Top Banner
DD preliminary issue COPYRIGHT All rights reserved. This work is copyright and cannot be reproduced or copied in any form or by any means (graphic, electronic or mechanical, including photocopying) without the written permission of STEA astute architecture. Any licence, express or implied, to use the document for any purpose whatsoever is restricted to the terms of the agreement or implied agreement with STEA astute architecture. DIMENSIONS Use figured dimensions only. DO NOT SCALE. Check all dimensions on site prior to fabrication or setout. project details job no. stage dwg no. revision original sheet size A1 [594 x 841mm] scale @ A1 issue date amendments sheet setup date dwg authors project leader date authorised for issue by project leader signature date issue description auth proj ldr checked by input project leader name in titleblock Ground Floor, 25 River St PO Box 758 Mackay, QLD. 4740 T (07) 4957 7341 E [email protected] W www.stea.com.au 31/10/2018 9:46:24 AM 31.10.18 5 Scone Airport Aviation Attraction and Terminal COVER SHEET & DRAWING LIST 8322 A 00-01 Author Bunnan Road, Scone NSW 2337 A 00-00 DRAWING LIST SHEET NUMBER SHEET NAME REVISION Current Revision Date A 00-01 COVER SHEET & DRAWING LIST 5 31.10.18 A 00-02 LEGENDS SHEET 5 31.10.18 A 01-02 SITE PLAN 4 31.10.18 A 01-03 SITE GRID SETOUT PLAN 3 31.10.18 A 01-21 OVERALL FLOOR PLAN GROUND 5 31.10.18 A 01-22 OVERALL FLOOR PLAN LEVEL 1 5 31.10.18 A 02-10 STAGE 1 WORKS - VIEW 3 31.10.18 A 02-11 GENERAL ARRANGEMENT PLAN GROUND PART 1 STAGE 1 3 31.10.18 A 02-12 GENERAL ARRANGEMENT PLAN GROUND PART 2 STAGE 1 3 31.10.18 A 02-13 GENERAL ARRANGEMENT PLAN LEVEL 1 PART 1 STAGE 1 3 31.10.18 A 02-14 GENERAL ARRANGEMENT PLAN LEVEL 1 PART 2 STAGE 1 3 31.10.18 A 02-15 GENERAL ARRANGEMENT ROOF PLAN PART 1 STAGE 1 3 31.10.18 A 02-16 GENERAL ARRANGEMENT ROOF PLAN PART 2 STAGE 1 3 31.10.18 A 02-21 GENERAL ARRANGEMENT PLAN GROUND PART 1 5 31.10.18 A 02-22 GENERAL ARRANGEMENT PLAN GROUND PART 2 5 31.10.18 A 02-23 GENERAL ARRANGEMENT PLAN CARPARK 5 31.10.18 A 02-24 GENERAL ARRANGEMENT PLAN LEVEL 1 PART 1 5 31.10.18 A 02-25 GENERAL ARRANGEMENT PLAN LEVEL 1 PART 2 5 31.10.18 A 02-26 GENERAL ARRANGEMENT ROOF PLAN PART 1 5 31.10.18 A 02-27 GENERAL ARRANGEMENT ROOF PLAN PART 2 5 31.10.18 A 03-00 SLAB SETOUT PLAN GROUND PART 1 STAGE 1 3 31.10.18 A 03-01 SLAB SETOUT PLAN GROUND PART 1 5 31.10.18 A 03-02 SLAB SETOUT PLAN GROUND PART 2 5 31.10.18 A 03-03 SLAB SETOUT PLAN LEVEL 1 PART 1 3 31.10.18 A 03-04 SLAB SETOUT PLAN LEVEL 1 PART 2 5 31.10.18 A 03-31 PARTITION SETOUT PLAN GROUND PART 1 5 31.10.18 A 03-32 PARTITION SETOUT PLAN GROUND PART 2 5 31.10.18 A 03-33 PARTITION SETOUT PLAN LEVEL 1 PART 1 5 31.10.18 A 03-34 PARTITION SETOUT PLAN LEVEL 1 PART 2 5 31.10.18 A 04-01 REFLECTED CEILING PLAN GROUND PART 1 5 31.10.18 A 04-01A REFLECTED CEILING PLAN GROUND PART 1 1_50 3 31.10.18 A 04-02 REFLECTED CEILING PLAN GROUND PART 2 5 31.10.18 A 04-03 REFLECTED CEILING PLAN LEVEL 1 PART 1 5 31.10.18 A 04-03A REFLECTED CEILING PLAN LEVEL 1 PART 1 1_50 3 31.10.18 A 04-04 REFLECTED CEILING PLAN LEVEL 1 PART 2 5 31.10.18 A 05-01 FLOOR & WALL FINISHES PLAN GROUND PART 1 5 31.10.18 A 05-02 FLOOR & WALL FINISHES PLAN GROUND PART 2 5 31.10.18 A 05-03 FLOOR & WALL FINISHES PLAN LEVEL 1 PART 1 5 31.10.18 A 05-04 FLOOR & WALL FINISHES PLAN LEVEL 1 PART 2 5 31.10.18 A 06-01 BUILDING ELEVATIONS 5 31.10.18 A 07-01 BUILDING SECTION 1 & 2 5 31.10.18 A 07-02 BUILDING SECTION 3 & 4 5 31.10.18 A 07-03 BUILDING SECTION 5 5 31.10.18 A 07-04 BUILDING SECTION 7 & 8 5 31.10.18 A 09-01 WALL TYPES 4 31.10.18 A 09-20 DETAIL SECTION SHEET 1 5 31.10.18 A 09-21 DETAIL SECTION SHEET 2 5 31.10.18 A 09-22 DETAIL SECTION SHEET 3 5 31.10.18 A 09-23 DETAIL SECTION WALLS 4 31.10.18 A 09-24 BULKHEAD DETAIL 1 31.10.18 A 09-40 DETAIL FRONT CLADDING SETOUT ELEVATIONS 4 31.10.18 A 09-50 HANGAR DOOR DETAILS 3 31.10.18 A 10-01 STAIR 1 PLANS & SECTIONS 5 31.10.18 A 10-02 STAIR 2 PLANS & SECTIONS 5 31.10.18 A 10-03 STAIR 3 & 4 PLANS & SECTIONS 5 31.10.18 A 10-04 STAIR DETAILS 5 31.10.18 A 10-05 STAIR 5 & 6 PLANS & SECTIONS 1 31.10.18 A 10-61 LIFT 1 PLANS & SECTIONS 5 31.10.18 A 11-00 AMENITIES STATUTORY SIGNAGE LOCATION PLANS 2 31.10.18 A 11-01 WET AREAS DETAILS SHEET 1 5 31.10.18 A 11-02 WET AREAS DETAILS SHEET 2 5 31.10.18 A 11-03 WET AREAS DETAILS SHEET 3 5 31.10.18 A 11-04 WET AREAS DETAILS SHEET 4 5 31.10.18 A 11-05 WET AREAS DETAILS SHEET 5 5 31.10.18 A 11-06 WET AREAS DETAILS SHEET 6 5 31.10.18 A 14-01 INTERNAL JOINERY DETAILS SHEET 1 4 31.10.18 A 15-01 DOOR SCHEDULE 4 31.10.18 A 15-20 DOOR DETAILS TYPICAL CIRCULATION AS1428.1_2009 5 31.10.18 A 16-01 WINDOW & LOUVRE LOCATIONS GROUND & LEVEL 1 5 31.10.18 A 16-51 WINDOW & LOUVRE ELEVATIONS SHEET 1 5 31.10.18 A 16-52 WINDOW & LOUVRE ELEVATIONS SHEET 2 3 31.10.18 A 16-53 WINDOW & LOUVRE ELEVATIONS SHEET 3 3 31.10.18 A 21-01 FINISHES DETAILS SHEET 1 4 31.10.18 Scone Airport Aviation Attraction and Terminal 19.06.18 1 PRELIM ISSUE 22.06.18 2 ISSUED FOR FINAL CLIENT REVIEW 24.08.18 3 PRE TENDER ISSUE FOR FINAL REVIEW 28.08.18 4 PRE TENDER ISSUE 31.10.18 5 TENDER ISSUE
13

Scone Airport Aviation Attraction and Terminal€¦ · project leader date authorised for issue by project leader signature date issue description auth proj ldr checked by input project

Jul 28, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Scone Airport Aviation Attraction and Terminal€¦ · project leader date authorised for issue by project leader signature date issue description auth proj ldr checked by input project

DD

preliminary issueCOPYRIGHT

All rights reserved. This work is copyright and cannot be reproduced or copied in any form or by any means

(graphic, electronic or mechanical, including photocopying) without the written permission of STEA

astute architecture. Any licence, express or implied, to use the document for any purpose whatsoever is restricted to the terms of the agreement or implied

agreement with STEA astute architecture.

