REVISION OF SPECIFICATION / STR
ITEM NAME: SCHEDULE OF TECHNICAL REQUIREMENTS FOR TRACTION
MOTOR ROLLER SUSPENSION BEARING TUBES WITH COMPONENTS FOR
BG DIESEL- ELECTRIC LOCOMOTIVES (ALCO & HHP BOTH) AND
DEMUs
Specification/STR No.: MP.STR.EM-01.01.12 (Revision-02)
1. RDSO is reviewing the specification/STR to cater to the
latest technological
developments in the field, modify clauses not relevant in the
present context and
making them more enabling with focus on functional
requirements.
2. It is requested that your comments / suggestions with regard
to improvements
/modifications in specification / STR of the above mentioned
item may be submitted
in the following format along with the justification for the
changes required.
Part A: Basic Information
SN Particulars Information
1 Name
2 Designation
3 Professional Qualification
4 Organization / Firm’s Name
5 Address for Correspondence
6 Contact No.
7 Email ID
8 Whether firm is registered with RDSO for the subject item. If
yes, details like date of registration, current status etc. If no,
firm’s experience in manufacturing of subject item or similar
item
9 Whether any technical document/Report/Study to support
suggested changes is available / enclosed for better
appreciation
Part B: Comments / Suggestions on the specification:
SN Clause No. of RDSO STR/ Spec
Clause, as it exists in RDSO STR/ Spec
Clause , as it should read after incorporation of comments
/suggestions in the RDSO Spec / STR
Justification for changes
Comments may be sent to following address within 15 days from
the date of
publication on rdso.indianrailways.gov.in
B P S Bhadoria, Joint Director/MP (EC&EM), Mobile
No.-9794863120, E-mail ID: [email protected],
[email protected] Phone no. : 0522-2450020 Fax No.
0522-2453916
mailto:[email protected]
-
Hkkjr ljdkj
jsy ea=ky;
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
बड़ीऱाइन डीजऱ विधुतीय ऱोकोमोटीि (एऱको और एचएचऩी ) एिं डी.ई.एम.य
ू.हेतु कर्षण मोटर केई टेऩर रोऱर सस्ऩेंन्शन बीयररगं ट्यूब ि
उऩभागों हेत ुतकनीकी आिशयकताओ की अनुसूची
SCHEDULE OF TECHNICAL REQUIREMENTS FOR TRACTION MOTOR
ROLLER SUSPENSION BEARING TUBES WITH COMPONENTS FOR BG
DIESEL ELECTRIC LOCOMOTIVES (ALCO & HHP ) AND DEMUs
एस टी आर सं – एम ऩी एसटीआरईएम.01.01.12(संशोधन-०२) दिसम् बर
2020
STR No. MP.STR.EM-01.01.12 (Revision-02 ) December 2020
vuqla/kku vfHkdYi ,oa ekud laxBu
ekud uxj] y[kuÅ -२२६०११
RESEARCH DESIGNS & STANDARDS ORGANISATION
MANAK NAGAR, LUCKNOW-226 011
RESEARCH DESIGNS & STANDARDS ORGANIZATION
Manak Nagar, Lucknow – 226011
-
LIST OF AMENDMENTS
S. No. Amendment Date
Revision No
Reasons for Amendment
Second issues
Following changes have been incorporated/ changed in the STR No.
MP.STR.EM-01.01.12(Rev-02)
1
Dec‟2020 02 1. Clause 1.0 Minor modification made in Scope to
remove Vendor make Drawing.
2. Clause 5.1 IS:1030,IS:1387,IS:2062,IS:2269,IS:5517, IS:12117,
ISO:9001,BS:1486 ,ASTM A513, ASTM A519. Latest version of amendment
& Reaffirmed are added.
3. Clause 5.2 IS:1500, IS:1599, IS:1608, IS:1757,IS: 3739 &
IS: 4897 , ASTM A370/05,ASTM A388, ASTMA609/A609M, ASTM E446 Latest
version of amendment & Reaffirmed are added.
