Top Banner
KITSAULT MINE PROJECT ENVIRONMENTAL ASSESSMENT VE51988 Section 6.2 Atmospheric Environment - Air Quality and Climate
48

Section 6.2 Atmospheric Environment - Air Quality and Climate

Feb 11, 2022

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Section 6.2 Atmospheric Environment - Air Quality and Climate

KITSAULT MINE PROJECT ENVIRONMENTAL ASSESSMENT

VE51988

Section 6.2 Atmospheric Environment - Air Quality

and Climate

Page 2: Section 6.2 Atmospheric Environment - Air Quality and Climate
Page 3: Section 6.2 Atmospheric Environment - Air Quality and Climate

KITSAULT MINE PROJECT

ENVIRONMENTAL ASSESSMENTATMOSPHERIC ENVIRONMENT – AIR QUALITY AND CLIMATE

Version 1.0

TOC 6.2-iVE51988 – Section 6.2 December 2011

TABLE OF CONTENTS

6.2  Atmospheric Environment - Air Quality and Climate .............................................. 6.2-1 6.2.1  Valued Components Scoping and Rationale ............................................ 6.2-1 

6.2.1.1  Valued Component / Issues Confirmation ............................ 6.2-7 6.2.2  VC #1: Air Quality ................................................................................... 6.2-11 

6.2.2.1  Introduction ......................................................................... 6.2-11 6.2.2.1.1  Relevant Legislation and Legal Framework ..... 6.2-12 6.2.2.1.2  Spatial Boundaries ........................................... 6.2-13 6.2.2.1.3  Temporal Boundaries ....................................... 6.2-14 

6.2.2.2  Information Source and Methods ....................................... 6.2-14 6.2.2.3  Detailed Baseline Description for Air Quality ...................... 6.2-16 6.2.2.4  Cultural, Ecological, or Community Knowledge ................. 6.2-18 6.2.2.5  Past, Present or Future Projects / Activities ....................... 6.2-18 6.2.2.6  Potential Effects of the Proposed Project and Proposed

Mitigation ............................................................................ 6.2-19 6.2.2.6.1  Identification and Analysis of Potential

Project Effects .................................................. 6.2-22 6.2.2.6.2  Mitigation Measures ......................................... 6.2-26 

6.2.2.7  Potential Residual Effects and Their Significance .............. 6.2-27 6.2.2.7.1  Potential Residual Effects After Mitigation ....... 6.2-27 6.2.2.7.2  Significance of Potential Residual Effects ........ 6.2-28 

6.2.2.8  Potential Cumulative Effects ............................................... 6.2-28 6.2.2.8.1  Identification and Analysis of Potential

Project Cumulative Effects ............................... 6.2-28 6.2.2.9  Conclusion .......................................................................... 6.2-29 

6.2.3  VC #2: Climate ....................................................................................... 6.2-29 6.2.3.1  Introduction ......................................................................... 6.2-29 

6.2.3.1.1  Relevant Legislation and Legal Framework ..... 6.2-31 6.2.3.1.2  Spatial Boundaries ........................................... 6.2-32 6.2.3.1.3  Temporal Boundaries ....................................... 6.2-34 

6.2.3.2  Information Source and Methods ....................................... 6.2-34 6.2.3.3  Detailed Baseline Description for Climate .......................... 6.2-35 6.2.3.4  Cultural, Ecological, or Community Knowledge ................. 6.2-36 6.2.3.5  Past, Present or Future Projects / Activities ....................... 6.2-36 6.2.3.6  Potential Effects of the Proposed Project and

Proposed Mitigation ............................................................ 6.2-36 6.2.3.6.1  Identification and Analysis of Potential

Project Effects .................................................. 6.2-37 6.2.3.6.2  Mitigation Measures ......................................... 6.2-38 

6.2.3.7  Potential Residual Effects and Their Significance .............. 6.2-39 6.2.3.7.1  Potential Residual Effects After Mitigation ....... 6.2-39 

6.2.3.8  Potential Cumulative Effects ............................................... 6.2-39 6.2.3.8.1  Identification and Analysis of Potential

Project Cumulative Effects ............................... 6.2-39 6.2.3.9  Conclusion .......................................................................... 6.2-39 

Page 4: Section 6.2 Atmospheric Environment - Air Quality and Climate

KITSAULT MINE PROJECT

ENVIRONMENTAL ASSESSMENTATMOSPHERIC ENVIRONMENT – AIR QUALITY AND CLIMATE

Version 1.0

TOC 6.2-iiVE51988 – Section 6.2 December 2011

List of Tables

Table 6.2.1-1:  Valued Component / Issue Interaction Matrix for Atmospheric Environment ........ 6.2-2 Table 6.2.1-2:  Potential Issues by Project Component and Valued Component -

Construction Phase ................................................................................................ 6.2-4 Table 6.2.1-3:  Potential Issues by Project Component and Valued Component -

Operations Phase .................................................................................................. 6.2-5 Table 6.2.1-4:  Potential Issues by Project Component and Valued Component -

Closure and Decommissioning Phase ................................................................... 6.2-6 Table 6.2.1-5:  Potential Issues by Project Component and Valued Component -

Post-Closure .......................................................................................................... 6.2-7 Table 6.2.1-6:  Atmospheric Environment Valued Component Selection Rationale ...................... 6.2-9 Table 6.2.2-1:  BC and Canadian Ambient Air Quality Guidelines and Objectives in µg/m3 ....... 6.2-12 Table 6.2.2-2:  Summarised Annual Production in Year 2 of Operations .................................... 6.2-14 Table 6.2.2-3:  Expected Background Concentration of Gaseous Pollutant in the

Project Area ......................................................................................................... 6.2-17 Table 6.2.2-4:  Historical Land Use Activities in Biophysical Cumulative Effects

Assessment Study Area ....................................................................................... 6.2-18 Table 6.2.2-5:  General Land Use Activities in Biophysical Cumulative Effects

Assessment Study Area ....................................................................................... 6.2-19 Table 6.2.2-6:  Reasonably Foreseeable Projects in Biophysical Cumulative Effects

Assessment Study Area ....................................................................................... 6.2-19 Table 6.2.2-7:  Summary of Dispersion Modelling Results .......................................................... 6.2-20 Table 6.2.2-8:  Potential Direct Project Effects on Air Quality ...................................................... 6.2-23 Table 6.2.2-9:  Potential Indirect Project Effects on Other Valued Components ......................... 6.2-23 Table 6.2.2-10:  Summary of Potential Interaction Between Project Direct Effects on

Other Valued Components and Air Quality .......................................................... 6.2-25 Table 6.2.2-11:  Potential Combined Project Effects by Project Phase on Air Quality .................. 6.2-26 Table 6.2.2-12:  Summary of Potential Project Effects to be Carried Forward into the

Assessment for Air Quality ................................................................................... 6.2-26 Table 6.2.2-13:  Potential Project Effect by Project Phase on Air Quality

and Mitigation Measures ...................................................................................... 6.2-27 Table 6.2.2-14:  Summary of Residual Effects for Air Quality ........................................................ 6.2-28 Table 6.2.2-15:  Residual Effects Assessment by Project Development Phase for Air Quality ..... 6.2-28 Table 6.2.2-16:  Project Related Residual Effects - Rationale for Carrying Forward

into the CEA ......................................................................................................... 6.2-29 Table 6.2.3-1:  Potential Indirect Project Effects on Other Valued Components ......................... 6.2-38 Table 6.2.3-2:  Potential Project Effect by Project Phase on Climate and Mitigation

Measures ............................................................................................................. 6.2-38 

List of Figures

Figure 6.2.2-1:  Local and Regional Study Areas for Air Quality ................................................... 6.2-15 Figure 6.2.3-1:  Study Areas for Social and Economic Conditions Adopted as Climate

Study Area ........................................................................................................... 6.2-33 

Page 5: Section 6.2 Atmospheric Environment - Air Quality and Climate

KITSAULT MINE PROJECT

ENVIRONMENTAL ASSESSMENTATMOSPHERIC ENVIRONMENT – AIR QUALITY AND CLIMATE

Version 1.0

TOC 6.2-iiiVE51988 – Section 6.2 December 2011

List of Appendices

Appendix 6.2-A: Atmospheric Environment Baseline Report Appendix 6.2-B: Supporting Data Used in Suspended Particulate Matter Emission Calculations Appendix 6.2-C: Emission Sources and Air Quality Modelling Appendix 6.2-D: Surface and Upper Air MET Data for AERMOD / AERMET Appendix 6.2-E: Detailed Baseline Climate Data 1971-2000

Page 6: Section 6.2 Atmospheric Environment - Air Quality and Climate
Page 7: Section 6.2 Atmospheric Environment - Air Quality and Climate

KITSAULT MINE PROJECT

ENVIRONMENTAL ASSESSMENTATMOSPHERIC ENVIRONMENT – AIR QUALITY AND CLIMATE

Version 1.0

Page 6.2-1VE51988 – Section 6.2 December 2011

6.2 Atmospheric Environment - Air Quality and Climate

This section of the Application presents an assessment of potential effects on the atmospheric environment from activities related to the Kitsault Mine Project (proposed Project) along with potential cumulative effects.

The atmospheric environment has two Valued Components (VCs): air quality and climate change. Adhering to the methodology outlined in Section 5.0, the following sections describe the scoping and rationale for the selection of VCs, spatial and temporal boundaries, descriptions of VCs, assessment of potential effects and mitigation measures, assessment of residual effects, potential cumulative effects considerations and associated limitations. The atmospheric environment assessment section is concluded with a summary of the significance of identified residual and cumulative effects for each VC.

6.2.1 Valued Components Scoping and Rationale

The purpose of scoping is to focus the assessment on key issues related to atmospheric environment, which was determined by the physical project, the natural environmental setting, and by the social and cultural backdrop of the proposed Project. In practical terms, the selection of VCs was based on outcomes from consultation with stakeholders and British Columbia Environmental Assessment Office (BC EAO) Working Group deliberations, which included the Nisga’a Nation and Aboriginal Groups’ interests, concerns raised by the general public and Avanti Kitsault Mine Ltd. (the proponent) as well as scientific and regulatory considerations.

The scoping process was carried out in the following steps:

Identification of key issues listed in the consultation database, which captured results from the pre-Application stage issue scoping process with the Nisga’a Nation and Aboriginal Groups, the public, other tenure holders and government agencies (see Section 4.0 for database information);

Identification of issues based on experience with similar projects and professional judgement;

Identification of VCs specific to the atmospheric environment that interact with Project components; and

Confirmation of identified VCs and summarisation of rationale for VC selection.

The scoping process recognised three key issues associated with atmospheric environment: diesel engines exhaust emissions; particulate matter (PM) in the air; and climate change. These issues are related to the proposed Project activities which will take place during construction, operations, and closure of a mine.

The following tables show details of the VC scoping and rationale which include key issues related to atmospheric environment. Table 6.2.1-1 is an interaction matrix, which is used as a tool for detecting valid connections among potential impacts between proposed Project components and atmospheric environment VCs. The table provides a visual summary of

Page 8: Section 6.2 Atmospheric Environment - Air Quality and Climate

KITSAULT MINE PROJECT

ENVIRONMENTAL ASSESSMENTATMOSPHERIC ENVIRONMENT – AIR QUALITY AND CLIMATE

Version 1.0

Page 6.2-2VE51988 – Section 6.2 December 2011

interactions that enables identifying and narrowing the scope of issues to be carried forward into the assessment. Potential effects are considered for each phase of the proposed Project. Effects, in the context of this Environmental Assessment (EA), are any actions resulting from the proposed Project development that cause a positive or negative change to a receptor (e.g., a change in concentration of particulate matter in air due to fugitive emissions from equipment operation). An effect is either a positive or negative response of the receptor. For example, reclamation of the Tailings Management Facility (TMF) area will have positive effect on air quality due to assimilation of atmospheric carbon dioxide by reclaimed vegetation. Only components or issues with the potential to cause effects are of concern. The type of interactions expected between the proposed Project component and VCs are denoted using the following symbols:

‘o’ indicate that there is an interaction;

‘-’ indicate a key interaction; and

‘+’ indicate a benefit.

