Top Banner
EHP4 for SAP ERP 6.0 December 2009 English CS/PM Generic Settings (SP) (215) SAP AG Dietmar-Hopp-Allee 16 69190 Walldorf Germany Building Block Configuration Guide
31
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: SO Conf

EHP4 for SAP ERP 6.0

December 2009

English

CS/PM Generic Settings (SP) (215)

SAP AGDietmar-Hopp-Allee 1669190 WalldorfGermany

Building Block Configuration Guide

Page 2: SO Conf

SAP Best Practices CS/PM Generic Settings (SP) (215): Configuration Guide

Copyright

© Copyright 2009 SAP AG. All rights reserved.

No part of this publication may be reproduced or transmitted in any form or for any purpose without the express permission of SAP AG. The information contained herein may be changed without prior notice.

Some software products marketed by SAP AG and its distributors contain proprietary software components of other software vendors.

Microsoft, Windows, Excel, Outlook, and PowerPoint are registered trademarks of Microsoft Corporation.

IBM, DB2, DB2 Universal Database, System i, System i5, System p, System p5, System x, System z, System z10, System z9, z10, z9, iSeries, pSeries, xSeries, zSeries, eServer, z/VM, z/OS, i5/OS, S/390, OS/390, OS/400, AS/400, S/390 Parallel Enterprise Server, PowerVM, Power Architecture, POWER6+, POWER6, POWER5+, POWER5, POWER, OpenPower, PowerPC, BatchPipes, BladeCenter, System Storage, GPFS, HACMP, RETAIN, DB2 Connect, RACF, Redbooks, OS/2, Parallel Sysplex, MVS/ESA, AIX, Intelligent Miner, WebSphere, Netfinity, Tivoli and Informix are trademarks or registered trademarks of IBM Corporation.

Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

Adobe, the Adobe logo, Acrobat, PostScript, and Reader are either trademarks or registered trademarks of Adobe Systems Incorporated in the United States and/or other countries.

Oracle is a registered trademark of Oracle Corporation.

UNIX, X/Open, OSF/1, and Motif are registered trademarks of the Open Group.

Citrix, ICA, Program Neighborhood, MetaFrame, WinFrame, VideoFrame, and MultiWin are trademarks or registered trademarks of Citrix Systems, Inc.

HTML, XML, XHTML and W3C are trademarks or registered trademarks of W3C®, World Wide Web Consortium, Massachusetts Institute of Technology.

Java is a registered trademark of Sun Microsystems, Inc.

JavaScript is a registered trademark of Sun Microsystems, Inc., used under license for technology invented and implemented by Netscape.

SAP, R/3, SAP NetWeaver, Duet, PartnerEdge, ByDesign, SAP Business ByDesign, and other SAP products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of SAP AG in Germany and other countries.

Business Objects and the Business Objects logo, BusinessObjects, Crystal Reports, Crystal Decisions, Web Intelligence, Xcelsius, and other Business Objects products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of Business Objects S.A. in the United States and in other countries. Business Objects is an SAP company.

All other product and service names mentioned are the trademarks of their respective companies. Data contained in this document serves informational purposes only. National product specifications may vary.

These materials are subject to change without notice. These materials are provided by SAP AG and its affiliated companies ("SAP Group") for informational purposes only, without representation or warranty of any kind, and SAP Group shall not be liable for errors or omissions with respect to the materials. The only warranties for SAP Group products and services are those that are set forth in the express warranty statements accompanying such products and services, if any. Nothing herein should be construed as constituting an additional warranty.

© SAP AG Page 2 of 24

Page 3: SO Conf

SAP Best Practices CS/PM Generic Settings (SP) (215): Configuration Guide

Icons

Icon Meaning

Caution

Example

Note or Tip

Recommendation

Syntax

Typographic Conventions

Type Style Description

Example text Words or characters that appear on the screen. These include field names, screen titles, pushbuttons as well as menu names, paths and options.