4. Clause 5.3 IS: 3739 & IS: 4897 ,Latest version of
amendment & Reaffirmed are added
5. Clause 7.1 IS:1030, IS:5517, IS2062, IS:2269 & BS:1486
Latest version of amendment & Reaffirmed are added
6. Clause 7.2 (SN-4&5)
ASTM A519 & ASTM A513 Latest version are added
7. Clause 7.3 (SN-3)
ASTM A513 Latest version are added
8. Clause 11.1 IS:1387 Latest reaffirmed 2018 is added
9. Clause 11.6 Test Certificate of Raw materials
incorporated.
10. Clause 12.1 & Clause 12.2
IS : 12117 –First revision. reaffirmed 2017 added
11. Clause 16.1 IS : 1608 & ASTM A 370/05 Latest version
added.
12. Clause 16.2 IS : 1500 Latest version added
13. Clause 16.3 IS : 1757, Latest version added
14. Clause 16.4 IS : 1599 Latest version added
15. Clause 17.0 MPI & DP Test incorporated in table in line
with clause no. 17.4 and 17.5
16. Clause 17.1 ASTM E446 latest version added
17. Clause 18.1 Type Test format for conducting the detailed
test on Prototype mentioned and Type test format is incorporated at
Annexure-IV
-
18. Clause 18.2 Acceptance Test , Sampling plan for conducting
the purchase inspection mentioned and Acceptance test format is
incorporated at Annexure-V
19. Clause 21 Preference to make in India incoporated
20. Clause 22 Reference of ISO documents added (Vendor changes
in Approved status) added
21. Clause 23 Field Trials and Performance Feed back
incorporated and format is given at Annexure-VI
-
Page 3 of 22
Contents 1.0 SCOPE:
............................................................................................................................
4
2.0 GENERAL REQUIREMENTS:
.......................................................................................
4 3.0 QUALITY ASSURANCE PLAN (QAP):
........................................................................
4 4.0 QUALITY CONTROL ORGANIZATION:
................................................................ 5
5.0 GOVERNING SPECIFICATIONS:
..................................................................................
65 6.0 INCOMING MATERIAL:
.............................................................................................
76
7.0 DIMENSIONS AND
TOLERANCES:.............................................................................
7 8.0 PROCESS OF MANUFACTURE:
....................................................................................
10 9.0 QUALITY ASSURANCE PROCESS – INSPECTION & TESTING PLAN:
............. 10 10.0 CHEMICAL COMPOSITION:
......................................................................................
11 11.0 MATERIAL SPECIFICATION:
....................................................................................
11
12.0 REQUIREMENT FOR CASTINGS:
.........................................................................
1211 13.0 REQUIREMENT FOR FORGINGS:
............................................................................
12 14.0 INSPECTION:
................................................................................................................
12
15.0 SAMPLING FOR MECHANICAL TESTS:
...................................................................
13
16.0 MECHANICAL TESTS:
...............................................................................................
13 17.0 OTHER SPECIAL TEST FOR SUSPENSION TUBE & ACCESSORIES:
................. 14
18.0 Type Test and Accetance Tests Formats
........................................................................
14 19.0 MARKING:
....................................................................................................................
15 20.0 PACKING:
.....................................................................................................................
15
21.0 PREFERENCE TO MAKE IN INDIA:
............................................................................
15 22.0 VENDOR CHANGES IN APPROVED STATUS:
....................................................... 15
23.0 FIELD TRIAL & PERFORMANCE FEEDBACK :
.................................................... 15
ANNEXURE - I
...............................................................................................................................
16
ANNEXURE - II
..............................................................................................................................
17 ANNEXURE – III
............................................................................................................................
18
ANNEXURE – IV
............................................................................................................................
19 ANNEXURE – V
.............................................................................................................................
20 ANNEXURE – VI
............................................................................................................................
21
-
Page 4 of 22
SCHEDULE OF TECHNICAL REQUIREMENTS FOR
TRACTION MOTOR ROLLER SUSPENSION BEARING TUBES WITH COMPONENTS
FOR BG DIESEL- ELECTRIC LOCOMOTIVES (ALCO & HHP BOTH) AND
DEMUs.
