© London St. Consulting Introducing Software Configuration Management into a CMMI Level 1 Project Presented at the KWSQA March 2006 by Pat Cross, London St. Consulting
28

Software Configuration Management into a CMMI Level 1 Project

Jun 23, 2015

Download

Technology

elliando dias
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Software Configuration Management into a CMMI Level 1 Project

© London St. Consulting

Introducing Software Configuration

Management into a CMMI Level 1

Project

Presented at the KWSQAMarch 2006

by Pat Cross, London St. Consulting

Page 2: Software Configuration Management into a CMMI Level 1 Project

March 2006 © London St. Consulting 2

What I want you to go away with

– Remembering how important Software Configuration Management (SCM) is.

– Remembering how hard it is for new people to understand SCM - or care about it.

– Having some guidelines to implementing SCM in projects that have started with no clear processes.

Page 3: Software Configuration Management into a CMMI Level 1 Project

March 2006 © London St. Consulting 3

What I want to cover today

– How do you recognize a CMMI Level 1 project, and how does it feel?

– Quick tour of SCM– Some guidelines to beginning the

implementation of SCM– Questions, stories and ideas from the

floor

Page 4: Software Configuration Management into a CMMI Level 1 Project

March 2006 © London St. Consulting 4

• CMM has been broadened to Capability Maturity Model Integrated (CMMI) to cover systems of all sorts.

The CMM and CMMI Models

Repeatable 2

Managed 4

Optimizing 5

Initial 1

Defined 3

Predictable process

Continuously improving process

Standard, consistent process

Disciplined process

Heroics

Page 5: Software Configuration Management into a CMMI Level 1 Project

March 2006 © London St. Consulting 5

CMM Level 1

– The Capability Maturity Matrix Integrated (CMMI) has 5 levels of process maturity

– Level 1 has no uniform processes – just heroics

– 60% of companies are at Level 1– Even some companies that are better

than Level 1, have projects within them that are working at Level 1

Page 6: Software Configuration Management into a CMMI Level 1 Project

March 2006 © London St. Consulting 6

How does Level 1 development feel?

– At the beginning of a project - exciting, free. Perhaps some schedule pressure.

– In the middle - uncomfortable, sense of injustice, some fear.

– At the end of development - panic, forced heroism, anger.

Page 7: Software Configuration Management into a CMMI Level 1 Project

March 2006 © London St. Consulting 7

How does Level 1 maintenance feel?

– Baffling - lack of documentation means hard to trouble shoot, hard to fix.

– Confusing - hard to keep track of •changes planned to go in •changes tried but unsuccessful •changes actually made to system

– Increasing disengagement

Page 8: Software Configuration Management into a CMMI Level 1 Project

March 2006 © London St. Consulting 8

What is Software CM?

• SCM is the art of managing the information about the product itself, including the source and executable code.

• SCM keeps you up to date on what you have, and protects your information and code from loss and unauthorized changes.

• SCM keeps you sane.

Page 9: Software Configuration Management into a CMMI Level 1 Project

March 2006 © London St. Consulting 9

Quick Tour of SCM

Classic CM has four parts:•configuration identification (what shall we

manage?)•configuration change control (who

authorizes what and how?)•configuration status accounting

(snapshots)•configuration audits (inventory checking)

Software also needs extra specific tools and documents

Page 10: Software Configuration Management into a CMMI Level 1 Project

March 2006 © London St. Consulting 10

Configuration Identification

• Early in the project, decide what pieces of software you want to treat as ‘an item’. Each item needs its own requirements, design and test documents.• If the code piece is too big, the effect of a change

on other parts of the software is hard to determine.

• If the pieces are too small, the administrative costs go up.

• Requirement and design documents are also Configuration Items (CIs)

Page 11: Software Configuration Management into a CMMI Level 1 Project

March 2006 © London St. Consulting 11

Configuration Change Control

• Changes are the most dangerous events in a software’s life.

• Deep technical insights are needed to judge all the effects of a change.

• It’s helpful to have a group of guru’s to make these decisions - the Configuration Control Board (CCB).

• The CCB also authorizes extra work.

Page 12: Software Configuration Management into a CMMI Level 1 Project

March 2006 © London St. Consulting 12

Configuration Status Accounting

• During development many people need to be clear about what version of requirements are current, what is the present version of design and the development versions of code.

• Sometimes you need to know all this information about some point in time in the past - or about a set of slightly different clients

• The system of retrieving this related information needs to be simple.

Page 13: Software Configuration Management into a CMMI Level 1 Project

March 2006 © London St. Consulting 13

Configuration Audits

• From time to time, someone needs to check that all the information related to every Configuration Item exists and is where it ought to be.

• If anything is missing, it should be re-constituated, maintenance will need it later.

Page 14: Software Configuration Management into a CMMI Level 1 Project

March 2006 © London St. Consulting 14

Software Additions for SCM

Software CM also includes:• a repository for code• Version Description Documents for each version,

describing the details of the components and the extent of testing. This is useful for developers.