Table 6.2.1-1: Valued Component / Issue Interaction Matrix for Atmospheric Environment

Project Component / Activity Atmospheric Environment

Air Quality Climate Change

Construction Phase

Existing access road - o

Equipment and machinery transportation to site including anticipated changes to traffic (e.g., type and volume) on public roads

- o

Fugitive emissions from equipment operation o NI

Land clearing o o

Excavating o o

Grading o o

Soil and till salvage, handling, and storage - NI

Mine infrastructure installations - o

Kitsault Pit development - -

Process plant and ancillary facilities - -

Development of borrow sources o NI

Expansion of exploration camp to create construction and permanent camps

o o

WRMF development o o

TMF development o o

Blasting - o

Operations Phase

Existing access road o o

Erosion control + NI

Page 9: Section 6.2 Atmospheric Environment - Air Quality and Climate

KITSAULT MINE PROJECT

ENVIRONMENTAL ASSESSMENTATMOSPHERIC ENVIRONMENT – AIR QUALITY AND CLIMATE

Version 1.0

Page 6.2-3VE51988 – Section 6.2 December 2011

Project Component / Activity Atmospheric Environment

Air Quality Climate Change

Soil and till salvage, handling, and storage o NI

Kitsault Pit Mining o o

Transportation of concentrate by truck - o

Processing - NI

WRMF development o o

TMF development o o

Blasting - o

Management of overburden stockpiles and waste rock disposals

+ NI

Waste water management and treatment plant

o +

Decommissioning and Closure Phase

Access and mine access road decommissioning and reclamation

o o

Equipment and machinery removal, recycling, and disposal

o o

Erosion control + NI

Re-vegetation + +

WRMF area reclamation + NI

TMF area reclamation + NI

Molybdenum concentrate stockpile areas reclamation and fugitive dust control

+ NI

Post-Closure

Monitoring and maintenance of terrain stability

+ NI

Monitoring and maintenance of soil stability and vegetation

+ +

Monitoring and maintenance of habitat compensation areas.

+ +

Project Phase: o - interaction; - - key interaction; + - benefit; NI - no interaction

Note: TMF - Tailings Management Facility; WRMF - Waste Rock Management Facility

The effects considered in the preceding interaction matrix are identified of sufficient importance for carrying forward into the assessment. In Tables 6.2.1-2 through 6.2.1-5 the identified issues are separated by phase, and each issue is described and listed with the affected VC and the rationale for identification of the issue. While some issues are common to all phases (e.g., wheel entrainment fugitive dust emissions on access roads increased PM concentration in air), some are phase-specific, such as those stemming from blasting activities during the operations phase.

Page 10: Section 6.2 Atmospheric Environment - Air Quality and Climate

KITSAULT MINE PROJECT

ENVIRONMENTAL ASSESSMENTATMOSPHERIC ENVIRONMENT – AIR QUALITY AND CLIMATE

Version 1.0

Page 6.2-4VE51988 – Section 6.2 December 2011

Prominent construction-related impacts on atmospheric environment are related to fugitive emissions from equipment operation and development of the Waste Rock Management Facility (WRMF) and TMF. Assembly of a Process Plant and ancillary facilities will be of low importance due to absence of major emission sources. Potential issues by project component associated with construction of the proposed mine are listed in Table 6.2.1-2.

Table 6.2.1-2: Potential Issues by Project Component and Valued Component - Construction Phase

Project Component Relevant Key Issues Project Setting

Component Rationale

Existing access road Vehicle emissions Air quality, climate change

Regulatory requirements, public health

Equipment and machinery transportation to site, including anticipated changes to traffic (e.g., type and volume) on public roads

Vehicle emissions Air quality, climate change

Regulatory requirements, public health

Fugitive emissions from equipment operation

Increase concentration of criteria air pollutants

Air quality, dust deposition, acid deposition, climate change

Regulatory requirements, occupational health and safety, codes of good practice, surface water quality

Land clearing Fugitive dust, reduced visibility

Air quality, dust deposition

Occupational health and safety; regulatory requirements

Excavating Equipment emissions, fugitive dust

Air quality Regulatory requirements

Grading Equipment emissions, fugitive dust

Air quality Regulatory requirements

Soil and till salvage, handling and storage

Equipment emissions, fugitive dust

Air quality Regulatory requirements

Mine infrastructure installations

Equipment emissions Air quality Regulatory requirements

Kitsault pit development

Equipment emissions, fugitive dust

Air quality Regulatory requirements

Process plant and ancillary facilities

Equipment and plant emissions, fugitive dust

Air quality, climate change

Regulatory requirements

Development of borrow sources

Equipment emissions, fugitive dust

Air quality, dust Regulatory requirement, impact on surrounding vegetation

Page 11: Section 6.2 Atmospheric Environment - Air Quality and Climate

KITSAULT MINE PROJECT

ENVIRONMENTAL ASSESSMENTATMOSPHERIC ENVIRONMENT – AIR QUALITY AND CLIMATE

Version 1.0

Page 6.2-5VE51988 – Section 6.2 December 2011

Project Component Relevant Key Issues Project Setting

Component Rationale

Expansion of exploration camp to create construction and permanent camps

Equipment emissions, fugitive dust

Air quality Regulatory requirements

WRMF development Exhaust gas emissions of construction equipment

Air quality Regulatory requirements

TMF development No air quality issues n/a n/a

Blasting Dust, products of ANFO combustion

Air quality Interaction with wildlife, blasting regulations

Note: Regulatory Requirements - Defined in sections Relevant Legislation and Legal Framework; TMF - Tailings Management Facility; WRMF - Waste Rock Management Facility; n/a – not applicable

During the operations phase, effects due to pit mining and transportation of concentrate and waste rock will be a primary concern. Potential effects include deterioration of air quality and lower visibility due to diesel emissions and fugitive dust emissions on access roads caused by moving vehicles. Mitigation will be required to minimize emissions. Insignificant effects are expected from a processing plant due to wet technology and operations taking place indoor in enclosed equipment. Potential issues by project component associated with the operations phase are listed in Table 6.2.1-3.

Table 6.2.1-3: Potential Issues by Project Component and Valued Component - Operations Phase

Project Component Relevant Key Issues Project Setting

Component Rationale

Existing access road Vehicle emissions Air quality Regulatory requirements

Erosion control Fugitive dust suppression

Air quality Dust deposition objectives

Emissions and dust generation (fugitive dust, equipment operation and movement)

Air pollution by equipment, materials handling, and stockpile erosion

Air quality, visibility, odours, climate change

Regulatory requirements, interaction with other VCs

Soil and till salvage, handling and storage including locations, volumes, and impacted areas

Excessive dusting, equipment exhausts

Air quality Dust deposition objectives, AAQO

Kitsault Pit mining Increase concentration of air pollutants

Air quality Regulatory requirements, interaction with other VCs

Page 12: Section 6.2 Atmospheric Environment - Air Quality and Climate

KITSAULT MINE PROJECT

ENVIRONMENTAL ASSESSMENTATMOSPHERIC ENVIRONMENT – AIR QUALITY AND CLIMATE

Version 1.0

Page 6.2-6VE51988 – Section 6.2 December 2011

Project Component Relevant Key Issues Project Setting

Component Rationale

Transportation of concentrate by truck

Fugitive dust, diesel exhausts

Air quality Regulatory requirement

Processing Dust Air quality and climate change

AAQO

WRMF operation Exhaust gas emissions of compacting and stacking equipment

Air quality Regulatory requirements

TMF operation Fugitive dust Air quality AAQO

Blasting Dust Air quality Interaction with wildlife, blasting regulations

Management of overburden stockpiles and waste rock dumps supported by relevant geotechnical data and stability analysis

Equipment emissions and fugitive dust

Air quality AAQO

Waste water management and treatment plant

Odours Organoleptic impacts Perception of low-quality air

Note: AAQO - Ambient Air Quality Objectives; Regulatory Requirements - Defined in Section 6.2.2.1.1 Relevant Legislation and Legal Framework; TMF - Tailings Management Facility; VC - Valued Component; WRMF - Waste Rock Management Facility

During the closure and decommissioning phase, vehicle emissions (diesel exhaust and fugitive dust) will be the most significant source of atmospheric impacts. Preparing of WRMF and TMF areas (grading, drainage) for re-vegetation and reclamation will have a marginal impact on air quality because of short duration and involvement of only few graders, dozers or compactors. Potential issues by project component associated with closure and decommissioning are listed in Table 6.2.1-4.

Table 6.2.1-4: Potential Issues by Project Component and Valued Component - Closure and Decommissioning Phase

Project Component Relevant Key Issues Project Setting

Component Rationale

Access and mine access road decommissioning and reclamation

Vehicle emissions Air quality Regulatory requirements

Equipment and machinery removal, recycling, and disposal

Vehicle emissions Air quality Regulatory requirements, public health

Erosion control No air quality issues n/a n/a

Page 13: Section 6.2 Atmospheric Environment - Air Quality and Climate

KITSAULT MINE PROJECT

ENVIRONMENTAL ASSESSMENTATMOSPHERIC ENVIRONMENT – AIR QUALITY AND CLIMATE

Version 1.0

Page 6.2-7VE51988 – Section 6.2 December 2011

Project Component Relevant Key Issues Project Setting

Component Rationale

Emissions and dust generation (equipment operation and movement)

No equipment in operation

n/a n/a

Re-vegetation No atmospheric environment issues

n/a n/a

WRMF area reclamation

Equipment emissions and dust generation

Air quality AAQO

TMF area reclamation No air quality issues n/a n/a

Molybdenum concentrate stockpile areas reclamation and fugitive dust control

Equipment emissions and dust generation

Air quality and fugitive dust

AAQO, dust precipitation objectives

Note: AAQO - Ambient Air Quality Objectives; Regulatory Requirements - Defined in sections Relevant Legislation and Legal Framework; n/a - not applicable, TMF - Tailings Management Facility; WRMF - Waste Rock Management Facility

No issues pertaining to atmospheric environment are expected for the post-closure phase of the proposed Project.

Table 6.2.1-5: Potential Issues by Project Component and Valued Component - Post-Closure

Project Component Relevant Key Issues Project Setting

Component Rationale

Monitoring and maintenance of terrain stability

No atmospheric environment issues

n/a n/a

Monitoring and maintenance of soil stability and vegetation

No atmospheric environment issues

n/a n/a

Monitoring and maintenance of habitat compensation areas

No atmospheric environment issues

n/a n/a

Note: n/a – not applicable

6.2.1.1 Valued Component / Issues Confirmation

The VCs selected for the atmospheric environment discipline have the potential to be directly affected by the proposed Project as follows:

Air Quality: diesel engine emissions, fugitive dust, and aggregate ore and waste handling activities may reduce air quality to unacceptable level; Potential air quality effects act as pathways to other terrestrial disciplines; and

Page 14: Section 6.2 Atmospheric Environment - Air Quality and Climate

KITSAULT MINE PROJECT

ENVIRONMENTAL ASSESSMENTATMOSPHERIC ENVIRONMENT – AIR QUALITY AND CLIMATE

Version 1.0

Page 6.2-8VE51988 – Section 6.2 December 2011

Climate change: emission of greenhouse gasses (GHG) by internal combustion engine and deforestation has the potential to contribute to global warming.

Table 6.2.1-6 presents the confirmation table for VC inclusion for the atmospheric environment discipline.

Page 15: Section 6.2 Atmospheric Environment - Air Quality and Climate

KITSAULT MINE PROJECT

ENVIRONMENTAL ASSESSMENTATMOSPHERIC ENVIRONMENT – AIR QUALITY AND CLIMATE

Version 1.0

Page 6.2-9VE51988 – Section 6.2 December 2011

Table 6.2.1-6: Atmospheric Environment Valued Component Selection Rationale

Valued Component

Rationale

Interaction with Proposed Project

Activities

Scientific Literature and Professional

Judgement

Nisga’a Lisims Government

Other Aboriginal Groups Included

by BC EAO Applicable

Government Agencies

Land and Resource

Management Plans

The Public and Other

Stakeholders

Federal, Provincial and

Other Regulations and

Guidelines

Air quality Proposed Project related emissions of criteria air contaminants including particulate matter (PM2.5

and PM10) and metals, nitrogen oxides, sulphur dioxide, and dustfall.