STR No. MP.STR.EM.01.01.12(Rev-02) December 2020
1.0 SCOPE:
The Motor Suspension Unit (MSU) tubes are vital parts of
traction motors used on Alco and HHP diesel electric locomotives as
well as DEMU of Indian Railways. These components are procured by
DLW, DMW and Zonal Railways from RDSO approved sources as per DLW,
DMW & BHEL/CGL drawings. In addition, a number of assembly
components are also procured as per DLW, DMW & BHEL/CGL
drawings. The schedule of technical requirement (STR) mentioned
hereunder is being issued to serve as a guide to manufacturers and
shall be read in conjunction with the relevant drawings. The firms
shall satisfy themselves to having complied with, all the
requirements of the drawings and STR. Approval shall be granted to
a firm that has the capability to supply fully machined suspension
tube as per the STR.
2.0 GENERAL REQUIREMENTS:
2.1 The firm shall have valid ISO-9001(2015) certification
issued by an approved agency with the activity desired clearly
mentioned in the scope of certification. The firm shall have a
Quality Manual indicating the extent of control over
production.
2.2 A system of regular submission of rejection details of
material giving rejection rate, cause of rejection, corrective
action taken etc. on quarterly basis shall be followed by the
firm.
2.3 The firm shall have a system of documentation with respect
to rejection at customer end, warranty replacement and failure of
item supplied by them during service.
2.4 The firm shall have a system of recording the plant,
machinery and control equipments remaining out of service, nature
of repairs done etc.
2.5 The testing and measuring equipment shall be duly calibrated
and the validity of calibration shall be current and verified by
physically checking the calibration certificate issued by the
Calibration Agency from where it was calibrated.
2.6 The firm shall have a system of easy traceability of the
product from manufacturing stage to finished product stage.
2.7 At the time of application, the firm must submit clause wise
compliance of this STR.
3.0 QUALITY ASSURANCE PLAN (QAP):
The firm shall prepare a Quality Assurance Plan (QAP) for all
items for which approval is sought and submit the same as a part of
compliance of this STR. The
-
Page 5 of 22
QAP shall be a comprehensive document covering the following
aspects including all the parameters in accordance with ISO
Document No. QM-RF-8.1-3, Version No. 1.0 or latest - Guidelines
for preparing QAP during registration. (i) Details of Quality
Control Organization of the firm along with key personnel
engaged in the QC function. (ii) Quality Assurance Process of
incoming materials used for the subject items. (iii) Process Flow
Chart indicating process of manufacture of an individual
product
or for a family of products, if the process is same. (iv)
Quality Assurance System – Inspection & Testing Plan including
stage
inspection. (v) Calibration scheme and status of calibration of
equipments used in the quality
process.
Details of the above aspects are described in the following
paragraphs. The QAP shall be approved by RDSO and shall form basis
of approval process.
3.1 Firm shall have to declare details of the manufacturing
operations to be conducted
in house or by outside agencies. Details of the outside agencies
shall be indicated and prior approval shall be taken from RDSO,
which reserves the right to inspect these firms also.
A general format for guidance is given below:
Product / Name of the process and details of machine used
indicating their capacities / accuracy limit
Acceptance limit of the parameters to be inspected during
different operations of MSU Tube and components
Standards followed for acceptance of the test parameters
Sample size & its frequency of inspection
Format no. for recording for traceability
Action taken on rejection, if any
Calibration scheme and status of calibration of equipments used
in the quality control process
4.0 QUALITY CONTROL ORGANIZATION:
4.1 The complete organizational setup of the quality control key
personnel and officials
along with their qualification and experience shall be
furnished. 4.2 The Quality Control Organization shall be headed by
a senior level official having
adequate technical qualification who shall directly report to
plant in-charge.
-
Page 6 of 22
5.0 GOVERNING SPECIFICATIONS:
The latest revisions as applicable to the specification referred
below shall be followed.
