STEP 1 Measure height and width of finished opening. Finished opening height = _______________. Finished opening width = _______________. PRIME-LINE SLIDING DOOR Installation Instructions STEP 2 Two Panel door width is 1 /2 finished opening plus 1 /2" per panel. Example: Opening width of 48", each door panel must be 24 1 /2". Three Panel door width is 1 /3 finished opening plus 1 /2" per panel. Example: Opening width of 96", each door panel must be 32 1 /2". Door Height should be 1 3 /4" less than the finished opening height (measured from header to finished floor or top of carpeting). Door Height Door Width KIT CONTAINS: No. of Panels Hardware 2 3 1 1 Track* 2 pr. 3 pr. Hangers A & B 1 2 Adjustable Door Guide 2 4 Brass Plated Steel Finger Pulls All All Necessary Fasteners * Track length is pre-cut slightly less than opening to minimize need to cut track. STEP 4 Fasten the track as illustrated below with track screws provided, centered between jambs. Use track as a template and mark screw hole locations. Drill 7 /64" pilot holes to approximate length of screws. STEP 5 Attach door hangers to the top/back of door panels using screws provided. Hangers should be 1-1 1 /2 " from side of door. Make sure you install matching hangers on each door panel. Use hanger as a template to mark screw hole locations. Drill 7 /64 " pilot holes to approximate length of screws. STEP 6 Hang doors on track, installing the rear door panel first. Door panel must be angled to engage track. STEP 7 To adjust and align doors with jambs, lift door at side near jamb to remove weight of door from hanger. Loosen screws and, using a slotted screwdriver in bottom slot, adjust left (raise) or right (lower) for proper alignment. Tighten screws. STEP 8 To install the bottom guide, insert nylon guide post section into metal door guide plate according to door thickness. Locate guide under overlap of doors as shown and fasten to floor, using screws provided. Use guide plate as a template and drill 7 /64" pilot holes to approximate length of screws. Note: Some carpeted floors may require the use of a bottom guide riser. See Slide-Co part no 16974. STEP 9 When installing finger pulls, drill a 3 /4 " hole 3 /8 " deep in the door panels, approximately 40" from the floor and 1- 1 1 /2 " from the edge. Insert door pull. STEP 10 If baseboard on the sides of door opening prevents proper closing, remove the baseboard as required. Front 1 3 /8 1 1 /8 1 Front 1 3 /8 1 1 /8 1 Approx. 40" from floor 1-1 1 /2 " STEP 3 If necessary cut track to at least 1 /8" less than the width of the finished opening. Use a fine tooth hacksaw. 1-1 1 /2 " To Raise Door To Lower Door Header Header Header Hanger A 1/2" Offset Hanger A 1/2" Offset Hanger B 1/4" Offset Hanger B 1/4" Offset 3 /4" Doors 1 3 /8" Doors 3 /16" 1 1 /16" FOR DOORS WEIGHING UP TO 60 LBS. EACH © 1998 PRIME-LINE San Bernardino, CA 1 3 /8 " 1 1 /8 " 3 /4 " 1 " Floating Center Guide Front Guide Mounting Hole Door thickness guide locations TOOLS NEEDED Drill with 3 /4" and 7 /64" bits Phillips Screwdriver Tape Measure Track Finger Pulls Hangers Adjustable Door Guide