DIMENSIONSUse figured dimensions only. DO NOT SCALE. Check all dimensions on

site prior to fabrication or setout.

project details

job no.

stage

dwg no. revision

original sheet size A1 [594 x 841mm]

scale @ A1issue date

amendments

sheet setup date

dwg authors

project leader

date

authorised for issue by project leader

signature

date issue description auth proj ldrchecked by

input project leader name in titleblock

Ground Floor, 25 River St

PO Box 758

Mackay, QLD. 4740

T (07) 4957 7341

E [email protected]

W www.stea.com.au

31/10/2018 9:46:24 AM

31.10.18

5

Scone Airport Aviation Attraction and Terminal

COVER SHEET & DRAWING LIST

8322 A 00-01

AuthorBunnan Road, Scone NSW 2337

A 00-00 DRAWING LIST

SHEET NUMBER SHEET NAME REVISIONCurrent Revision

Date

A 00-01 COVER SHEET & DRAWING LIST 5 31.10.18

A 00-02 LEGENDS SHEET 5 31.10.18

A 01-02 SITE PLAN 4 31.10.18

A 01-03 SITE GRID SETOUT PLAN 3 31.10.18

A 01-21 OVERALL FLOOR PLAN GROUND 5 31.10.18

A 01-22 OVERALL FLOOR PLAN LEVEL 1 5 31.10.18

A 02-10 STAGE 1 WORKS - VIEW 3 31.10.18

A 02-11 GENERAL ARRANGEMENT PLAN GROUND PART 1 STAGE 1 3 31.10.18

A 02-12 GENERAL ARRANGEMENT PLAN GROUND PART 2 STAGE 1 3 31.10.18

A 02-13 GENERAL ARRANGEMENT PLAN LEVEL 1 PART 1 STAGE 1 3 31.10.18

A 02-14 GENERAL ARRANGEMENT PLAN LEVEL 1 PART 2 STAGE 1 3 31.10.18

A 02-15 GENERAL ARRANGEMENT ROOF PLAN PART 1 STAGE 1 3 31.10.18

A 02-16 GENERAL ARRANGEMENT ROOF PLAN PART 2 STAGE 1 3 31.10.18

A 02-21 GENERAL ARRANGEMENT PLAN GROUND PART 1 5 31.10.18

A 02-22 GENERAL ARRANGEMENT PLAN GROUND PART 2 5 31.10.18

A 02-23 GENERAL ARRANGEMENT PLAN CARPARK 5 31.10.18

A 02-24 GENERAL ARRANGEMENT PLAN LEVEL 1 PART 1 5 31.10.18

A 02-25 GENERAL ARRANGEMENT PLAN LEVEL 1 PART 2 5 31.10.18

A 02-26 GENERAL ARRANGEMENT ROOF PLAN PART 1 5 31.10.18

A 02-27 GENERAL ARRANGEMENT ROOF PLAN PART 2 5 31.10.18

A 03-00 SLAB SETOUT PLAN GROUND PART 1 STAGE 1 3 31.10.18

A 03-01 SLAB SETOUT PLAN GROUND PART 1 5 31.10.18

A 03-02 SLAB SETOUT PLAN GROUND PART 2 5 31.10.18

A 03-03 SLAB SETOUT PLAN LEVEL 1 PART 1 3 31.10.18

A 03-04 SLAB SETOUT PLAN LEVEL 1 PART 2 5 31.10.18

A 03-31 PARTITION SETOUT PLAN GROUND PART 1 5 31.10.18

A 03-32 PARTITION SETOUT PLAN GROUND PART 2 5 31.10.18

A 03-33 PARTITION SETOUT PLAN LEVEL 1 PART 1 5 31.10.18

A 03-34 PARTITION SETOUT PLAN LEVEL 1 PART 2 5 31.10.18

A 04-01 REFLECTED CEILING PLAN GROUND PART 1 5 31.10.18

A 04-01A REFLECTED CEILING PLAN GROUND PART 1 1_50 3 31.10.18

A 04-02 REFLECTED CEILING PLAN GROUND PART 2 5 31.10.18

A 04-03 REFLECTED CEILING PLAN LEVEL 1 PART 1 5 31.10.18

A 04-03A REFLECTED CEILING PLAN LEVEL 1 PART 1 1_50 3 31.10.18

A 04-04 REFLECTED CEILING PLAN LEVEL 1 PART 2 5 31.10.18

A 05-01 FLOOR & WALL FINISHES PLAN GROUND PART 1 5 31.10.18

A 05-02 FLOOR & WALL FINISHES PLAN GROUND PART 2 5 31.10.18

A 05-03 FLOOR & WALL FINISHES PLAN LEVEL 1 PART 1 5 31.10.18

A 05-04 FLOOR & WALL FINISHES PLAN LEVEL 1 PART 2 5 31.10.18

A 06-01 BUILDING ELEVATIONS 5 31.10.18

A 07-01 BUILDING SECTION 1 & 2 5 31.10.18

A 07-02 BUILDING SECTION 3 & 4 5 31.10.18

A 07-03 BUILDING SECTION 5 5 31.10.18

A 07-04 BUILDING SECTION 7 & 8 5 31.10.18

A 09-01 WALL TYPES 4 31.10.18

A 09-20 DETAIL SECTION SHEET 1 5 31.10.18

A 09-21 DETAIL SECTION SHEET 2 5 31.10.18

A 09-22 DETAIL SECTION SHEET 3 5 31.10.18

A 09-23 DETAIL SECTION WALLS 4 31.10.18

A 09-24 BULKHEAD DETAIL 1 31.10.18

A 09-40 DETAIL FRONT CLADDING SETOUT ELEVATIONS 4 31.10.18

A 09-50 HANGAR DOOR DETAILS 3 31.10.18

A 10-01 STAIR 1 PLANS & SECTIONS 5 31.10.18

A 10-02 STAIR 2 PLANS & SECTIONS 5 31.10.18

A 10-03 STAIR 3 & 4 PLANS & SECTIONS 5 31.10.18

A 10-04 STAIR DETAILS 5 31.10.18

A 10-05 STAIR 5 & 6 PLANS & SECTIONS 1 31.10.18

A 10-61 LIFT 1 PLANS & SECTIONS 5 31.10.18

A 11-00 AMENITIES STATUTORY SIGNAGE LOCATION PLANS 2 31.10.18

A 11-01 WET AREAS DETAILS SHEET 1 5 31.10.18

A 11-02 WET AREAS DETAILS SHEET 2 5 31.10.18

A 11-03 WET AREAS DETAILS SHEET 3 5 31.10.18

A 11-04 WET AREAS DETAILS SHEET 4 5 31.10.18

A 11-05 WET AREAS DETAILS SHEET 5 5 31.10.18

A 11-06 WET AREAS DETAILS SHEET 6 5 31.10.18

A 14-01 INTERNAL JOINERY DETAILS SHEET 1 4 31.10.18

A 15-01 DOOR SCHEDULE 4 31.10.18

A 15-20 DOOR DETAILS TYPICAL CIRCULATION AS1428.1_2009 5 31.10.18

A 16-01 WINDOW & LOUVRE LOCATIONS GROUND & LEVEL 1 5 31.10.18

A 16-51 WINDOW & LOUVRE ELEVATIONS SHEET 1 5 31.10.18

A 16-52 WINDOW & LOUVRE ELEVATIONS SHEET 2 3 31.10.18

A 16-53 WINDOW & LOUVRE ELEVATIONS SHEET 3 3 31.10.18

A 21-01 FINISHES DETAILS SHEET 1 4 31.10.18

Scone Airport Aviation Attraction and Terminal

19.06.18 1 PRELIM ISSUE

22.06.18 2 ISSUED FOR FINAL CLIENTREVIEW

24.08.18 3 PRE TENDER ISSUE FORFINAL REVIEW

28.08.18 4 PRE TENDER ISSUE

31.10.18 5 TENDER ISSUE

Page 2: Scone Airport Aviation Attraction and Terminal€¦ · project leader date authorised for issue by project leader signature date issue description auth proj ldr checked by input project

PROPOSED CARPARK

PROPOSED AVIATION

ATTRACTION HANGER

PROPOSED TERMINAL

BUNNAN ROAD

WALTER PYE AVENUE

SITE BOUNDARY

SITE BOUNDARY

SITE BOUNDARY

DD

preliminary issueCOPYRIGHT

All rights reserved. This work is copyright and cannot be reproduced or copied in any form or by any means

(graphic, electronic or mechanical, including photocopying) without the written permission of STEA

astute architecture. Any licence, express or implied, to use the document for any purpose whatsoever is restricted to the terms of the agreement or implied

agreement with STEA astute architecture.

