/2009A-19 12/22/2014
A-100
3/15/12 -Transferred Out - Resides in Florida not MCL(QSL)
SECTION REV. DATEE-0 2/1/2012E-0 Supp A 10/27/2010E-0 Supp A1 8/13/2013E-0 Supp B 04/26/16 (A)E-0 Supp C 4/5/2011E-0 Supp C1 6/3/2015E-0 Supp D 4/10/2013E-0 Supp E 8/1/2011E-0 Supp F 12/08/14
Revision Date 01/2018Updated Quarterly - January, April, July, OctoberUpdated Quarterly - See pg. 4 of SRL for MCL Manual Section Request InstructionsAll requests for export MCL Manual Sections are to be forwarded to Procurement/Purchasing/Buyer
* E-55 12/21/17 (A)E-56 7/28/2011E-57 9/27/2011E-58 10/26/2011E-59 11/16/2015E-60 8/15/2011E-61 11/30/2011E-63 Cancelled RemovedE-64 7/28/2011E-68 01/09/2017 ( C) E-68 Supp A 4/7/2011E-68 Supp B 9/11/2017E-69 7/28/2011E-71 7/28/2011E-72 5/11/2012E-72 Supp A 7/28/2011E-72 Supp B 11/16/2015E-72 Supp C 4/7/2011E-73 11/18/2015E-74 7/20/2011E-75 11/9/2011E-76 Supp B 01/25/2017 (B)E-76 Supp A 11/18/2015E-76 Supp B 11/18/2015E-78 2/24/2015
MCL Manual Sections
Page 16 of 138
* Revised Since Previous Edition of 10/26/17
Revision Date 01/2018Updated Quarterly - January, April, July, OctoberUpdated Quarterly - See pg. 4 of SRL for MCL Manual Section Request InstructionsAll requests for export MCL Manual Sections are to be forwarded to Procurement/Purchasing/Buyer
MISCELLANEOUSMCL MANUAL SECTIONS
+ Added Since Previous Edition of 10/26/17
E-78 Supp A 8/15/2011E-78 Supp B 7/21/2011E-78 Supp C 06/01/16 (A)E-78 Supp D 11/19/2015E-85 11/19/2015E-90 5/11/2012E-90 Supp A 5/11/2012E-92 3/12/2010E-95 4/7/2011E-96 5/14/2012E-99 11/9/2011E-101 8/15/2011E-102 Cancelled Cancelled 9/2/2008E-106 8/16/2011E-107 8/17/2011E-110 8/17/2011E-111 9/29/2011E-112 06/30/16 (A)E-112 Supp A 4/2/2013E-113 Cancelled Cancelled 11/17/2011E-115 8/17/2011E-116 8/25/2011E-117 8/25/2011E-117 Supp A 11/19/2015E-117 Supp B 10/24/2011E-117 Supp C 11/19/2015E-117 Supp D 11/19/2015E-118 8/12/2011E-119 10/28/2011E-122 1/9/2012E-124 8/12/2011E-125 8/12/2011E-127 8/12/2011E-128 8/12/2011E-129 8/12/2011E-130 8/26/2011E-131 6/25/2014E-132 9/29/2011E-133 6/20/2011E-134 5/11/2011E-134 Supp A 11/11/13E-135 Cancelled Cancelled 9/2/2008E-136 7/24/2010E-137 9/13/2011E-138 8/26/2011E-139 5/8/2015E-140 8/30/2011E-141 07/20/16 (A)E-142 12/9/2014E-142 Supp A 11/14/2016 (B)E-142 Supp B Cancelled Removed
* E-143 11/20/17 (A)E-144 Cancelled RemovedE-144 Supp A Cancelled RemovedE-144 Supp B 8/31/2011E-145 8/31/2011E-146 9/14/2011E-147 5/7/2013E-148 9/14/2011E-149 9/14/2011E-150 9/14/2011E-151 1/6/2012E-151 Supp A 9/15/2011E-151 Supp B 9/15/2011E-151 Supp C 11/8/2010
* E-152 11/20/17 (B)E-152 Supp A 9/15/2011E-152 Supp B 8/1/2014E-153 9/15/2011E-154 11/9/2011E-155 Cancelled Cancelled 9/2/2008E-157 9/15/2011E-158 4/13/2015E-159 9/15/2011E-160 01/23/2017 (D)E-161 5/9/2012E-161 Supp A Cancelled 06/03/2016E-162 9/15/2011E-163 9/15/2011E-164 9/15/2011E-165 9/19/2011E-166 07/17/17 (A)E-166 Supp A 08/14/17 (B)E-166 Supp B 08/14/17 (B)
MCL Manual Sections
Page 17 of 138
* Revised Since Previous Edition of 10/26/17
Revision Date 01/2018Updated Quarterly - January, April, July, OctoberUpdated Quarterly - See pg. 4 of SRL for MCL Manual Section Request InstructionsAll requests for export MCL Manual Sections are to be forwarded to Procurement/Purchasing/Buyer
MISCELLANEOUSMCL MANUAL SECTIONS
+ Added Since Previous Edition of 10/26/17
E-166 Supp C 11/14/2014E-167 07/08/16 (E)E-167 Supp A 7/29/2014E-168 9/16/2011
* E-169 12/19/17 (A)E-170 10/21/2011E-170 Supp A 9/16/2011E-170 Supp B 9/16/2011E-171 Cancelled 9/2/2008E-172 9/14/2011E-173 5/17/2011E-175 9/16/2011E-176 5/14/2012E-178 9/16/2011E-179 9/23/2011E-180 Cancelled Cancelled 9/2/2008E-181 9/16/2011E-182 9/16/2011E-183 9/16/2011E-184 9/16/2011E-185 9/16/2011E-185 Supp. A 4/27/2012E-186 Cancelled 5/2/2011E-187 9/16/2011E-188 10/21/2011E-189 9/16/2011E-190 3/18/2016E-190 Supp A 8/27/2015E-190 Supp B 3/18/2016E-194 9/16/2011E-195 3/9/2016E-195 Supp A 3/10/2016E-195 Supp B 9/16/2011E-195 Supp C 6/6/2013E-195 Supp D 3/10/2016E-195 Supp E 9/9/2011E-195 Supp F 11/23/2016 (B)E-196 4/4/2013E-197 Cancelled 5/2/2011E-199 4/9/2013E-200 9/16/2011E-201 06/14/16 (A)E-202 4/9/2013E-203 6/25/2014E-204 11/14/2011E-205 Full Version 8/26/2014E-205 Redacted Version 3/5/2015E-206 9/29/2011E-207 06/15/16 (A)E-208 9/30/2011E-209 9/30/2011E-210 9/30/2011E-211 9/30/2011E-212 11/23/16(A)E-213 11/30/16 (A)E-214 Cancelled 06/14/2016E-215 cancelled Cancelled 9/30/2011E-217 11/8/2011E-218 07/24/17 (B)
Revision Date 01/2018Updated Quarterly - January, April, July, OctoberUpdated Quarterly - See pg. 4 of SRL for MCL Manual Section Request InstructionsAll requests for export MCL Manual Sections are to be forwarded to Procurement/Purchasing/Buyer
SECTION REV. DATEE-1000 4/7/2011E-1000 Supp C 10/25/2011E-1000 Supp F 10/25/2011E-1000 Supp G 10/25/2011E-1000 Supp H 10/25/2011E-1000 Supp I 11/9/2011E-1000 Supp S 9/30/2011E-1001 4/3/2014E-1005 11/9/2011E-1008 10/25/2011E-1044 11/9/2011E-1071 RemovedE-1071A RemovedE-1107 11/9/2011E-1107 Supp A 11/9/2011E-1108 1/10/2012E-1109 1/20/2012E-1110 6/11/2014E-1121 1/10/2012E-1141 4/9/2013
MCL Manual Sections
Page 19 of 138
* Revised Since Previous Edition of 10/26/17
Revision Date 01/2018Updated Quarterly - January, April, July, OctoberUpdated Quarterly - See pg. 4 of SRL for MCL Manual Section Request InstructionsAll requests for export MCL Manual Sections are to be forwarded to Procurement/Purchasing/Buyer
12/8/2011 TRANSFERRED OUT: Lab. Control of SSME Turbopump Parts and Materials
F-56
5/31/2012 TRANSFERRED OUT: Cleaning of Rocket Engine Plumbing
F-57 07/13/17 (E)F-57 Supp A 07/13/17 (C)F-57 Supp B 7/13/2017F-57 Supp C 7/13/2017
F-58
3/15/2012 TRANSFERRED OUT: Lab. Control Plus At Space Propulsion
F-60 03/23/2017 (C )F-61 04/15/16 (C)F-62 05/19/17 (C)F-64 04/27/17 (B)F-65 04/15/16 (B)F-66 Full Version 3/26/2013F-66 Redacted Version 3/26/2013F-69 11/22/16 (B)F-70 1/29/2016
Laboratory Control Space Shuttle
MCL Manual Sections
Page 20 of 138
* Revised Since Previous Edition of 10/26/17
Revision Date 01/2018Updated Quarterly - January, April, July, OctoberUpdated Quarterly - See pg. 4 of SRL for MCL Manual Section Request InstructionsAll requests for export MCL Manual Sections are to be forwarded to Procurement/Purchasing/Buyer
MISCELLANEOUSMCL MANUAL SECTIONS
+ Added Since Previous Edition of 10/26/17
Main Engine (SSME)Turbopump Parts & Materials
Current Revisions for SSME F-54 Addenda Residein the"Rocket Engineering Instruction (REI)"
Revision Date 01/2018Updated Quarterly - January, April, July, OctoberUpdated Quarterly - See pg. 4 of SRL for MCL Manual Section Request InstructionsAll requests for export MCL Manual Sections are to be forwarded to Procurement/Purchasing/Buyer
Revision Date 01/2018Updated Quarterly - January, April, July, OctoberUpdated Quarterly - See pg. 4 of SRL for MCL Manual Section Request InstructionsAll requests for export MCL Manual Sections are to be forwarded to Procurement/Purchasing/Buyer