Cross-references to other documentation.

Example text Emphasized words or phrases in body text, titles of graphics and tables.

EXAMPLE TEXT Names of elements in the system. These include report names, program names, transaction codes, table names, and individual key words of a programming language, when surrounded by body text, for example, SELECT and INCLUDE.

Example text Screen output. This includes file and directory names and their paths, messages, source code, names of variables and parameters as well as names of installation, upgrade and database tools.

EXAMPLE TEXT Keys on the keyboard, for example, function keys (such as F2) or the ENTER key.

Example text Exact user entry. These are words or characters that you enter in the system exactly as they appear in the documentation.

<Example text> Variable user entry. Pointed brackets indicate that you replace these words and characters with appropriate entries.

© SAP AG Page 3 of 24

Page 4: SO Conf

SAP Best Practices CS/PM Generic Settings (SP) (215): Configuration Guide

Content

CS/PM Generic Settings (SP)...................................................................................................5

1 Purpose............................................................................................................................. 5

2 Preparation........................................................................................................................ 5

2.1 Prerequisites............................................................................................................5

3 Configuration..................................................................................................................... 5

3.1 Settings Service Processing / Basic........................................................................5

3.1.1 Define Planner Groups........................................................................................5

3.2 Settings Service Processing / Service Order...........................................................6

3.2.1 Configure Order Types........................................................................................6

3.2.2 Assign Order Types to Maintenance Plants........................................................6

3.2.3 Change Goods Movements Documentation for Order........................................7

3.2.4 Credit Limit Checks, Sales Document Types for Service Orders........................7

3.2.5 Set Scheduling Parameters.................................................................................8

3.2.6 Assign Costing Parameters and RA Keys...........................................................8

3.2.7 Define Control Parameters for Completion Confirmations...................................9

3.2.8 Define Change Docs, Collective Purc. Req. Indicator, Oper. No.........................9

3.2.9 Maintain Default Values for Control Keys for Order Types................................10

3.2.10 Default Values for Task List Data and Profile Assignments...............................11

3.2.11 Define Access Sequence for Determining Address Data..................................12

3.2.12 Settlement Rule: Define Time and Distribution Rule.........................................12

3.2.13 Define Partner Determination Procedure and Partner Function........................13

3.2.14 Define Scope of Check......................................................................................13

3.2.15 Define Inspection Control..................................................................................14

3.2.16 Define Priority Type for Orders..........................................................................16

3.2.17 Assign Object Information Keys to Order Types................................................16

3.2.18 Assign Number Range Group for Service Orders.............................................17

3.3 Master data............................................................................................................18

3.3.1 Create Task List................................................................................................18

3.3.2 Create Service Product.....................................................................................21

3.3.3 Create Service Master.......................................................................................21

3.3.4 Create Functional Location................................................................................22

© SAP AG Page 4 of 24

Page 5: SO Conf

SAP Best Practices CS/PM Generic Settings (SP) (215): Configuration Guide

CS/PM Generic Settings (SP)

1 PurposeThis configuration guide provides the information you need to set up the configuration of this building block manually.

If you do not want to configure manually and prefer an automated installation process using BC Sets and other tools, refer to the installation guide of this building block.

2 Preparation

2.1 PrerequisitesBefore you start installing this building block, you must install prerequisite building blocks. For more information, see the building block prerequisite matrix (Prerequisites_Matrix_[xx]_EN_DE.xls; the placeholder [xx] depends on the SAP Best Practices version you use, e.g. BL refers to the SAP Best Practices Baseline Package: Prerequisites_Matrix_BL_EN_DE.xls). This document can be found on the SAP Best Practices documentation DVD in the folder ..\BBLibrary\Documentation\.

3 Configuration

3.1 Settings Service Processing / Basic

3.1.1 Define Planner Groups

UseIn this step, you define maintenance planner groups.