Extensive scientific literature including “Surface Mining of Non-Coal Minerals,” National Academy of Sciences, Washington, D.C.; “Effects of Changing Environmental Rules Kitsault Molybdenum Mine” (Marine Georesources & Geotechnology, Vol. 13, Issue 1&2, 1995, pp. 119-133); professional judgement based on environmental assessment of pit mining projects.

The BC Government document: “The New Relationship’ concerning Nisga’a Nation and Aboriginal Groups” defines the strategic vision that includes sustainable environmental management, with the best air and water quality.

No record available

Requirement for Applications submitted to BC EAO, Input to health affects assessment, BC MOE, EC

Kitsault-Stagoo Special Forest Management area

The regional area residents including Nisga’a Nation and Aboriginal groups; hunters; loggers; tourists; NLG; BC EAO as described in relevant sections of the EA.

National and Provincial Ambient Air Quality Objectives, Canada-Wide Standards for Particle Matter and Ozone

Page 16: Section 6.2 Atmospheric Environment - Air Quality and Climate

KITSAULT MINE PROJECT

ENVIRONMENTAL ASSESSMENTATMOSPHERIC ENVIRONMENT – AIR QUALITY AND CLIMATE

Version 1.0

Page 6.2-10VE51988 – Section 6.2 December 2011

Valued Component

Rationale

Interaction with Proposed Project

Activities

Scientific Literature and Professional

Judgement

Nisga’a Lisims Government

Other Aboriginal Groups Included

by BC EAO Applicable

Government Agencies

Land and Resource

Management Plans

The Public and Other

Stakeholders

Federal, Provincial and

Other Regulations and

Guidelines

Climate change

Proposed Project related emissions of particulate matter and greenhouse gases

GHCN2 Beta: “The Global Historical Climatology Network,” Canadian Climate Normals, Rescan (2010a); Canada’s Greenhouse Gas Inventory

The Nisga’a Nation and Aboriginal Groups’ historical knowledge of microclimate changes.

No record available

Requirement by BC MOE, EC, HC

Kitsault-Stagoo Special Forest Management Plan as shown in relevant section of the EA.

The area residents including the Nisga’a Nation and Aboriginal groups, hunters, loggers, tourists

Clean Air Act of Canada; Canada - British Columbia Agreement in Principle on Climate Change; The Kyoto Protocol of the United Nations Framework Convention on Climate Change

Note: BC - British Columbia; BC EAO - British Columbia Environmental Assessment Office; BC MOE - British Columbia Ministry of Environment; EA - Environmental Assessment; EC - Environment Canada; GHCN2 – Global Historical Climatology Network version 2; HC - Health Canada; NLG - Nisga’a Lisims Government; PM2.5 - Particulate matter no greater than 2.5 μm in aerodynamic diameter; PM10 - Particulate matter no greater than 10 μm in aerodynamic diameter; VC - Valued Component;

Page 17: Section 6.2 Atmospheric Environment - Air Quality and Climate

KITSAULT MINE PROJECT

ENVIRONMENTAL ASSESSMENTATMOSPHERIC ENVIRONMENT – AIR QUALITY AND CLIMATE

Version 1.0

Page 6.2-11VE51988 – Section 6.2 December 2011

6.2.2 VC #1: Air Quality

6.2.2.1 Introduction

The objective of the air quality assessment is to determine air quality changes due to the operation of the proposed Project in consideration of the baseline air quality data.

Mining would be carried out using a conventional open pit, truck, and shovel operation. The equipment potentially responsible for air pollution include drills, shovels, loader, haul trucks, large bulldozers, graders, and other support equipment. The plant area accommodates buildings and production infrastructure such as a crusher, ore stockpile, mill, shops and warehouse buildings, and utilities.

A limited number of emission sources would be present at the mine. The most significant are various mining equipment and hauling trucks powered by diesel engines. Their exhausts contain air pollutants such as nitrogen oxides (NOx), Volatile Organic Compounds (VOC), PM (mainly small sizes, PM no greater than 10 µm in aerodynamic diameter (PM10) and PM no greater than 2.5 µm in aerodynamic diameter (PM2.5)), carbon monoxide (CO), and carbon dioxide (CO2).

Mining activities and molybdenum ore processing facilities would generate dust. The dust arises predominantly from inert soil, ore materials, and tailings. The main potential sources of dust would include the Process Plant, WRMF, low-grade (ore) stockpile (LGS), ore and waste hauling trucks, tailings and waste rock disposal, soil stripping, and overburden storage. These are generally dispersed-area sources rather than specific point sources. Plant-located dust emission sources would include the crusher, mill, and vents. Drilling and blasting would also contribute to air pollution. Supporting data used in suspended PM emission calculations are presented in Appendix 6.2-B.

Potential air quality issues need to be evaluated in the context of the regulatory framework. They include: (a) internal combustion engine sources producing sulphur dioxide (SO2), NOx, CO, PM, metals, and possibly VOC emissions; (b) non-combustion sources such as stockpiles and wind-eroded tailings producing fugitive dust containing PM2.5 and PM10, which are of interest relative to health impacts; and (c) traffic and fugitive road dust emissions. Fugitive dust emissions are especially high during the times of high winds and dry weather.

In order to assess the maximum ground-level concentrations of gaseous contaminants, PM2.5, PM10, and suspended particulates (SP), air dispersion modelling was performed with the current version of the air quality dispersion model used for predicting maximum ground level contaminants released from a source (AERMOD). Three cases of air quality assessment were considered:

The ‘Baseline Case,’ which considers existing conditions including concentrations detailed in the Atmospheric Environment Baseline Report (Appendix 6.2-A);

The ‘Project Case,’ which considers the baseline with the addition of the proposed Project; and

Page 18: Section 6.2 Atmospheric Environment - Air Quality and Climate

KITSAULT MINE PROJECT

ENVIRONMENTAL ASSESSMENTATMOSPHERIC ENVIRONMENT – AIR QUALITY AND CLIMATE

Version 1.0

Page 6.2-12VE51988 – Section 6.2 December 2011

The ‘Cumulative Case,’ considering the Project case with the addition of all reasonably foreseeable emission sources in the proposed Project study area.

6.2.2.1.1 Relevant Legislation and Legal Framework

The emissions of air contaminants can have direct and indirect effects on humans, animals, vegetation, soil, and water. For this reason, environmental regulatory agencies have established ambient air quality criteria known as Ambient Air Quality Objectives (AAQO).

British Columbia (BC) and Canada have the following air quality related regulations:

BC Environmental Management Act (BC EMA), (Government of BC 2004); and

Canadian Environmental Protection Act (CEPA), 1999 (Government of Canada 1999).

Ambient air quality in BC is regulated by the provincial government (BC Ministry of Environment (BC MOE) 2004). The federal government has also set objectives for air quality (Canadian Council of Ministers of the Environment (CCME) 2003), which are taken into account by federal agencies in a project review. The compounds identified as the most significant for this proposed Project subjected to quantitative evaluation of ground level concentrations include SO2, nitrogen dioxide (NO2), CO, and SP (PM2.5, PM10 and total suspended particulates (TSP)). These objectives are shown in Table 6.2.2-1.

Table 6.2.2-1: BC and Canadian Ambient Air Quality Guidelines and Objectives in µg/m3

Pollutant Averaging

Period

BC Guidelines / Objectives Canadian Objectives

Level A Level B Level C Maximum Desirable

Maximum Acceptable

Maximum Tolerable

SO2 Annual 25 50 80 30 60

24-hour 160 260 360 150 300 800

1-hour 450 900 900-1,300

450 900

NO2 Annual 60 100

24-hour 200 300

1-hour 400 1,000

CO 8-hour 5500 11,000 14,300 6,000 15,000 20,000

1-hour 14300 28,000 35,000 15,000 35,000

TSP Annual 60 70 75 60 70

24-hour 150 200 260 120 400

PM10 Annual

Interim 24-hour 50

Page 19: Section 6.2 Atmospheric Environment - Air Quality and Climate

KITSAULT MINE PROJECT

ENVIRONMENTAL ASSESSMENTATMOSPHERIC ENVIRONMENT – AIR QUALITY AND CLIMATE

Version 1.0

Page 6.2-13VE51988 – Section 6.2 December 2011

Pollutant Averaging

Period

BC Guidelines / Objectives Canadian Objectives

Level A Level B Level C Maximum Desirable

Maximum Acceptable

Maximum Tolerable

PM2.5 Annual 8

24-hour 25

Note: CO - carbon monoxide; µg/m3 - micrograms per cubic metre; NO2 - nitrogen dioxide; PM2.5 - particulate matter no greater than 2.5 μm in aerodynamic diameter; PM10 - particulate matter no greater than 10 μm in aerodynamic diameter; SO2 - sulphur dioxide; TSP - total suspended particulates

For National Ambient Air Quality Objectives (NAAQOs), three levels of concentration have been defined:

1. Maximum Desirable Level (Level A) defines the long-term goal for air quality and provides a basis for an anti-degradation policy for unpolluted parts of the country and for the continuing development of control technology.

2. The Maximum Acceptable Level (Level B) is intended to provide adequate protection against adverse effects on soil, water, vegetation, animals, visibility, personal comfort, and well-being.

3. The Maximum Tolerable Level (Level C) denotes the concentration of an air contaminant that requires abatement without delay to avoid further deterioration to air quality that would endanger the prevailing Canadian life-style or, ultimately, to air quality that would pose a substantial risk to public health.

6.2.2.1.2 Spatial Boundaries

Spatial boundaries for the Air Quality VC are limited to the geographic areas for which there is a reasonable expectation of direct effect of the proposed Project. For cumulative effects assessments (CEAs), boundaries are selected by working outward from the zone of influence for the effects specific to the proposed Project. If the zone of influence of the proposed Project overlaps with that of another project or human activity, the study area boundary for cumulative environmental effects (CEE) is expanded to encompass this additional zone.

For air quality assessment, three spatial boundaries are defined: the Local Study Area (LSA); the Regional Study Area (RSA); and the Cumulative Effects Study Area (CESA).

A LSA is a band 2 kilometre (km) wide surrounding the proposed Project footprint. It covers the area where concentrations caused by the proposed Project emissions could exceed some thresholds (e.g., AAQO) and where most of the airborne dust would fall to the ground. The proposed size of the LSA is based on experience from similar projects involving mineral open pit mines and on likely characteristics of emissions and their dispersion in the atmosphere such as near-ground-level releases, low emission rates, and dispersion mitigation by surrounding hills and forests.

Page 20: Section 6.2 Atmospheric Environment - Air Quality and Climate

KITSAULT MINE PROJECT

ENVIRONMENTAL ASSESSMENTATMOSPHERIC ENVIRONMENT – AIR QUALITY AND CLIMATE

Version 1.0

Page 6.2-14VE51988 – Section 6.2 December 2011

A RSA extends by 2.5 km beyond the LSA and 4.5 km off the proposed Project footprint. In this area, predicted concentrations are expected to be quantifiable, but lower than the AAQO and deposition criteria. This area can provide air quality data and information for assessing environmental effects resulting from activities of the proposed Project on airshed, watershed, and ecological components. The Kitsault Townsite, which falls within the RSA, is included in the CEA for air contaminants showing noticeable concentrations as predicted by the dispersion model.

A CESA overlaps the RSA and includes past, present, and reasonably foreseeable future human activities likely to result in residual effects or impacts on air quality. Only those human activities that have residual effects which have a temporal and spatial overlap with the proposed Project’s residual effects are considered. The study areas are shown in Figure 6.2.2-1.

6.2.2.1.3 Temporal Boundaries

Temporal boundaries include the following phases: construction; commissioning / operations; and decommissioning and closure. The air quality assessment is based on the worst-case scenario when air quality impacts would be the greatest throughout the life of the proposed Project. This is predicted to occur in Year 2 of operations when the ore mining rate and the materials handling quantities would be at the highest rates. Materials inventory in Year 2 in each category is summarised in Table 6.2.2-2.

