Turning Waste Organics Into Energy: Joint Venture between: South Davis Sewer District and ALPRO Energy & Water 1380 West Center Street North Salt Lake, UT 84054
15

South Davis Sewer District and ALPRO Energy & Water...and ALPRO Energy & Water 1380 West Center Street North Salt Lake, UT 84054 View from Charter school South Plant Nutrient Recovery

Feb 06, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • Turning Waste Organics Into Energy:Joint Venture between:

    South Davis Sewer Districtand ALPRO Energy & Water

    1380 West Center StreetNorth Salt Lake, UT 84054

  • View from Charter schoolSouth Plant Nutrient Recovery ProjectSouth Davis Sewer District

  • History• Dannon Yogurt

    • Digest Solids from plant generate electricity• Corporate changed path

    • Central Valley Sewer District• New egg digesters• 6 empty digesters• Use stranded equipment• Feedstock contracts

    • South Davis Sewer District• Private vs Public vs Private Public Partnership

  • PHASE 1 – Wasatch Resource Recovery & Nutrient Recovery

    WASATCH RESOURCE RECOVERY PHASE 11 SCALES2 FOG RECEIVING3 SUBSTRATE RECEIVING4 SOURCE SEPARATED RECEIVING5 EXPIRED BEVERAGE RECEIVING6 HYDROLYSIS / EQ TANK7 ANAROBIC DIGESTERS8 CHEMICAL / NUTRIENT RECEIVING9 CAKE RECOVERY10 CAKE STORAGE11 ODOR CONTROL12 BIOGAS CONDITIONING13 COMPRESSION STATION

    SOUTH DAVIS PLANT NUTRIENT RECOVERY14 BIO-SOLIDS DE-WATERING15 MIX / DARK TANK16 MIX / DARK TANK PUMP STATION17 GREENHOUSE / PHOTO BIO-REACTOR18 MEMBRANE BIO-REACTOR19 ALGAE DE-WATERING / DRYING20 OPERATIONS BUILDING21 STOCK CULTURE / PILOT SYSTEM

  • Project Construction

  • FUTURE PHASES

    PHASE 21 FOUR ADDITIONAL MIX / DARK TANKS2 FOUR ADDITIONAL GREENHOUSES / PHOTO BIO-REACTORS3 DIGESTER CLEANING BASIN4 2 NEW ANAEROBIC DIGESTERS5 NEW HYDROLYSIS / EQ TANK6 5 NEW CO-GENERATION ENGINATORS W/SCRUBBERS7 NEW SCRUBBING PUMP STATION8 ADDITIONAL ALGAE DE-WATERING9 ALGAE REFINING PROCCESSES10 COMPOSTING AREA11 ADDITIONAL GAS SCRUBBING12 ODOR CONTROL

  • OfftakesConstituent Phase 1 Phase 2

    Methane 2500 Dekatherms per day 5000 Dekatherms per day

    Carbon Dioxide from Gas Conditioning 75 tons per day 40 tons per day

    Carbon Dioxide from Exhaust Scrubbing 0 25 tons per day

    Carbon from Effluent and Pressate 3 tons per day 8 tons per day

    Dewatered Digestate – Cake 40 dry tons per day 80 dry tons per day

    Cake NPK 7:6:1 5:5:1

    Nitrogen from Anaerobic Digestion 6,300 lbs. / day 12,500 lbs. / day

    Nitrogen from WWTP 700 lbs. / day 700 lbs. / day

    Phosphorus from Anaerobic Digestion 2,000 lbs. / day 4,000 lbs. / day

    Phosphorus from WWTP 133 lbs. / day 133 lbs. / day

    Algae Production 8,000 lbs / day 40,000 lbs. / day

  • • Carbon Capture and Sequestration Tax Credits for Biomass 26 U.S. Code 45Q

    • Tax credit of $15 (today) to $35 (2026) per metric ton of carbon-oxide captured.

  • Wasatch Resource Recovery at Build-out.