Revision Date 01/2018Updated Quarterly - January, April, July, OctoberUpdated Quarterly - See pg. 4 of SRL for MCL Manual Section Request InstructionsAll requests for export MCL Manual Sections are to be forwarded to Procurement/Purchasing/Buyer
Revision Date 01/2018Updated Quarterly - January, April, July, OctoberUpdated Quarterly - See pg. 4 of SRL for MCL Manual Section Request InstructionsAll requests for export MCL Manual Sections are to be forwarded to Procurement/Purchasing/Buyer
SECTION REV DATEM-500 2/15/2012M-500 Supp A 2/15/2012M-503 8/18/2011M-504 2/15/2012M-520 2/15/2012M-526 2/16/2012M-530 2/16/2012M-537 Supp A 2/21/2012M-558 2/16/2012
N – SECTIONSSpectrographic Tests
SECTION REV. DATEN Contents RemovedN-0 2/22/2012N-0 Supp A 2/22/2012N-11 2/22/2012N-26 2/22/2012N-29 2/22/2012N-30 2/22/2012N-30 Supp A 2/22/2012N-35 12/14/2011N-36 2/22/2012N-37 2/22/2012N-51 2/22/2012N-56 2/24/2012N-60 7/18/2014N-60 Supp A 2/24/2012N-61 2/24/2012N-62 2/24/2012N-63 2/24/2012N-64 2/24/2012
MCL Manual Sections
Page 25 of 138
* Revised Since Previous Edition of 10/26/17
Revision Date 01/2018Updated Quarterly - January, April, July, OctoberUpdated Quarterly - See pg. 4 of SRL for MCL Manual Section Request InstructionsAll requests for export MCL Manual Sections are to be forwarded to Procurement/Purchasing/Buyer
Revision Date 01/2018Updated Quarterly - January, April, July, OctoberUpdated Quarterly - See pg. 4 of SRL for MCL Manual Section Request InstructionsAll requests for export MCL Manual Sections are to be forwarded to Procurement/Purchasing/Buyer
Revision Date 01/2018Updated Quarterly - January, April, July, OctoberUpdated Quarterly - See pg. 4 of SRL for MCL Manual Section Request InstructionsAll requests for export MCL Manual Sections are to be forwarded to Procurement/Purchasing/Buyer
Revision Date 01/2018Updated Quarterly - January, April, July, OctoberUpdated Quarterly - See pg. 4 of SRL for MCL Manual Section Request InstructionsAll requests for export MCL Manual Sections are to be forwarded to Procurement/Purchasing/Buyer
SECTION REV. DATEV Contents RemovedV-0 8/5/2013V-0 Supp A 8/5/2013V-0 Supp B 8/5/2013V-0 Supp C 8/6/2013
MCL Manual Sections
Page 29 of 138
* Revised Since Previous Edition of 10/26/17
Revision Date 01/2018Updated Quarterly - January, April, July, OctoberUpdated Quarterly - See pg. 4 of SRL for MCL Manual Section Request InstructionsAll requests for export MCL Manual Sections are to be forwarded to Procurement/Purchasing/Buyer
Revision Date 01/2018Updated Quarterly - January, April, July, OctoberUpdated Quarterly - See pg. 4 of SRL for MCL Manual Section Request InstructionsAll requests for export MCL Manual Sections are to be forwarded to Procurement/Purchasing/Buyer
Revision Date 01/2018Updated Quarterly - January, April, July, OctoberUpdated Quarterly - See pg. 4 of SRL for MCL Manual Section Request InstructionsAll requests for export MCL Manual Sections are to be forwarded to Procurement/Purchasing/Buyer
MISCELLANEOUSMCL MANUAL SECTIONS
+ Added Since Previous Edition of 10/26/17
+ X-28 12/5/2017X-27 3/26/2017X-31 8/30/2013X-32 8/25/2010X-32 App A 8/23/2010X-32 App B 8/23/2010X-32 App C 8/23/2010X-32 App D 8/23/2010X-33C 05/09/16 (C)X-41 Cancelled Cancelled 8/9/2010
DATEMTQ1-1 SUPERSEDED BY MTT130 01/2002MTQ1-2 11/1995MTQ1-3 SUPERSEDED BY MTT130 01/2002MTQ1 TEIL 4 10/1989MTQ2 BEIBLATT 2 TEIL 1 CANCELLED 02/1985MTQ2-1 SUPERSEDED BY MTT2-1 12/2007
MTQ2-1 BEIBLATT 1 SUPERSEDED BY MTT2-1BEIBLATTT I 12/2007
MTQ2-2 SUPERSEDED BY MTT2-2 04/2009
MTQ2-2 BEIBLATT 1 SUPERSEDED BY MTT2-2 BEIBLATT 1 07/2009
MTQ2-2 BEIBLATT 2 TEIL 1 02/1985MTQ2-3 02/2004MTQ2 TEIL 4 11/1992
MTU & Techspace Aero
Page 44 of 138
MTQ2 TEIL 5 04/1992MTQ2-6 04/2004MTQ2-7 03/1996MTQ2 TEIL 8 02/1993MTQ3 10/1985MTQ5 11/1997MTQ5 BEIBLATT 1 SUPERSEDED BY MTT305-3 09/2005MTQ5 BEIBLATT 2 03/1999MTQ6 CANCELLED 08/1987MTQ6-1 SUPERSEDED BY MTT306-2 & -4 10/2006MTQ6 TEIL 2 11/1992MTQ7 05/1997MTQ8 CANCELLED 06/1981MTQ8 SUPP 1 CANCELLED 06/1981MTQ8-1 11/1996MTQ8-1 BEIBLATT 1 02/1996MTQ8 TEIL 2 07/1991MTQ9 10/1996MTQ15 04/1990MTQ16 11/1989MTQ25 CANCELLED 05/1980MTQ26 12/1995MTQ27 02/2004MTQ28 02/1994MTQ28 BEIBLATT 1 11/1999MTQ28 BEIBLATT 2 11/1999MTQ29 01/2003MTQ30 02/2001MTQ31 04/1986MTQ32 08/1985MTQ34 07/1981MTQ34 BEIBLATT 1 12/1986MTQ36-1 08/1979MTQ36-2 05/1990MTQ36-4 SUPERSEDED BY MTT306-2 10/2006 WITHDRAWN 01/2006MTQ36-5 WITHDRAWN 10/1979MTQ37 WITHDRAWN 07/1990MTQ37 BEIBLATT 1 08/1990MTQ38 TEIL 1 11/1990MTQ38 TEIL 2 09/1985MTQ39 SUPERSEDED BY MTT32-1 04/2004MTQ40 CANCELLED 05/1984MTQ41 CANCELLED 10/1979MTQ41-1 07/1996MTQ42 01/2005MTQ42 BEIBLATT 1 03/1982MTQ45 05/1997MTQ46 03/1996MTQ48 07/1994MTQ49 12/1998MTQ49-3 09/2004MTQ50 TEIL 1 05/1991MTQ52 CANCELLED 05/1986MTQ53-1 WITHDRAWN 10/1994MTQ54 WITHDRAWN 07/1984MTQ55 CANCELLED 11/1980MTQ56 06/1990MTQ57 07/1991MTQ58 SUPERSEDED BY MTT358 03/2007MTQ58 TEIL 1 CANCELLED 08/1992MTQ59 WITHDRAWN 07/1982MTQ61 CANCELLED 02/1984MTQ62 SUPERSEDED BY MTT362 03/2005MTQ63 07/1986MTQ64 SUPERSEDED BY MTT164 11/2006MTQ65 11/1990MTQ66-1 SUPERSEDED BY MTT366-2 11/2006MTQ66 TEIL 2 05/1984MTQ66-3 08/1999MTQ66-4 11/1998MTQ66-5 11/1997MTQ67 CANCELLED 07/1988MTQ67 TEIL 1 WTHDRAWN 03/1993MTQ67 BEIBLATT 1 TEIL 1 WITHDRAWN 10/1993MTQ67-2 WITHDRAWN 02/1995
MTU & Techspace Aero
Page 45 of 138
MTQ68 WITHDRAWN 03/1982MTQ69 07/1996MTQ70 WITHDRAWN 12/1996MTQ71 TEIL 1 06/1991MTQ71-1 BEIBLATT 1 08/2001MTQ71 TEIL 3 CANCELLED 08/1990MTQ72 CANCELLED 02/1989MTQ72-1 SUPERSEDED BY PROCESS DATA SHEET IPM 07 04 05-01 06/2004
MTQ72-2 11/1990MTQ72-3 12/1992MTQ73-1 03/1995MTQ73-1 BEIBLATT 1 11/1994MTQ73 TEIL 2 02/1991MTQ73-2 BEIBLATT 1 03/1995MTQ73-3 03/1995MTQ73-4 08/1995MTQ73-5 09/1996MTQ74 WITHDRAWN 02/1986MTQ75 WITHDRAWN 07/1985MTQ76 PRELIMINARY 08/1983MTQ76 TEIL 1 08/1985MTQ76 TEIL 2 03/1985MTQ76 TEIL 3 02/1985MTQ80 11/1997MTQ80 TEIL 1 CANCELLED 05/1990MTQ85 02/1996MTQ85 BEIBLATT 1 12/2004MTQ87 03/1988MTQ91 WITHDRAWN 02/1994MTQ91 BEIBLATT 1 WITHDRAWN 01/1994MTQ91 BEIBLATT 2 WITHDRAWN 07/1990MTQ92 WITHDRAWN 06/1990MTQ93-1 WITHDRAWN 01/1996MTQ93-2 WITHDRAWN 07/1995MTQ93 TEIL 3 WITHDRAWN 11/1994MTQ93-7 WITHDRAWN 05/1996MTQ93-8 WITHDRAWN 01/1997MTQ97 SUPERSEDED BY MTQ49-3 12/1998MTQ98 SUPERSEDED BY MTQ71-1 05/1998MTQ99 WITHDRAWN 07/1994MTQ100 12/1995MTQ103 SUPERSEDED BY MTT403 11/2004MTQ104 02/1996MTQ105 11/1999MTQ106 04/1998MTQ108 SUPERSEDED BY MTT255 05/2005MTQ109 02/1998MTQ111 02/1997MTQ115 01/1998MTQ130 07/2002MTQ131 05/2000MTQ135 SUPERSEDED BY MTT435 09/2004MTQ500-0 SUPERSEDED BY MANUAL MM 02 12/2003
MTQ500-0 BEIBLATT 1 SUPERSEDED BY MANUAL MM 02 12/2003
MTQ500-1 SUPERSEDED BY MANUAL MM 02 12/2003MTQ500-2 SUPERSEDED BY MANUAL MM 02 12/2003
MTQ500-2 BEIBLATT 1 SUPERSEDED BY MANUAL MM 02 12/2003
MTQ500-3 SUPERSEDED BY MANUAL MM 02 12/2003MTQ500-4 SUPERSEDED BY MANUAL MM 02 12/2003MTQ500-5 SUPERSEDED BY MTT450-1 11/2003
MTQ500-6 SUPERSEDED BY MANAGEMENT MANUAL MM 02 12/2003
MTQ500-7 SUPERSEDED BY MANAGEMENT MANUAL MM 02 12/2003