Table 6.2.2-2: Summarised Annual Production in Year 2 of Operations

Mine Production

(kt)

Low Grade Stockpile

(kt)

Waste Rock(kt)

Total Mined(kt)

Snow(kt)

Mill Production

(kt)

Grade (% Mo)

14,600 4,126 22,940 41,666 112 14,600 0.100

Note: kt - kilotonne; % - percent; Mo - Molybdenum

6.2.2.2 Information Source and Methods

Information on background concentrations of particulates was obtained by on-site monitoring of dustfall over a long-term survey and the 24-hour spot surveys for SP at several locations within the mine site area. Information sources for the background concentration of gaseous pollutants unique to the proposed Project include various Environment Canada (EC) and the private sector reports described in the subsequent section.

Page 21: Section 6.2 Atmospheric Environment - Air Quality and Climate

CLARYLAKE

AVANTI C REEK

LIME CREEK

KITSAULTTOWNSITE

CL ARY CREEK

KILLAMLAKE

ALICEARM

Patsy

Creek

LAKE#493

LAKE#901

KITSAULT FSR (ALICE ARM ROAD)

ALICE ARM

PATSY LAKE

KSI GWINHAT'AL

ILL IANCE RIVER

LIME C

REEK

ROUNDY CREEK

FALLS CREEK

HO A N CREEK

FOXY C

REEK

W ILAUKS CREEK

KITSA UL

T RIV

E R

MORLEY C

REEK

DAK RIVER

THEO

PHILUS C

REEK

466000

466000

468000

468000

470000

470000

472000

472000

474000

474000

476000

476000

478000

478000

480000

480000

482000

482000

484000

484000

6136

000

6136

000

6138

000

6138

000

6140

000

6140

000

6142

000

6142

000

6144

000

6144

000

6146

000

6146

000

6148

000

6148

000

6150

000

6150

000

Reference

November 2011

VE51988

UTM Zone 9

DATE:

JOB No:

PROJECTION:

ANALYST: FigureMYPDF FILE:04-50-001_study_area.pdf

GIS FILE:04-50-001.mxd

NAD83DATUM:

Local and Regional Study Areasfor Air Quality

PROJECT:

Kitsault Mine Project

QA/QC:TT

CLIENT:

Avanti Kitsault Mine Ltd.

Y:\GI

S\Pr

ojects

\VE\VE

5198

8_Kit

sault

\Map

ping\0

4_air

-quali

ty\Ba

selin

e\04-5

0-001

.mxd

LegendAccess RoadMine Site RoadTransmission LineStreamWaterbodyPipeline - FreshwaterDiversion DitchClary Lake Freshwater IntakeProcess PlantOpen PitOre StockpileTopsoil StockpilesWaste Rock Management FacilityTailings BeachTailings Management Facility (TMF) Supernatant PondLocal Study AreaRegional Study Area

0 1 20.5Kilometres

1:60,000Scale:

KEY MAP

UNITED STATES

ALASKA

UNITED STATES

BRITISH COLUMBIA ALBERTA

YUKON NORTHWEST TERRITORIES

Calgary

Kelowna

Kitimat

Stewart

Edmonton

Victoria

Kamloops

Vancouver

Fort Nelson

Prince George

Fort St. John

Juneau

Project Location

1. Base Data Geobase 1:20,000 (TRIM) Land and Resource Data Warehouse 1:20,000 (TRIM)Image: Orthophoto 40cm2. Project InfrastructureSupplied by AMEC and Knight Piesold on March 2011

hansi.liuatkinson
Typewritten Text
6.2.2-1
Page 22: Section 6.2 Atmospheric Environment - Air Quality and Climate
Page 23: Section 6.2 Atmospheric Environment - Air Quality and Climate

KITSAULT MINE PROJECT

ENVIRONMENTAL ASSESSMENTATMOSPHERIC ENVIRONMENT – AIR QUALITY AND CLIMATE

Version 1.0

Page 6.2-16VE51988 – Section 6.2 December 2011

6.2.2.3 Detailed Baseline Description for Air Quality

Real time monitoring of the background dust deposition and concentration of suspended PM was completed by Rescan Environmental Services Ltd. (Rescan) and AMEC Earth and Environmental (AMEC) (Appendix 6.2-A) at several sampling locations within the proposed Project area. The objective of collecting ambient aerosol concentration data was to identify background particulate concentration levels that would be used to evaluate the magnitude of anthropogenic particulate concentrations throughout the proposed Project duration with reference to AAQO. Also, knowing the background concentration of PM is critical in assessing overall (cumulative) impacts of air quality on critical receptors and potential indirect effects to soil and vegetation from air contaminants.

The study completed by Rescan involved continuous measurement of dustfall at five monitoring stations during four monthly periods, from June 2009 to September 2009. The monitoring results show the overall average daily dustfall rate of 0.21 milligrams per decimetre square per day (mg/dm2-day). The highest dustfall was 0.46 mg/dm2-day in July 2009. Analyses of the deposited dust for acid compounds and metals revealed very low concentrations, within the range of the analytical instrument’s detection limit. Cumulative dustfall is calculated by adding the baseline daily dustfall to the dustfall predicted by a dispersion model for the proposed Project dust emissions.

Baseline concentrations of TSP, inhalable particles of 10 micrometres (μm) or less in diameter and respirable particles of 2.5 μm or less in diameter were measured continuously by AMEC from 8 October 2010 to 12 October 2010 at five locations within the proposed Project area. The overall average concentrations were 3.5 micrograms per cubic metre (µg/m3) TSP, 2.5 µg/m3 PM10 and 2.3 µg/m3 PM2.5. These baseline concentrations are added to the proposed Project-generated concentrations predicted by dispersion modelling for the CEA to evaluate compliance with relevant ambient air quality objectives.

In absence of anthropogenic emission sources in the area, baseline ambient monitoring has not been conducted for gaseous compounds at the mine site. Instead, background concentrations have been conservatively estimated using assumptions and other surveys. Background SO2, NO2, and CO concentrations for the mine site were expected to be similar to those from a relatively uncontaminated and remote undisturbed location in northern Canada. A description of those expected background concentrations is presented in the following paragraphs while a tabular summary of those background values is listed in Table 6.2.2-3.

The background concentration of SO2 is expected to be minimal because there are no significant nearby local or regional emissions. Based on the following reports, “Review of National Ambient Air Quality Objectives for Sulphur Dioxide, Desirable and Acceptable Levels” (EC 1987a) and “Application for Environmental Assessment Certificate” (Rescan 2006) for the proposed Galore Creek project by NovaGold Canada Inc., the background SO2 concentrations are assumed to be 4.0 µg/m3 (1-hour and 24-hour averages) and 2.0 µg/m3 (annual average), respectively.

Page 24: Section 6.2 Atmospheric Environment - Air Quality and Climate

KITSAULT MINE PROJECT

ENVIRONMENTAL ASSESSMENTATMOSPHERIC ENVIRONMENT – AIR QUALITY AND CLIMATE

Version 1.0

Page 6.2-17VE51988 – Section 6.2 December 2011

The background concentrations of NO2 were monitored in 2005 and 2006 at Kitimat, BC. The monthly average concentration reported by EC (2008) was 5 µg/m3. Using the average time converter, the background NO2 concentrations at regulated average periods were calculated, and are shown in Table 6.2.2-3.

For background concentrations of CO, EC (1987b) indicated that levels “in relatively unpolluted air of 29 to 115 µg/m3” have been observed. As a conservative estimate for this air quality evaluation, a background level of 100 µg/m3 of CO was assumed for all averaging time periods.

Table 6.2.2-3: Expected Background Concentration of Gaseous Pollutant in the Project Area

Substance Symbol Averaging Period Expected Concentrations

(g/m3)

Sulphur dioxide 1 SO2 1-hour 4 24-hour 4 Annual 2

Carbon monoxide 2 CO 1-hour 100 24-hour 100 Annual 100

Nitrogen dioxide 3 NO2 1-hour 11 24-hour 11 Annual 3

Notes: g/m3 - microgram per cubic metre 1 Federal-Provincial Advisory Committee on Air Quality. Review of National Ambient Air Quality Objectives for Sulphur Dioxide, Desirable and Acceptable Levels. Environment Canada Report En 41-17/2-1987E, 1987. Application for Environmental Assessment Certificate. NovaGold Canada Inc. (Proj. #762-1). Rescan™ Environmental Services Ltd. 2006. 2 National Air Pollution Surveillance (NAPS) Network. Annual Data Summary for 2005 and 2006. Environmental Science and Technology Centre Report 7/AP/39. Environment Canada, October 2008. 3 Federal-Provincial Advisory Committee on Air Quality. Review of National Ambient Air Quality Objectives for Carbon Monoxide, Desirable and Acceptable Levels. Environment Canada Report En 41-17/1-1987E, 1987.

Less common air contaminants such as NOx, ozone (O3) and sulphur oxides (SOx) are unlikely to be of concern for the baseline studies because there are currently no identified significant anthropogenic sources near the proposed Project. O3 levels are typically expressed in parts per billion by volume (ppbv, or ppb), which represent the fraction of air molecules represented by ozone. Typical background ozone levels at remote locations in the Northern Hemisphere are from 20 ppbv to 40 ppbv, varying by season and latitude (Sillman 2003).

The previously listed estimates or measurements of ambient background air quality are exclusive of those taken during extraordinary events. Those events are considered to be rare occurrences and are not normally used when considering existing background in

Page 25: Section 6.2 Atmospheric Environment - Air Quality and Climate

KITSAULT MINE PROJECT

ENVIRONMENTAL ASSESSMENTATMOSPHERIC ENVIRONMENT – AIR QUALITY AND CLIMATE

Version 1.0

Page 6.2-18VE51988 – Section 6.2 December 2011

relation to cumulative effects from a proposed project and other sources for an air quality evaluation. These extraordinary events include, but are not limited to, forest fires, weather-related stratospheric ozone intrusion, and volcanic emissions (United States Environmental Protection Agency (US EPA) 1986).

6.2.2.4 Cultural, Ecological, or Community Knowledge

Desk-based research was conducted to identify Nisga’a Nation and Aboriginal groups’ rights, interests, and values related to air quality; however, none was available from public, secondary sources. Ongoing future consultation and engagement activities and data collection efforts in collaboration with the Nisga’a Nation may result in additional information and understanding during the Application review period.

6.2.2.5 Past, Present or Future Projects / Activities

Tables 6.2.2-4, 6.2.2-5, and 6.2.2-6 below present a review of the historical land use, general land use, and reasonably foreseeable projects, respectively, that have been identified within the CESA. Although there are several hydropower projects proposed in the area (e.g., Alice Arm, Upper Kitsault Valley, and Kitsault River / Homestake Creek), available information indicates that these projects will not proceed in the foreseeable future.

Table 6.2.2-4: Historical Land Use Activities in Biophysical Cumulative Effects Assessment Study Area

Project / Activity Description

Kitsault Mine and exploration Exploration, which appears to have begun in the area in 1911, identified the presence of an ore body in late 1964. The mine was owned by B.C. Molybdenum, a subsidiary of Kennco Explorations Ltd. (Kennco) from 1963 to 1972 and by Climax Molybdenum Company of British Columbia (Climax) and affiliates from 1973 to 1998. Between January 1968 and April 1972, approximately 9.3 Mt of ore were produced with about 22.9 million pounds of molybdenum recovered. Climax returned the mine to production in 1981 but production was terminated again because of low metal prices in 1982.

Kitsault Townsite The Kitsault Townsite, built in the 1970s and opened in 1981 to support the Kitsault Mine, was occupied for less than two years. The Townsite, which is located approximately 5 km from the proposed Project, was purchased by Kitsault Resort Ltd. in 2005 and has been maintained by caretakers.

Note: Climax - Climax Molybdenum Company of British Columbia; Kennco - Kennco Explorations Ltd.; km - kilometre; Mt - million tonnes

Page 26: Section 6.2 Atmospheric Environment - Air Quality and Climate

KITSAULT MINE PROJECT

ENVIRONMENTAL ASSESSMENTATMOSPHERIC ENVIRONMENT – AIR QUALITY AND CLIMATE

Version 1.0

Page 6.2-19VE51988 – Section 6.2 December 2011

Table 6.2.2-5: General Land Use Activities in Biophysical Cumulative Effects Assessment Study Area

Project / Activity Description

Transportation and access Within the CESA, Hwy 37 is used by local residents and tourists as well as commercial / industrial traffic associated with activities such as exploration.