Procedure1. Access the activity using one of the following navigation options:

IMG Menu Plant Maintenance and Customer Service Maintenance and Service Processing Basic Settings General Data Define Planner Groups

Transaction Code SPRO

2. On the Change View “Maintenance planner groups”: Overview screen, choose New Entries

3. Make the following entries:

PlPl PG Name Telephone

1000 001 Customer Service

4. Save your entries and go back.

© SAP AG Page 5 of 24

Page 6: SO Conf

SAP Best Practices CS/PM Generic Settings (SP) (215): Configuration Guide

3.2 Settings Service Processing / Service Order

3.2.1 Configure Order Types

UseIn this step, you make all of the settings regarding the order types used during the process.

Procedure1. Access the activity using one of the following navigation options:

IMG Menu Plant Maintenance and Customer Service Maintenance and Service Processing Maintenance and Service Orders Functions and Settings for Order Types Configure Order Types

Transaction Code OIOA

2. On the Change View “Maintenance Order Types”: Overview screen, choose New Entries

3. Make the following entries:

Order Type Description Settlement Profile Release immediately

YBS1 SP Service Order YBSV03

4. Save your entries.

3.2.2 Assign Order Types to Maintenance Plants

UseIn this activity, you assign the order types to the maintenance plant. This enables service processing in the plant.

Procedure1. Access the activity using one of the following navigation options:

IMG Menu Plant Maintenance and Customer Service Maintenance and Service Processing Maintenance and Service Orders Functions and Settings for Order Types Assign Order Types to Maintenance Plants

Transaction Code OIOD

2. On the Change View “Valid Order Types By Planning Plant”: Overview screen, choose New Entries.

3. Make the following entries:

PlPl Name 1 Type Order Type text

1000 Production Plant 1000 YBS1 Internal Repair Order

4. Save your entries.

© SAP AG Page 6 of 24

Page 7: SO Conf

SAP Best Practices CS/PM Generic Settings (SP) (215): Configuration Guide

3.2.3 Change Goods Movements Documentation for Order

UseIn this step, you specify that all the movements of materials for the service order are documented and assigned to the order.

Procedure1. Access the activity using one of the following navigation options:

IMG Menu Plant Maintenance and Customer Service Maintenance and Service Processing Maintenance and Service Orders Functions and Settings for Order Types Goods Movements for Order Define Documentation for Goods Movements for the Order

Transaction Code SPRO

2. On the Change View “Goods Movement Documentation for Order”: Overview screen, choose New Entries.

3. Make the following entries:

Plnt Type PurchOrder PlGoodsLss UnplGoodsLss GR refrbshmnt

1000 YBS1 x x x

4. Save your settings and go back.

3.2.4 Credit Limit Checks, Sales Document Types for Service Orders

UseIn this step, you define data for the service order types, which are used during the process.

Procedure1. Access the activity using the following navigation options:

IMG Menu Plant Maintenance and Customer Service Maintenance and Service Processing Maintenance and Service Orders Functions and Settings for Order Types Credit Limit Checks, Sales Document Types for Service Orders

Transaction Code SPRO

2. On the Change View “Service order indicator”: Overview screen, choose New Entries.

3. Make the following entries:

OrType Description Service Sales DocType

Credit limit ch Credit group or

DIP profil

YBS1 Repair service

x

© SAP AG Page 7 of 24

Page 8: SO Conf

SAP Best Practices CS/PM Generic Settings (SP) (215): Configuration Guide

4. Save your settings.

3.2.5 Set Scheduling Parameters

UseIn this activity, you set all of the scheduling parameters in the order types used during the process.

Procedure1. Access the activity using one of the following navigation options:

IMG Menu Plant Maintenance and Customer Service Maintenance and Service Processing Maintenance and Service Orders Scheduling Set Scheduling Parameters

Transaction Code OPU7

2. On the Change View “Specify Scheduling Parameters” Overview screen, select the plant 1000, order type YBSI and choose Details.