DIMENSIONSUse figured dimensions only. DO NOT SCALE. Check all dimensions on

site prior to fabrication or setout.

project details

job no.

stage

dwg no. revision

original sheet size A1 [594 x 841mm]

scale @ A1issue date

amendments

sheet setup date

dwg authors

project leader

date

authorised for issue by project leader

signature

date issue description auth proj ldrchecked by

input project leader name in titleblock

Ground Floor, 25 River St

PO Box 758

Mackay, QLD. 4740

T (07) 4957 7341

E [email protected]

W www.stea.com.au 1 : 400

31/10/2018 9:46:26 AM

31.10.18

4

Scone Airport Aviation Attraction and Terminal

SITE PLAN

8322 A 01-02

AuthorBunnan Road, Scone NSW 2337

0

SCALE 1:

5 m

100

4321

SCALE 1 : 400A 06-01

SITE PLAN1

LOCALITY PLAN

N

22.06.18 1 ISSUED FOR FINAL CLIENTREVIEW

24.08.18 2 PRE TENDER ISSUE FORFINAL REVIEW

28.08.18 3 PRE TENDER ISSUE

31.10.18 4 TENDER ISSUE

Page 3: Scone Airport Aviation Attraction and Terminal€¦ · project leader date authorised for issue by project leader signature date issue description auth proj ldr checked by input project

UP

1

1

F F

2

2

H H

3

3

4

4

5

5

6

6

7

7

8

8

9

9

10

10

11

11

12

12

13

13

14

14

C C

A A

15

15

A 07-01

1

A 07-01

1

A 07-02

3

A 07-02

3

A 07-02

4

A 07-02

4

A 07-03

5

A 07-03

5

4A 06-01

1A 06-01

2A 06-01

3A 06-01

G G

E E

D D

B B

ZA 09-50

TERMINALARO

COMMS.MALE

9.32 m²FEMALE

PWD

ENTRANCE FOYER

OUTDOOR SERVICE AREA

ADMIN.

OFFICE

CAFE

THEATRE

STORE 1

STORE 2

STORE 3

HANGAR

64180

48000

LINE OF ROOF ABOVE LINE OF ROOF ABOVE

LINE OF ROOF ABOVE

LIN

E O

F R

OO

F A

BO

VE

LINE OF ROOF ABOVE

LINE OF ROOF ABOVE

LINE OF ROOF ABOVE

LINE OF ROOF ABOVE

LIN

E O

F R

OO

F A

BO

VE

LIN

E O

F R

OO

F A

BO

VE

LIN

E O

F R

OO

F A

BO

VE

SCONE AIRPORT FRONT

SIGN TO LANDSCAPE

ARCHITECTS DRAWINGS

A 07-01

2

A 07-01

2

DD

preliminary issueN

COPYRIGHT

All rights reserved. This work is copyright and cannot be reproduced or copied in any form or by any means

(graphic, electronic or mechanical, including photocopying) without the written permission of STEA

astute architecture. Any licence, express or implied, to use the document for any purpose whatsoever is restricted to the terms of the agreement or implied

agreement with STEA astute architecture.

DIMENSIONSUse figured dimensions only. DO NOT SCALE. Check all dimensions on

site prior to fabrication or setout.

project details

job no.

stage

dwg no. revision

original sheet size A1 [594 x 841mm]

scale @ A1issue date

amendments

sheet setup date

dwg authors

project leader

date

authorised for issue by project leader

signature

date issue description auth proj ldrchecked by

input project leader name in titleblock

Ground Floor, 25 River St

PO Box 758

Mackay, QLD. 4740

T (07) 4957 7341

E [email protected]

W www.stea.com.au 1 : 200

31/10/2018 9:46:30 AM

31.10.18

5

Scone Airport Aviation Attraction and Terminal

OVERALL FLOOR PLAN GROUND

8322 A 01-21

Author

08/21/11Bunnan Road, Scone NSW 2337

0

SCALE 1:

5 m

100

4321

19.06.18 1 PRELIM ISSUE

22.06.18 2 ISSUED FOR FINAL CLIENTREVIEW

24.08.18 3 PRE TENDER ISSUE FORFINAL REVIEW

28.08.18 4 PRE TENDER ISSUE

31.10.18 5 TENDER ISSUE

Page 4: Scone Airport Aviation Attraction and Terminal€¦ · project leader date authorised for issue by project leader signature date issue description auth proj ldr checked by input project

UP

1

1

F F

2

2

H H

3

3

4

4

5

5

6

6

7

7

8

8

9

9

10

10

11

11

12

12

13

13

14

14

C C

A A

15

15

A 07-01

1A 07-02

3A 07-02

4A 07-03

5

4A 06-01

1A 06-01

2A 06-01

3A 06-01

G G

E E

D D

B B

1220

026

0036

0098

0035

0026

0057

00

7200 7200 7200 7200 8000 8000 8000 8000 8000 8000 8000 8000 8000 8000

21.06 m²KITCHEN

FOYER

FUNCTION 1

FUNCTION 2

STORE

STORE

FEMALE PWDMALE

OUTDOOR DECK

PLANT AREA

A 07-01

2

DD

preliminary issueN

COPYRIGHT

All rights reserved. This work is copyright and cannot be reproduced or copied in any form or by any means

(graphic, electronic or mechanical, including photocopying) without the written permission of STEA

astute architecture. Any licence, express or implied, to use the document for any purpose whatsoever is restricted to the terms of the agreement or implied

agreement with STEA astute architecture.

DIMENSIONSUse figured dimensions only. DO NOT SCALE. Check all dimensions on

site prior to fabrication or setout.

project details

job no.

stage

dwg no. revision

original sheet size A1 [594 x 841mm]

scale @ A1issue date

amendments

sheet setup date

dwg authors

project leader

date

authorised for issue by project leader

signature

date issue description auth proj ldrchecked by

input project leader name in titleblock

Ground Floor, 25 River St

PO Box 758

Mackay, QLD. 4740

T (07) 4957 7341

E [email protected]

W www.stea.com.au 1 : 200

31/10/2018 9:46:33 AM

31.10.18

5

Scone Airport Aviation Attraction and Terminal

OVERALL FLOOR PLAN LEVEL 1

8322 A 01-22

Author

08/21/11Bunnan Road, Scone NSW 2337

0

SCALE 1:

5 m

100

4321

19.06.18 1 PRELIM ISSUE

22.06.18 2 ISSUED FOR FINAL CLIENTREVIEW

24.08.18 3 PRE TENDER ISSUE FORFINAL REVIEW

28.08.18 4 PRE TENDER ISSUE

31.10.18 5 TENDER ISSUE

Page 5: Scone Airport Aviation Attraction and Terminal€¦ · project leader date authorised for issue by project leader signature date issue description auth proj ldr checked by input project

DD

preliminary issueCOPYRIGHT

All rights reserved. This work is copyright and cannot be reproduced or copied in any form or by any means

(graphic, electronic or mechanical, including photocopying) without the written permission of STEA

astute architecture. Any licence, express or implied, to use the document for any purpose whatsoever is restricted to the terms of the agreement or implied

agreement with STEA astute architecture.

