Solar business models
in Italy, Spain and
Turkey
This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 646554
PV Financing EU-wide webinar, Wednesday 17 May 2017SolarPower Europe
@PVFinancing
Intro
Sonia Dunlop, Policy Adviser, SolarPower Europe
Agenda
11:00 Introduction, Sonia Dunlop, SolarPower Europe
11:05 Direct wire PPAs in Italy: legislation and case studies, Riccardo Battisti, Senior ProjectManager, Ambiente Italia
11:20 Cooperative models in Spain, Gijsbert Huijink, Manger, SOM Energia (“the green energy cooperative”)
11:35 The unlicensed business model in Turkey, Faruk Telemcioglu, General-Secretary, GUNDER(Turkish Solar Energy Society)
11:50 Conclusions and next steps, Sonia Dunlop, SolarPower Europe
A recording of the webinar will be available after the broadcast.
Send us your questions!
With GoToWebinar(preferred):Use questions box on right hand side of your screen
Get involved via Twitter:@PVFinancing@SolarPowerEU@soniakdunlop@RiccardoBatt@AI_AIP@SomEnergia@GunderSolar
Direct wire PPAs in Italy: legislation and case studies
Riccardo Battisti, Senior Project Manager, Ambiente Italia
Direct wire PPAs in Italy Legislation and case studies
Riccardo Battisti, Ambiente Italia
This project has received fundingfrom the European Union’s Horizon 2020research and innovation programmeunder grant agreement No 646554
Webinar ‘Solar business models in Italy, Spain and Turkey’May, 17th 2017
The sole responsibility for the contents of this publication lies with the authors. It does not necessarily reflect the opinion of the European Union.Neither the European Commission nor the authors are responsible for any use that may be made of the information contained therein.
@AI_AIP @PVFinancing
• Private consultancy company in the energy and environment field
• 20 years of activity
• More than 1,500 local, national and international projects
• 30 experts and 4 offices
• Role in PV Financing: National Implementation Partner for Italy
@AI_AIP @PVFinancing
TOPICS
• PPA legislation and profitability
• Energy cost and electricity bill structure
• Case studies
• Future outlook
@AI_AIP @PVFinancing
PPA LEGISLATION
• REMOVED! The PV plant should be installed in an area owned (or managed) by the customer
• Only one final user, thus excluding many market segments (commercial centres, airports, industrial parks, office buildings and multi-family houses)
• Except for common loads
@AI_AIP @PVFinancing
PPA PROFITABILITY
• Wholesale price is low (around 45 €/MWh)
• So self-consumption rate is a key profitability parameter
• Which sectors then?– Industrial
– Commercial
– Office buildings
– Public buildings: Lower consumption and smaller size but reliable consumers
@AI_AIP @PVFinancing
GRID ELECTRICITY COST
• For enterprises in 2016 (source: ENEA)
• Without taxes
• 20÷500 MWh/year: 180 €/MWh
• Up to 2,000 MWh/year: 164 €/MWh
• Up to 20,000 MWh/year: 145 €/MWh
@AI_AIP @PVFinancing
ELECTRICITY BILLSTRUCTURE
Around 50% iscapacity-based
@AI_AIP @PVFinancing
ELECTRICITY BILLSELF-CONSUMPTION SAVINGS
PPAcap price
(65÷70%)
@AI_AIP @PVFinancing
L‘OREAL INDUSTRIAL PLANT
• 3 MWp PV plant
• Total yield: 3,600 MWh/year
• Specific yield: 1,200 kWh/year per kWp
• Self-consumption rate: 100%
• PV output: 30% of the total demand
Source: Qualenergia.it
@AI_AIP @PVFinancing
L‘OREAL INDUSTRIAL PLANT
• Investment: 3,000,000 €(about 1,000 €/kWp)
• Balance sheet finance, no debtfinancing
• 20 years contract, including a “take or pay” provision
• 10% savings with respect to grid price
• Investor also broker for the additionalenergy demand of the factory
Source: Enersol
@AI_AIP @PVFinancing
ARESE SHOPPING CENTRE
• 50% of the common loads covered by PV (1.4 MWp)
• Lighting and space cooling through heat pumps
• Also 2 cogeneration units
Source: Solar Frontier Europe
@AI_AIP @PVFinancing
ARESE SHOPPING CENTRE
• Expected yield: 1,500 MWh/year
• Self-consumption rate: almost 100%
Source: Solar Frontier Europe
@AI_AIP @PVFinancing
ARESE SHOPPING CENTRE
@AI_AIP @PVFinancing
OUTLOOKELECTRICITY MARKET
• Reform of the electricity market is under consultation
• Expected (declared…) deadlines:– Published June 2017
– Into force January 2018
• PV plants (with storage) could get revenues from additional gridservices (management of energy flows, frequency, voltage, etc.)