5.1 For Materials: (i) IS: 1030-1998 (5th Rev.) Reaffirmed 2017
or latest version - “Carbon steel castings
for general engineering purposes- specification”. (ii) IS:
1387-1993 (Second Rev.) Reaffirmed 2018 or latest version -
“General
requirements for the supply of metallurgical materials”. (iii)
IS: 2062- 2011 (7th Revision),Reaffirmed 2018 or latest version
Steel for general
structural purposes – Specification (Fifth Rev.). (iv) IS:
2269-,2006(5th Revision ) Reaffirmed 2016 or latest version
Specification for
Hexagon socket head screws. (v) IS: 5517-1993(2nd Revision),
Reaffirmed 2019 or latest version Steels for hardening
and tempering – Specification. (vi) IS: 12117 – 1996(1st
Revision) Reaffirmed 2017 or latest version : Norms for
classification of Steel Foundries for quality assurance (First
Rev.), Feb.2002. (vii) ISO: 9001- 2015: Purchasing Procedure.
(viii) BS: 1486 Part-II 1961( or latest version) for Zinc Plated
Grease Nipple. (ix) ASTM A513 – 20 or Latest version Steel Tubing.
(x) ASTM A519-17 or Latest version – Hot finished seamless tubing.
5.2 For tests: (i) IS: 1500(Part-1)(5th Revision ) 2019or latest
version „Method for Brinell hardness test
for metallic materials (ii) IS: 1599 - 1985 4th revision 2019 or
latest ‟Method for bend test for steel products
other than sheet, strip, wire and tube).‟ (iii) IS: 1608(Part-1)
– 4th Revision 2018 or latest „Method for tensile testing of
steel
products‟. (iv) IS: 1757(Part-1) - 3rd revision 2014 or latest
version „Method for Charpy Pendulum
impact test (V-Notch) for metallic materials‟. (v) ASTM A370/05
-19 or latest version Tensile Test. (vi) ASTM A388, 2007- 19 or
latest Ultrasonic Test for steel forgings. (vii) ASTM A609/A609M-
91-12 (Reapproved 2018) or latest - Ultrasonic Test for steel
castings. (viii) ASTM E446 -15 or latest version - Radiography
test Level- III for central portion and
Level- II for both side housing bores. 5.3 For dimensional
tolerances: (i) IS: 3739-1987 (First Rev.) Reaffirmed 2018 -
Dimensional tolerances for carbon and
constructional steel products. (ii) IS: 4897- 1994(3rd Revision
) Reaffirmed 2017or latest version Deviations on
untoleranced dimensions and mass of steel castings. 5.4 For
welding:
A.I 1651- EMD welding, brazing and soldering specification.
-
Page 7 of 22
6.0 INCOMING MATERIAL:
6.1 A complete Bill of Material (BOM) indicating all input
material required for
manufacturing of the product, governing specification and their
sources of supplies as approved by the firm in accordance with
clause 7.4.1 of ISO:9001 (2000) shall be furnished.
6.2 Test results of incoming raw material with reference to test
certificate issued by the
supplier and the results of internal tests carried out by the
firm for verification shall be submitted as a part of QAP.
7.0 DIMENSIONS AND TOLERANCES:
The MSU tube and components shall conform to the respective
drawings indicated for dimensions, tolerances, finish and material
etc.:
7.1 List of drawings of Suspension Tube & Accessories (10
Components) for traction motor type TM 4907 application (Class of
locos WDM3A & WDG3A):
Sl. no.
Description DMW Drawing no.
Material Specifications & Tests
1 Suspension Tube (Machined) for TM 4907
1/DCW/M/TM-398, Alt- W
Casting - Carbon Steel- IS: 1030-1998 (Fifth Rev.)Reaffirmed
2017 or latest , Gr. 280-520W.
2 Bearing Housing for TM 4907
1/DCW/M/TM-414, Alt- Nil
Forging - IS:5517-1993:(2nd Revision), Reaffirmed 2019 or latest
version for Carbon Steel, Gr. 45 C8.
