SD PUC EPACT 2005 PURPA Standards Workshop DG Interconnection Jeff Rud – Power Supply Specialist East River Electric Power Cooperative
13

SD PUC EPACT 2005 PURPA Standards Workshop DG …

Jan 16, 2022

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: SD PUC EPACT 2005 PURPA Standards Workshop DG …

SD PUC EPACT 2005PURPA Standards Workshop

DG Interconnection

Jeff Rud – Power Supply SpecialistEast River Electric Power Cooperative

Page 2: SD PUC EPACT 2005 PURPA Standards Workshop DG …

East River Electric Power Cooperative Membership Area

21 Member Systems

84,000 retail accounts

36,000 square miles

Page 3: SD PUC EPACT 2005 PURPA Standards Workshop DG …

Bulk Power Supply

70% Basin“All Requirements”

30% WAPA

Page 4: SD PUC EPACT 2005 PURPA Standards Workshop DG …

Integrated System

• Basin Electric’s high voltage transmission system– 2,400 miles– Integrated with

Western Area Power Administration

– Together there are more than 10,000 miles of transmission

Page 5: SD PUC EPACT 2005 PURPA Standards Workshop DG …

East River Transmission System

• 2600 miles of transmission line

• 212 substations• Connect East

River’s 21 member distribution systems to the Integrated System

Page 6: SD PUC EPACT 2005 PURPA Standards Workshop DG …

DG Interconnection

What is Covered -• Customer-owned generation• Grid connected• Emergency backup generators that

operate disconnected from the electrical grid excluded

Page 7: SD PUC EPACT 2005 PURPA Standards Workshop DG …

History

• WAPA “Behind the meter generation policy” set rules for interconnection to the Basin-WAPA Integrated System

• 2001 - DG rates for customer-owned generation • 2002 - East River DG Interconnection materials

jointly developed with member systems– NRECA DG Toolkit– MN DG Interconnection– ER Member Sioux Valley Energy - lead role

Page 8: SD PUC EPACT 2005 PURPA Standards Workshop DG …

DG Interconnection Requirements Overview

• Introduction• Interconnection Approval Process• General Rules, Rights and Obligations• Technical Requirements• Protective Devices and Systems• Metering (WAPA Meter policy also

applies)• Certification and Testing Criteria

Page 9: SD PUC EPACT 2005 PURPA Standards Workshop DG …

DG Interconnection Requirements Overview

• Same requirements for any device producing electrical energy

• Familiar to DG Equipment vendors• References Existing Industry Standards

– Power Quality – IEEE 519– DG Interconnection IEEE 1547– Grounding , Surge Withstand, Protection

• Approved by member distribution cooperative engineers

Page 10: SD PUC EPACT 2005 PURPA Standards Workshop DG …

Oak LaneColony160 kW

Customer-Owned DG Projects - Wind

16 Small Wind Turbines10 to 39 kW

Pipestone School750 kW

Page 11: SD PUC EPACT 2005 PURPA Standards Workshop DG …

Customer-Owned DG Projects - Biomass

• 2,400 cow dairy• Anaerobic digester• 375 kW bio-gas generator• Base load generation

Page 12: SD PUC EPACT 2005 PURPA Standards Workshop DG …

Customer-Owned DG Projects – Peaking Resources

• 2000 kW emergency backup generator at ethanol plant

• Grid connected with paralleling switchgear

Page 13: SD PUC EPACT 2005 PURPA Standards Workshop DG …

Lessons Learned

• DG Equipment Vendors are familiar, BUT– May want the utility to adjust their protective

systems to accommodate their product• Customers/Do-It-Yourselfers with small

generation may be intimidated• Standard Document for all ER member

systems valuable• Large base-load DG can have special

needs