Mining exploration Mining exploration activities are ongoing in the CESA. A number of private claims are surrounded by the proposed Project’s mineral tenure area.

Trapping and guide outfitting The proposed Project footprint falls within one trap line tenure area that is routinely used in the winter. The eastern section of the road leading from Hwy 37 falls within another trap line tenure area. The Land Use RSA (and Wildlife RSA) falls within the boundaries of one Guide Outfitter.

Marine boat traffic (Alice Arm Lodge water taxi and recreational users)

Mining exploration companies working in the area often stay at the Alice Arm Lodge, which offers a water taxi service from Prince Rupert. Marine vessels are known to use Alice Arm to deliver supplies (for example to the Alice Arm Lodge). Recreational boaters have been observed anchored in Alice Arm and rowing to shore for a short period of time.

Fishing Recreational fishing in Alice Arm.

Note: CESA - Cumulative Effects Study Area; Hwy - Highway; RSA - Regional Study Area

Table 6.2.2-6: Reasonably Foreseeable Projects in Biophysical Cumulative Effects Assessment Study Area

Project / Activity Construction Operations Area and Rationale

Northwest Transmission Line Project

Spring 2011 – 2013 Unknown – with routine maintenance it would operate into the foreseeable future

The Northwest Transmission Line is a 287 kV 335 km transmission line between the Skeena substation (near Terrace) and Bob Quinn Lake.

Note: BC - British Columbia; kV - kilovolt; km - kilometre

6.2.2.6 Potential Effects of the Proposed Project and Proposed Mitigation

Assessment of potential effects of the proposed Project involves the following steps:

Identification of main emission sources including PM, NOx, SO2, and CO;

Calculation of emission rates; and

Dispersion modelling and analysis of model predictions.

The above assessment components are described in detail in Appendix 6.2-C.

Page 27: Section 6.2 Atmospheric Environment - Air Quality and Climate

KITSAULT MINE PROJECT

ENVIRONMENTAL ASSESSMENTATMOSPHERIC ENVIRONMENT – AIR QUALITY AND CLIMATE

Version 1.0

Page 6.2-20VE51988 – Section 6.2 April 2012

The AERMOD model was used for dispersion modelling because of its capability of addressing the potential air quality for the proposed mine and ore processing facility, as well as addressing all nearby terrain locations, simultaneously. The BC MOE lists the AERMOD model as a refined core model for assessments in BC in their “Guidelines for Air Quality Modelling in British Columbia” (BC MOE 2008). The AERMOD model was discussed with BC MOE meteorologist staff as an acceptable model in this particular Application (a copy of the e-mail is available upon request). The BC modelling guideline was used as the basis for modelling procedures related to this air quality evaluation. The MM5 meteorological data for surface and upper air was used in the modelling process and is described in Appendix 6.2-D.

The predicted hourly, daily, and annual maximum ground level concentrations (GLC) for each of the modelled contaminants (model prediction plus baseline) and the percentage of compliance with AAQO are summarised in Table 6.2.2-7.

Table 6.2.2-7: Summary of Dispersion Modelling Results

Air Contaminant Averaging

Period AAQO (µg/m3)

Maximum GLC (µg/m3) % AAQO Model Background Total

TSP 24 hour 120 122 4 126 101

Annual 70 23 n/a 23 33

Inhalable Particulate (PM10)

24 hour 50 46 3 49 98

Fine particulate (PM2.5) 24 hour 25 23 2 25 100

Annual 8 1 1 2 25

NO2 1 hour 400 523 11 534 133

1 hour 400 362 1 11 373 1 93 1

24 hour 200 46 11 57 29

Annual 100 4 3 7 7

SO2 1 hour 450 2 4 6 1

24 hour 150 0.2 4 4.2 3

Annual 30 0 2 2 7

CO 1 hour 15000 1 100 101 1

8 hour 6000 0 100 100 1

Note: AAQO - Ambient Air Quality Objectives; NO2 - nitrogen dioxide; PM2.5 - particulate matter no greater than 2.5 µm in aerodynamic diameter; PM10 - particulate matter no greater than 10 µm in aerodynamic diameter; SO2 - sulphur dioxide; TSP - total suspended particulates; CO - carbon monoxide; µg/m3 –

microgram per cubic metre 1 Max GLC 99.95th percentile

The dispersion model predictions indicate that in general the proposed Project would comply with AAQO. However, the one-hour maximum NO2 concentrations in the immediate vicinity of the proposed Project’s western fence line could experience elevated GLC, approximately

Page 28: Section 6.2 Atmospheric Environment - Air Quality and Climate

KITSAULT MINE PROJECT

ENVIRONMENTAL ASSESSMENTATMOSPHERIC ENVIRONMENT – AIR QUALITY AND CLIMATE

Version 1.0

Page 6.2-21VE51988 – Section 6.2 December 2011

33% over the acceptable AAQO. This maximum concentration is only 53% of the maximum tolerable national objective, which is 1,000 µg/m3. Dispersion modelling of NO2 1-hour average 99.95th percentile, the fifth highest prediction, revealed maximum GLC equal to 362 µg/m3 which is 7% less than the maximum GLC. The 24-hour and annual maximum GLC of NO2 are well below the respective AAQO.

Concentrations of SO2 are predicted to be very low for all averaged times as a new low-sulphur diesel regulations have been enforced recently. CO would be at the background concentration levels due to atmospheric dispersion and low concentrations in diesel exhaust. Concentrations of PM (TSP, PM10 and PM2.5) are predicted around the maximum permissible values at 24-hour average time. This can be expected, considering the large amount of aggregate material being mined, handled, and processed.

Dustfall is associated with emissions and drift of fugitive dust. The drift distance is governed by the initial injection height of the particles, the terminal settling velocity of the particle, and the degree of atmospheric turbulence. Theoretical drift distance, as a function of particle diameter and mean wind speed, has been computed for fugitive dust emissions. Results indicate that, for a typical mean wind speed of 16 kilometres per hour (km/h), particles larger than about 100 µm are likely to settle out within 6 to 9 metres (m) from the edge of the road or other point of emission. Particles that are 30 to 100 µm in diameter are likely to undergo impeded settling. These particles, depending upon the extent of atmospheric turbulence, are likely to settle within tens to a couple of hundred metres from the road, pit or solid waste disposal area within the Project property line (US EPA 1995).

The emissions inventory for the Proposed Project shows that approximately 95% of crustal particulate matter emissions originate from haul truck wheel entrainment (75%) and from material deposited by the conveyor (25%, see air quality model description in Appendix 6.2-C). As described above, the greatest fugitive dust deposition rates are expected to occur close to haul and access roads and adjacent to ore stockpiles. The ore stockpiles for the proposed Project will be located well within the foot-print of the proposed mine site. Therefore, assessment of potential effects of fugitive dust deposition will focus on areas adjacent to haul roads.

Rates of dustfall can be conservatively estimated based on the predicted maximum annual mean TSP concentration along with an estimate of the average deposition velocity of the emitted dust. In addition, field measurements and modelling of dust deposition have demonstrated that dust deposition rates decrease exponentially with distance from a haul road (Etyemezian 2003a; Etyemezian 2003b; Brown 2009; US EPA AP-42).

Table 6.2.2-7 shows that the model prediction for maximum annual mean ambient TSP concentration beyond the fenceline is 23 µg/m3. Deposition velocities for particulate matter greater than 10 µm in areas with tall vegetation typically range between 1 and 10 centimetres per second (cm/s). Assuming an average deposition velocity of 5 cm/s, the estimated dust deposition rate at the location of maximum TSP concentration is 3.0 grams per metre square per month (g/m2/month). Using a deposition decay correlation from an

Page 29: Section 6.2 Atmospheric Environment - Air Quality and Climate

KITSAULT MINE PROJECT

ENVIRONMENTAL ASSESSMENTATMOSPHERIC ENVIRONMENT – AIR QUALITY AND CLIMATE

Version 1.0

Page 6.2-22VE51988 – Section 6.2 December 2011

unpaved road in a similar setting (-0.065 m-1, Brown 2009) the predicted dust deposition rate will be approximately:

2.1 g/m2/month 5 m from the road;

1.5 g/m2/month 10 m from the road;

0.8 g/m2/month 20 m from the road;

0.41 g/m2/month 30 m from the road;

0.11 g/m2/month 50 m from the road;

0.004 g/m2/month 100 m from the road; and

6*10-6 g/m2/month 200 m from the road

The dustfall rates discussed above refer to crustal particulates emitted from peripheral haul roads. The aggregate material on those haul roads can be assumed to be similar to aggregate or surface material on existing roads. Therefore, the composition of the dust (metal and acid concentrations) can be assumed to be similar to the composition of dust collected during baseline studies (Appendix 6.2-A).

BC monthly dustfall objective is 8.7 g/m2 (BC MOE 1979), which is approximately four times that of predicted dustfall within 5 m of the haul roads.

O3 concentrations were not measured in the proposed Project airshed and they were not modelled for the proposed Project emission sources. It is unlikely that the insignificant project emissions of NO2 (1,293 tonnes per year (t/y)) and VOCs (approximately 0.58 t/y based on diesel engines emission factors) would contribute significantly to additional increment in ground-level O3 concentrations (see Appendix 6.2-C). Likewise, concentrations of other air contaminants, including VOCs, other hydrocarbons or metals associated with diesel or particulate emissions are not expected to affect ambient air quality outside the fence line of the proposed project to the extent that the AAQO would be exceeded. This assessment is based on a preliminary assessment of emissions, professional judgement and experience from developments of similar projects. These air contaminants were also not identified as constituents of concern by the BC MOE in the review of the air quality modelling plan prepared for the Project.

6.2.2.6.1 Identification and Analysis of Potential Project Effects

Potential direct Project effects on air quality and other VCs are presented in Tables 6.2.2-8 and 6.2.2-9.

Page 30: Section 6.2 Atmospheric Environment - Air Quality and Climate

KITSAULT MINE PROJECT

ENVIRONMENTAL ASSESSMENTATMOSPHERIC ENVIRONMENT – AIR QUALITY AND CLIMATE

Version 1.0

Page 6.2-23VE51988 – Section 6.2 December 2011

Table 6.2.2-8: Potential Direct Project Effects on Air Quality

Project Component

Project Phase Potential Direct Project Effect Likelihood of Occurrence

Traffic on service and haul roads

C, O, D/C, PC Dust deposition Likely

Diesel engine emission

C, O, D/C, PC Increase in concentration of air contaminants Likely

Land clearing C Increase in concentration of air contaminants Likely

Excavating C Increase in concentration of air contaminants Likely

Grading C Increase in concentration of air contaminants Likely

Mine infrastructure installations

C, D/C Increase in concentration of air contaminants Likely

Kitsault Pit Development

C, O, D/C, PC Increase in concentration of air contaminants Likely

WRMF development

C, O, D/C, PC Increase in concentration of air contaminants Likely

TMF development

C Increase in concentration of air contaminants Likely

Surface water mgt and ground water mgt

C, O, D/C, PC No direct effect Unlikely

Re-vegetation D/C Decrease Project emissions Likely

Project phase: C - construction; D/C - decommissioning and closure; O - operations; PC - post-closure

Note: TMF - Tailings Management Facility; WRMP - Waste Rock Management Facility

Table 6.2.2-9: Potential Indirect Project Effects on Other Valued Components

Direct Project Effect (Adverse

or Positive)

Project Phase

Potential Indirect Project Effect

Carry Forward

(yes / no) Rationale

Dust deposition C, O, D/C, PC

Intake of dust components by plants

Yes Molybdenum ore and mineral waste dust contains inorganic compounds which could be taken up by leaves and roots

C, O, D/C, PC

Contamination of surface water

Yes Molybdenum ore and mineral waste dust contains inorganic compounds slightly soluble in water

C, O, D/C Visibility No Limited local visibility

Page 31: Section 6.2 Atmospheric Environment - Air Quality and Climate

KITSAULT MINE PROJECT

ENVIRONMENTAL ASSESSMENTATMOSPHERIC ENVIRONMENT – AIR QUALITY AND CLIMATE

Version 1.0

Page 6.2-24VE51988 – Section 6.2 December 2011

Direct Project Effect (Adverse

or Positive)

Project Phase

Potential Indirect Project Effect

Carry Forward

(yes / no) Rationale

caused by fugitive dust during dry weather

Increase in concentration of air contaminants

C, O, D/C, PC

Human and wildlife health effects, Change in soil and surface water

Yes Poor air quality may affect employees and any long-term residents located at the affected area

C, O, D/C, PC

Climate change Yes Climate alteration caused by emission of GHG

Project phase: C - construction; D/C - decommissioning and closure; O - operations; PC - post-closure

Note: GHG - greenhouse gases

A potential interaction between direct effects of the proposed Project on other VCs and air quality is summarised in Table 6.2.2-10. The direct and indirect Project effects on air quality are summarised in Tables 6.2.2-11 and 6.2.2-12.

