FLEXINET project 608627 Intelligent Systems Configuration Services for Flexible Dynamic Global Production Networks The FLEXINET project no. 608627 is funded under the Seventh Framework Programme FP7-2013-NMP-ICT-FOF (RTD) Duration: 1 st July 2013 – 30 th June 2016 For further informa.on contact the project coordinator, Prof Bob Young. Email: [email protected]
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
FLEXINET project 608627
Intelligent Systems Configuration Services for Flexible Dynamic Global Production Networks
The FLEXINET project no. 608627 is funded under the Seventh Framework Programme FP7-2013-NMP-ICT-FOF (RTD)
Duration: 1st July 2013 – 30th June 2016
For further informa.on contact the project coordinator, Prof Bob Young. Email: [email protected]
FLEXINET project 608627
FLEXINET project 608627
! To understand how best to configure and re-configure a global production network, in the context of ever changing product-service requirements.
! To provide services that support the design and provision of flexible interoperable networks of production systems that can rapidly and accurately be re-configured.
FLEXINET Aims
FLEXINET project 608627
The FLEXINET Concept
FLEXINET – Configuring a global (product-service) production network – ‘early’ business decision support
FLEXINET emphasis on ‘early’ business decision support
There are many poten-al global produc-on network solu-ons
Network knowledge supports network configura-on
Produc-on Network knowledge supports early product/service viability decisions
FLEXINET: especially targeted at an improved and rapid understanding of new business development opportunities
FLEXINET Services
Strategic Business Model Evaluator
Produc;on Network Configurator
Product-‐Service Co-‐evolu;on Management
The FLEXINET approach – FLEXINET Software Services
analyse proposed changes in the context of the existing network inter-relationships in a simulation based “what-if” analysis of cost and risk
support network configuration based on Social, Technological, Economic, Environmental and Political factors
ensure that new product-service-production network elements remain compliant in terms of combined PLM/SLM requirements
FLEXINET project 608627
Legal factors
Social factors
Economic factors
Poli-cal factors
Technological factors
Risk factors
A world of Production Systems, Service Systems, external factors, risks, markets and business opportunities
FLEXINET project 608627
Identify potential Product-Service Production System Configurations
FLEXINET project 608627
Evaluate potential Product-Service Systems Configurations
PNES: Tac;cal business model configura;on
ERAS: Business cost and risk evalua;on
PSCoMS: Product-‐Service Co-‐evolu;on
We provide software services to support the evaluation of these configurations at the Strategic, Tactical and Product-Service Co-Evolution levels
FLEXINET project 608627
Underlying the Services are Formal Ontologies
Capture Knowledge about your “world” of interest • knowledge harmonisa-on • clearly defined vocabularies • computer interpretable -‐> consistency checks • use KB to answer ques-ons
Enterprise ontologies must be built from a common base
for ease of construc;on, effec;ve interoperability and
flexible re-‐use
Level 2 Natural Systems
Level 3
Level 5
Level 0
Level 1
Ontology Layers CORE (ULO)
Systems
Designed Systems
Manufacturing Business Systems
Product-‐Service Lifecycle Systems Marke-ng Finance
Produce Dispose/ End of life
Enterprise Specific
(Highfleet)
FLEXINET is concerned with modeling the elements of global produc;on network systems
FLEXINET will use these models to support ‘what-‐if” queries on the
configura;on of these elements into global produc;on systems
Healthcare Systems Banking Systems
Design Operate
Level 2 Designed Systems
Level 3 Manufacturing Business Systems
class Level 3 - Manufacturing Business Systems
ParticipatorRole
Manufacturer
ParticipatorProduct
RoleManufactured
Product
BasicOrganisation
SystemManufacturing Organisation
Lower level layers are specialisations of higher level layers
Level 1 Systems
Level 5 Enterprise Specific -‐ Custom Drinks
class Level 1 - System
BasicSystem
Level 0 - Core::TimeSpan
BasicInformation
BasicMaterial
BasicEnergy
RoleInput
RoleOutput
RoleResource
RoleConstraint
Basic Role
class Level 4 - Product Service Production Systems
RoleManufacturer
ParticipatorProducer
RoleParticipator
Production Engineer
BasicSystem
Production Method
class Level 5- Enterprise Specific
RoleManufactured Product
ParticipatorProduct
CD_Container
Role Task
Feasibility StudyCD_Feasibility
Study
RoleComponent
FunctionCD_Content
RoleComponent
FunctionCD_Ingredients
BasicInformation
LocationCD_Country
class Level 2 - Designed Systems
BasicInformation
VisualisationReport
ParticipatorRole
Customer
ParticipatorRole
Supplier
ParticipatorRole
Product
FunctionRole
Product Request
BasicInformationLocation
BasicExternal Factors
InformationLegislation/Legal
Factors
FunctionRole
Component
BasicSystem
Organisation
BasicMaterial
Equipment
RoleParticipator
BasicSystem
Level 2 - Natural
Systems::Person
RoleTask
Feasibility Study
RoleTask
RoleFunction
BasicInformationExternal Factors
BasicInformation
MetricDistance
BasicInformation
Metric
A UML Class model of Level 1
Level 1 formal definition – based on Common Logic
FLEXINET Applications mapped to Service Packages
Strategic business model evaluator
Early warning no-fica-on applica-on
Strategic risk assessment applica-on
Ini-al risk analysis and documenta-on
P/S ideas management
product-‐ service compliance
STRATEGIC (ERAS)
Product Service Co-‐Evolu;on (PSCoMS)
TACTICAL (PNES)
Business model impact analysis
Reference model fragments for GPN
Technology Effect Analyser
Business Model Accelerator
Opera;onal Business Model Configurator
Opera;onal risk assessment applica;on
Business model Configurator
Knowledge Maintenance
User Experience Evalua-on
Collabora-ve design review
Idea Genera-on Process
Design Process
INDESIT Scenario – New Product-Service
KSB Scenario – Product Innovation through new technology
Iden-fy poten-al new applica-on areas for the technology
Develop details of GPN design scenarios
Analyse GPN scenarios to support management proposi-ons
CustomDrinks Scenario – Made-to-order drinks 19 of XX
FLEXINET project 608627
FLEXINET: expected impact for end users
! Improved response to customer requirements.
! Radical improvements in the evaluation of the critical parameters involved in network configuration.
! Reduced cost of introducing new product/service variants.
! Improved scheduling and decision making within the production network.
! Improved robustness of the supply network in its ability to work to forecast.