DIMENSIONSUse figured dimensions only. DO NOT SCALE. Check all dimensions on

site prior to fabrication or setout.

project details

job no.

stage

dwg no. revision

original sheet size A1 [594 x 841mm]

scale @ A1issue date

amendments

sheet setup date

dwg authors

project leader

date

authorised for issue by project leader

signature

date issue description auth proj ldrchecked by

input project leader name in titleblock

Ground Floor, 25 River St

PO Box 758

Mackay, QLD. 4740

T (07) 4957 7341

E [email protected]

W www.stea.com.au

31/10/2018 9:46:34 AM

31.10.18

3

Scone Airport Aviation Attraction and Terminal

STAGE 1 WORKS - VIEW

8322 A 02-10

Author

08/22/18Bunnan Road, Scone NSW 2337

24.08.18 1 PRE TENDER ISSUE FORFINAL REVIEW

28.08.18 2 PRE TENDER ISSUE

31.10.18 3 TENDER ISSUE

Page 6: Scone Airport Aviation Attraction and Terminal€¦ · project leader date authorised for issue by project leader signature date issue description auth proj ldr checked by input project

UP

11

10

9

8

7

6

5

4

3

2

1

21

20

19

18

17

16

15

14

13

12

UP

11 10 9 8 7 6 5 4 3 2 1

21201918171615141312

UP

FB1

FB1

FB2

FB2

FB2

FB2

LSP

LSPRAS

22

1

1

F F

2

2

H H

3

3

4

4

5

5

6

6

7

7

8

8

C C

A A

7200 7200 7200 7200 8000 8000 8000

1220

026

0036

0098

0035

0026

0057

00

A 07-01

1

A 07-01

1

A 07-02

3A 07-02

4

A 07-02

4

A 07-04

1

A 07-04

2

4A 06-01

1A 06-01

7200 7200 7200 7200 8000 8000 8000

1A 11-01

LINE OF CATWALK ABOVE LINE OF CATWALK ABOVE

LIN

E O

F C

AT

WA

LK A

BO

VE

LIN

E O

F C

AT

WA

LK A

BO

VE

LINE OF ROOF ABOVE LINE OF ROOF ABOVE

LINE OF ROOF ABOVE LINE OF ROOF ABOVE

TGSI

1A 11-02

1A 11-03

STAIR 1

1A 10-01

G G

E E

D D

B B

STAIR 2 STAIR 3

1A 10-02 1

A 10-03

1A 10-61

3A 16-51

2A 16-51

1A 16-51

4A 16-51

5A 16-51

6A 16-51

7A 16-51

8A 16-51

9A 16-51

TGSI

FRIDGE

PR

OF

ILE

WA

LL S

HE

ET

ING

PR

OF

ILE

WA

LL S

HE

ET

ING

PR

OF

ILE

WA

LL S

HE

ET

ING

PROFILE WALL SHEETING PROFILE WALL SHEETING PROFILE WALL SHEETING

TILED

FOOTPATH

TILED

FOOTPATH

10A 16-51

1A 09-40

2A 09-40

3A 09-40

2A 21-01

11A 16-51

1A 14-01

TILED

FOOTPATH

TILED

FOOTPATH

MAIN SWITCHBOARD TO

ELECTRICAL ENGINEERS DETAILS & DRAWINGS

DB & COMMS RACK TO

ELECTRICAL ENGINEERS DETAILS & DRAWINGS

PO

LE M

OU

NT

ED

LIG

HT

TO

ELE

CT

RIC

AL

EN

GIN

EE

RS

DE

TA

ILS

& D

RA

WIN

GS

FLO

OR

PO

WE

R B

OX

ES

TO

ELE

CT

RIC

AL

EN

GIN

EE

RS

DE

TA

ILS

& D

RA

WIN

GS

FIP ECP

FIRE FIP & ECP TO FIRE

ENGINEERS DETAILS & DRAWINGS

DP

FNCE 1

1A 16-52

12A 16-51

COL

COL

COL

COL

COL

COL

FNCE 1 3000

3548

LIN

E O

F R

OO

F A

BO

VE

LIN

E O

F R

OO

F A

BO

VE

D.GR.12

D.GR.02

D.G

R.1

1

D.G

R.0

8

D.G

R.0

6

D.G

R.0

4

D.G

R.3

1

D.GR.30

D.GR.19

D.GR.18

D.GR.17 D.G

R.0

7

PROFILE WALL SHEETING

BRE 01 BRE 01

BRE01

BR

E01

BR

E01

BR

E01

D.GR.21

TICKET

OFFICE

D.G

R.1

4

D.GR.03

1.49 m²STORAGE

7.12 m²COMMS.

8.81 m²MALE

7.16 m²PWD

9.32 m²FEMALE

D.GR.01

D.G

R.1

3

D.GR.09

D.GR.10

30.20 m²FOYER

48.88 m²ENTRANCE

36.89 m²AMENITIES' CORRIDOR

12.82 m²ARO

55.14 m²OUTDOOR SERVICE AREA

10.91 m²BIN STORE AREA

24.60 m²THEATRE

22.72 m²ADMIN.

8.97 m²OFFICE

85.43 m²CAFE

COVERED AREA

73.34 m²TERMINAL

D.GR.05RISER

D.GR.20

D.GR.15

D.GR.16

LV3LV3 LV3 LV3BRE 01

D.GR.32

CAFE DESIGN

ONLY INDICATIVE

DESIGN ONLY

INDICATIVE

BOL 1

BOL 1

BOL 1

BOL 1

BOL 1

BOL 1

BOL 1

BOL 1

1500

1500

1500

1500

1500

1500

1500

1500

1500

3100

STAINLESS STEEL

BOLLARD H1200mm

BOL 1

BOL 1

BOL 1

WATERTANKS & CONCRETE

PAD REFER TO HYDRAULIC ENGINEERS DETAILS

WATERTANK

CONCRETE FOOTPATH CONCRETE FOOTPATH

CO

NC

RE

TE

FO

OT

PA

TH

LAN

DC

AP

E Z

ON

E T

O L

AN

DC

SC

AP

E

AR

CH

ITE

CT

S D

RA

WIN

GS

LANDSCAPE ZONE TO LANDSCAPE

ARCHITECTS DRAWINGS

LANDSCAPE ZONE TO LANDSCAPE

ARCHITECTS DRAWINGS

LANDSCAPE ZONE TO LANDSCAPE

ARCHITECTS DRAWINGS

KERB / PRAM RAMP

TO CIVIL ENG.

DETAILS

KERB / PRAM RAMP

TO CIVIL ENG.

DETAILSBOL 1

BOL 1

REFER FOR THE STRUCTURE

TO STAGE 1 WORKS

LANDSCAPE ZONE TO LANDSCAPE

ARCHITECTS DRAWINGS

DPDP

DP DP DP

STAIR 6

A 07-01

2

A 07-01

2

4803

4848

9650

• ALL DRAWINGS ARE TO BE READ IN CONJUNCTION

WITH THE GENERAL NOTES, DWG. A 00-02

• USE FIGURED DIMENSIONS ONLY. DO NOT SCALE

FROM DRAWINGS. CHECK ALL DIMENSIONS ON SITE

BEFORE SETOUT OR FABRICATION.

• THE CONTRACTOR MUST VERIFY AND CHECK ALL

SITE CONDITIONS INCLUDING CEILING HEIGHTS AND

DIMENSIONS BEFORE COMMENCING WORK ON SITE.

GENERAL NOTES

BUILDING ROOF ENCLOSURE - PHASE 1

BUILDING WORKS ENCLOSURE LEGEND

(BY OTHERS)

BRE 01

BRE 02 BUILDING ROOF ENCLOSURE - PHASE 2

BUILDING WALL ENCLOSUREBWE

DD

preliminary issueN

COPYRIGHT

All rights reserved. This work is copyright and cannot be reproduced or copied in any form or by any means

(graphic, electronic or mechanical, including photocopying) without the written permission of STEA

astute architecture. Any licence, express or implied, to use the document for any purpose whatsoever is restricted to the terms of the agreement or implied

agreement with STEA astute architecture.