Page 32: Section 6.2 Atmospheric Environment - Air Quality and Climate

KITSAULT MINE PROJECT

ENVIRONMENTAL ASSESSMENTATMOSPHERIC ENVIRONMENT – AIR QUALITY AND CLIMATE

Version 1.0

Page 6.2-25VE51988 – Section 6.2 December 2011

Table 6.2.2-10: Summary of Potential Interaction Between Project Direct Effects on Other Valued Components and Air Quality

Direct or Indirect Project Effect

Air

Qu

alit

y an

d C

limat

e C

han

ge

No

ise

An

d V

ibra

tio

n

Hyd

rog

eolo

gy

Gro

un

dw

ater

Qu

alit

y

Fre

shw

ater

an

d

Sed

imen

t Q

ual

ity

Su

rfac

e H

ydro

log

y

Fre

shw

ater

Fis

her

ies

Mar

ines

Wat

er Q

ual

ity

Mar

ine

Bio

ta

Ter

rest

rial

E

nvi

ron

men

t

Wild

life

and

Th

eir

Hab

itat

En

viro

nm

enta

l Hea

lth

Eco

no

mic

So

cial

Her

itag

e

Hea

lth

Nis

ga’

a N

atio

n L

and

U

se

Ab

ori

gin

al G

rou

ps

Lan

d U

se

Dust deposition

- NI NI NI o NI o NI n/a o o o NI NI NI o o o

Concentration of air contaminants

- NI NI NI o NI o NI n/a - o - NI NI NI - o o

Interaction definitions: Interaction definitions: o - interaction; - - key interaction; + - benefit; NI - no interaction; n/a - not applicable

Page 33: Section 6.2 Atmospheric Environment - Air Quality and Climate

KITSAULT MINE PROJECT

ENVIRONMENTAL ASSESSMENTATMOSPHERIC ENVIRONMENT – AIR QUALITY AND CLIMATE

Version 1.0

Page 6.2-26VE51988 – Section 6.2 December 2011

Table 6.2.2-11: Potential Combined Project Effects by Project Phase on Air Quality

Potential Indirect Project Effect

Potential Combined Project Effect

Project Phase

Likelihood of Occurrence

Vegetation mortality Change in air quality due to Project emissions and vegetation mortality

C Likely

Change in air quality due to re-vegetation

Positive change in air quality due to lower proposed Project emissions and re-vegetation enhancement effect

C, O, D/C Likely

Climate Change Change in air quality due to Project emissions climate change

C, O, D/C Likely

Secondary atmospheric contaminants

Transformation of SO2 and NO2 to other chemical compounds

C, O, D/C Likely

Project phase: C - construction; D/C - decommissioning and closure; O - operations; PC - post-closure

Note: NO2 - nitrogen dioxide; SO2 - sulphur dioxide

Effects of the proposed Project to be further considered in the air quality assessment are summarised in Table 6.2.2-12.

Table 6.2.2-12: Summary of Potential Project Effects to be Carried Forward into the Assessment for Air Quality

Adverse Effects / Positive Effects Project Phase Direction

Dust deposition C, O, D/C Negative

Fugitive dust emissions C, O, D/C, PC Negative

Changes to baseline air quality C, O, D/C Negative

Project phase: C - construction; D/C - decommissioning and closure; O - operations; PC - post-closure

6.2.2.6.2 Mitigation Measures

Methods to minimise releases of atmospheric contaminants and their mitigation success rating are shown in Table 6.2.2-13. Rating of mitigation success is based on information published for similar projects, professional literature (AWMA 1992), Internet sources (e.g., http://www.mining-technology.com/features/feature76035/), and the US EPA Compilation of Air Pollutant Emission Factors (US EPA 2011).

Page 34: Section 6.2 Atmospheric Environment - Air Quality and Climate

KITSAULT MINE PROJECT

ENVIRONMENTAL ASSESSMENTATMOSPHERIC ENVIRONMENT – AIR QUALITY AND CLIMATE

Version 1.0

Page 6.2-27VE51988 – Section 6.2 December 2011

Table 6.2.2-13: Potential Project Effect by Project Phase on Air Quality and Mitigation Measures

Project Effect Project Phase

Mitigation / Enhancement Measure

Mitigation Success Rating

Deterioration of air quality and emissions of GHG

C, O Using modern construction / mining equipment that meets latest applicable Canadian emissions standards

High prevention / reduction

C, O Ensuring proper equipment maintenance

Medium prevention / reduction

C Limiting vehicle and construction equipment idling

High prevention / reduction

C, O Conserving energy by reducing unnecessary lighting, heating, and air conditioning; proper building and facilities insulation

Medium prevention / reduction

C, O Minimising land disturbance Medium to high prevention / reduction

C, O, D/C, PC

Establishing speed limits on unpaved surfaces

Medium to high prevention / reduction

C Minimising clearing and grubbing areas

High prevention / reduction

C, O Optimising vehicle movement Low prevention / reduction

C, O Using dust suppression measures (refer to Section 11.2.5, Dust Management Plan)

Medium to high prevention / reduction

Project phase: C - construction; D/C - decommissioning and closure; O - operations; PC - post-closure

Note: GHG - greenhouse gas

6.2.2.7 Potential Residual Effects and Their Significance

6.2.2.7.1 Potential Residual Effects After Mitigation

A residual effect is any measurable or demonstrable environmental effect remaining after mitigation. From an air quality perspective, if the level of a residual effect is less than the AAQO, it is not significant.

In this proposed Project, the maximum predicted ambient concentrations of TSP, PM10, PM2.5 SO2 and CO concentrations comply with the appropriate air quality criteria. Only concentrations of NO2 one-hour average are likely to have any residual air quality effects (Table 6.2.2-14). The affected area is small and is adjacent to the proposed Project fence line on the west side (see Figure 6.2.2.6-1 in Appendix 6.2-C). NO2 concentration at longer averaging times are predicted to meet the relevant air quality objectives.

Page 35: Section 6.2 Atmospheric Environment - Air Quality and Climate

KITSAULT MINE PROJECT

ENVIRONMENTAL ASSESSMENTATMOSPHERIC ENVIRONMENT – AIR QUALITY AND CLIMATE

Version 1.0

Page 6.2-28VE51988 – Section 6.2 December 2011

An assessment of residual effects of GHG emissions is carried out in section VC #2: Climate.

Table 6.2.2-14: Summary of Residual Effects for Air Quality

Project Phase Residual Effect Direction

O Deterioration of air quality and emissions of GHG Negative

Project phase: O – operations

Note: GHG - greenhouse gas

6.2.2.7.2 Significance of Potential Residual Effects

The residual effect on air quality was subjected to nine rating criteria to determine significance (Table 6.2.2-15); these criteria are described in Section 5.0: Assessment Methodology.

Table 6.2.2-15: Residual Effects Assessment by Project Development Phase for Air Quality

Parameter Stage of Development / Rating

Stage of project development Operations

Residual effect Deterioration of air quality and emissions of GHG

Effect attribute

Magnitude Low

Spatial scale Local

Duration Long-term

Frequency Intermittent

Reversibility Yes

Ecological context Low

Direction Negative

Certainty Medium

Residual effect significance Not significant (Minor)

Level of confidence Medium

Note: GHG - greenhouse gas

6.2.2.8 Potential Cumulative Effects

6.2.2.8.1 Identification and Analysis of Potential Project Cumulative Effects

The CEA includes all of the existing, approved, and planned projects and activities associated with atmospheric emissions which could negatively affect air quality in the region. Projects are typically some form of commercial or industrial development that is planned, constructed, and operated – a refinery development or resource access road, for

Page 36: Section 6.2 Atmospheric Environment - Air Quality and Climate

KITSAULT MINE PROJECT

ENVIRONMENTAL ASSESSMENTATMOSPHERIC ENVIRONMENT – AIR QUALITY AND CLIMATE

Version 1.0

Page 6.2-29VE51988 – Section 6.2 December 2011

example. Activities may either be part of a project or may arise over time because of ongoing human presence in an area (Canadian Environmental Assessment Agency (Agency) 1999). Table 6.2.2-16 provides a summary of Project-related effects on air quality and the rationale for carrying forward into the CEA.

Table 6.2.2-16: Project Related Residual Effects - Rationale for Carrying Forward into the CEA

Project Component

Project Phase

Residual Effect Rationale Carried Forward in CEA

Mine site facilities

O Deterioration of air quality and emissions of GHG rated as not significant (minor)

Existing and planned facilities and operations in the area indicate that no anthropogenic emission sources exist or are anticipated in the 30 km radius from the centre of the proposed Project area.

No

Project phase: O - operations

Note: CEA - cumulative effects assessment; GHG - greenhouse gas; km - kilometre

A study of inventory data of existing and planned facilities and operations in the area presented in Table 6.2.2-5 has shown that no anthropogenic emission sources exist or are anticipated in the 30 km radius from the centre of the proposed Project area. Usually a 30 km distance is sufficient to disperse emitted contaminants to concentrations at the background levels. Therefore, cumulative effects and a cumulative impact of the proposed Project are not expected.

6.2.2.9 Conclusion

Dispersion modelling was undertaken to assess the effect of atmospheric emissions associated with open pit mining and ore processing on air quality. Ground level concentrations of criteria air contaminants were predicted across the LSA and RSA. The area within the mine boundary was excluded for assessment purposes as this area is restricted to the general public and subject to work place safety standards rather than ambient air quality objectives. Numerous emission mitigation methods are proposed to minimise the proposed Project impact on the atmospheric environment. In general, the modelling results confirm compliance with ambient air quality objectives. The proposed Project is not likely to have significant adverse effects on air quality.

6.2.3 VC #2: Climate

6.2.3.1 Introduction

Incorporating climate change considerations into an EA helps to determine whether the proposed Project is consistent with jurisdictional requirements and initiatives to manage

Page 37: Section 6.2 Atmospheric Environment - Air Quality and Climate

KITSAULT MINE PROJECT

ENVIRONMENTAL ASSESSMENTATMOSPHERIC ENVIRONMENT – AIR QUALITY AND CLIMATE

Version 1.0

Page 6.2-30VE51988 – Section 6.2 December 2011

emissions. It also assists the proponent in using best practices that adapt to possible climate change impacts, such as changes in the frequency or intensity of extreme weather events, or increases in mean temperatures or altered precipitation patterns and amounts. In the EA process, the proponent determines and documents whether climate change is a potential consideration, and also declares all information sources used (Agency 2003).

Climate change has emerged as a long-term environmental challenge of global significance. The Intergovernmental Panel on Climate Change (IPCC), established under the auspices of the United Nations, notes a high probability of continuing global climatic change if GHG emissions continue to increase (IPCC 2001). Based on current levels of GHG in the atmosphere, even immediate reductions in emissions would not be rapid enough to reverse the observed changes in climate in the short term (Burton and van Aalst 1999).

The climate in the proposed Project area is classed as ‘temperate coastal’, characterised by high precipitation, and verging on a rain forest environment. Cloudy and foggy conditions are typical in summer months, with high precipitation in winter (Knight Piésold Consulting Ltd. (Knight Piésold) 2011). The climate in the area is controlled by four major factors:

Westerly winds cause atmospheric disturbances to cross the area from west to east;

Proximity to the Pacific Ocean results in moderate temperatures and an abundant moisture supply;

The North Pacific semi-permanent high-pressure cell controls the seasonal distribution of precipitation by forcing the major storm tracts to migrate over the area, moving south during October and north during March; and

The rugged topography creates distinct radiation balances and wind circulations (Amax 1976).