• Most probably only pilot projects in the first stage
@AI_AIP @PVFinancing
OUTLOOKNON-RESIDENTIAL BILL
• Non-residential customers: Industrial, tertiary, agriculture• 75% of the national consumption• Reform currently under consultation• Jan 2018…?
• System charges increase their capacity-based share…But how much?• 5 scenarios: 10÷50% moved to the capacity-based share• 3 of them drastically negative for PV (estimated cut of 4.5 billion
investments until 2030)• The Energy Authority is oriented towards the 2 ‘positive’ ones
(estimated market decrease: 7÷12%)• Capacity-based share of system charges could be 10÷30%• Of course it is retroactive…
@AI_AIP @PVFinancing
OUTLOOKMULTIPLE USERS
• ‘Closed distribution systems’ (SDC): Private grids with multiple consumers
• Petition (about 25,000 signatures) to the Prime Minister for amending the ‘Competition Law’ and including this topic
• View of the Regulatory Authority: SDCs should not be used for promoting renewables and efficiency (this should be done throughincentives) but only when it is cheaper than the connection to the public grid
• Positive opinion by the Authority for Competition and Market
@AI_AIP @PVFinancing
OUTLOOK
• Workshop on May 16th
• Ministry for Economic Development: – «Self-consumption will be a key point of the new National Energy Strategy»
– «A proposal will be sent to the EC in the second half of 2017»
– «Grid and system charges should not hinder self-consumption»
– «The growth of self-consumption is sustainable for the grid costs»
@AI_AIP @PVFinancing
CONCLUSIONS
• PPA is a promising business model in Italy
• Especially in specific application segments (public buildings, large industrial or commercial plants)
• Main risks are:– Stability of user consumption (low wholesale price)
– Lower value of electricity savings with the new electricity bill
• Possible ‘compensations’:– Additional revenues from grid services
– Multiple consumers reducing risk and unlocking new market segments
Transfer of SPV shares is not possible until commercial operation
MAIN LAWS FOR RENEWABLE ENERGY
• ELECTRICITY MARKET LAW (No: 6446) - 2013Electricity Market Law No. 4628 (2001)
• LAW ON UTILIZATION OF RENEWABLE ENERGY SOURCES FOR THE PURPOSE OF GENERATING ELECTRICAL ENERGY (Law No: 5346) - 2005
SECONDARY REGULATIONS FOR RENEWABLE ENERGY
• ELECTRICITY MARKET LICENSING REGULATION• THE REGULATION FOR UNLICENSED GENERATION OF ELECTRICAL POWER IN THE ENERGY MARKET• TECHNICAL REGULATION FOR EVALUATING LICENSE APPLICATIONS BASED ON WIND
ENERGY GENERATION• TECHNICAL REGULATION FOR EVALUATING LICENSE APPLICATIONS BASED ON SOLAR
ENERGY GENERATION• THE REGULATION ON COMPETITION FOR GRID CONNECTION RIGHTS FOR THE SOLAR AND
WIND POWER GENERATION PLANTS (Tender Regulation)• REGULATION FOR PRE-LICENSE WIND AND SOLAR MEASUREMENTS• COMMUNIQUÉ ON MEASUREMENT STANDARDS FOR WIND AND SOLAR POWER PRE-
LICENSE APPLICATIONS• REGULATION REGARDING DOCUMENTATION AND SUPPORT OF RENEWABLE ENERGY
Regulatory Framework
* 10 years for plants to be commissioned until 31/12/2020 ** Incentive for local content-5 years for plants to be commissioned until 31/12/2020
Support mechanism in the electricity market related secondary legislation;
• Payment of only 10% of the total licensing fee
• Exemption from payment of annual license fees for the first 8 years of operation
• Priority for system connection
• Exemption from being a balancing mechanism unit
• Purchasing option from the market up to 100% of the quantity inserted in the relevant license
Feed-in Tariffs
In Turkey, renewable electricity production is mainly promoted through a guaranteed feed-in tariff mechanism. The Renewable Energy Support Mechanism’s feed-in tariff forrenewable energy sources is between 7,3 – 13,3 $ - cents/kWh for the first 10 years ofoperation.