• Release Notes for each version explaining new features and known problems. This is for users.

• a database showing the relationship between all versions. This is particularly needed when there is a lot of branching.

Page 15: Software Configuration Management into a CMMI Level 1 Project

March 2006 © London St. Consulting 15

Repositories and Databases

• It is virtually impossible to manage code versions without a tool• while you can make one in-house, you are

better off buying a commercial one

• Features should include:• identification of every change and who

signs it in• ability to recreate any version• relationship between versions of

requirements and design documents and versions of code

Page 16: Software Configuration Management into a CMMI Level 1 Project

March 2006 © London St. Consulting 16

Some CM Terms

– Configuration Item (CI) - a convenient product subsystem

– Change forms eg CR, ECN, IR– Impact Statements– Configuration Control Board (CCB) - a

group which judges technical and managerial aspects of changes and approves or disapproves

– Baseline - a reference freeze point for a CI

Page 17: Software Configuration Management into a CMMI Level 1 Project

March 2006 © London St. Consulting 17

SQA and SCM

• In some companies SQA is also responsible for SCM.

• In all circumstances, SQA is responsible for assuring that SCM has the proper procedures, human resources and tools.

• Many people think a tool is all you need.• SQA may need to take missionary action

to introduce procedures and get human resources assigned.

Page 18: Software Configuration Management into a CMMI Level 1 Project

March 2006 © London St. Consulting 18

SCM in a Level 1 Company

• Level 1 companies do not have stable procedures for any actions.

• For SCM specifically, they tend to think procedures are time-wasting bureaucracy.

• SCM procedures and resources are required for Level 1 registration.

Page 19: Software Configuration Management into a CMMI Level 1 Project

March 2006 © London St. Consulting 19

Behaviour Changes (1)

• Any change in human behaviour requires an ‘emotional event’.

• Even if people agree with you theoretically, they will not change what they do unless the change is tied to an emotion.

• For SCM, even the remembered emotions around “nasty surprises” can be enough to nudge them into change.

Page 20: Software Configuration Management into a CMMI Level 1 Project

March 2006 © London St. Consulting 20

Behaviour Changes (2)

• Once they are willing to change, they need to learn and practice the change, until it becomes normal– it is easy to backslide when the

project pressure mounts.• Once it becomes ‘just how we do things

here’, you can relax.• For SCM this can take about a year.

Page 21: Software Configuration Management into a CMMI Level 1 Project

March 2006 © London St. Consulting 21

Guidelines - In the Beginning

– You have to have an ALLY (preferably the Project Leader)

– Even if you are the Project Leader, you still have to have an ally

– If you don’t have an ally, spend your time selling to find one. Use present problems and future projections, stress outcomes.

– When you find an ally, teach them as much CM as possible.

Page 22: Software Configuration Management into a CMMI Level 1 Project

March 2006 © London St. Consulting 22

Guidelines - Start with a Vulnerability

– Find the situation which is giving most grief now, propose a simple fix

– Discuss it in detail with your ally and a little bit with the others. Get the Project Leader on board in any case.

– Alter the fix to meet their needs and write a one page description using project vocabulary.

Page 23: Software Configuration Management into a CMMI Level 1 Project

March 2006 © London St. Consulting 23

Example of a Fix (1)

Vulnerability: – The project is suffering because

different people are changing the product and no-one knows what is today’s product.

Fix:– Appoint one person to be the the point

of contact for all changes. Everyone has to bring their changes to her.

Page 24: Software Configuration Management into a CMMI Level 1 Project

March 2006 © London St. Consulting 24

Example of a Fix (2)

Vulnerability: – One group makes changes and other

groups’ work is affected badly. Anger is in the air.

Fix:– Set up a ‘vetting’ committee of all the

groups to review changes by email. Default is ‘accept’ after one day. (This is a proto-CCB.)

Page 25: Software Configuration Management into a CMMI Level 1 Project

March 2006 © London St. Consulting 25

Example of a Fix (3)

Vulnerability: – Maintenance is required at night-time,

when normal authorization is not available.

Fix:– Set up 3 lists of actions

• No authorization required (eg refresh certain data)

• Retroactive authorization required (alter certain scripts)

• Forbidden without prior authorization (core code)

Page 26: Software Configuration Management into a CMMI Level 1 Project

March 2006 © London St. Consulting 26

Guidelines - Implement the process

– Project Leader should explain the new process and its benefits and move decisively to use them.

– Let it settle a few weeks before SQA checks how it is working out, Project Leader should back SQA publicly.

– Take the feedback to SQA seriously, make sure actions are taken and followed up.

Page 27: Software Configuration Management into a CMMI Level 1 Project

March 2006 © London St. Consulting 27

Guidelines - The Uses of a Roadmap

– Deciding on how to implement CM completely is a necessary job for you and your ally

– Showing the group the vision and the map increases speed of implementation.

– Showing the vision and map to other interacting groups helps them to adapt to your changes.

Page 28: Software Configuration Management into a CMMI Level 1 Project

© London St. Consulting

28

Questions and Discussion