DIMENSIONSUse figured dimensions only. DO NOT SCALE. Check all dimensions on

site prior to fabrication or setout.

project details

job no.

stage

dwg no. revision

original sheet size A1 [594 x 841mm]

scale @ A1issue date

amendments

sheet setup date

dwg authors

project leader

date

authorised for issue by project leader

signature

date issue description auth proj ldrchecked by

input project leader name in titleblock

Ground Floor, 25 River St

PO Box 758

Mackay, QLD. 4740

T (07) 4957 7341

E [email protected]

W www.stea.com.au 1 : 100

31/10/2018 9:46:43 AM

31.10.18

5

Scone Airport Aviation Attraction and Terminal

GENERAL ARRANGEMENT PLAN GROUND PART 1

8322 A 02-21

AuthorBunnan Road, Scone NSW 2337

0

SCALE 1:

5 m

100

4321

19.06.18 1 PRELIM ISSUE

22.06.18 2 ISSUED FOR FINAL CLIENTREVIEW

24.08.18 3 PRE TENDER ISSUE FORFINAL REVIEW

28.08.18 4 PRE TENDER ISSUE

31.10.18 5 TENDER ISSUE

Page 7: Scone Airport Aviation Attraction and Terminal€¦ · project leader date authorised for issue by project leader signature date issue description auth proj ldr checked by input project

F F

H H

8

8

9

9

10

10

11

11

12

12

13

13

14

14

C C

A A

15

15

A 07-04

1

A 07-04

2

A 07-03

5

A 07-03

5

3A 06-01

8000 8000 8000 8000 8000 8000 8000

TGSI

LINE OF ROOF ABOVE

LINE OF ROOF ABOVE

G G

E E

D D

B B

1220

026

0036

0098

0035

0026

0057

00

PR

OF

ILE

WA

LL S

HE

ET

ING

PROFILE WALL SHEETINGPROFILE WALL SHEETING

PR

OF

ILE

WA

LL S

HE

ET

ING

PROFILE WALL SHEETINGPROFILE WALL SHEETING

PROFILE WALL SHEETING PROFILE WALL SHEETING PROFILE WALL SHEETING

PROFILE WALL SHEETING

6A 16-52

DISTRIBUTION BOARD TO

ELECTRICAL ENGINEERS DETAILS & DRAWINGS

BRE 01BRE 01BRE 01BRE 01

BRE 01BRE 01

BR

E01

BR

E01

BRE01

D.GR.25

D.GR.24 D.GR.29

D.GR.23

D.GR.28

D.GR.22

D.GR.27

HEAL PROOF GRATE TO

HYD. ENGINEERS DETAILS & DRAWINGS

D.GR.26

41.02 m²STORE 2

37.03 m²STORE 1

37.03 m²STORE 3

HANGER

HANGAR DOORS

LV3 LV3 LV3 LV3 LV3 LV3 LV3 LV3 LV3

STAIR 4

WATERTANKS & CONCRETE

PAD REFER TO HYDRAULIC ENGINEERS DETAILS

WATERTANK WATERTANK WATERTANK WATERTANK

WATERTANKS & CONCRETE

PAD REFER TO HYDRAULIC ENGINEERS DETAILS

WATERTANKS & CONCRETE

PAD REFER TO HYDRAULIC ENGINEERS DETAILS

WATERTANKS & CONCRETE

PAD REFER TO HYDRAULIC ENGINEERS DETAILS

CONCRETE PATH

CONCRETE PATH

CO

NC

RE

TE

PA

TH

CO

NC

RE

TE

PA

TH

LINE OF CATWALK ABOVE

REFER FOR THE STRUCTURE TO

STAGE 1 WORKS

LINE OF CATWALK ABOVE

REFER FOR THE STRUCTURE TO

STAGE 1 WORKS

DP

STAIR 5

DP

DP

DP DP DP DP DP DP DP DP

BUILDING ROOF ENCLOSURE - PHASE 1

BUILDING WORKS ENCLOSURE LEGEND

(BY OTHERS)

BRE 01

BRE 02 BUILDING ROOF ENCLOSURE - PHASE 2

BUILDING WALL ENCLOSUREBWE

DD

preliminary issueN

COPYRIGHT

All rights reserved. This work is copyright and cannot be reproduced or copied in any form or by any means

(graphic, electronic or mechanical, including photocopying) without the written permission of STEA

astute architecture. Any licence, express or implied, to use the document for any purpose whatsoever is restricted to the terms of the agreement or implied

agreement with STEA astute architecture.

DIMENSIONSUse figured dimensions only. DO NOT SCALE. Check all dimensions on

site prior to fabrication or setout.

project details

job no.

stage

dwg no. revision

original sheet size A1 [594 x 841mm]

scale @ A1issue date

amendments

sheet setup date

dwg authors

project leader

date

authorised for issue by project leader

signature

date issue description auth proj ldrchecked by

input project leader name in titleblock

Ground Floor, 25 River St

PO Box 758

Mackay, QLD. 4740

T (07) 4957 7341

E [email protected]

W www.stea.com.au 1 : 100

31/10/2018 9:46:45 AM

31.10.18

5

Scone Airport Aviation Attraction and Terminal

GENERAL ARRANGEMENT PLAN GROUND PART 2

8322 A 02-22

AuthorBunnan Road, Scone NSW 2337

0

SCALE 1:

5 m

100

4321

19.06.18 1 PRELIM ISSUE

22.06.18 2 ISSUED FOR FINAL CLIENTREVIEW

24.08.18 3 PRE TENDER ISSUE FORFINAL REVIEW

28.08.18 4 PRE TENDER ISSUE

31.10.18 5 TENDER ISSUE

NOTE: REFER TO A09-01

FOR WALL DETAILS

Page 8: Scone Airport Aviation Attraction and Terminal€¦ · project leader date authorised for issue by project leader signature date issue description auth proj ldr checked by input project

FB2

FB2

FB2

FB2

1

1

C C

A A

A 07-01

1

A 07-04

2

1A 06-01

D D

B B

1220

026

0036

00

LINE OF ROOF ABOVE

LIN

E O

F R

OO

F A

BO

VE

010203040506070809101112131415161718

8000

8000

19

20

21

22

23

24

25

26

27

28

29 30 31 32 33 34 35 36 37 40 41 42 43 44 45 46 47 48 49

5051525354555657585960616263

64 65 66 67 68 69 70 71 72 73 74 75 76 77

TILED

FOOTPATH

TILED

FOOTPATH

TILED

FOOTPATH

8000

8000

CARPARK LEVELS & ROAD TO

CIVIL ENGINEERS DETAILS AND DRAWINGS

CARPARK LEVELS & ROAD TO

CIVIL ENGINEERS DETAILS AND DRAWINGS

CARPARK LEVELS & ROAD TO

CIVIL ENGINEERS DETAILS AND DRAWINGS

CARPARK LEVELS & ROAD TO

CIVIL ENGINEERS DETAILS AND DRAWINGS

TY

PIC

AL

5400

TY

PIC

AL

5400

TYPICAL

2500

COL

POLE MOUNTED LIGHT

TO ELECTRICAL

ENGINEERS DETAILS &

DRAWINGS

POLE MOUNTED LIGHT TO

ELECTRICAL ENGINEERS

DETAILS & DRAWINGS

KERB RAMP TO

AS1428,1

BOL

SITE BOUNDARY

SITE BOUNDARY

STAINLESS STEEL BOLLARDS WITH SOCKET

OUTLETS FOR EVENTS DAYS TO ELECTRICAL

ENGINEERS DETAILS & SPECIFICATION.

LAN

DS

CA

PE

ZO

NE

TO

LA

ND

SC

AP

E

AR

CH

ITE

CT

S D

RA

WIN

GS

LAN

DS

CA

PE

ZO

NE

TO

LAN

DS

CA

PE

AR

CH

ITE

CT

S D

RA

WIN

GS

LAN

DS

CA

PE

ZO

NE

TO

LAN

DS

CA

PE

AR

CH

ITE

CT

S D

RA

WIN

GS

LANDSCAPE ZONE TO

LANDSCAPE

ARCHITECTS DRAWINGS

SCONE AIRPORT FRONT

SIGN TO LANDSCAPE

ARCHITECTS DRAWINGS

SITE BOUNDARY

LAN

DS

CA

PE

ZO

NE

TO

LAN

DS

CA

PE

AR

CH

ITE

CT

S D

RA

WIN

GS

BOL 1

BOL 1

BOL 1

BOL 1

BOL 1

BOL 1

BOL 1

TILED

FOOTPATHKERB / PRAM RAMP

TO CIVIL ENG.