3 End Cover (RWE) for TM 4907
1/DCW/M/TM-416, Alt-Nil
Forging - IS: 5517-1993:(2nd Revision), Reaffirmed 2019 or
latest version for Carbon Steel, Gr. 45 C8.
4 End Cover (GWE) for TM 4907
1/DCW/M/TM-417, Alt-Nil
Forging - IS: 5517-1993 :(2nd Revision), Reaffirmed 2019 or
latest version for Carbon Steel, Gr. 45 C8.
5 Abutment Piece for TM 4907
1/DCW/M/TM-418, Alt-Nil
Forging - IS: 5517-1993 :(2nd Revision), Reaffirmed 2019 or
latest version for Carbon Steel, Gr. 45 C8.
6 Enclosure for TM 4907
1/DCW/M/TM-419, Alt-Nil
Forging - IS: 5517-1993:(2nd Revision), Reaffirmed 2019 or
latest version for Carbon Steel, Gr. 45 C8.
7 Adjustment Washer for TM 4907
1/DCW/M/TM-415, Alt-Nil
IS: 2062- 1999 7th revision 2011 (Reaffirmed 2016)for Steel
Plate Gr- B.
8 Socket Head Screw M10 x 30 long
4/DCW/M/TM-421, Alt-Y
IS: 2269- 1995,2006 P 12.9 5th revision (Reffirmed 2016) or
latest version
9 Socket Head Screw M12 x 70 long
4/DCW/M/TM-423, Alt-Y
IS: 2269- 1995,2006 P 12.9 5th revision (Reffirmed 2016) or
latest version
10 Socket Head Screw M12 x 90 long
4/DCW/M/TM-422, Alt-Y
IS: 2269- 1995,2006 P 12.9 5th revision (Reffirmed 2016) or
latest version
-
Page 8 of 22
11 Grease Nipple 4/DCW/M/TM-420, Alt-Nil
BS: 1486 Part-II 1961 (Zinc Plated). or latest version
7.1.1 In case cast components (i.e. item at sl. no. 2 to 6
mentioned above) are chosen as
per clause 11.2, then the material shall be Carbon Steel- IS:
1030-1998 (Fifth Rev.) Reaffirmed 2017 or latest version , Gr.
280-520W.
7.1.2 Hardware‟s as per item no. 8 to 11 of clause 7.1 if not
manufactured by the supplier
itself, shall be out sourced from reputed brand / manufacturers
to be declared in the QAP. (If sources are not specified in the
relevant drawings)
7.2 Housing Bearing Kit for HHP Loco (consisting of 11 items) as
per DLW Part
No 17454499 & DGR. No. K- 1745037 Alt. ‘e’:
S. No.
Description DLW Part No. / Drawing No.
Material Specifications and Tests
1 Housing Bearing Machine
17020864 / 40075563 Alt. „d‟ or latest.
EMS 15 – Cast Steel as per casting drawing no. 40075432. A.I
1651- Weld Braze Specification mentioned in drawing no.
40075563.
2 Cap (CE) Axle Bearing Mach.
17250626 / 40086808 Alt.
„c‟ or latest.
Material as per casting drawing no. 40076800: Casting- EMS 9
Nodular Iron and ETI 827 or Plate - MS 4361 steel.
3 Cap PE Axle Bearing Mach.
17250365 / 40076796 Alt. „b‟ or latest.
Material as per casting drawing no. 40076797: Casting- EMS 9
Nodular Iron and ETI 827 or Plate - MS 4361 steel.
4 Seal PE 17250493 / 40076794 Alt. „b‟ or latest.
Material as per casting drawing no. 40076795: Tubing- ASTM
A519-17 or latest version or latest version Hot finished seamless
tubing or Plate - MS 4361 steel.
5 Spacer CE 17087636 / 40076798 Alt. „b‟ or latest.
ASTM A513-20 or latest version Type 5 (DOM) Steel Tubing as per
drawing no. 40076798.
6 Seal 17271472 / 40076990 Alt. „b‟ or latest.
Nitrile (Buna-N) as per drawing no. 40076990.