MTQ500-8 SUPERSEDED BY MANAGEMENT MANUAL MM 02 12/2003
MTQ500-9 SUPERSEDED BY MANAGEMENT MANUAL MM 02 12/2003
MTQ500-10 SUPERSEDED BY MANAGEMENT MANUAL MM 02 12/2003
MTQ500-11 SUPERSEDED BY MANAGEMENT MANUAL MM 02 12/2003
MTU & Techspace Aero
Page 46 of 138
MTQ500-12 SUPERSEDED BY MANAGEMENT MANUAL MM 02 12/2003
MTQ500-13 SUPERSEDED BY MANAGEMENT MANUAL MM 02 12/2003
MTQ500-14 SUPERSEDED BY MANAGEMENT MANUAL MM 02 12/2003
MTQ500-15 SUPERSEDED BY MANAGEMENT MANUAL MM 02 12/2003
MTQ500-16 SUPERSEDED BY MANAGEMENT MANUAL MM 02 12/2003
MTQ500-17 SUPERSEDED BY MANAGEMENT MANUAL MM 02 12/2003
MTQ500-18 SUPERSEDED BY MANAGEMENT MANUAL MM 02 12/2003
MTQ500-19 SUPERSEDED BY MANAGEMENT MANUAL MM 02 12/2003
MTQ500-20 SUPERSEDED BY MANAGEMENT MANUAL MM 02 12/2003
MTQ500-21 SUPERSEDED BY MANAGEMENT MANUAL MM 02 12/2003
MTQ500-21 BEIBLATT 1 SUPERSEDED BY MTQ500-24 BEIBEIBLATTT 2 12/1997
MTQ500-23 SUPERSEDED BY THE BEIBEIBLATTT 1 ZU MM 02 02/2004
MTQ500-24 BEIBLATT 3 09/2003MTQ500-25 10/2003MTQ500-26 11/2000MTQ500-27 SUPERSEDED BY MM 02 BEIBEIBLATTT 2 07/2004MTQ500-27 BEIBLATT 1 SUPERSEDED BY MM 02 BEIBEIBLATTT 2 07/2004
MTQ500-27 BEIBLATT 2 SUPERSEDED BY MM 02 BEIBEIBLATTT 2 07/2004
MTQ500-28 SUPERSEDED BY MM 02 BEIBEIBLATTT 3 07/2004MTQ3030 WITHDRAWN - NO REPLACEMENT 11/1999
MTS - MATERIALSREVISION
DATEMTS1001 TEIL 1 05/1984MTS1001-2 10/2009MTS1002-1 05/2005MTS1003 WITHDRAWN 06/1994MTS1004-1 WITHDRAWN 05/1998MTS1004-2 WITHDRAWN 05/1998MTS1004 TEIL 3 WITHDRAWN 06/1994MTS1005 WITHDRAWN 06/1994MTS1006-3 12/1998MTS1006-4 02/2001MTS1007 TEIL 1 03/1992MTS1007-2 05/1998MTS1007-3 12/1998MTS1007-4 05/1998MTS1008 04/2008
MTS1018 WITHDRAWAL NOTIFICATION - NO REPLACEMENT 04/1998
MTS1019-1 07/1997MTS1020-1 05/1998MTS1021-1 07/2000MTS1024 TEIL 1 WITHDRAWAL NOTIFICATION - NO REPLACEMENT 06/1994
MTS1024 TEIL 2 WITHDRAWAL NOTIFICATION 02/1996MTS1025 TEIL 1 WITHDRAWAL NOTIFICATION 02/1996MTS1041 TEIL 1 01/1996MTS1042-1 GERMAN 04/1999
MTU & Techspace Aero
Page 47 of 138
MTS1042-2 GERMAN 04/1999MTS1043-1 GERMAN 09/1996MTS1043-2 GERMAN 02/1997MTS1044 TEIL 1 WITHDRAWAL NOTIFICATION 06/1994MTS1046-1 12/1999MTS1059 SUPERSEDES 05-12 ISSUE 06/2012MTS1061 SUPERSEDES 06-12 ISSUE 12/2013MTS1061 BEIBLATT 1 SUPERSEDED BY MTS1061 02/2006MTS 1062 SUPERSEDES 02-08 ISSUE 01/2016MTS1070 02/2007MTS1070 BEIBLATT 1 SUPERSEDED BY MTS1070 10/1996MTS1077 03/2007MTS1077 BEIBLATT 1 SUPERSEDED BY MTS1077 03/2007MTS1080 03/2007MTS1080 BEIBLATT 1 SUPERSEDED BY MTS1080 03/2007MTS1083 TEIL 1 06/1989MTS1084 TEIL 1 SUPERSEDES 09-95 ISSUE 08/2015MTS1086 -1 06/2009MTS1087 TEIL 1 05/1993MTS1094-1 SUPERSEDES 07-15 ISSUE 04/2016MTS1094-1 BEIBLATT 1 11/1992MTS1094-2 10/2008MTS1096-1 07/2000MTS1098-1 06/2002MTS1099-1 09/2003MTS1099 TEIL 2 06/1994MTS1100-1 04/2007MTS1101-1 04/2002MTS1101-2 04/2002MTS1101-3 GERMAN ONLY 04/2002MTS1101-4 GERMAN ONLY 04/2002MTS1101-5 09/2003MTS1101-6 GERMAN ONLY 04/2002MTS1101-7 GERMAN ONLY 04/2002MTS1103-1 07/2007MTS1103-2 07/2000MTS1103- 07/2000MTS1103- 4 10/2000MTS1103 BEIBLATT 1 TEIL 3 04/1994MTS1113 02/2008MTS1125 06/2007MTS1125 BEIBLATT 1 SUPERSEDED BY MTS1125 06/2007MTS1150-1 06/1997MTS1150 TEIL 2 05/1995MTS1150 TEIL 3 07/1995MTS1150 TEIL 4 05/1995MTS1150 TEIL 5 SUPERSEDES 12-87 ISSUE 02/2011MTS1152 REVISED SUPERSEDES 11-15 ISSUE 11/2016MTS1155-1 09/1999MTS1159 TEIL 1 WITHDRAWAL NOTIFICATION 02/1996MTS1160-1 07/1998MTS1165 10/2005MTS1169 TEIL 1 WITHDRAWAL NOTIFICATION 06/1994MTS1176-1 11/2004MTS1176-2 11/2004MTS1183-1 01/2003MTS1184 TEIL 1 WITHDRAWAL NOTIFICATION 06/1994MTS1187 TEIL 1 REVISED 04/2015MTS1187 TEIL 2 05/1995MTS1187 TEIL 3 REVISED 05/1995MTS1187 TEIL 4 SUPERSEDES 10/83 ISSUE 09/2010MTS1187 TEIL 5 05/1995MTS1189-1 REVISED 05/2013MTS1190 TEIL 1 06/1994MTS1190 TEIL 2 06/1994MTS1190 TEIL 3 06/1994MTS1199 TEIL 1 WITHDRAWAL NOTIFICATION 02/1996MTS1201 11/1985MTS1202 TEIL 1 06/1994MTS1202 TEIL 2 06/1994MTS1202 TEIL 3 06/1994
MTU & Techspace Aero
Page 48 of 138
MTS1204 TEIL 3 07/1994MTS1206-1 SUPERSEDES 07-15 ISSUE 11/2015MTS1210 SUPERSEDES 02-16 ISSUE 08/2016MTS1213-2 09/2004MTS1213-3 09/2004MTS1213-4 GERMAN 10/2004MTS1221 SUPERSEDED BY MTS1070 07/2001
MTS1221 BEIBLATT 1 WITHDRAWN - NO REPLACEMENT 07/2001
MTS1221 BEIBLATT 2 WITHDRAWN - NO REPLACEMENT 07/2001
MTS1228 10/1996MTS1228 BEIBLATT 1 10/1985MTS1230 TEIL 1 WITHDRAWAL NOTIFICATION 02/1996MTS1234 SUPERSEDES 03/06 ISSUE 04/2012MTS1235 08/2006MTS1238 TEIL 1 05/1994MTS1239 TEIL 1 04/1994MTS1246 TEIL 1 11/1995
MTS1263-1 12/2004MTS1267-1 09/2006MTS1267-2 09/2006MTS1267-3 09/2006MTS1267-4 02/2008MTS1267-5 09/2006MTS1279 TEIL 1 11/1988MTS1279 TEIL 2 11/1988MTS1279 TEIL 3 11/1988MTS1279 TEIL 5 11/1988MTS1280 04/1998MTS1281-1 02/2005MTS1285 TEIL 1 WITHDRAWAL NOTIFICATION 07/1995MTS1288-1 GERMAN 04/1997MTS1295 TEIL 1 04/1987MTS1295 TEIL 2 04/1987MTS1295 NEW 02/2013MTS1301 TEIL 1 05/1988MTS1301 BEIBLATT 1 TEIL 1 12/1987MTS1323-1 REVISED SUPERSEDES 10-04 ISSUE 10/2013MTS1327-1 03/2005MTS1327-2 03/2005MTS1327-3 03/2005MTS1328-1 05/2006MTS1333 NEW 07/2017MTS1340-1 04/2006MTS1348-1 09/1996MTS1356 TEIL 2 03/1990MTS1357- 1 08/2007MTS1357- 2 08/2007MTS1359-1 GERMAN 09/1999MTS1360-2 SUPERSEDED BY MTS1410-2 10/2007MTS1364-1 12/2008MTS1364-2 04/2002MTS1371-2 03/2004MTS1373-1 SUPERSEDES 02-12 ISSUED 02/2016MTS1373-2 10/2011
MTS1377-1 12/99 English
MTS1378 TEIL 1 07/1995MTS1378 TEIL 2 05/1995MTS1378 TEIL 3 07/1995MTS1378 TEIL 4 05/1995MTS1379 TEIL 1 05/1993MTS1383-1 07/2002MTS1383-2 07/2002MTS1385-1 12/2004MTS1385 BEIBLATT 1 TEIL 1 04/1995MTS1387-1 07/1997MTS1387-2 07/1997MTS1388 TEIL 1 10/1993MTS1389-1 07/2005MTS1389-2 07/2005
MTU & Techspace Aero
Page 49 of 138
MTS1391 TEIL 1 10/1993MTS1392 TEIL 1 02/1994MTS1393 TEIL 1 04/1994MTS1394-1 04/1996MTS1394-2 04/1996MTS1398 TEIL 1 05/1995MTS1398-2 04/1996MTS1401 TEIL 1 09/1995MTS1401 TEIL 2 09/1995MTS1403 TEIL 1 12/1995MTS1405-1 04/1996MTS1406-1 08/2002MTS1406-2 08/2002MTS1406-3 04/1996MTS1406-4 04/1996MTS1407-1 04/1996MTS1407-2 08/2002MTS1424-1 09/2004MTS1424-2 09/2004MTS1424-3 09/2004MTS1424-4 09/2004MTS1424-5 09/2004MTS1426-1 04/2000MTS1427 NEW 12/2016MTS1435-1 03/2001MTS1436-1 02/2008MTS1436-2 11/2007MTS1441-1 SUPERSEDES 02-12 ISSUED 02/2016MTS1441-2 SUPERSEDES 07-11 ISSUE 12/2011MTS1448 NEW 02/2013MTS1452 11/2006
2560 Rev F 2565 Rev. D 2567-05 2570-02A 2571 Rev. E
2574 Rev 00 2581 Rev C 2582 2583 Rev 22584 (New) 2585 (New) 2591 New 2593 Rev B2596 New 2600-02 2602 New 2603 New 2604-022605 2607 2608 New 2609 Rev D 2610-01 2614B 2612 New 2617 Rev. A 2618 Rev. C
2620 New 2621 Rev. A 2622 Rev. B 2623 Rev. B2625 Rev A - New
2626 Rev. 2 *2628A 2638 New 2642 New 2644 New2645A 2647 New 2649 New 2650 New 2654A2655 New 2656 New 2657 New 2658 New 2665 New*2673 Rev. A 5000A 5001A 5003 New 5005 New+5006 New +5007 New +5008 New +5009 New +5010 New+5011 New +5012 New +5014 New +5015-- New
* Revised Since Previous Edition of 10/26/17
Revision Date 01/2018Updated Quarterly - January, April, July, OctoberThis document contains no technical data subject to the EAR or the ITAR.