3. Make the following entries:

Plant Order Type Prod Scheduler

Adjust Dates Scheduling Type

Automatic Scheduling

1000 YBSI * Adjust basic dates, adjust Dep. Reqmts to operation date

Forwards X

4. Save your entries and choose Back.

5. Repeat steps 2 to 4 for the order types SM02 and SM03.

6. Save your entries.

3.2.6 Assign Costing Parameters and RA Keys

UseIn this step, you define the parameters for the correct calculation of costs in the service order.

Procedure1. Access the activity using one of the following navigation options:

IMG Menu Plant Maintenance and Customer Service Maintenance and Service Processing Maintenance and Service Orders Functions and Settings for Order Types Costing Data for Maintenance and Service Orders Assign Costing Parameters and Results Analysis Keys

Transaction Code OIOF

© SAP AG Page 8 of 24

Page 9: SO Conf

SAP Best Practices CS/PM Generic Settings (SP) (215): Configuration Guide

2. On the Change View “Calculation Parameters for MaintOrders”: Overview screen, select plant 1000, order type YSB1.

3. Choose Details and make the following settings.

Plant Order Type Planned var. cal.

Actual var. cal. Results Analysis Key

1000 YSB1 PM01 PM01

4. Choose Back.

5. Save your entries.

3.2.7 Define Control Parameters for Completion Confirmations

UseIn this step, you set the assignment required for completion confirmation of the service orders.

Procedure1. Access the activity using one of the following navigation options:

IMG Menu Plant Maintenance and Customer Service Maintenance and Service Processing Completion Confirmations Define Control Parameters for Completion Confirmations

Transaction Code OIOR

2. On the Change View “Confirmation Parameters”; Overview screen, select the entries in the table below and follow the procedure described in steps 3 and 4:

Plant Name 1 Type Description of order type

1000 Production Plant 1000 YBS1 Service order

3. Choose Details.

4. Make the following settings:

Order Type Field Value

YBSI Default Values

Propose Dates X

Propose Activities X

HR Update

No HR update X

5. Save your entries.

© SAP AG Page 9 of 24

Page 10: SO Conf

SAP Best Practices CS/PM Generic Settings (SP) (215): Configuration Guide

3.2.8 Define Change Docs, Collective Purc. Req. Indicator, Oper. No.

UseIn this step, you can define:

Whether changes to the order header are recorded using documents and are displayed in the form of an action log

The increment at which numbers for the individual operations should be assigned

Whether just one purchase requisition (collective purchase requisition) should be generated for external material and operations for each order

Whether reservations or purchase requisitions relevant to materials planning should be generated when an order is created or only when the order is released

Whether the net price should be copied unchanged from the purchase requisition into the purchase order

Procedure1. Access the activity using one of the following navigation options:

IMG Menu Plant Maintenance and Customer Service Maintenance and Service Processing Maintenance and Service Orders Functions and Settings for Order Types Define Change Docs, Collective Purc. Req. Indicator, Operation No. Interval

Transaction Code SPRO

2. On the Change View “Increment for Automatic Operation Number ”: Overview screen, make following entries.

Plnt Type

MatStatChngeDoc

Increment

OrdStChgDc

CollReqstn

Res/PurRq

PCD active

Work-flow

Change doc

1000 YBS1

0010 X X From release

X x

NetOrder Pr

OPStatChangeDoc PRTStatChangeDoc

x x

3. Save your entries.

3.2.9 Maintain Default Values for Control Keys for Order Types

UseIn this step, you can determine which control key is proposed in the operations of maintenance orders for the combination maintenance plant and order type.