As climate change affects large territorial areas and is caused by numerous natural and anthropogenic factors, assessment of VCs associated with climate within an atmospheric environment area of assessment is addressed only in general terms. No detailed prediction of the proposed Project impacts on climate has been attempted.

It is important to understand the difference between climate and weather. Climate is a description of the long-term (usually more than 30 years) pattern of weather over a large area, using meteorological parameters which are continuously monitored. In addition to long-term climate change, there are shorter-term climate variations. This so-called climate variability could be represented by periodic or intermittent changes related to El Niño, La Niña, volcanic eruptions, or other changes in the Earth’s systems. Studying climate and climate change is important because changes would affect people around the world. Rising global temperatures are expected to raise sea levels, and change precipitation and other local climate conditions. Changing regional climate could alter forests, crop yields, and water supplies. It could also affect human health, animals, and many types of ecosystems.

Page 38: Section 6.2 Atmospheric Environment - Air Quality and Climate

KITSAULT MINE PROJECT

ENVIRONMENTAL ASSESSMENTATMOSPHERIC ENVIRONMENT – AIR QUALITY AND CLIMATE

Version 1.0

Page 6.2-31VE51988 – Section 6.2 December 2011

Weather is the day-to-day state of the atmosphere, and its short-term (minutes to weeks) variation. It is the set of meteorological elements in a given atmosphere at a given time. Elements of weather usually include:

Air temperature;

Relative humidity;

Precipitation;

Snow depth;

Solar radiation;

Atmospheric pressure; and

Wind speed and direction.

All of the above weather elements have been recorded by Rescan at the proposed Project area during the period from 15 November 2008 to 18 November 2010. A full discussion of weather at the mine site is presented in the Atmospheric Environment Baseline Report (Appendix 6.2-A and Rescan 2010).

6.2.3.1.1 Relevant Legislation and Legal Framework

Climate change legislation and legal agreements include the following:

The Convention on Climate Change (UNFCCC 1992);

The Kyoto Protocol (Kyoto 1997);

The Montreal Protocol (Montreal Protocol 1987); and

BC Greenhouse Gas Reduction Targets Act (Bill-44 2007).

The Convention on Climate Change entered into force on 21 March 1994. Over 190 countries, including Canada, have ratified the accord. It sets the over-arching framework for efforts to meet the challenge posed by climate change, requiring governments to: gather and share information on GHG emissions, national policies, and best practices; develop national strategies for addressing GHG emissions and adapting to expected impacts; provide financial and technological support from developed nations to developing countries; and otherwise co-operate in preparing for adaptation to climate change and its effects on the environment.

The Kyoto Protocol is an international agreement linked to the United Nations Framework Convention on Climate Change. The major feature of the Kyoto Protocol is that it sets binding targets for 37 industrialised countries and the European community for reducing GHG emissions. These binding targets amount to an average of 5% cut in GHG emissions from 1990 levels in the five-year commitment period from 2008 to 2012.

Page 39: Section 6.2 Atmospheric Environment - Air Quality and Climate

KITSAULT MINE PROJECT

ENVIRONMENTAL ASSESSMENTATMOSPHERIC ENVIRONMENT – AIR QUALITY AND CLIMATE

Version 1.0

Page 6.2-32VE51988 – Section 6.2 December 2011

The major distinction between the Protocol and the Convention is that while the Convention encourages industrialised countries to stabilise GHG emissions, the Protocol commits them to do so.

The “Montreal Protocol on Substances that Deplete the Ozone Layer” (a protocol to the Vienna Convention for the Protection of the Ozone Layer) is an international treaty designed to protect the O3 layer by phasing out the production of numerous substances believed to be responsible for O3 depletion. Most of these substances are also GHGs. Concentration of O3 in the atmospheric air has a strong connection with climate change. The Protocol was negotiated and signed by Canada along with 23 other countries in 1987.

Greenhouse Gas Reduction Targets Act (Government of BC 2007) puts into law BC’s target of reducing GHG by at least 33% below 2007 levels by 2020. It also required that realistic, economically viable interim targets for 2012 and 2016 be set by the end of 2008, and further establishes an emission reduction target of 80% below 2007 levels by 2050. The government is also required to publish a report every two years outlining the progress made towards reaching the emissions reduction targets. Specific policy measures have been applied to reduce emissions in each major economic sector, including development of key legislation to introduce a revenue-neutral carbon tax, enabling BC to join a regional cap and trade system, imposing emissions standards on vehicles, regulating landfill gas emissions, imposing a low-carbon fuel standard, and encouraging green community development.

6.2.3.1.2 Spatial Boundaries

As climate change may have long-term economic, social, and human health consequences, spatial boundaries for economic and social VCs are adopted for the climate. The boundaries are defined in Section 7.0 and Section 8.0 and are shown in Figure 6.2.3-1.

Page 40: Section 6.2 Atmospheric Environment - Air Quality and Climate
Page 41: Section 6.2 Atmospheric Environment - Air Quality and Climate

Kitsault Mine Project

Kitsault Townsite

Nass Wildlife Area

Alice Arm

113

37

UNITED STATES

CANADA

16

1616

37

Dixon Entrance

16

37113

25

26

Peace River B

Kitimat-Stikine A

Stikine Region

Kitimat-Stikine D

Bulkley-Nechako C

Bulkley-Nechako G

Skeena-Queen Charlotte D

Kitimat-Stikine B

Kitimat-Stikine C (Part 1)

Bulkley-Nechako E

Nisga'a

Skeena-Queen Charlotte C

Kitimat-Stikine C (Part 2)

Bulkley-Nechako B

Bulkley-Nechako A

Skeena-Queen Charlotte A

Stewart

Bulkley-Nechako DKitimat

Port Edward

Granisle

Houston

Lax Kw'alaams 1

Prince Rupert

Masset

Terrace

Laxgalts'ap

New Hazelton

Smithers

Gitwangak 1

S1/2 Tsimpsean 2

Kispiox 1

Kitimat-Stikine E

Gitsegukla 1

Dolphin Island 1

Telkwa

Aiyansh (Kitladamas) 1

Port Clements

Burns Lake

Fort Ware 1

Moricetown 1

Gitanyow 1

Ingenika Point

Dzitline Lee 9

Nedoats 11

Masset 1

Kitsumkaylum 1

Kuz Che 5

Cheslatta 1

Babine 6

Tadinlay 15

Ye Koo Che 3

North Tacla Lake 7

Jean Baptiste 28

Babine 17

Francois Lake 7

Babine 25

Tatla't East 2 Skins Lake 16B

Fraser Lake

Maxan Lake 4

Bihl' k'a 18

Tacla Lake (Ferry Landing) 9

Poison Creek 17A

9

8

7

6

5

43

21

28

27

25

24

23

22

21

20

18

17

16

15

14

13

1211

10

Stewart

Nass Camp

Meziadin Junction

Cranberry Junction

Kitwanga

30

29

19

ReferenceBase Data Geobase 1:20,000 (TRIM) Land and Resource Data Warehouse 1:20,000 (TRIM)Atlas of Canada scale 1:1,000,000.

November 2011

VE51988

UTM Zone 9

DATE:

JOB No:

PROJECTION:

ANALYST: FigureMYPDF FILE:14-50-002_v5_study_areas.pdf

GIS FILE:14-50-002_v5.mxd

NAD83DATUM:

Study Areas For Social And Economic Conditions -

Adopted As Climate Study Area

PROJECT:

Kitsault Mine Project

QA/QC:TT

CLIENT:

Avanti Kitsault Mine Ltd.

Y:\GI

S\Pr

ojects

\VE\VE

5198

8_Kit

sault

\Map

ping\1

4_so

cio-ec

onom

ics\B

aseli

ne\14

-50-00

2_v5

.mxd

50 0 5025Kilometres

1:1,800,000Scale:

LegendPopulated PlaceKitsault Mine ProjectRoadHighwayInternational / Provincial BorderStreamWaterbodyNisga'a NationNass Wildlife Area

Major ProjectsMinesHydro PowerOther DevelopmentLinear DevelopmentCensus SubdivisionLocal Study AreaRegional Study Area

ID P ro ject N ame1 Galore Creek Gold/Silver/Copper M ine2 M ount Klappan Coal Pro ject3 Schaft Creek Porphyry Copper-Gold M ine4 Kerr -Sulphurets - M itchell (KSM ) Gold Copper M ine5 Bear River Aggregate Pro ject6 Red Chris Porphyry Copper/Gold Pro ject7 M ount Klappen Coal Slurry P ipeline8 Sustut Gold and Copper Pro ject9 Davidson M olydbdenum M ine

10 Swamp point Aggregate11 Bronson Slope Hydropower12 Forest Kerr Hydroelectric13 Jade Lake Power Pro ject14 Kinskuch Hydro Pro ject15 Long Lake Power Pro ject16 GJ Kinaskan Lake Copper-Gold Pro ject17 M clymont Creek Hydroelectric Pro ject18 M ore Creek Hydroelectric Pro ject19 Kitsault River and Homestake Creek Hydro Pro ject20 Dasque-M iddle Hydro Pro ject21 Snowfield Gold Pro ject22 Hudson Bay M ountain Development23 Upper Kitsault Valley Hydropower Pro jects24 Alice Arm Hydropower Pro jects25 Northwest Transmission Line26 Stewart Omineca Resource Road27 Northwest Community College28 Bronson Slope Gold and Copper M ine29 Biocoal Pellet Production Plant30 Suskwa Biomass Power Pro ject

KEY MAP

BRITISH COLUMBIA

UNITED STATES

ALASKA

UNITED STATES

BRITISH COLUMBIA ALBERTA

YUKON NORTHWEST TERRITORIES

Calgary

Kelowna

Kitimat

Stewart

Edmonton

Victoria

Kamloops

Vancouver

Fort Nelson

Prince George

Fort St. John

Juneau

Project Location

37

hansi.liuatkinson
Typewritten Text
6.2.3-1
Page 42: Section 6.2 Atmospheric Environment - Air Quality and Climate
Page 43: Section 6.2 Atmospheric Environment - Air Quality and Climate

KITSAULT MINE PROJECT

ENVIRONMENTAL ASSESSMENTATMOSPHERIC ENVIRONMENT – AIR QUALITY AND CLIMATE

Version 1.0

Page 6.2-34VE51988 – Section 6.2 December 2011

6.2.3.1.3 Temporal Boundaries

Climate is commonly defined as the weather averaged over a long period of time. For the IPCC (2001), climate in a narrow sense is usually defined as the “average weather”, or more rigorously as the statistical description in terms of the mean and variability of relevant measurements over a period of time ranging from months to thousands or millions of years. The standardised period is 30 years, as established by the World Meteorological Organization (WMO), but other periods may be used depending on the purpose. These measurements are most often surface weather variables such as temperature, precipitation, and wind. The standardised 30-year period is accepted for the proposed Project to accommodate periods of site preparation, construction of the production plant and camp, road construction, 16 years of operations, decommissioning, and post closure.

6.2.3.2 Information Source and Methods

Several climate stations are located in the general proposed Project region. Regional stations include multiple stations operated by the Meteorological Service of Canada (MSC), as well as two stations located in Alaska and operated by the Alaska Climate Research Center (ACRC). Many of the stations in the region have been deactivated, and thus do not have data that are concurrent with the recent site data collection.

The website for the Weather Office of EC, located at http://climate.weatheroffice.gc.ca/climate_normals/index_e.html, provides climate normals for the period of 30 years (1971-2000) for the nearest stations at:

Prince Rupert (Lat.: 54o 17’ N; Long.: 130o 27’ W; Elev.: 35.4 m);

Germansen Landing (Lat.; 55° 47' N; Long.: 124° 42' W; Elev.: 766.0 m);

Fort St. James (Lat.: 54° 27' N; Long.: 124° 15' W; Elev.: 685.8 m); and

Babine Lake – Pinkut Creek (Lat.; 54° 27' N; Long.: 125° 27' W; Elev.: 713.2 m).

The data from these stations offers detailed statistics from which overall regional trends can be derived. A station at Kalder Lake about 20 km southwest of the mine site collected temperature and precipitation data but stopped collecting data in 1988. Given that this station has not been active for almost 20 years, this data was not considered current from a climate perspective.