N = Sources Listed in SpecificationP = Patent Notice Applies
PWA Specifications Inactive for New Designs (In Italics) - Highlighted in Green - * to the left indicates revision* Revised Since Previous Edition of 10/26/17
Revision Date 01/2018Updated Quarterly - January, April, July, OctoberThis document does not contain any export regulated technical data.
N = Sources Listed in SpecificationP = Patent Notice Applies
PWA Specifications Inactive for New Designs (In Italics) - Highlighted in Green - * to the left indicates revision* Revised Since Previous Edition of 10/26/17
Revision Date 01/2018Updated Quarterly - January, April, July, OctoberThis document does not contain any export regulated technical data.
Spec Revision Spec Code
P&W Production & Development Specifications - (PWA)
I = Engineering source Approved for Ingot and/or Forging Stock
Q = Sources Qualified by MCL (PWA Source Qualification List)
N = Sources Listed in SpecificationP = Patent Notice Applies
PWA Specifications Inactive for New Designs (In Italics) - Highlighted in Green - * to the left indicates revision* Revised Since Previous Edition of 10/26/17
Revision Date 01/2018Updated Quarterly - January, April, July, OctoberThis document does not contain any export regulated technical data.
Spec Revision Spec Code
P&W Production & Development Specifications - (PWA)
I = Engineering source Approved for Ingot and/or Forging Stock
Q = Sources Qualified by MCL (PWA Source Qualification List)
N = Sources Listed in SpecificationP = Patent Notice Applies
PWA Specifications Inactive for New Designs (In Italics) - Highlighted in Green - * to the left indicates revision* Revised Since Previous Edition of 10/26/17
Revision Date 01/2018Updated Quarterly - January, April, July, OctoberThis document does not contain any export regulated technical data.
Spec Revision Spec Code
P&W Production & Development Specifications - (PWA)
I = Engineering source Approved for Ingot and/or Forging Stock
Q = Sources Qualified by MCL (PWA Source Qualification List)
N = Sources Listed in SpecificationP = Patent Notice Applies
PWA Specifications Inactive for New Designs (In Italics) - Highlighted in Green - * to the left indicates revision* Revised Since Previous Edition of 10/26/17
Revision Date 01/2018Updated Quarterly - January, April, July, OctoberThis document does not contain any export regulated technical data.
Spec Revision Spec Code
P&W Production & Development Specifications - (PWA)
I = Engineering source Approved for Ingot and/or Forging Stock
Q = Sources Qualified by MCL (PWA Source Qualification List)
N = Sources Listed in SpecificationP = Patent Notice Applies
PWA Specifications Inactive for New Designs (In Italics) - Highlighted in Green - * to the left indicates revision* Revised Since Previous Edition of 10/26/17
Revision Date 01/2018Updated Quarterly - January, April, July, OctoberThis document does not contain any export regulated technical data.
Spec Revision Spec Code
P&W Production & Development Specifications - (PWA)
I = Engineering source Approved for Ingot and/or Forging Stock
Q = Sources Qualified by MCL (PWA Source Qualification List)
N = Sources Listed in SpecificationP = Patent Notice Applies
PWA Specifications Inactive for New Designs (In Italics) - Highlighted in Green - * to the left indicates revision* Revised Since Previous Edition of 10/26/17
Revision Date 01/2018Updated Quarterly - January, April, July, OctoberThis document does not contain any export regulated technical data.
Spec Revision Spec Code
P&W Production & Development Specifications - (PWA)
I = Engineering source Approved for Ingot and/or Forging Stock
Q = Sources Qualified by MCL (PWA Source Qualification List)
N = Sources Listed in SpecificationP = Patent Notice Applies
PWA Specifications Inactive for New Designs (In Italics) - Highlighted in Green - * to the left indicates revision* Revised Since Previous Edition of 10/26/17
Revision Date 01/2018Updated Quarterly - January, April, July, OctoberThis document does not contain any export regulated technical data.
Spec Revision Spec Code
P&W Production & Development Specifications - (PWA)
I = Engineering source Approved for Ingot and/or Forging Stock
Q = Sources Qualified by MCL (PWA Source Qualification List)
N = Sources Listed in SpecificationP = Patent Notice Applies
PWA Specifications Inactive for New Designs (In Italics) - Highlighted in Green - * to the left indicates revision* Revised Since Previous Edition of 10/26/17
Revision Date 01/2018Updated Quarterly - January, April, July, OctoberThis document does not contain any export regulated technical data.
Spec Revision Spec Code
P&W Production & Development Specifications - (PWA)
I = Engineering source Approved for Ingot and/or Forging Stock
Q = Sources Qualified by MCL (PWA Source Qualification List)
N = Sources Listed in SpecificationP = Patent Notice Applies
PWA Specifications Inactive for New Designs (In Italics) - Highlighted in Green - * to the left indicates revision* Revised Since Previous Edition of 10/26/17
Revision Date 01/2018Updated Quarterly - January, April, July, OctoberThis document does not contain any export regulated technical data.
Spec Revision Spec Code
P&W Production & Development Specifications - (PWA)
I = Engineering source Approved for Ingot and/or Forging Stock
Q = Sources Qualified by MCL (PWA Source Qualification List)
N = Sources Listed in SpecificationP = Patent Notice Applies
PWA Specifications Inactive for New Designs (In Italics) - Highlighted in Green - * to the left indicates revision* Revised Since Previous Edition of 10/26/17
Revision Date 01/2018Updated Quarterly - January, April, July, OctoberThis document does not contain any export regulated technical data.
Spec Revision Spec Code
P&W Production & Development Specifications - (PWA)
I = Engineering source Approved for Ingot and/or Forging Stock
Q = Sources Qualified by MCL (PWA Source Qualification List)
N = Sources Listed in SpecificationP = Patent Notice Applies
PWA Specifications Inactive for New Designs (In Italics) - Highlighted in Green - * to the left indicates revision* Revised Since Previous Edition of 10/26/17
Revision Date 01/2018Updated Quarterly - January, April, July, OctoberThis document does not contain any export regulated technical data.
Spec Revision Spec Code
P&W Production & Development Specifications - (PWA)
I = Engineering source Approved for Ingot and/or Forging Stock
Q = Sources Qualified by MCL (PWA Source Qualification List)
N = Sources Listed in SpecificationP = Patent Notice Applies
PWA Specifications Inactive for New Designs (In Italics) - Highlighted in Green - * to the left indicates revision* Revised Since Previous Edition of 10/26/17
Revision Date 01/2018Updated Quarterly - January, April, July, OctoberThis document does not contain any export regulated technical data.
Spec Revision Spec Code
P&W Production & Development Specifications - (PWA)
I = Engineering source Approved for Ingot and/or Forging Stock
Q = Sources Qualified by MCL (PWA Source Qualification List)
N = Sources Listed in SpecificationP = Patent Notice Applies
PWA Specifications Inactive for New Designs (In Italics) - Highlighted in Green - * to the left indicates revision* Revised Since Previous Edition of 10/26/17
Revision Date 01/2018Updated Quarterly - January, April, July, OctoberThis document does not contain any export regulated technical data.
Spec Revision Spec Code
P&W Production & Development Specifications - (PWA)
I = Engineering source Approved for Ingot and/or Forging Stock
Q = Sources Qualified by MCL (PWA Source Qualification List)
N = Sources Listed in SpecificationP = Patent Notice Applies
PWA Specifications Inactive for New Designs (In Italics) - Highlighted in Green - * to the left indicates revision* Revised Since Previous Edition of 10/26/17
Revision Date 01/2018Updated Quarterly - January, April, July, OctoberThis document does not contain any export regulated technical data.
Spec Revision Spec Code
P&W Production & Development Specifications - (PWA)
I = Engineering source Approved for Ingot and/or Forging Stock
Q = Sources Qualified by MCL (PWA Source Qualification List)
N = Sources Listed in SpecificationP = Patent Notice Applies
PWA Specifications Inactive for New Designs (In Italics) - Highlighted in Green - * to the left indicates revision* Revised Since Previous Edition of 10/26/17
Revision Date 01/2018Updated Quarterly - January, April, July, OctoberThis document does not contain any export regulated technical data.
Spec Revision Spec Code
P&W Production & Development Specifications - (PWA)
I = Engineering source Approved for Ingot and/or Forging Stock
Q = Sources Qualified by MCL (PWA Source Qualification List)
N = Sources Listed in SpecificationP = Patent Notice Applies
PWA Specifications Inactive for New Designs (In Italics) - Highlighted in Green - * to the left indicates revision* Revised Since Previous Edition of 10/26/17
Revision Date 01/2018Updated Quarterly - January, April, July, OctoberThis document does not contain any export regulated technical data.
Spec Revision Spec Code
P&W Production & Development Specifications - (PWA)
I = Engineering source Approved for Ingot and/or Forging Stock
Q = Sources Qualified by MCL (PWA Source Qualification List)
N = Sources Listed in SpecificationP = Patent Notice Applies
PWA Specifications Inactive for New Designs (In Italics) - Highlighted in Green - * to the left indicates revision* Revised Since Previous Edition of 10/26/17
Revision Date 01/2018Updated Quarterly - January, April, July, OctoberThis document does not contain any export regulated technical data.