© SAP AG Page 10 of 24

Page 11: SO Conf

SAP Best Practices CS/PM Generic Settings (SP) (215): Configuration Guide

Procedure1. Access the activity using one of the following navigation options:

IMG Menu Plant Maintenance and Customer Service Maintenance and Service Processing Maintenance and Service Orders Functions andSettings for Order Types Control Key Maintain Default Values for Control Keys for Order Types

Transaction Code OIO6

2. On the Change View “Control Key default”: Overview screen, select the planning plant 1000 and order type YBS1 and choose Details.

3. Make the following settings:

Field User Action and Values

Control key PM01

4. Save your entries.

3.2.10 Default Values for Task List Data and Profile Assignments

UseIn this IMG activity you define which default values should be copied to the order data for order processing.

Procedure1. Access the activity using one of the following navigation options:

IMG Menu Plant Maintenance and Customer Service Maintenance and Service Processing Maintenance and Service Orders Functions and Settings for Order Types Default Values for Task List Data and Profile Assignments

Transaction Code SPRO

2. On the Change View “Screen Ref. Object, General Profiles, Task List Presett”: Overview screen, choose New Entries.

3. Make the following settings:

Plant Order Type

Short text Extern Profile

Mat. Profile

Maint Profile

Meas Unit Extern Oper

1000 YBS1 SP Service Order

YBSVS1 YBSVM1 0000001 H

Task List data

OperSelection

WrkCntrSelect Renumber Incl.once.comp

Oper.sorting

X X X X X

4. Save your entries.

© SAP AG Page 11 of 24

Page 12: SO Conf

SAP Best Practices CS/PM Generic Settings (SP) (215): Configuration Guide

3.2.11 Define Access Sequence for Determining Address Data

UseIn this work step, you can define the access sequence for determining address data.

The address data is used to provide the delivery address for the one-time address of the purchase requisition.

Procedure1. Access the activity using one of the following navigation options:

IMG Menu Plant Maintenance and Customer Service Maintenance and Service Processing Maintenance and Service Order Functions and Settings for Order Types Define Access Sequence for Determining Address Data

Transaction Code SPRO

2. On the Change View “Access sequence addresses for address proposal purch. dat”: Overview screen, select the PlPL 1000 and the type YBS1 .

3. Make the following settings:

PlPL Type Typ A1 A2 A3 A4 A5

1000 YBS1 OKP 1 2 3 4 5

4. Save your entries.

3.2.12 Settlement Rule: Define Time and Distribution Rule

UseIn this step, you can define for each order type the time by which the settlement rule must be maintained during order processing.

Procedure1. Access the activity using one of the following navigation options:

IMG Menu Plant Maintenance and Customer Service Maintenance and Service Processing Maintenance and Service Orders Functions and Settings for Order Types Settlement Rule: Define Time and Creation of Distribution Rule

Transaction Code SPRO

2. On the Change View “Time for settlement rule, Distribution Rule for Sub-Ord”: Overview screen, make the following entries:

Order Cat Settlement rule Time Distrib. Rule sub-order

YBS1 Mandatory for completion No special handling of sub-

© SAP AG Page 12 of 24

Page 13: SO Conf

SAP Best Practices CS/PM Generic Settings (SP) (215): Configuration Guide

orders

3. Save your entries.

3.2.13 Define Partner Determination Procedure and Partner Function

UseIn this step, you define the partners for plant maintenance and customer service.

Procedure1. Access the activity using one of the following navigation options:

IMG Menu Plant Maintenance and Customer Service Maintenance and Service Processing Maintenance and Service Order Partner Define Partner Determination Procedure and Partner Function

Transaction Code OIOM

2. On the Change View “Assign Partner Determination Procedure to Order”: Overview screen, select the type YBS .

3. Make the following settings:

Order Type PartnerSch Customer Funkt.of S.. Spl. Crtn Funct.p..

YBS1 SV SP VW X VW VW

4. Save your entries.

3.2.14 Define Scope of Check

Use

In this activity, you define the check scope. Checking group and checking rule together specify the scope of the check.