DETAILS

KERB / PRAM RAMP

TO CIVIL ENG.

DETAILS

KERB RAMP TO

AS1428,1

DD

preliminary issueN

COPYRIGHT

All rights reserved. This work is copyright and cannot be reproduced or copied in any form or by any means

(graphic, electronic or mechanical, including photocopying) without the written permission of STEA

astute architecture. Any licence, express or implied, to use the document for any purpose whatsoever is restricted to the terms of the agreement or implied

agreement with STEA astute architecture.

DIMENSIONSUse figured dimensions only. DO NOT SCALE. Check all dimensions on

site prior to fabrication or setout.

project details

job no.

stage

dwg no. revision

original sheet size A1 [594 x 841mm]

scale @ A1issue date

amendments

sheet setup date

dwg authors

project leader

date

authorised for issue by project leader

signature

date issue description auth proj ldrchecked by

input project leader name in titleblock

Ground Floor, 25 River St

PO Box 758

Mackay, QLD. 4740

T (07) 4957 7341

E [email protected]

W www.stea.com.au 1 : 100

31/10/2018 9:46:46 AM

31.10.18

5

Scone Airport Aviation Attraction and Terminal

GENERAL ARRANGEMENT PLAN CARPARK

8322 A 02-23

AuthorBunnan Road, Scone NSW 2337

0

SCALE 1:

5 m

100

4321

19.06.18 1 PRELIM ISSUE

22.06.18 2 ISSUED FOR FINAL CLIENTREVIEW

24.08.18 3 PRE TENDER ISSUE FORFINAL REVIEW

28.08.18 4 PRE TENDER ISSUE

31.10.18 5 TENDER ISSUE

Page 9: Scone Airport Aviation Attraction and Terminal€¦ · project leader date authorised for issue by project leader signature date issue description auth proj ldr checked by input project

UP

UP

11

10

9

8

7

6

5

4

3

2

1

21

20

19

18

17

16

15

14

13

12

UP

16151413121110987654321

1:100

FA

LL

1:20

RA

MP

UP

1

1

F F

2

2

H H

3

3

4

4

5

5

6

6

7

7

8

8

C C

A A

A 07-01

1

A 07-02

3A 07-02

4

A 07-04

1

A 07-04

2

4A 06-01

1A 06-01

PUDDLE FRANGE DRAIN PUDDLE FRANGE DRAIN

SSL 224800

SSL 221950

1100

GLA

SS

BA

LUS

TR

AD

E

1100

GLA

SS

BA

LUS

TR

AD

E

VOID

VOID

1100

GLA

SS

BA

LUS

TR

AD

E

1100 GLASS BALUSTRADE

LINE OF ROOF ABOVE LINE OF ROOF ABOVE

LINE OF ROOF ABOVE LINE OF ROOF ABOVE

LINE OF ROOF ABOVE LINE OF ROOF ABOVE

LINE OF ROOF ABOVE LINE OF ROOF ABOVE LINE OF ROOF ABOVE

LIN

E O

F R

OO

F A

BO

VE

1A 11-04

1A 11-051

A 11-06

2A 10-01

G G

E

D D

B B

1220

026

0036

0098

0035

0026

0057

00

7200 7200 7200 7200 8000 8000 8000

1220

026

0036

0098

0035

0026

0057

00

2A 10-02

2A 10-03

STAIR 3

2A 10-61

OPERABLE WALL

VOID

VOID

TGSI1100 GLASS

BALUSTRADE

TGSI

PR

OF

ILE

WA

LL S

HE

ET

ING

PROFILE WALL SHEETING

PR

OF

ILE

WA

LL S

HE

ET

ING

PROFILE WALL SHEETING

10A 16-51

1A 09-40

2A 09-40

3A 09-40

11A 16-51

DPDPDP

DP DP DP DP

DP

DP

13A 16-51

14A 16-51

1A 16-52

LIN

E O

F R

OO

F A

BO

VE

LIN

E O

F R

OO

F A

BO

VE

BRE 01

D.L

1.03

D.L1.02D.L1.01

D.L1.06

D.L1.09

D.L1.08

D.L1.05

BRE01

BR

E01

BR

E01

SSL 225617

33.61 m²FUNCTION 2

33.75 m²FUNCTION 111.53 m²

STORE

21.06 m²KITCHEN

10.76 m²MALE

12.08 m²FEMALE

53.86 m²OUTDOOR DECK

FOYER

6.32 m²PWD

8.44 m²STORE

STAIR 2

STAIR 1

D.L1.07

D.L1.04

PROFILE WALL SHEETINGBRE 01

HANGAR DOORS TO STRUCTURAL

ENG. DETAILS AND DOOR MANUFACTURERS DETAILS.

WEATHERPROOF

LOUVRES TO

MECHANICAL DRAWINGS

WEATHERPROOF

LOUVRES TO

MECHANICAL DRAWINGS

CONCRETE WALKPATH TO LANDSCAPE

ARCHITECTURAL DRAWINGS

1100

GLA

SS

BA

LUS

TR

AD

E

STAIR 6

DP DP DP

WATER TANK TO CIVIL ENG. DETAILS

3A 10-05

D.L

1.10

JOINERY

PUDDLE FRANGE

DRAINAGE SYSTEM

TO HYD. ENG. DETAIL

A 07-01

2

• ALL DRAWINGS ARE TO BE READ IN CONJUNCTION

WITH THE GENERAL NOTES, DWG. A 00-02

• USE FIGURED DIMENSIONS ONLY. DO NOT SCALE

FROM DRAWINGS. CHECK ALL DIMENSIONS ON SITE

BEFORE SETOUT OR FABRICATION.

• THE CONTRACTOR MUST VERIFY AND CHECK ALL

SITE CONDITIONS INCLUDING CEILING HEIGHTS AND

DIMENSIONS BEFORE COMMENCING WORK ON SITE.

GENERAL NOTES

BUILDING ROOF ENCLOSURE - PHASE 1

BUILDING WORKS ENCLOSURE LEGEND

(BY OTHERS)

BRE 01

BRE 02 BUILDING ROOF ENCLOSURE - PHASE 2

BUILDING WALL ENCLOSUREBWE

DD

preliminary issueN

COPYRIGHT

All rights reserved. This work is copyright and cannot be reproduced or copied in any form or by any means

(graphic, electronic or mechanical, including photocopying) without the written permission of STEA

astute architecture. Any licence, express or implied, to use the document for any purpose whatsoever is restricted to the terms of the agreement or implied

agreement with STEA astute architecture.

DIMENSIONSUse figured dimensions only. DO NOT SCALE. Check all dimensions on

site prior to fabrication or setout.

project details

job no.

stage

dwg no. revision

original sheet size A1 [594 x 841mm]

scale @ A1issue date

amendments

sheet setup date

dwg authors

project leader

date

authorised for issue by project leader

signature

date issue description auth proj ldrchecked by

input project leader name in titleblock

Ground Floor, 25 River St

PO Box 758

Mackay, QLD. 4740

T (07) 4957 7341

E [email protected]

W www.stea.com.au 1 : 100

31/10/2018 9:46:50 AM

31.10.18

5

Scone Airport Aviation Attraction and Terminal

GENERAL ARRANGEMENT PLAN LEVEL 1 PART 1

8322 A 02-24

AuthorBunnan Road, Scone NSW 2337

0

SCALE 1:

5 m

100

4321

19.06.18 1 PRELIM ISSUE

22.06.18 2 ISSUED FOR FINAL CLIENTREVIEW

24.08.18 3 PRE TENDER ISSUE FORFINAL REVIEW

28.08.18 4 PRE TENDER ISSUE

31.10.18 5 TENDER ISSUE

NOTE: ALL COLUMNS SIZE AND DETAILS

TO STRUCTURAL ENG. DETAILS AND DRAWINGS

Page 10: Scone Airport Aviation Attraction and Terminal€¦ · project leader date authorised for issue by project leader signature date issue description auth proj ldr checked by input project

UP

TERMINALARO

COMMS.MALE

9.26 m²FEMALE

PWD

ENTRANCE FOYER

OUTDOOR SERVICE AREA

ADMIN.