Spec Revision Spec Code
P&W Production & Development Specifications - (PWA)
I = Engineering source Approved for Ingot and/or Forging Stock
Q = Sources Qualified by MCL (PWA Source Qualification List)
N = Sources Listed in SpecificationP = Patent Notice Applies
PWA Specifications Inactive for New Designs (In Italics) - Highlighted in Green - * to the left indicates revision* Revised Since Previous Edition of 10/26/17
Revision Date 01/2018Updated Quarterly - January, April, July, OctoberThis document does not contain any export regulated technical data.
Spec Revision Spec Code
P&W Production & Development Specifications - (PWA)
I = Engineering source Approved for Ingot and/or Forging Stock
Q = Sources Qualified by MCL (PWA Source Qualification List)
N = Sources Listed in SpecificationP = Patent Notice Applies
PWA Specifications Inactive for New Designs (In Italics) - Highlighted in Green - * to the left indicates revision* Revised Since Previous Edition of 10/26/17
Revision Date 01/2018Updated Quarterly - January, April, July, OctoberThis document does not contain any export regulated technical data.
Spec Revision Spec Code
P&W Production & Development Specifications - (PWA)
I = Engineering source Approved for Ingot and/or Forging Stock
Q = Sources Qualified by MCL (PWA Source Qualification List)
N = Sources Listed in SpecificationP = Patent Notice Applies
PWA Specifications Inactive for New Designs (In Italics) - Highlighted in Green - * to the left indicates revision* Revised Since Previous Edition of 10/26/17
Revision Date 01/2018Updated Quarterly - January, April, July, OctoberThis document does not contain any export regulated technical data.
Spec Revision Spec Code
P&W Production & Development Specifications - (PWA)
I = Engineering source Approved for Ingot and/or Forging Stock
Q = Sources Qualified by MCL (PWA Source Qualification List)
N = Sources Listed in SpecificationP = Patent Notice Applies
PWA Specifications Inactive for New Designs (In Italics) - Highlighted in Green - * to the left indicates revision* Revised Since Previous Edition of 10/26/17
Revision Date 01/2018Updated Quarterly - January, April, July, OctoberThis document does not contain any export regulated technical data.
Spec Revision Spec Code
P&W Production & Development Specifications - (PWA)
I = Engineering source Approved for Ingot and/or Forging Stock
Q = Sources Qualified by MCL (PWA Source Qualification List)
+ Added Since Previous Edition of 10/26/17
36522B E36523A N36525-- N36530A E36545R N36546B E,Q36541--36550C E,Q36555A N36561A (Cancelled) -36564-- N36568D N36569B N36579-- N36580A Cancelled -36595B N36599C -36600F C36603F -36604E N36610L E,Q,C36611A N36612A N36614A E,C36615F E,Q,C36617-- Development C36618-- Development C36619C C36623A E,C36630A Development C36631A Development C36632A Development C36633A Development C36640D C36641-- Development N36650J E,Q,C36653A Development C36655F E,Q,C36658A Development C36660-- C36661A Development C36662A Development C36663A Development C36667-- Development36670D E,Q,C36673A Development C36675A Development C36678A Development C36680A C36683B (Cancelled) Q36691-- Development C36692-- Development C36693-- Development C36700F -36701D -
N = Sources Listed in SpecificationP = Patent Notice Applies
PWA Specifications Inactive for New Designs (In Italics) - Highlighted in Green - * to the left indicates revision* Revised Since Previous Edition of 10/26/17
Revision Date 01/2018Updated Quarterly - January, April, July, OctoberThis document does not contain any export regulated technical data.
Spec Revision Spec Code
P&W Production & Development Specifications - (PWA)
I = Engineering source Approved for Ingot and/or Forging Stock
Q = Sources Qualified by MCL (PWA Source Qualification List)
N = Sources Listed in SpecificationP = Patent Notice Applies
PWA Specifications Inactive for New Designs (In Italics) - Highlighted in Green - * to the left indicates revision* Revised Since Previous Edition of 10/26/17
Revision Date 01/2018Updated Quarterly - January, April, July, OctoberThis document does not contain any export regulated technical data.
Spec Revision Spec Code
P&W Production & Development Specifications - (PWA)
I = Engineering source Approved for Ingot and/or Forging Stock
Q = Sources Qualified by MCL (PWA Source Qualification List)
N = Sources Listed in SpecificationP = Patent Notice Applies
PWA Specifications Inactive for New Designs (In Italics) - Highlighted in Green - * to the left indicates revision* Revised Since Previous Edition of 10/26/17
Revision Date 01/2018Updated Quarterly - January, April, July, OctoberThis document does not contain any export regulated technical data.
Spec Revision Spec Code
P&W Production & Development Specifications - (PWA)
I = Engineering source Approved for Ingot and/or Forging Stock
Q = Sources Qualified by MCL (PWA Source Qualification List)
N = Sources Listed in SpecificationP = Patent Notice Applies
PWA Specifications Inactive for New Designs (In Italics) - Highlighted in Green - * to the left indicates revision* Revised Since Previous Edition of 10/26/17
Revision Date 01/2018Updated Quarterly - January, April, July, OctoberThis document does not contain any export regulated technical data.
Spec Revision Spec Code
P&W Production & Development Specifications - (PWA)
I = Engineering source Approved for Ingot and/or Forging Stock
Q = Sources Qualified by MCL (PWA Source Qualification List)
N = Sources Listed in SpecificationP = Patent Notice Applies
PWA Specifications Inactive for New Designs (In Italics) - Highlighted in Green - * to the left indicates revision* Revised Since Previous Edition of 10/26/17
Revision Date 01/2018Updated Quarterly - January, April, July, OctoberThis document does not contain any export regulated technical data.
Spec Revision Spec Code
P&W Production & Development Specifications - (PWA)
I = Engineering source Approved for Ingot and/or Forging Stock
Q = Sources Qualified by MCL (PWA Source Qualification List)
N = Sources Listed in SpecificationP = Patent Notice Applies
PWA Specifications Inactive for New Designs (In Italics) - Highlighted in Green - * to the left indicates revision* Revised Since Previous Edition of 10/26/17
Revision Date 01/2018Updated Quarterly - January, April, July, OctoberThis document does not contain any export regulated technical data.
Spec Revision Spec Code
P&W Production & Development Specifications - (PWA)
I = Engineering source Approved for Ingot and/or Forging Stock
Q = Sources Qualified by MCL (PWA Source Qualification List)
Aerospace Material Specifications (AMS) RequirementsWhich Modify & are an Integral Part of
In certain instances, the PW Engineering Department modifies requirements cited in industry or government documents specified on engineering drawings (e.g., AMS - - Aerospace Material Specifications) by issuing a PWA Spec Supplement. Normally, the spec supplement appears on both the engineering drawing and the P&W Purchase Order. However, where a spec supplement has been issued but does not appear on the engineering drawing, interpret the drawing as invoking the supplement: for example; the other requirement "AMS 4928 TI ALLOY" shall be interpreted as equivalent to "AMS 4928 & PWA-S-4928 TI ALLOY". A listing of issued PWA Spec Supplements is as listed below.
E = Engineering Source ApprovedI = Engineering source Approved for Ingot and/or Forging StockN = Sources Listed in SpecificationP = Patent Notice Applies
Some drawings may refer to other PWA-S, not noted below; these requirements are now incorporated in the basic AMS or have been cancelled.
Q = Sources Qualified by MCL (PWA Source Qualification List)
C = Controlled
PWA-SUPPS
Page 90 of 138
Reference specification PWA-360 Section A4.2.2 Modifications to specified documents.
Aerospace Material Specifications (AMS) RequirementsWhich Modify & are an Integral Part of
In certain instances, the PW Engineering Department modifies requirements cited in industry or government documents specified on engineering drawings (e.g., AMS - - Aerospace Material Specifications) by issuing a PWA Spec Supplement. Normally, the spec supplement appears on both the engineering drawing and the P&W Purchase Order. However, where a spec supplement has been issued but does not appear on the engineering drawing, interpret the drawing as invoking the supplement: for example; the other requirement "AMS 4928 TI ALLOY" shall be interpreted as equivalent to "AMS 4928 & PWA-S-4928 TI ALLOY". A listing of issued PWA Spec Supplements is as listed below.
E = Engineering Source ApprovedI = Engineering source Approved for Ingot and/or Forging StockN = Sources Listed in SpecificationP = Patent Notice Applies
Some drawings may refer to other PWA-S, not noted below; these requirements are now incorporated in the basic AMS or have been cancelled.
Q = Sources Qualified by MCL (PWA Source Qualification List)
Revision Date 01/2018Updated Quarterly - January, April, July, OctoberThis document does not contain any export regulated technical data.