Feed-in Tariffs & Premiums
Bonus for local content
56
Feed-in-Tariffs, (Günder’s Survey (245 participants); 76% - main
leverage for PVS investments, 83% - PVS investments can not be realized
without FiT) Purchase guarantees,
Connection priorities,
Lower license fees,(Only 1% of licensing fee, Exemption to pay annual license fee for 8 years in operation)
License exemptions for applications below 1 MW
Various practical conveniences in project preparation and land acquisition.
Index: national documentsAUSTRIARoof rental contract Dachvermietung (Österreich)Leasing contract Pachtvertrag (Österreich)Solar cooperative association by-laws Vereinstatuten (Österreich)Self-consumption model guidelines Leitfaden zu PV-EigenverbrauchsmodellenPolicy advisory paper Austria Nationales PositionspapierFRANCECollective self-consumption contract Modèle d’autoconsommation collective d’électricité (France)Surplus electricity in collective self consumption electricity contract Modèle de contrat de vente du surplus d’électricité dans le cadre d’une autoconsommation collective (France)Solar business model implementation guidelines Guide de Mise en Oeuvre de Projets PV en FrancePolicy advisory paper France Reccommendations pour un deployment accru du photvoltaique en FranceGERMANYNeighbour electricity model implementation guidelines “Geschäftsmodelle Mit Pv-Mieterstrom“Policy advisory paper Germany Nationales PositionspapierITALYOperational leasing contract for a PV plant Contratto di locazione operativa di impianto fotovoltaico (italia)Power Purchase Agreement contract for electricity supply through a PV plant Accordo per la costruzione di impianto dedicato e somministrazione di energia elettrica secondo lo schema del sistema efficiente di utenza (italia)Solar business model implementation guidelines Impianti fotovoltaici: linee guida per l’implementazionePolicy advisory paper Italy Fotovoltaico in Italia, quale politiche di supporto?
SPAINContract template for the participation in the crowdfunding of a PV installation Contrato de cuentas en participación para la explotación de una instalación fotovoltaica ubicada en (España)Contract template for representation in the electricity trading market for a prosumer with self-consumption 2 Contrato de representación de mercado para la venta de excedentes de una instalación del autoconsumo (España)Cooperative by-laws template Plantilla de estatutos corporativa (España)Solar business model implementation guidelines Pautas de Implementación NacionalNational report on regulatory framework Spain Informe nacional de asesoramiento regulatorioTURKEYContract for lease of PV system FV sistemlerin kiralanması için Örnek KontratElectricity utility, investor and solar supplier contract Kontrat tipi 1: Kamu Hizmetleri(Elektrik), yatırımcı ve solar tedarikçi model I (Türkiye)Electricity supply contract for solar PV electricity supply and example electricity bill Fotovoltaik Elektrik Arzı ve Örnek Elektrik faturası için Örnek Elektrik Arzı Sözleşmesi (Türkiye)Solar business model implementation guidelines Ulusal uygulama rehberiPolicy advisory paper Turkey Ulusal Politika Tavsiye BelgesiUNITED KINGDOMPower Purchase Agreement (United Kingdom)Making Solar Pay: the future of the solar PPA market in the UKUK National Policy Advisory Paper