OFFICE

CAFE

THEATRE

HANGAR

LINE OF ROOF ABOVE LINE OF ROOF ABOVE

LINE OF ROOF ABOVE

LINE

OF R

OOF

ABOV

E

LINE OF ROOF ABOVE

LINE OF ROOF ABOVE

LINE OF ROOF ABOVE

LINE OF ROOF ABOVE

LINE

OF R

OOF

ABOV

E

LINE

OF R

OOF

ABOV

ELIN

E OF

ROO

F AB

OVE

MAX 1:4 GRADE OFTURF MOUNDING

MAX 1:4 GRADE OFTURF MOUNDING

E1

E1

E1

E1 E1

E1

E2

E2

Signage wall - referto signage wall detail

T1T1

T1

PT1

PT1

M1 M1

M1

M1

M1

M1 PT1

M1

E1

M3

COPYRIGHTAll rights reserved. This work is copyright and cannot bereproduced or copied in any form or by any means(graphic, electronic or mechanical, includingphotocopying) without the written permission of PDTArchitects. Any licence, express or implied, to use thedocument for any purpose whatsoever is restricted to theterms of the agreement or implied agreement with PDTArchitects.DIMENSIONSUse figured dimensions only. DO NOT SCALE. Check all dimensionson site prior to fabrication or setout.

project details

sheet title

document no.

stage

original sheet size A1 [594 x 841mm]

scaleissue date

amendments

sheet setup datedwg authors

datesignature

project leader

authorised for issue by project leader

Scone Airport

Scone Walter Pye Drive, Scone. NSW

8322

date issue description auth proj ldrchecked by

job sheet revision

- -

L3, 100 McLachlan St, 4006po box 607 fortitude valley qld 4006www.pdt.com.au

quality assurance AS/NZS ISO 9001t +61 7 3232 1300

construction issue

Scale 1:200

10m86420

SURFACE FINISHES PLAN

10-09-18 1:200 @ A1 CD

LA-02-01 B

28-08-18 A TENDER TB TB

AUGUST 2018

TAB

TAB

10-09-18 B TENDER TB TB

Page 11: Scone Airport Aviation Attraction and Terminal€¦ · project leader date authorised for issue by project leader signature date issue description auth proj ldr checked by input project

STORE 1

STORE 2

STORE 3

HANGAR

MAX 1:4 GRADE OFTURF MOUNDING

T1

PT1

E1

COPYRIGHTAll rights reserved. This work is copyright and cannot bereproduced or copied in any form or by any means(graphic, electronic or mechanical, includingphotocopying) without the written permission of PDTArchitects. Any licence, express or implied, to use thedocument for any purpose whatsoever is restricted to theterms of the agreement or implied agreement with PDTArchitects.DIMENSIONSUse figured dimensions only. DO NOT SCALE. Check all dimensionson site prior to fabrication or setout.

project details

sheet title

document no.

stage

original sheet size A1 [594 x 841mm]

scaleissue date

amendments

sheet setup datedwg authors

datesignature

project leader

authorised for issue by project leader

Scone Airport

Scone Walter Pye Drive, Scone. NSW

8322

date issue description auth proj ldrchecked by

job sheet revision

- -

L3, 100 McLachlan St, 4006po box 607 fortitude valley qld 4006www.pdt.com.au

quality assurance AS/NZS ISO 9001t +61 7 3232 1300

construction issue

Scale 1:200

10m86420

SURFACE FINISHES PLAN

10-09-18 1:200 @ A1 CD

LA-02-02 B

28-08-18 A TENDER TB TB

AUGUST 2018

TAB

TAB

10-09-18 B TENDER TB TB

Page 12: Scone Airport Aviation Attraction and Terminal€¦ · project leader date authorised for issue by project leader signature date issue description auth proj ldr checked by input project

H

Y

D

R

A

N

T

S

T

O

P

V

A

L

V

E

H

Y

D

R

A

N

T

T

E

L

.

P

I

T

S

T

O

P

V

A

L

V

E

P

O

W

E

R

P

O

L

E

S

IG

N

T

A

N

K

E

L

E

C

S

W

T

2

2

1

.

6

0221.70

2

2

1

.

8

0

2

2

1

.

8

0

2

2

1

.

9

0

2

2

1

.

9

0

221.90

2

2

2

.

0

0

2

2

2

.

0

0

2

2

2

.

0

0

2

2

2

.

1

0

2

2

2

.

1

0

2

2

2

.

1

0

2

2

2

.

2

0

2

2

2

.

2

0

2

2

2

.

2

0

2

2

2

.

3

0

2

2

2

.

3

0

2

2

2

.

3

0

2

2

2

.

4

0

2

2

2

.

4

0

2

2

2

.

4

0

2

2

2

.

5

0

2

2

2

.5

0

2

2

2

.5

0

2

2

2

.6

0

2

2

2

.6

0

2

2

2

.

6

0

2

2

2

.7

0

2

2

2

.7

0

22

2.7

0

REMOVE EXISTING TREES

TIE INTO EXISTINGROADWAY AS PER DETAILON DRAWING C601

EXISTING GROUND SERVICES TO BEDELINEATED & PROTECTED DURING

THE COURSE OF THE WORKS (TYPICAL)

eFeF

eFeF

eFeF

eFeF

eFeF

eFeF

eFeF

eF

eCW

eCW

eCW

eCW

eCW

eCW

eCW

eCW

eCW

eCW

eCW

eCW

eCW

eCW

eCW

eCW

eCW

eCW

eCW

eCW

eCW

eCW

eCW

eCW

eCW

eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW

eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW

eS eS eS X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW

eSeS

eSeS

eSeS

eS eS eS eS eS eS eS eS eS eS eS eS eS eS eS eS eS eS eS eS eS eS eS eS eS eS

NP NP

NPNP

NPNP

NP

NP

NP NP NP NP NP NP NP NP NP NP

eCW

eCW

eCW

eCW

eCW

eCW

eCW

eCW

eCW

eCW

eCW

eCW

eCW

eCW

eCW

eCW

eCW

eCW

eCW

eCW

eCW

Ø225mm

Ø

3

7

5

m

m

Ø375mm

Ø375mm

Ø450mm

1-1

1-2

1-3

1-4

1-5

1-6

Ø

225m

m

2-1

Ø

3

7

5

m

m

Ø750mm

3-1

3-2

3-3

4-1

Ø

3

7

5

m

m

FUTURE Ø600mm EXTEN

SION

PROPOSED ELECTRICALPAD MOUNT

EXISTING DRIVEWAY TOBE DEMOLISHED ANDLANDSCAPED TO SUITADJACENT WORKS

PROPOSED HYDRANTCONCRETE PAD

PROPOSED ELECTRICAL AND HYDRAULICSERVICES TO BE INSTALLED UNDER SWALEAND LOWER SUBSOIL DRAINAGE LINE

PROPOSED HYDRAULIC SERVICES TO BEINSTALLED UNDER SWALE AND LOWERSUBSOIL DRAINAGE LINE

HANGAR DOWNPIPE TO CONNECT TOSTORMWATER PIT

HANGAR DOWNPIPES TO CONNECTTO STORMWATER PIT

HANGAR DOWNPIPES TO CONNECTTO STORMWATER PIT

PROPOSED STORMWATER PIT ANDPIPE TO BE POSITIONED TO AVOIDFLOODLIGHT MAST FOOTING

PROPOSED HYDRANT LOCATION TOAVOID CLASH WITH STORMWATER PIPE.LOCALISED EARTHWORKS REQUIRED TOPROVIDE LEVEL ACCESS PLATFORM

300mm WIDE BERM BEHIND BACK OFASPHALT EXTENT AND/OR BACK OFKERB (TYPICAL)

EXISTING GROUND SERVICES TO BEDELINEATED & PROTECTED DURING

THE COURSE OF THE WORKS (TYPICAL)

BATTER TO EXISTING AT 1in4 SLOPEAND LANDSCAPE WITH APPROVED

GRASS TYPE (TYPICAL)

FUTURE AIRSIDE ACCESS GATE TO BELOCATED IN THE CORNER OF THE APRON. SITESUPERVISOR TO PROVIDE DIRECTION ONREQUIRED INTERFACE WORKS

ALL SEWER WORKS TO BE CLASS D RATEDAND SUITABLE FOR FUTURE ACCESS ROADOVER TOWARDS AIRSIDE ACCESS GATE

15 Jersey Street, TurramurraNew South Wales, Australia 2074

Telephone: 0408 696 526www.chrispconsulting.com.au

A.B.N. 11 164 806 044c Copyright

CHRISPCONSULTING

REVJOB NUMBER: SHEET No

REV DATE REVISION DESCRIPTION NAMETITLE CLIENT

SCALE

THIS DRAWING AND THE INFORMATION CONTAINED THEREON HAVE BEEN CREATED SOLELY FOR A PARTICULAR PURPOSE AND CLIENT. THIS ISPROTECTED BY COPYRIGHT. YOU MAY NOT REPRODUCE ANY OF IT IN ANY FORM WITHOUT THE WRITTEN PERMISSION BY CHRISP CONSULTING.IF YOU DO, YOU MAY HAVE TO PAY FOR DAMAGES TO CHRISP CONSULTING OR YOU MAY BE PROSECUTED.