Q = Sources Qualified by MCL (PWA Source Qualification List)
+ Added Since Previous Edition of 10/26/17
PWPS Power Systems Specifications (Industrial Gas Turbine)
C = ControlledE = Engineering Source ApprovedI = Engineering source Approved for Ingot and/or Forging StN = Sources Listed in SpecificationP = Patent Notice Applies
* Revised Since Previous Edition of 10/26/17
Revision Date 01/2018SPEC_NO REV CODE STATUS
3501 N MP CODE DEFINITION 83104PG E MP ATP Acceptance Test Procedure 83114JR J MP CRS Component Requirements Specification CMS4000 C MP D Design Standard CMS4000ADD G MP HS Hamilton Sundstrand Internal Procedure CP16.01-01 E QS MCL Materials Control Lab Document CP17.50-05 K D MP Materials & Processes Specification CP17.50-10 C D Cancelled PPS Purchase Performance Specification CPS1000 -- MP QS Quality Specification CPS1000-01 -- MPCPS1020 A MPCPS1020-01 A MPCPS1020-01ADD C MPCPS1020ADD C MPCPS11000 A MPCQ13.01-03-09 A D Inactive for New DesignsDM03 E D Inactive for New DesignsDM04 E D Inactive for New DesignsDS2214 A CRSDS2399 C PPSDS2952 A PPSDS2953 C PPSDS2954 A CRSED742731 P DED742731ADD A DEN10.04 AF DEN10.04-01 AE DEN10.04-04 Y DEN10.05 P DEN10.11-01 AE DEN10.11-02 P DEN10.11-03 D D CancelledEN10.11-04 C D CancelledEN10.11-05 D D
APU SPECIFICATIONS
+ Added Since Previous Edition of 10/26/17
* Revised Since Previous Edition of 10/26/17
Revision Date 01/2018SPEC_NO REV CODE STATUS
APU SPECIFICATIONS
+ Added Since Previous Edition of 10/26/17
EN10.12-06 L DEN10.16-05 R DEN10.16-08 M DEN10.16-10 AP HS CancelledEN10.16-11 AU DEN10.16-13 AK DEN10.23-01 AL HS CancelledEN10.24-06 AG DEN10.24-08 W DEN10.24-11 F DEN10.24-12 N DEN10.24-23 B DEN10.32-01 AA DEN10.32-03 AC DEN10.32-08 G DEN10.32-09 D D CancelledEN10.32-11 L D CancelledEN10.32-40 A DEN10.35 D DEN10.36 D HS CancelledEN10.55-12 J D CancelledEN20.01 -- DEN20.04 CF DEN20.05 BG HS CancelledEN20.05-03 J DEN20.07 H CRSEN20.07-01 F DEN20.07-04 B DEN20.09 E DEN25.40-03 R DEN25.40-03A D D Inactive for New DesignsEN25.40-04 W DEN25.40-05 W DEN25.40-06 L D
* Revised Since Previous Edition of 10/26/17
Revision Date 01/2018SPEC_NO REV CODE STATUS
APU SPECIFICATIONS
+ Added Since Previous Edition of 10/26/17
EN25.40-07 A D Inactive for New DesignsEN25.40-08 C D Inactive for New DesignsEN25.40-10 P DES1223 E PPSES1475 G CRSES1582 B CRSES9-1110 E QSES9-1118 AE ATPES9-1122 L ATPES9-21 U D Inactive for New DesignsES9-27 C QSES9-4 P DES9-41 -- DES9-42 B DES9-45 L MPES9-47 -- DES9-56 C MPES9-56-1 A MPES9-56-2 A MPES9-58 F MPES9-58-1 D MPES9-58-2 C MPES9-6 J D Inactive for New DesignsESR0004 M QSESR0006 -- QSESR0012 AB ATPESR0032 B DESR0055 B PPSESR0097 D QSESR0140 -- MPESR0141 -- MPESR0142 -- MPESR0144 C MPESR0151 H MCL
* Revised Since Previous Edition of 10/26/17
Revision Date 01/2018SPEC_NO REV CODE STATUS
APU SPECIFICATIONS
+ Added Since Previous Edition of 10/26/17
ESR0153 B MPESR0157 U MPESR0160 A MPESR0161 C DESR0163 D MPESR0164 A MPESR0183 J PPSESR0304 D DESR0306 D CRSESR0317 A CRSESR0345 B CRSESR0356 D PPSESR0430 A PPSESR0448 -- CRSESR0458 C PPSESR0481 A MPESR0494 B PPSESR0502 B CRSESR0559 C MCLESR0560 D MPESR0611 J CRSESR0631 C MPESR0650 -- MPESR0679 B PPSESR0693 -- CRSESR0694 -- PPSESR0708 AR ATPESR0734 -- MPESR0736 -- ATPESR0773 C PPSESR0780 A DESR0788 D QSESR0847 -- PPSESR0870 B PPS
* Revised Since Previous Edition of 10/26/17
Revision Date 01/2018SPEC_NO REV CODE STATUS
APU SPECIFICATIONS
+ Added Since Previous Edition of 10/26/17
ESR0871 C PPSESR0872 A PPSESR0873 -- PPSESR0874 -- PPSESR0875 -- PPSESR0876 -- PPSESR0877 B PPSESR0879 A ATPESR0881 A PPSESR0883 A ATPESR0884 A CRSESR0889 B CRSESR0904 -- ATPESR0906 -- PPSESR0908 -- PPSESR0909 D ATPESR0911 F PPSESR0916 A PPSESR0917 A PPSESR0938 J ATPESR0941 C MPESR0954 A ATPESR0957 B PPSESR0960 -- CRSESR0963 -- PPSESR0978 B CRSESR0995 A CRSESR1009 J MPESR1020 A ATPESR1022 D PPSESR1049 -- MPESR1052 A PPSESR1055 -- CRSESR1058 B MP
* Revised Since Previous Edition of 10/26/17
Revision Date 01/2018SPEC_NO REV CODE STATUS
APU SPECIFICATIONS
+ Added Since Previous Edition of 10/26/17
ESR1078 H PPSESR1105 A MPESR1112 D CRSESR1113 D PPSESR1127 A ATPESR1163 A CRSESR1164 H PPSESR1183 A PPSESR1184 A PPSESR1185 -- PPSESR1295 C PPSESR1302 E PPSESR1356 -- CRSESR1364 A PPSESR1375 B ATPESR1384 B PPSESR1386 C DESR1431 -- CRSESR1510 A ATPESR1532 -- PPSESR1589 -- QSESR1644 B QSESR1662 -- MPESR1795 C MPESR1829 -- DHS10724 B MPHS1082 C DHS1122 -- QSHS12000 F DHS1211 -- QSHS12220 B MPHS12220ADD B MP CancelledHS12674 E MPHS12674ADD C MP
* Revised Since Previous Edition of 10/26/17
Revision Date 01/2018SPEC_NO REV CODE STATUS
APU SPECIFICATIONS
+ Added Since Previous Edition of 10/26/17
HS12719 B QSHS12719ADD B QSHS13472 A QSHS13506 A MPHS13506ADD A MP CancelledHS13576 A MPHS13576ADD A MPHS1360 E DHS140 F MPHS140ADD A MPHS14589 A MPHS14589ADD B MPHS14612 A MPHS14612ADD A MPHS14722 D MP Inactive for New DesignsHS14722ADD A MP CancelledHS15000 M DHS15000ADD E HS CancelledHS15314 F DHS15314ADD -- DHS1550 J MPHS16151 A MPHS16151ADD B MPHS178 H MPHS191 V MPHS191ADD T MPHS2053 H DHS2062 H MPHS2073 C MPHS2087 B MPHS2212 G DHS240 D MPHS246 M MPHS248 U MP
* Revised Since Previous Edition of 10/26/17
Revision Date 01/2018SPEC_NO REV CODE STATUS
APU SPECIFICATIONS
+ Added Since Previous Edition of 10/26/17
HS248ADD F MPHS291 F MPHS31 R QSHS3150 F MPHS3197 L MPHS3197ADD H MPHS332 E MPHS333 AK DHS334 P MPHS392 N MPHS424 AD MPHS43 M MPHS43ADD D MPHS44 E MPHS4444 B DHS447 U QSHS447ADD G QSHS4508 C DHS453 C MPHS454 H MPHS457 A MPHS461 L MPHS48 G MPHS4845 F QSHS4845ADD G QSHS4883 B MPHS5036 J MPHS5036ADD E MPHS522 D MPHS523 C MPHS5263 P PPSHS5598 B MPHS5623 E MPHS5803 B MP
* Revised Since Previous Edition of 10/26/17
Revision Date 01/2018SPEC_NO REV CODE STATUS
APU SPECIFICATIONS
+ Added Since Previous Edition of 10/26/17
HS67 N MPHS7014 A MPHS7434 G MPHS7434ADD L MPHS750 E MPHS760 C MPHS7725 B MCLHS7725ADD A MCLHS841 G QSHS851 B MCLHS9138 E DHS915 B MPHS915ADD -- MPHS923 AA MPHS923ADD F MPHS93 K QSHSC0001 A DHSC16022 -- CRSHSC16199 D DHSF-5138.00 -- HS CancelledHSM17 T HS CancelledHT0985 4 HS CancelledHT0990 6 HS CancelledJDM10.06 F D Inactive for New DesignsMS02.40-01 D MPMS02.40-01ADD -- MPMS02.43 AF MPMS02.43_ADDENDUM -- MPMS02.43-01 -- MPMS02.44 B MPMS06.04 U MPMS06.B N MPMS10.25 M MPMS10.25_ADDENDUM -- MP Cancelled
* Revised Since Previous Edition of 10/26/17
Revision Date 01/2018SPEC_NO REV CODE STATUS
APU SPECIFICATIONS
+ Added Since Previous Edition of 10/26/17
MS11.18-01 H MPMS18.02 B MP Inactive for New DesignsMS20.01 AW MPMS20.04 D MPMS21.07 G MPMS28.01 V MPMS28.02 F MPMS28.04 H MPMS28.05 C MPMS28.07 A MPMS28.08 -- MPMS28.10 -- MPMS29.01-01 F MP Inactive for New DesignsMS29.01-02 N MPMS29.01-03 N MPMS29.01-05 F MPMS29.01-06 B MPMS29.01-07 -- MPMS29.01-08 J MPMS29.01-11 A MPMS29.01-12 A MPMS29.01-13 A MPMS29.02 F MPMS29.03 B MPMS29.04 J MPMS29.05-01 G MPMS29.05-02 G MPMS29.05-03 A MPMS34.00-01 U MPMS34.00-02 A MPMS34.28-05 J MPMS34.28-05ADD -- MPMS34.28-20 B MPMS34.28-55 B MP
* Revised Since Previous Edition of 10/26/17
Revision Date 01/2018SPEC_NO REV CODE STATUS
APU SPECIFICATIONS
+ Added Since Previous Edition of 10/26/17
MS34.28-55ADD -- MPMS34.28-56 A MPMS34.28-57 -- MPMS34.28-59 B MPMS34.28-59ADD -- MP CancelledMS34.28-60 B MPMS34.28-60ADD A MPMS34.28-64 -- MPMS34.28-66 A MPMS34.28-66ADD -- MPMS34.28-74 -- MPMS34.30-10 L MPMS34.30-10ADD B MPMS34.30-19 H MPMS34.30-19_ADDENDUM -- MPMS34.30-20 G MPMS34.31-05 M MPMS34.31-05ADD -- MPMS34.31-07 H MPMS34.33 B MPMS34.40-06 M MPMS34.40-06ADD -- MPMS34.40-12 C MPMS34.40-19 B MPMS34.40-21 C MPMS34.40-28 A MPMS34.40-29 C MPMS34.40-30 B MPMS34.40-31 D MPMS34.40-33 F MPMS34.40-33ADD -- MPMS34.50-01 AB MPMS34.50-04 F MPMS34.50-05 D MP