Procedure1. Access the activity using one of the following navigation options:

IMG Menu Plant Maintenance and Customer Service Maintenance and Service Processing Maintenance and Service Orders Functions and Settings for Order Types Availability Check for Material, PRTs and Capacities Define Scope of Check

Transaction Code OPJJ

2. On the Change View “Availability Check Control”: Overview screen, choose new entries and enter the following entries:

area Name Value Description

header

© SAP AG Page 13 of 24

Page 14: SO Conf

SAP Best Practices CS/PM Generic Settings (SP) (215): Configuration Guide

area Name Value Description

Availability check 02 Indiv. requirements

Checking rule PM Checking rule for plant maintenance

stocks

Include safety stock

x

StockInTransfer x

Incl. quality insp stock

x

Replenishment lead time

Check without RLT

x

In/outward movements

Incl. purchase orders

X

Incl. purch. Requisitions

X

Incl. dependent reqs

X

Include reservations

X

Include sales reqmts

X

Include deliveries X

Incl. planned orders

X Check all planned orders

Incl. production orders

X Take all production orders into account

3. Save your entries and go back.

3.2.15 Define Inspection Control

Use

In this activity, you define the check control. The checking rule together with the checking group specifies the scope of the check.

Procedure

© SAP AG Page 14 of 24

Page 15: SO Conf

SAP Best Practices CS/PM Generic Settings (SP) (215): Configuration Guide

1. Access the activity using one of the following navigation options:

IMG Menu Plant Maintenance and Customer Service Maintenance and Service Processing Maintenance and Service Orders Functions and Settings for Order Types Availability Check for Material, PRTs and Capacities Define Inspection Control

Transaction Code OIOI

2. On the Change View “Order Control”: Overview screen, choose new entries and make the following entries:

area Name Value Description

header

Plant 1000 Indiv. requirements

Order Type YBS1 Checking rule for plant maintenance

Availability check 1

Material availability

No check x

Checking Rule PM

PRT availability

No check x

Capacity availability

No check x

3. Go back

4. Choose New entries and enter the following entries:

area Name Value Description

header

Plant 1000 Indiv. requirements

Order Type YBS1 Checking rule for plant maintenance

Availability check 2

Material availability

Check material availability when saving order

x

Checking Rule PM

Release material 1 User decides on release if parts are missing

PRT

© SAP AG Page 15 of 24

Page 16: SO Conf

SAP Best Practices CS/PM Generic Settings (SP) (215): Configuration Guide

availability

No check x

Capacity availability

No check x

5. go back

6. Save your entries and go back.

3.2.16 Define Priority Type for Orders

UseIn this step, you define the priority types and assign to the service orders.

Procedure1. Access the activity using one of the following navigation options:

IMG Menu Plant Maintenance and Customer Service Maintenance and Service Processing Maintenance and Service Orders General Data Define Priorities

Transaction Code SPRO

2. Choose the activity Define Priority Types for Orders

3. On the Change View “Priority type per order type”: Overview enter the following data:

Type Name PrTyp Priority type

YBS1 Internal Repair Order SM Service priorities

4. Save your entries and go back.

3.2.17 Assign Object Information Keys to Order Types

Use

In this step you can assign an object information key to each order type.

Procedure1. Access the activity using one of the following navigation options:

IMG Menu Plant Maintenance and Customer Service Maintenance and Service Processing Maintenance and Service Orders Object Information Assign Object Information Keys to Order Types

© SAP AG Page 16 of 24

Page 17: SO Conf

SAP Best Practices CS/PM Generic Settings (SP) (215): Configuration Guide

Transaction Code OIOJ

2. On the Change View “Object Info for Order Type”; Overview screen, make the following entries:

OrTyp Description ObjectInfo

YBS1 Internal Repair Order YB

3. Save your entries and go back.

3.2.18 Assign Number Range Group for Service Orders

UseIn the following process you assign number range groups for service orders. This process is needed to create an order.