DRAWN

DESIGNED

DRG CHECK

DESIGN CHECK

APPROVED

ISSUE FOR COORDINATION

UPPER HUNTER SHIRE COUNCIL

18016

KR

KL

CP

CP

CP

SCONE AIRPORT AVIATION VISITOR

ATTRACTION AND TERMINAL

C301 C

CIVIL WORKS PLAN - SHEET 1 OF 2

1:200@A1

A 06.06.18 ISSUE FOR COORDINATION

B 19.06.18 PRELIMINARY ISSUE

C 23.09.18 ISSUE FOR TENDER

AIRSIDE PAVEMENT GRADING TO BE CONFIRMED PRIOR TO CONSTRUCTION

KERB AND GUTTERK&G

CIVIL LEGEND

STORMWATER

EXISITNG POWER

EXISTING TELSTRA

EXISTING SEWER

EXISTING GAS

EXISTING WATER

PRAM RAMP

1-3

Page 13: Scone Airport Aviation Attraction and Terminal€¦ · project leader date authorised for issue by project leader signature date issue description auth proj ldr checked by input project

T

E

L

.

P

I

T

T

A

N

K

E

L

E

C

S

W

T

P

P

221.60

2

2

1

.

7

0

2

2

1

.

8

0

2

2

1

.

9

0

2

2

2

.0

0

2

2

2

.1

0

2

2

2

.

2

0

2

2

2

.

3

0

2

2

2

.

4

0

ROADWAY AS PER DETAIL

eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW

X X X X X X X X X X X X X X X X X X X X X X X X X X X

eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW

eSeS

eSeS

eSeS

ePO

ePO

ePO

ePO

ePO

ePO

ePO

ePO

ePO

ePO

ePO

ePO

ePO

ePO

ePO

ePO

NP NP

eCW

eCW

eCW

eCW

eCW

eCW

eCW

eCW

eCW

eCW

eCW

eCW

eCW

eCW

eCW

eCW

eCW

eCW

eCW

eCW

eCW

Ø375mm

Ø450mm

Ø525mm Ø525mm Ø525mm Ø525mm Ø525mm

1-5

1-61-7

1-8

1-9

1-10

1-11

Ø

3

7

5

m

m

Ø750mm Ø750mm

Ø750mm

Ø750mm

Ø

7

5

0

m

m

3-1

3-2

3-33-4

3-5 3-6

3-7

FUTURE Ø600mm EXTEN

SION

PROPOSED ELECTRICALPAD MOUNT

EXISTING DRIVEWAY TOBE DEMOLISHED ANDLANDSCAPED TO SUITADJACENT WORKS

PROPOSED HYDRANTCONCRETE PAD

PROPOSED ELECTRICAL AND HYDRAULICSERVICES TO BE INSTALLED UNDER SWALEAND LOWER SUBSOIL DRAINAGE LINE

PROPOSED HYDRAULIC SERVICES TO BEINSTALLED UNDER SWALE AND LOWERSUBSOIL DRAINAGE LINE

EXISTING POWER POLE TO BE REMOVED AS PARTOF BUILDING WORKS. REFER TO ELECTRICALWORKS PACKAGE FOR FURTHER DETAIL

HANGAR WORKS IS REQUIRED TO UPGRADEØ600mm RCP TO Ø750 RCP. STORMWATER LINE TOBE LOCATED WITHIN AIRSIDE APRON TO ALLOWFOR FUTURE MAINTENANCE

GRATED DRAIN AT HANGAR ENTRANCE TOCONNECT TO STORMWATER PIT

HANGAR DOWNPIPE TO CONNECT TOSTORMWATER PIT

HANGAR DOWNPIPE TO CONNECT TOSTORMWATER PIT

PROPOSED RAINWATERTANK PAD FOOTINGS(TYPICAL)

PROPOSED HYDRANT LOCATION TOAVOID CLASH WITH STORMWATER PIPE.LOCALISED EARTHWORKS REQUIRED TOPROVIDE LEVEL ACCESS PLATFORM

PROPOSED HYDRANT LOCATION TOAVOID CLASH WITH STORMWATER PIPE.LOCALISED EARTHWORKS REQUIRED TOPROVIDE LEVEL ACCESS PLATFORM

REFER TO HYDRAULICPLANS FORSTORMWATERDRAINAGE IN THISLOCATION

STORMWATER TO OUTLET INTO PROPOSEDBASIN. AND MAKE GOOD FINISH TOPREVENT EROSION AT PIPE ENTRY. REFERTO AIRSIDE DRAINAGE DESIGN FOR DETAILS

STORMWATER TO OUTLET INTO PROPOSEDBASIN. AND MAKE GOOD FINISH TOPREVENT EROSION AT PIPE ENTRY. REFERTO AIRSIDE DRAINAGE DESIGN FOR DETAILS

BATTER TO EXISTING AT 1in4 SLOPEAND LANDSCAPE WITH APPROVED

GRASS TYPE (TYPICAL)

HANGAR FLOOR TO MEET PROPOSED APRONEDGE AT RL 222.00. CONFIRMATION WITH AIRSIDEDESIGNER AND COUNCIL REPRESENTATIVE PRIORTO COMMENCEMENT OF CONSTRUCTION

DETENTION BASIN TO BE CONSTRUCTEDPRIOR TO FINALISATION OF PROJECTSTORMWATER WORKS

15 Jersey Street, TurramurraNew South Wales, Australia 2074

Telephone: 0408 696 526www.chrispconsulting.com.au

A.B.N. 11 164 806 044c Copyright

CHRISPCONSULTING

REVJOB NUMBER: SHEET No

REV DATE REVISION DESCRIPTION NAMETITLE CLIENT

SCALE

THIS DRAWING AND THE INFORMATION CONTAINED THEREON HAVE BEEN CREATED SOLELY FOR A PARTICULAR PURPOSE AND CLIENT. THIS ISPROTECTED BY COPYRIGHT. YOU MAY NOT REPRODUCE ANY OF IT IN ANY FORM WITHOUT THE WRITTEN PERMISSION BY CHRISP CONSULTING.IF YOU DO, YOU MAY HAVE TO PAY FOR DAMAGES TO CHRISP CONSULTING OR YOU MAY BE PROSECUTED.

DRAWN

DESIGNED

DRG CHECK

DESIGN CHECK

APPROVED

ISSUE FOR COORDINATION

UPPER HUNTER SHIRE COUNCIL

18016

KR

KL

CP

CP

CP

SCONE AIRPORT AVIATION VISITOR

ATTRACTION AND TERMINAL

C302 C

CIVIL WORKS PLAN - SHEET 2 OF 2

1:200@A1

A 06.06.18 ISSUE FOR COORDINATION

B 19.06.18 PRELIMINARY ISSUE

C 23.09.18 ISSUE FOR TENDER

AIRSIDE PAVEMENT GRADING TO BE CONFIRMED PRIOR TO CONSTRUCTION

KERB AND GUTTERK&G

CIVIL LEGEND

STORMWATER

EXISITNG POWER

EXISTING TELSTRA

EXISTING SEWER

EXISTING GAS

EXISTING WATER

PRAM RAMP

1-3

Martins4
Cross-Out
Martins4
Cross-Out
Martins4
Inserted Text
Detention basin being removed and associated stormwater being redesigned