* Revised Since Previous Edition of 10/26/17
Revision Date 01/2018SPEC_NO REV CODE STATUS
APU SPECIFICATIONS
+ Added Since Previous Edition of 10/26/17
MS34.50-06 E MPMS34.50-07 C MPMS34.52-01 AB MP Inactive for New DesignsMS34.52-02 T MPMS34.52-03 R MPMS34.52-04 E MPMS34.52-05 F MP CancelledMS34.52-06 H MPMS34.52-09 B MPMS34.52-12 -- MPMS35.07 D MPMS35.11 B MPMS35.12 C MPMS37.09-01 AE MPMS37.14 AD MPMS37.15 AD MPMS37.15ADD -- MPMS37.30 B MPMS37.30ADD -- MPMS37.33 -- MPMS38.01-04 G MPMS40.16 H MPMS40.16ADD -- MPMS45.09 A MPPN02.01 CC DPN02.01-02 D DPN02.01-03 A DPN02.01-04 -- QSPN02.01-05 -- QSPN02.02 E DPN02.03 K MCLPN02.04 -- DPN02.05 -- DPN02.07 K QS
* Revised Since Previous Edition of 10/26/17
Revision Date 01/2018SPEC_NO REV CODE STATUS
APU SPECIFICATIONS
+ Added Since Previous Edition of 10/26/17
PN02.13 A DPN02.14 -- MCLPN03.01 B DPN03.03 A DPN04.01-03 A MPPN04.02-04 B QSPN04.03 -- DPN04.05-01 -- MPPN05.15 BJ MPPN05.16-01 B MP CancelledPN05.17 H MPPN05.19 C MPPN05.23 S MP Inactive for New DesignsPN05.26 J MP Inactive for New DesignsPN05.27 B MP Inactive for New DesignsPN05.29 AD MPPN05.32 E MPPN05.41 W MPPN05.41-03 R MPPN05.41-05 C MPPN05.48 B MPPN07.40 G MPPN07.41 M MPPN09.0000-N F MPPN09.0000-SR-5 C MPPN09.0000-SR-6 B MPPN09.17-4-PH V MPPN09.17-7-PH C MPPN09.2802-A-1 C MPPN09.410-HD C MPPN09.4340-HD E MPPN09.440-HFD D MPPN09.52100-HDF G MPPN09.52100-HF D MP
* Revised Since Previous Edition of 10/26/17
Revision Date 01/2018SPEC_NO REV CODE STATUS
APU SPECIFICATIONS
+ Added Since Previous Edition of 10/26/17
PN09.52100-MF J MPPN09.6419-H2D G MPPN09.6470-CN E MPPN09.9310-CHDF B MPPN09.9315-CA F MPPN09.9315-CHF AA MPPN09.9315-CMF P MPPN09.CP10V-H2D2 B MPPN09.CP10V-H3D2 G MPPN09.HWDS-AC-1 B MPPN09.HWDS-CN K MPPN09.HWDS-H2D-1 F MPPN09.HWDS-H3D F MPPN09.IRON-HD C MPPN09.IRON-ND-1 F MPPN09.PREFACE BR MPPN099310-CHDF J MPPN12.02 D MPPN12.03 J MPPN12.03SUPI A MPPN12.03SUPII -- MPPN12.03SUPIII -- MPPN12.03SUPIV B MPPN13.02 K MPPN13.04 AF MCLPN13.05-06 U MPPN13.06 N MPPN13.12-03 F MPPN13.17 K MCLPN14.05-01 H MPPN14.05-01S1 -- MP Inactive for New DesignsPN14.05A R MPPN14.06-01 AA MPPN14.06-02 -- MP
* Revised Since Previous Edition of 10/26/17
Revision Date 01/2018SPEC_NO REV CODE STATUS
APU SPECIFICATIONS
+ Added Since Previous Edition of 10/26/17
PN14.06-03 B MPPN14.08-02 B MPPN14.10 AB MPPN14.10-01 C MPPN14.12 AH MPPN14.13 -- MPPN14.16-03 AA MPPN14.16-04 F MPPN14.30 L MPPN14.40 G MPPN14.50 BA MPPN14.50-03 P MPPN14.52 H MPPN14.52-02 A MPPN14.55 -- MPPN14.58 K MPPN14.59 F MPPN15.01 AV MPPN15.01-03 C MPPN15.10 D MCLPN15.12 W MPPN15.32 R MPPN15.34 B MPPN15.40 V MPPN15.43 P MCLPN15.47 L MPPN15.52-01 B D Inactive for New DesignsPN15.55 Y MPPN15.66 F MPPN15.67 E MCLPN16.01 AL QSPN16.01-01 C QSPN16.03 AV QSPN16.03-01 C QS
* Revised Since Previous Edition of 10/26/17
Revision Date 01/2018SPEC_NO REV CODE STATUS
APU SPECIFICATIONS
+ Added Since Previous Edition of 10/26/17
PN16.03-02 B QS Inactive for New DesignsPN16.03-02SUP1 B QS Inactive for New DesignsPN16.03-04 B QSPN16.03-07 A QSPN16.04 AM QSPN16.05 AK QSPN16.05SUP1 A QS Inactive for New DesignsPN16.06 Y QSPN16.06-03 D QSPN16.16 -- MCLPN16.17 G MCLPN16.19 C MCLPN16.21 A DPN17.09-01 V MPPN17.10-06 B MPPN17.10-13 D MPPN17.10-14 H MPPN17.10-15 F MPPN17.10-17 D MPPN17.10-26 D MPPN17.10-31 E MPPN17.10-34 B MPPN17.10-39 A MPPN17.10-43 C MPPN17.10-45 A MPPN17.10-46 A MPPN17.10-49 A MPPN17.24 F PPSPN17.26-04 F MPPN17.26-09 A MPPN17.26-10 AA PPSPN17.27-13 C MPPN17.28-05 B MPPN17.31 W PPS
* Revised Since Previous Edition of 10/26/17
Revision Date 01/2018SPEC_NO REV CODE STATUS
APU SPECIFICATIONS
+ Added Since Previous Edition of 10/26/17
PN17.33 Y DPN17.33-01 C DPN17.36 AM DPN17.42 T DPN17.43 D DPN17.50 DP DPN17.50-01 L DPN17.51 G PPSPN17.53 M PPSPN17.70-01 AG DPN17.70-02 F DPN17.70-03 H DPN17.70-06 C DPN17.70-07 C DPN18.03 L DPN18.06 -- DPN19.54 -- PPSPN19.59 -- MPPN23.01 A DPN26.03 F MPPN26.03-01 K MPPN26.04 U PPSPN26.04-01 G PPSPN26.05 L PPSPN26.05-01 AF PPSPN26.06 -- PPSPN26.09 M PPSPN26.09-01 C PPSPN26.10 B PPSPN26.11 E PPSPN26.12 K PPSPN26.13 C PPSPN29.03 D DPN29.07 A MP
* Revised Since Previous Edition of 10/26/17
Revision Date 01/2018SPEC_NO REV CODE STATUS
APU SPECIFICATIONS
+ Added Since Previous Edition of 10/26/17
PN29.08 A MPPN29.12 -- DPN30.03 A MPPN43.01 B MPPS30.01 L MPQC13.01-03 V MCLQC13.02 L MCLSP0130 12 HS CancelledSP0532 2 HS CancelledSP1228 29 HS CancelledSP1236 4 MCLSVHS14130 D MP Inactive for New DesignsSVHS15460 C MP Inactive for New DesignsSVHS3717 E D Inactive for New DesignsTS2491 D ATPTS5372 C ATPTS5515 C ATP
* Revised Since Previous Edition of 10/26/17
Revision Date 01/2018Updated Quarterly - January, April, July, OctoberThis document does not contain any export regulated technical data.
+ Added Since Previous Edition of 10/26/17
QUALITY STNDS
Page 110 of 138
* Revised Since Previous Edition of 10/26/17
Revision Date 01/2018Updated Quarterly - January, April, July, OctoberThis document contains no technical data subject to the EAR or the ITAR.
BIS-1KBIS-3ABIS-4E RedactedBIS-6C Cancelled - Use VIS-114BIS-7C Cancelled - Use VIS-114BIS-9CBIS-10BBIS-11CBIS-12A BIS-13BBIS14-B
CIS-1F New Standard
CDS-1BCDS-2D Cancelled - Use VIS-322 & VIS-23CDS-3D CDS-4A
CVS-1A Cancelled - Use CVS-12CVS-2F Cancelled - Use CVS-12CVS-4E CVS-6P Cancelled - Use CVS-12CVS-8E Cancelled - Use CVS-12CVS-9B Cancelled - Use CVS-12CVS-10ACVS-11A CVS-12PCVS-13B Cancelled - Use CVS-12CVS-14 NewCVS-15B
DCS-1-100EDCS-1-101EDCS-1-102EDCS-1-103DDCS-1-104DDCS-1-105DDCS-1-106FDCS-1-150D Obsoleted - No further requirementsDCS-1-151B Obsoleted - No further requirementsDCS-1-152A Obsoleted - No further requirementsDSC-197 NewDCS-1-200DDCS-1-201ADCS-1-202BDCS-1-203BDCS-1-204ADCS-1-205DDCS-1-206ADCS-1-207ADCS-1-208BDCS-1-209DDCS-1-210ADCS-1-211HDCS-1-212FDCS-1-213CDCS-1-214BDCS-1-215KDCS-1-216TDCS-1-217LDCS-1-218CDCS-1-219MDCS-1-220D Obsoleted - Use DCS-1-219DCS-1-250ADCS-1-251BDCS-1-260B Obsoleted - No further requirementsDCS-1-261B Obsoleted - No further requirementsDCS-2A Cancelled - No longer requiredDCS-3LDCS-4A Obsoleted - Use DCS-1DCS-5A Obsoleted - Use QEP 7.2.33DCS-6 Obsoleted - Use PW-QA-6080DCS-7 Master DDCS-7-1ADCS-7-2ADCS-7-3ADCS-7-4ADCS-7-5ADCS-7-6ADCS-7-7ADCS-7-8ADCS-7-9ADCS-7-10ADCS-7-11BDCS-7-12ADCS-7-12.1ADCS-7-12.2ADCS-7-13ADCS-7-14ADCS-7-15ADCS-7-16ADCS-7-17ADCS-7-18ADCS-7-19A
QUALITY STNDS
Page 113 of 138
* Revised Since Previous Edition of 10/26/17
Revision Date 01/2018Updated Quarterly - January, April, July, OctoberThis document contains no technical data subject to the EAR or the ITAR.
DCS-7-20ADCS-7-30ADCS-7-40ADCS-7-48ADCS-7-49ADCS-7-50ADCS-7-51ADCS-7-52ADCS-7-53ADCS-7-54ADCS-7-55ADCS-7-55.1ADCS-7-56ADCS-7-57ADCS-7-57.1ADCS-7-57.2ADCS-7.58ADCS-7.59ADCS-7.60ADCS-7.61ADCS-7.62ADCS-7.63ADCS-7.64ADCS-7.65ADCS-7.70ADCS-7.80ADCS-8 Master LDCS-8-1EDCS-8-2B Cancelled - Use DCM 8-2DCS-8-3LDCS-8-4BDCS-8-5BDCS-8-6BDCS-8-7CDCS-8-8ADCS-8-9D Cancelled - Use DCM-8DCS-8-10ADCS-8-11ADCS-8-12CDCS-8-13ADCS-8-14A ObsoletedDCS-8-15BDCS-8-17CDCS-8-18BDCS-8-19CDCS-8-20ADCS-8-21ADCS-8-22ADCS-8-23ADCS-8-25ADCS-8-26ADCS-8-27BDCS-8-28ADCS-8-29ADCS-8-30ADCS-8-31ADCS-8-32ADCS-8-33ADCS-8-34ADCS-8-35A Cancelled - No further requirementsDCS-8-36A Cancelled-Functional Test requirments-F404 partsDCS-8-37ADCS-8-38A
QUALITY STNDS
Page 114 of 138
* Revised Since Previous Edition of 10/26/17
Revision Date 01/2018Updated Quarterly - January, April, July, OctoberThis document contains no technical data subject to the EAR or the ITAR.