At present, no specific method has been designed to address quantitative climate change issues through the Application of the EA Certificate. Several evaluation tools have been developed to examine the overall effectiveness of EA (Sadler 1996; Wood 1999; Agency 2003; ClimAdapt 2003); however, an evaluation tool to examine how well EA processes have been designed to address climate change issues is nonexistent. Some studies have suggested that mitigation and / or adaptation to climate change should focus on a broad range of issues such as political commitment, policy, regulation, institutional roles and responsibility, stakeholder capacity, guidelines, enforcement, incentive schema, and data management (Adger et al. 200; Smith et al. 2003).

Page 44: Section 6.2 Atmospheric Environment - Air Quality and Climate

KITSAULT MINE PROJECT

ENVIRONMENTAL ASSESSMENTATMOSPHERIC ENVIRONMENT – AIR QUALITY AND CLIMATE

Version 1.0

Page 6.2-35VE51988 – Section 6.2 December 2011

In the proposed Project, climate change is addressed in broad terms because no suitable computer models are available to calculate the climate change rates using model input data specific to the proposed Project associated with a relatively small-scale mining and processing operation extracting mineral deposits. Only emissions of GHG have been quantitatively estimated based on predicted consumptions of diesel fuel.

Biological studies and ecological modelling related to climate change are beginning globally, but considerable work remains to be done. In some cases, the potential effects from climate change may be large enough to drastically change conclusions of the EA, but further study is still needed to determine what types of systems and projects are the most vulnerable. One of the strong points of the EA process is the consistent manner used to assess the significance of impacts. The assessment of magnitude, duration, and likelihood are largely unchanged by incorporating climate change into the process.

6.2.3.3 Detailed Baseline Description for Climate

Current regional climate within the proposed Project area can be inferred from limited observations at the mine site and long-term observations at the nearest meteorological stations such as Germansen Landing, Fort St. James, and Babine Lake-Pinkut Creek. These observations indicate the following:

1. Prevailing winds in the stations area are from the south and southwest, with south and southeast winds more common in winter; and west, southwest, and northeast winds more common in summer.

2. Hourly wind speeds in the 0.0 to 10.3 metres per second (m/s) range prevail, with few winds over 9.0 m/s. Monthly median speeds range from 1.8 to 2.6 m/s. The maximum gusts in excess of 9.0 m/s occurred on 28 of 260 days, with the strongest gusts usually coming from the west or north.

3. Median ambient temperatures range from a low of about –12.5 degrees Celcius (°C) in February to about 14.3°C in July.

4. Atmospheric stability (as indicated by the difference in temperatures measured 2 m and 10 m above the grade, net radiation, and solar radiation) follows a diurnal cycle with stable conditions occurring during the night and unstable conditions occurring during the day. Unstable conditions occur more frequently in spring and summer.

The most relevant nearest weather station operated by EC with 30-year meteorological data is located in Prince Rupert. The annual averages are summarised as follows:

Temperature: 7.1oC;

Precipitation rainfall: 2,468 millimetres per annum (mm/a);

Precipitation snowfall: 126 centimetres per annum (cm/a);

Wind speed: 13.1 km/h (3.6 m/s);

Wind most frequent direction: southeast (SE);

Page 45: Section 6.2 Atmospheric Environment - Air Quality and Climate

KITSAULT MINE PROJECT

ENVIRONMENTAL ASSESSMENTATMOSPHERIC ENVIRONMENT – AIR QUALITY AND CLIMATE

Version 1.0

Page 6.2-36VE51988 – Section 6.2 December 2011

Percent of possible daylight hours: 25.8;

Relative humidity 0600 LST: 88.6%;

Relative humidity 1500 LST: 75.3%; and

Sea-level pressure: 101.3 kilopascals (kPa).

The comprehensive monitoring results collected at that station from 1971 to 2000 is shown in Appendix 6.2-E.

A short-term (2009-2010) monitoring of weather elements by the Kitsault climate station reveals the following key findings:

The mean annual temperature is estimated to be 3.2 °C, with minimum and maximum mean monthly temperatures of -6.0 °C and 11.6 °C occurring in January and July respectively;

The mean annual wind speed is approximately 1.9 m/s;

The mean annual relative humidity is approximately 81%;

The mean annual lake evaporation (potential evapotranspiration) is estimated to be 450 millimetres (mm); and

The mean annual precipitation is estimated to be 2000 mm, with 45% falling as rain and 55% falling as snow.

6.2.3.4 Cultural, Ecological, or Community Knowledge

Desk-based research was conducted to identify the Nisga’a Nation’s and Aboriginal groups’ rights, interests, and values related to climate; however, none was available from public, secondary sources. Ongoing future consultation and engagement activities and data collection efforts in collaboration with the Nisga’a Nation may result in additional information and understanding during the Application review period.

6.2.3.5 Past, Present or Future Projects / Activities

Tables 6.2.2-3, 6.2.2-4, and 6.2.2-5 present a review of the historical land use, general land use and reasonably foreseeable projects, respectively that have been identified within the CESA. Although there are several hydropower projects proposed in the area (e.g., Alice Arm, Upper Kitsault Valley, and Kitsault River / Homestake Creek), available information indicates that these projects will not proceed in the foreseeable future.

6.2.3.6 Potential Effects of the Proposed Project and Proposed Mitigation

The following general guidelines addressing climate change associated with GHG emissions and global warming have been collected and are presented below:

“Practitioner’s Guide to Incorporating Climate Change into the Environmental Impact Assessment Process” (ClimAdapt 2003);

“Climate Change Considerations in Environmental Assessment” (Agency 2003);

Page 46: Section 6.2 Atmospheric Environment - Air Quality and Climate

KITSAULT MINE PROJECT

ENVIRONMENTAL ASSESSMENTATMOSPHERIC ENVIRONMENT – AIR QUALITY AND CLIMATE

Version 1.0

Page 6.2-37VE51988 – Section 6.2 December 2011

“The World Bank Handbook on Greenhouse Gas Assessment for assessing the project-level greenhouse gas emissions in World Bank funded projects” (World Bank 1998); and

“Towards Sustainable Mining: Energy Use and GHG Emissions Management Assessment Protocol” (Mining Association of Canada (MAC) 2010).

6.2.3.6.1 Identification and Analysis of Potential Project Effects

Potential directly measurable effects of the proposed Project on climate change are unlikely. To find the Kitsault climate trends, a long-term monitoring of weather parameters is required. The monitoring of meteorology data by the Kitsault Meteorology Station would continue throughout the proposed Project lifetime and the post-closure period. This monitoring would include five monthly snow course surveys as necessary at the height of the snowpack to characterise site conditions for an EA Application.

As shown in Section 6.2.2, predicted proposed Project emissions would be low due to the absence of major emission sources. It is therefore unlikely that predicted proposed Project emissions would cause measurable changes to the climate, even within the Alice Arm / Kitsault airshed area. However, the proposed Project would contribute to the GHG inventory for the Province of BC and Canada contributing to global warming.

Based on diesel fuel consumption by the proposed Project equipment, the emission rates of GHG (methane / carbon dioxide (CH4 / CO2) and NO2) have been calculated and analysed with reference to provincial and Canadian inventories and Canada’s international obligations. As detailed in Section 6.2.2, the total annual GHG emissions resulting from the combustion of diesel fuel would be 35.845 kilotonnes (kt) of CO2 equivalent. Under the Greenhouse Gas Reductions Target Act, the BC government made a legally binding commitment to reduce GHG emissions by at least 33% by 2020 and 80% by 2050 below the 2007 level (BC MOE 2010). Total Provincial GHG emissions in 2008 were 68.7 million tonnes (Mt) and in Canada they were 263 Mt. Predicted Project annual contribution to the BC inventory will be 0.0522% and 0.0136% of Canadian GHG emissions.

GHG emissions from the proposed Project sources would contribute to CO2 assimilation through plants and to global warming, which are both identified as indirect Project effects. This contribution is shown in Table 6.2.3-1.

Page 47: Section 6.2 Atmospheric Environment - Air Quality and Climate

KITSAULT MINE PROJECT

ENVIRONMENTAL ASSESSMENTATMOSPHERIC ENVIRONMENT – AIR QUALITY AND CLIMATE

Version 1.0

Page 6.2-38VE51988 – Section 6.2 December 2011

Table 6.2.3-1: Potential Indirect Project Effects on Other Valued Components

Direct Project Effect (Adverse or

Positive)

Project Phase

Potential Indirect Project Effect

Carry Forward

(yes / no) Rationale

Climate Change C, O, D/C, PC CO2 assimilation in plants Yes Plant metabolism

Global warming Yes Scientific evidence of global warming

Project phase: C - construction; O - operations; D/C - decommissioning and closure; PC - post-closure

Note: CO2 - carbon dioxide

A potential interaction between direct measurable effects of the proposed Project on other VCs and climate change is unlikely.

6.2.3.6.2 Mitigation Measures

In general, air quality and climate change are treated as separate issues in national and international policies, even though most practices and technologies that would reduce GHG emissions would also cause a net reduction of emissions of air pollutants. However, air pollutant reduction measures do not always reduce GHG emissions, as many require the use of additional energy (State and Territorial Air Pollution Program Administrators / Association of Local Air Pollution Control Officials (STAPPA / ALAPCO) 1999).

Potential methods to minimise climate change are shown in Table 6.2.3-2.

Table 6.2.3-2: Potential Project Effect by Project Phase on Climate and Mitigation Measures

Project Effect Project Phase

Mitigation / Enhancement Measure Mitigation Success

Rating

Climate change from GHG emissions and energy demand

C, O Using modern construction / mining equipment that meets latest applicable Canadian emissions standards

Medium prevention / reduction

C, O Ensuring proper equipment maintenance Medium prevention / reduction

C, O Limiting vehicle and construction equipment idling and optimise vehicle movement

Low prevention / reduction

C, O Implement 3Rs (reduce, reuse, recycle) Low prevention

C Construct energy-efficient buildings - may reduce energy consumption by 25%

High reduction

O, D/C, PC Re-vegetating the parts of the mine site that will not be disturbed in the future

Medium to high prevention / reduction

C, D/C, PC Avoid de-forestation and re-establish lost forest at the Project footprint area

Medium to high prevention / reduction

Project phase: C - construction; D/C - decommissioning and closure; O - operations; PC - post-closure

Page 48: Section 6.2 Atmospheric Environment - Air Quality and Climate

KITSAULT MINE PROJECT

ENVIRONMENTAL ASSESSMENTATMOSPHERIC ENVIRONMENT – AIR QUALITY AND CLIMATE

Version 1.0

Page 6.2-39VE51988 – Section 6.2 December 2011

6.2.3.7 Potential Residual Effects and Their Significance

6.2.3.7.1 Potential Residual Effects After Mitigation

A residual effect is any measurable or demonstrable environmental effect remaining after mitigation. Taking into account the vast size of the atmosphere in the climate study area as compared to predicted size of CO2 emissions from the proposed Project sources, it can be expected that residual effects of climate change would neither be measurable nor demonstrable. No measurable residual effects are anticipated.

6.2.3.8 Potential Cumulative Effects

6.2.3.8.1 Identification and Analysis of Potential Project Cumulative Effects

The CEA includes all of the existing, approved, and planned projects and activities in the region. At this time, existing and anticipated projects include small-scale developments such as mining, transmission line, hydroelectric plant, and numerous explorations. It is unlikely that these projects would emit large quantities of greenhouse gases; therefore, their residual effects, combined with residual effect of the proposed Project, are not carried forward into the CEA.

6.2.3.9 Conclusion

Current regional climate within the proposed Project area can be inferred from limited observations at the mine site and long-term observations at nearest meteorological stations such as Germansen Landing, Fort St. James, Mackenzie, and Babine Lake / Pinkut Creek. A comprehensive 30-year climate data report, collected by EC is available for Prince Rupert, which is the nearest location, approximately 140 km south-southwest of the proposed Project, where long-term meteorological observations have been recorded.

GHG from mobile and stationary diesel-powered equipment serving the Project contribute to the global greenhouse effect with the annual GHG estimated at 35.845 kt of CO2 equivalent.

Long-term monitoring of meteorological parameters during the lifetime of the proposed Project and beyond at the proposed Project site and the nearest EC weather stations would be carried out to assess trends in climate change.