10 ' 20' 30' 10' 20' WL PSP 0 0 20' 40 ' WL 10' 30' Section of Notional “Rho-Cee” WEC for Portugal Reinforced concrete structure Dimensions in feet Resonant Center Periods 5.2 sec (42m) 6.9 sec (74m) 8.8 sec (121m) Composite concrete floats Hydraulic power take-off Cylinder support structure TBD 28 kW/m average output 60 kW/m (?) rating Blue Tech & Blue Economy Summit
8

Section of Notional “Rho-Cee” WEC for Portugal Reinforced concrete structure Dimensions in feet Resonant Center Periods 5.2 sec (42m) 6.9 sec (74m) 8.8.

Jan 02, 2016

Download

Documents

Franklin Norman
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Section of Notional “Rho-Cee” WEC for Portugal Reinforced concrete structure Dimensions in feet Resonant Center Periods 5.2 sec (42m) 6.9 sec (74m) 8.8.

10'

20'

30'

10'

20'

WL

PSP

0

0 20' 40'WL

10' 30'

Section of Notional “Rho-Cee” WEC for Portugal

Reinforced concrete structure

Dimensions in feet

Resonant Center Periods

5.2 sec (42m)

6.9 sec (74m)

8.8 sec (121m)

Composite concrete floats

Hydraulic power take-off

Cylinder support structure TBD

28 kW/m average output

60 kW/m (?) rating

Blue Tech & Blue Economy Summit

Page 2: Section of Notional “Rho-Cee” WEC for Portugal Reinforced concrete structure Dimensions in feet Resonant Center Periods 5.2 sec (42m) 6.9 sec (74m) 8.8.

~1/6th scale “Rho-Cee” being prep’d for absorption test at Ohmsett facility

Blue Tech & Blue Economy Summit

Page 3: Section of Notional “Rho-Cee” WEC for Portugal Reinforced concrete structure Dimensions in feet Resonant Center Periods 5.2 sec (42m) 6.9 sec (74m) 8.8.

Generic ρC – Scalable: L ~ T2

Three one/third Octave Bands dimensions in feet

Blue Tech & Blue Economy Summit

Page 4: Section of Notional “Rho-Cee” WEC for Portugal Reinforced concrete structure Dimensions in feet Resonant Center Periods 5.2 sec (42m) 6.9 sec (74m) 8.8.

Incident Energy Spectrum for Rayleigh Distributed Wind P-M Spectra

with a Candidate 3/3 Octave Pass Band

0

20

40

60

80

100

120

140

3.2 4.0 5.0 6.3 8.0 10.0 12.5 16.0 20.0 25.0 32.0 40.0

1/3 OB period, sec.

1/3

OB

MW

-hr/

m-y

rBlue Tech & Blue Economy Summit

Page 5: Section of Notional “Rho-Cee” WEC for Portugal Reinforced concrete structure Dimensions in feet Resonant Center Periods 5.2 sec (42m) 6.9 sec (74m) 8.8.

Yearly Cost Function – very preliminary

$/m = 2400 + 2500 [ 17.07(Tm/Tr)4 +

38.25(Tm/Tr)2 ] x 0.08 +1500*kW x 0.133

maintenance

PTO @ 5.5% for 15 yrs for average

input power Tm, max band period

Tr, ref T, here 12.5 sec

PTO & WEC structure alone

$/m3 reinforced concrete structure bulkheads

partitionsstructure @ 5.5%

for 20 yrs

Blue Tech & Blue Economy Summit

Page 6: Section of Notional “Rho-Cee” WEC for Portugal Reinforced concrete structure Dimensions in feet Resonant Center Periods 5.2 sec (42m) 6.9 sec (74m) 8.8.

Cents per kW-hr vs Max Period for Various BWs

1.0

10.0

100.0

1 10 100

Acceptance Band Upper 1/3 OB Period, sec

Ce

nts

/kW

-hr

3/3 OB

4/3 OB

5/3 OB

cost includes: Rho-Cee structure, power take-off, maintenance

70% PTO Efficiency

Blue Tech & Blue Economy Summit

Page 7: Section of Notional “Rho-Cee” WEC for Portugal Reinforced concrete structure Dimensions in feet Resonant Center Periods 5.2 sec (42m) 6.9 sec (74m) 8.8.

Waves, Wind ± 60°

calm

calm

Extending the Wind Turbine support provided by the PSP“span”: 1040m; WT spacing: 200m (extendable-leeward); rotor diameter: 90m; ρC length: 1200m

WT rating: 3MW; ρC rating: 30kW/m; 200m dock; struts: 200m x 15’ concrete culvert pipe, w/rails

estimated total “foundation” cost: $1677/kW

Total Power Rating: 72MW WAG Total Cap Cost Est: $300M

PE Storage: ~12MW-Hr, cold

ρC / PSP

Blue Tech & Blue Economy Summit

Page 8: Section of Notional “Rho-Cee” WEC for Portugal Reinforced concrete structure Dimensions in feet Resonant Center Periods 5.2 sec (42m) 6.9 sec (74m) 8.8.

~0.8 LMi

~1 km

A Possible Arrangement of 3 - 1km floating Rho-Cee WEC Breakwaters to

Protect the Columbia River

Bar Passage(subject to many considerations)

(Note: The scale on the chart appears bogus!)

Produced energy to pay for the project !