DCS-8-39ADCS-9B Obsoleted - No longer requiredDCS-10MDCS-12DDCS-13DDCS-14F Cancelled - Use ASQR-01DCS-15A Obsoleted DCS-16A Cancelled - Use HIM-1DCS-17 Master D Cancelled - Use HIM-1DCS-17-1 Cancelled - Use HIM-1DCS-17-2 Cancelled - Use HIM-1DCS-17-3A Cancelled - Use HIM-1DCS-17-4 Cancelled - Use HIM-1DCS-17-5 Cancelled - Use HIM-1DCS-17-6 Cancelled - Use HIM-1DCS17-7A Cancelled - Use HIM-1DCS17-9DCS-18-CDCS-20-GDCS-22A ObsoletedDCS-23WDCS-24 ObsoletedDCS-25A ObsoletedDCS-27B Obsoleted - No longer requiredDCS-28A ObsoletedDCS-29EDCS-30A Cancelled - Use PWA 360DCS-31CDCS-33A ObsoletedDCS-34EDCS-35CDCS-36A ObsoletedDCS-37HDCS-38CDCS-39BDCS-40CDCS-41FDCS-42DDCS-43CDCS-44GDCS-46ADCS-47B CancelledDCS-48HDCS-49A ObsoletedDCS-50BDCS-51FDCS-52EDCS-53CDCS-54CDCS-56GDCS-57DDCS-58D Cancelled - Use PWA 350DCS-59C CancelledDCS-60EDCS-60 Appendix AU
DCS-61BDCS-63B Obsoleted - No longer requiredDCS-64B Cancelled - Use DCM 2DCS-65B CancelledDCS-68DDCS-68B Appendix
Redacted
QUALITY STNDS
Page 115 of 138
* Revised Since Previous Edition of 10/26/17
Revision Date 01/2018Updated Quarterly - January, April, July, OctoberThis document contains no technical data subject to the EAR or the ITAR.
DCS-71DDCS-72DDCS-75C CancelledDCS-76BDCS-77C CancelledDCS-78A Obsoleted - No further requirementsDCS-79B CancelledDCS-80 Cancelled - Use PWA 355DCS-83 Obsoleted - No further requirementsDCS-85A Cancelled-No longer required due to ECR systemDCS-85B Appendix
DCS-86B CancelledDCS-88A Cancelled - Use ASQR-01DCS-89B CancelledDCS-90A CancelledDCS-91A CancelledDCS-92JDCS-94A Cancelled - Use PWA-310DCS-95DDCS-98B CancelledDCS-99A Cancelled - Use PWA-357DCS-101BDCS-104B Cancelled - Use VIS-454DCS-105A Cancelled - Use ASQDCS-106BDCS-107ADCS-108A Obsoleted - No longer requiredDCS-109BDCS-109 App. CDCS-110B Cancelled - Use DCM-5DCS-111-1A Obsoleted - No longer requiredDCS-111-2A Obsoleted - No longer requiredDCS-111-3A Obsoleted - No longer requiredDCS-111-4A Obsoleted - No longer requiredDCS-111-5A Obsoleted - No longer requiredDCS-111-6A Obsoleted - No longer requiredDCS-111-7A Obsoleted - No longer requiredDCS-111-8A Obsoleted - No longer requiredDCS-111-9A Obsoleted - No longer requiredDCS-111-10A Obsoleted - No longer requiredDCS-111-12A Obsoleted - No longer requiredDCS-111-13A Obsoleted - No longer requiredDCS-111-14A Obsoleted - No longer requiredDCS-111-15A Obsoleted - No longer requiredDCS-111-16A Obsoleted - No longer requiredDCS-111-17A Obsoleted - No longer requiredDCS-111-18A Obsoleted - No longer requiredDCS-111-19A Obsoleted - No longer requiredDCS-111-20C Obsoleted - No longer requiredDCS-111-21A Obsoleted - No longer requiredDCS-111-25A Obsoleted - No longer requiredDCS-111-28A Obsoleted - No longer requiredDCS-111-29A Obsoleted - No longer requiredDCS-111-31A Obsoleted - No longer requiredDCS-119BDCS-120BDCS-120A Appendix
DCS-121ADCS-123CDCS-123C Appendix
QUALITY STNDS
Page 116 of 138
* Revised Since Previous Edition of 10/26/17
Revision Date 01/2018Updated Quarterly - January, April, July, OctoberThis document contains no technical data subject to the EAR or the ITAR.
DCS-124A CancelledDCS-125DDCS-126BDCS-127ADCS-129ADCS-130ADCS-131CDCS-132ADCS-133BDCS-135B Obsoleted - No longer requiredDCS-139A Obsoleted - No longer requiredDCS-140ADCS-141BDCS-142ADCS-145BDCS-145 Appendix A
FPS-105DFPS-106BFPS-107BFPS-108BFPS-109 NewFPS-200A CancelledFPS-201B CancelledFPS-300BFPS-301CFPS-302BFPS-304B CancelledFPS-305G Cancelled-Use FPVS-8FPS-306TFPS-307C Obsoleted-Use FPVS-4FPS-308DFPS-309M Cancelled-Use FPVS-4FPS-310BFPS-312E Cancelled-Use FPS-306FPS-313A CancelledFPS-370A Obsoleted-No further requirementsFPS-371A Obsoleted-No further requirementsFPS-372A Obsoleted-No further requirementsFPS-373A Obsoleted-No further requirementsFPS-374A Obsoleted-No further requirementsFPS-701B CancelledFPS-703A CancelledFPS-704A CancelledFPS-705A CancelledFPS-706A CancelledFPS-707A Obsoleted-No further requirementsFPS-708A Obsoleted-No further requirementsFPS-709HFPS-A-Vendor A FPS INDEX Cancelled-No further requirements
MPS-115BMPS-116A MPS-117A MPS-118A MPS-119A MPS-200A Cancelled-No further requirementsMPS-370A Cancelled-No further requirementsMPS-371A Cancelled-No further requirementsMPS-372B Cancelled-No further requirementsMPS-701A CancelledMPS-A-Vendor A Obsoleted-No further requirementsMPS-B-Vendor B Obsoleted-No further requirementsMPS-C-Vendor A Obsoleted-No further requirementsMPS-D-Vendor A Obsoleted-No further requirementsMPS-E-Vendor A Cancelled-Refer to MPS-MMPS-F-Vendor A Obsoleted-No further requirementsMPS-G-Vendor A Obsoleted-No further requirements
VIS-308CVIS-309EVIS-310CVIS-311JVIS-313C Cancelled-No further requirementsVIS-315A Obsoleted-No further requirementsVIS-316DVIS-317C Obsoleted-No further requirementsVIS-318DVIS-319A Obsoleted-No further requirementsVIS-320 ObsoletedVIS-321C VIS-322W VIS-323J Cancelled-Use VIS-322VIS-325L VIS-327A Obsoleted- Use PWA-349VIS-328G VIS-329D Cancelled-Use VIS-108VIS-333A Cancelled-Use MCL ManualVIS-335CVIS-337DVIS-341D Cancelled-Use FPVS-4VIS-343A VIS-344B Cancelled-Use VIS-229VIS-347C VIS-348D Cancelled-Use VIS-518VIS-349H Cancelled-Use VIS-544VIS-350EVIS-351A ObsoletedVIS-352DVIS-353C Cancelled-Use FPVS-21 Sec. I & IIVIS-356A VIS-357B VIS-359C Cancelled-Use VIS-544VIS-360A VIS-361A VIS-363DVIS-364A VIS-365C VIS-366B VIS-369TVIS-370A Cancelled-No further requirementsVIS-371A Cancelled-No further requirementsVIS-372A Cancelled-No further requirementsVIS-373B Cancelled-No further requirementsVIS-374A Cancelled-No further requirementsVIS-375A Cancelled-No further requirementsVIS-376A Cancelled-No further requirementsVIS-377A Cancelled-No further requirementsVIS-378C Cancelled-No further requirementsVIS-379B Cancelled-No further requirementsVIS-380D Cancelled-No further requirementsVIS-381C Cancelled-No further requirementsVIS-382D Cancelled-No further requirementsVIS-383A Cancelled-No further requirementsVIS-384C Cancelled-No further requirementsVIS-385B Cancelled-No further requirementsVIS-386B Cancelled-No further requirementsVIS-387B Cancelled-No further requirementsVIS-388D Cancelled-No further requirementsVIS-390D Cancelled-No further requirementsVIS-400C VIS-401A
QUALITY STNDS
Page 132 of 138
* Revised Since Previous Edition of 10/26/17
Revision Date 01/2018Updated Quarterly - January, April, July, OctoberThis document contains no technical data subject to the EAR or the ITAR.
XRS-111 NewXRS-201 Cancelled-Parts insp. to this std. inactiveXRS-202A Cancelled-Parts insp. to this std. inactiveXRS-203B Cancelled-Parts insp. to this std. inactiveXRS-204H Cancelled-Parts insp. to this std. inactiveXRS-205F Cancelled-Parts insp. to this std. inactiveXRS-206A Cancelled-Parts insp. to this std. inactiveXRS-207A Cancelled-Parts insp. to this std. inactiveXRS-208E Cancelled-Parts insp. to this std. inactiveXRS-209D Cancelled-Parts insp. to this std. inactiveXRS-210A Cancelled-Parts insp. to this std. inactiveXRS-211A Cancelled-Parts insp. to this std. inactiveXRS-212A Cancelled-Parts insp. to this std. inactiveXRS-300D XRS-301B Cancelled-Use XRS-306XRS-302BXRS-303B XRS-304A Cancelled-No Further RequirementsXRS-305B XRS-306DXRS-307C XRS-308B Obsoleted-No further requirementsXRS-309A Obsoleted-No further requirementsXRS-310B Cancelled-Use XRS-MasterXRS-311B Obsoleted-No further requirementsXRS-312A Obsoleted-No further requirementsXRS-313CXRS-314G XRS-315GXRS-316JXRS-317D XRS-318DXRS-319GXRS-320B CancelledXRS-321A XRS-322B CancelledXRS-323C XRS-324D Cancelled-Use XRS-96XRS-325C XRS-327A XRS-328 NewXRS-370E Obsoleted-No further requirementsXRS-701EXRS-702B XRS-706A XRS-707B XRS-708B
* Revised Since Previous Edition of 10/26/17
Revision Date 01/2018Updated Quarterly - January, April, July, OctoberThis document contains no technical data subject to the EAR or the ITAR.