ASSEMBLY INSTRUCTIONS SLIDING DOOR Decide which hand is required. Right hand opening illustrated. Change the hand by turning the door upside down. V01/01/2013
ASSEMBLY INSTRUCTIONS
SLIDING DOOR
Decide which hand is required. Right hand opening illustrated.
Change the hand by turning the door upside down.
V01/01/2013
BEFORE YOU START, HERE IS SOME IMPORTANT INFORMATION
1) General Information
2) Additional Notes
Please inspect this product upon delivery. any missing parts or manufacturing
defects must be reported immediately to the supplier. Damage of defects reported
later will not be accepted. TAKE CARE WHEN HANDLING GLASS PARTS-AVOID
HEAVY CONTACT BETWEEN THE GLASS EDGES AND ANY HARD SURFACE.
Glass breakage claims will not be accepted after the product has been unpacked.
Please note--alumimium is a soft metal, and undergoes a series of extrusion.
fabrication, polishing and anodising processes in order to create your finished
shower enclosure. Some light surface marks are normal, and is a result of the
manufacturing processes. Quality control has ensured that this item is of a good
standard, and is fit for purpose.
Please read these instructions carefully before starting installation.Special care should be taken when drilling walls to avoid hidden pipes or electrical cables.
Note: this product is heavy and may require two people to install.
TOOLS REQUIRED
This product is heavy and may require two people to install.
Ø3mm Drill bit
Ø6mm Drill bit
Pencil
Spirit level
Tape measure
DESCRIPTION DESCRIPTIONPART IMAGE PART IMAGE
Drill
Flat-headScrewdriver
Cross headScrewdriver
Hammer
Silicone Sealant
1
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)(11)
(13)
(12)
(14)
(15)
(16)
(17)
(18)
(19)
(20)
(21)
(22)
(1)6xWall Plugs (8)1xUpright Magnet Profile (15)1xPlastic Water Deflectors
(2)2xWall Profiles (9)1xMagnet Seal A (16)1xHandle
(3)1xSide Panel (10)1xMagnet Seal B (17)1xMoving Panel
(4)1xCorner Post Profile (11)1xBottom Profile (18)1xFixed Panel
(5)18xScrew Cover Clips (12)2xGlass Clips (19)2xTop Double Rollers
(6)6xScrew 4x30 (13)2xBottom Double Rollers (20)1xTop Profile
(7)18xScrew Cover Caps (14)1xPlastic Water Deflector (21)8xScrews 3.5x30
(22)2xScrews 4x10
ASSEMBLY INSTRUCTIONS-DRAWING+SIDE PANEL
2
Sid
e p
an
el
Door
ASSEMBLY INSTRUCTIONS
If you require help, we advise you firstly contact a competent plumber
MAKE SURE THE TRAY IS LEVEL, USING A SPIRIT LEVEL, BEFORE INSTALLING THIS SHOWER
PANEL / DOOR.
Installation Steps
M4X10
M4X10
M3.5X30
M3.5X30
M3.5X30
M3.5X30
Step 1
Step 2
3
Step 7
Step 8
6
How to adjust the width of the
sliding door
Minimum 10mm internal overlap required
Glass panel
Glass panel
Vertical profile
Vertical profile
Wall profile
Wall profile
Wall
Wall
Maximum adjustment
Minimum adjustment
x6
x6
x6
Step 3
Step 4
9
How to adjust the width of the
side panel
Minimum 10mm internal overlap required
Glass panel
Glass panel
Vertical profile
Vertical profile
Wall profile
Wall profile
Wall
Wall
Maximum adjustment
Minimum adjustment
CARE AND MAINTENANCE
COMMITMENT TO QUALITY
1) AFTER CARE INSTRUCTIONS
2) MAINTENANCE
Regularly clean your shower product with warm soapy water
Clean the plastic parts with a cloth and mild detergent. Never
use any abrasive creams, dissolvents, acetone or detergents
and disinfectants that contain chlorine. The supplier acceptsno liability for any type of use of care other than those contained
in these instructions. The supplier reserves the right to introduce
technical changes without notice.
It is our intention that the quality and functions of this productare of the highest standard. If you require help we advise you
firstly contact a competent plumber. However we understand that
this may not always be the case, so should you experience
any problems please contact out customer services quoting
the following:
Product name: 6mm Sliding Shower Door
Product code: SSD1002 SSD1102 SSD1202 SSD1602
Customer help line number:0844 804 45 45
to prevent lime scale build up. Do not use abrasive cleaning
fluids or materials, or strong chemical cleaners as this will
damage the product surface.
10