Prerequisites Order type is set up.

Procedure1. Access the activity using one of the following navigation options:

IMG Menu Plant Maintenance and Customer Service Maintenance and Service Processing Maintenance and Service Orders Functions and Settings for Order Types Configure Number Ranges

Transaction Code OION

2. Choose .

3. Select Modules.

4. Position your cursor on the order type you wish to assign (YBS1) in the Not Assigned area in the lower section of the screen.

5. Choose (Select Element (F2)).

6. Choose .

7. Choose to save your entries.

8. Confirm the dialog box Transport number range intervals with Continue (Enter).

Result Order types are assigned to number ranges.

© SAP AG Page 17 of 24

Page 18: SO Conf

SAP Best Practices CS/PM Generic Settings (SP) (215): Configuration Guide

3.3 Master data

3.3.1 Create Task List

UseIn this activity, you create the task list. The operations in the task list are copied in the service order.

Procedure1. Access the transaction using one of the following maintenance options:

SAP menu Logistics Plant Maintenance Preventive Maintenance Work Scheduling Task Lists General Maintenance Task Lists Create

Transaction code IA05

2. On the Create general task list: Initial screen enter the following data:

Field Name Description User Action and Values

Comment

Group 100000 Enter the number from the external number range

Key date Today`s date

3. Confirm with Enter.

4. On the Create general task list: Header General View screen enter the following data:

Field Name Description User Action and Values

Comment

Group counter 1

Description Service The field you find in the line after the field group counter

Planning plant 1000

Assignments to Header

Work center Serv01 / 1000 You can use the f4-help function, tab work center category enter the Work center cat. 0005

Usage 4

Status 4

5. Choose Operation Overview.

6. Enter for each line the following data:

© SAP AG Page 18 of 24

Page 19: SO Conf

SAP Best Practices CS/PM Generic Settings (SP) (215): Configuration Guide

Field Name Description User Action and Values

Comment

Line 0010

Operation description

Activity

Work 1

Un h

Duration 1

Un h

C 1

7. Choose Task list overview.

8. Choose New entries.

9. On the Create general task list:Header General View screen enter the following data

Field Name Description User Action and Values

Comment

Group counter 2

Description Global Task List The field you find in the line after the field group counter

Planning plant 1000

Assignments to Header

Work center Serv01 / 1000 You can use the f4-help function, tab work center category enter the Work center cat. 0005

Usage 4

Status 4

10. Choose Operation Overview.

11. Enter for each line the following data:

Field Name Description User Action and Values

Comment

Line 0010

Operation description

Global operation

Work 1

Un h

Duration 1

Un h

© SAP AG Page 19 of 24

Page 20: SO Conf

SAP Best Practices CS/PM Generic Settings (SP) (215): Configuration Guide

Field Name Description User Action and Values

Comment

C 1

12. Choose Task list overview.

13. Choose New entries

14. On the Create general task list: Header General View screen enter the following data:

Field Name Description User Action and Values

Comment

Group counter 3

Description Service T&M The field you find in the line after the field group counter

Planning plant 1000

Assignments to Header

Work center Serv01 / 1000 You can use the f4-help function, tab work center category enter the Work center cat. 0005

Usage 4

Status 4

15. Choose Operation Overview.

16. Enter for each line the following data:

Field Name Description User Action and Values

Comment

Line 0010

Operation description

Activity1

Work 1

Un h

Duration 1

Un h

C 1

Line 0020

Operation description

Activity2

Work 1

Un h

Duration 1

© SAP AG Page 20 of 24

Page 21: SO Conf

SAP Best Practices CS/PM Generic Settings (SP) (215): Configuration Guide

Field Name Description User Action and Values

Comment

Un h

C 1

17. Choose Task list overview.

18. Save your entries.

19. Choose Back.

3.3.2 Create Service Product

UseIn this activity, you create the service product. The service product is required to create the service order.

Procedure1. Access the transaction using one of the following maintenance options:

SAP menu Logistics Customer Service Service Agreements Environment Sales and Distribution Service Products

Transaction code OISD

2. On the Create /process Service Products: Initial Screen choose New Entries and enter the following data:

Plnt Service Product

Work ctr

BusA Gen TL G A Rtyp RObj Ref. equipment

1000 D100 SERV01 0001 100000 1

1000 D101 SERV01

1000 D102 SERV01 100000 2

1000 D103 SERV01 100000 3

3. Save your settings.

4. Choose Back.

3.3.3 Create Service Master

UseIn this activity, you create the service Master.

Procedure1. Access the transaction using one of the following maintenance options:

SAP menu Logistics Materials Management Service Master Service

© SAP AG Page 21 of 24

Page 22: SO Conf

SAP Best Practices CS/PM Generic Settings (SP) (215): Configuration Guide

Service Master

Transaction code AC01

2. On the Create Service Master Record Screen enter the data. If you

have created service master records earlier, choose Create New Service.

Field Name Description User Action and Values

Comment

Activity number 4000000 Overwrite the entry %_1.

Description Planned Service In the line with the activity number the right field

Service Category SERV Choose the Value in the pull down menu

Base Unit of Measure

M2

Mat/Srv.Grp YBSVS1

Valuation Class 3200

3. Save your settings.

4. Choose Back.

3.3.4 Create Functional Location

Use

The business object functional location is an organizational unit within Logistics that structures the maintenance objects of a company according to functional, process-related or spatial criteria. A functional location represents the place at which a maintenance task is to be performed.

ProcedureYou can use the following style if the SAP GUI and the SAP NWBC descriptions only diverge in the navigation options. For diverging descriptions, see the examples in the Template Appendix.

1. Access the transaction choosing one of the following navigation options:

Option 1: SAP Graphical User Interface (SAP GUI)

SAP ECC menu Logistics Plant Maintenance Management of Technical Objects Functional Location Create

Transaction code IL01

2. On the Create Functional location: Initial screen, make the following entries:

© SAP AG Page 22 of 24

Page 23: SO Conf

SAP Best Practices CS/PM Generic Settings (SP) (215): Configuration Guide

Field name Description User action and values Comment

Functional loc. YB50000/00000001

StrIndicator ISRE

FunctLocCat. S

3. Confirm your entries with Enter.

4. On the Create Functional Location: Master data screen, make the following entries:

Field name Description User action and values Comment

Description Enter text of your choice that describes the equipment to be created.

For example,

Building 1

5. Confirm your entries with Enter.

6. On Location tab page, make the following entries:

Field name Description User action and values Comment

MaintPlant 1000

7. Confirm your entries with Enter.

8. On Organization tab page, make the following entries:

Field name Description User action and values Comment

Cost Center 1701

Main Work Ctr SERV01

9. Confirm your entries with Enter.

If you do not enter 1000 in addition to the main work center, the system issues a message. Confirm this message with Continue/Enter.

10. On Sales and Distribution tab page, make the following entries:

Field name Description User action and values Comment

Sales Org 1000

Distrib. Channel 10

Division 10

11. Confirm your entries with Enter.

If you do not enter 1000 in addition to the main work center, the system issues a message. Confirm this message with Continue/Enter.

12. Choose GOTO Multilingual Texts and enter the following data:

Lang. Sh Text

© SAP AG Page 23 of 24

Page 24: SO Conf

SAP Best Practices CS/PM Generic Settings (SP) (215): Configuration Guide

EN Building 1

DE Gebäude 1

11. Choose Back to return. Confirm the Word processing dialog box with Yes.

12. Save your entries and make a note of the equipment number:__________________________.

13. Choose Back to return to the SAP Easy Access menu.

ResultYou have successfully created the equipment in the system.

© SAP AG Page 24 of 24