7 Seal 17271496 / 9084265 Alt. „c‟
or latest.
Nitrile (Buna-N) as per drawing no. 4084265.
8 Plug 1/8 PT 17300083 / 8348617 Alt. „Ba‟ or latest.
Steel as per drawing no. 8348617.
9 Plug 3/8 PT 17300010 / 8348619 Alt. „Ba‟ or latest.
Steel as per drawing no. 8348619.
10 Screw Hexagon Socket Head Cap
19250010- 138293 Alt. „g‟
or latest.
Alloy Steel- Quenched & Tempered to Surface Hardness of
Rockwell C37- 45 as per drawing no. 138293.
-
Page 9 of 22
11 Screw Hexagon Socket Head Cap
19250022- 138299 Alt. „Bc‟
or latest.
Alloy Steel- Quenched & Tempered to Surface Hardness of
Rockwell C37- 45 as per drawing no. 138299.
7.2.1 Hardware‟s as per item no. 8 to 11 of clause 7.2, if not
manufactured by the supplier
itself, shall be out sourced from reputed brand / manufacturer
as recommended in the DLW drawing no. K- 1745037 of Housing Bearing
Kit.
7.2.2 Nitrile seals as per item no. 6 & 7 of clause 7.2, if
not manufactured by the supplier itself, shall be out sourced from
reputed manufacturers already approved with RDSO for similar items.
The sources shall be declared in the QAP.
7.3 Housing Bearing Kit for HHP Loco (consisting of 4 items) as
per DLW Part
No. 17454487 & DRG. No. K-1745036 Alt. ‘c’:
S. No.
Description DLW Part No. / Drawing No.
Material Specifications and Tests
1 Seal Gear 17250756 / 40009050 Alt.
„a‟ or latest
MS 4361 Steel as per drawing no. 40009050
2 Cover Assembly
17250390 / 40012764 Alt. „Ab‟ or latest
MS 4361 Steel as per drawing no. 40012026 for Cover-GR Case AY-
Mach.
3 Tube 17203510 / 40076189 Alt. „Bb‟ or latest
ASTM A513-20 or latest version Type 5 (DOM) Steel Tubing as per
drawing no. 40076189.
4 Ring 17043980 / 40076190 Alt. „Ab‟ or latest
MS 4361 Steel as per drawing no. 40076190.
7.4 List of drawings of Suspension Tube & Accessories for
traction motor type TM 4303 / C1005TM application (1400 HP
DEMU):
S. No.
Description BHEL Drg. No. CGL Drg. No. Qty.
1 General Arrangement Axle Suspension Unit.
04391580002 (Latest) CGM/106001 (Latest) 1
2 Roller bearing suspension tube
04391580001 (Latest) CGM/106801 (Latest) 1
3 Bearing Housing 14451575001 (Latest) CGM/206803 (Latest) 1
4 Adjustment Washer 14451575002 (Latest) CGM/206805 (Latest)
1
5 End Cover- RWE 14451575003 (Latest) CGM/206806 (Latest) 1
6 End Cover- GWE 14451575005 (Latest) CGM/206802 (Latest) 1
7 Abutment Piece 14451575004 (Latest) CGM/206804 (Latest) 1
8 Enclosure 14391580001 (Latest) CGM/206801 (Latest) 1
9 Socket Head Screw (M10 x 30 Long)
44391560001 (Latest) CGM/42201 (Latest) 6
10 Socket Head Screw (M12 x 70 Long)
44391560003 (Latest) CGM/42202 (Latest) 16
11 Socket Head Screw (M30 -- CGM/406801 (Latest) 8
-
Page 10 of 22
x 110 Long)
12 Grease Nipple 34394028003 (Latest) CGM/42203 (Latest) 2
13 Spring Washer A30 -- CGM/32204 (Latest) 8
The manufacturer shall supply suspension tube & components
for DEMU application as per the details & drawings provided
above or by the purchaser. Quality control aspects of the tube
& components shall conform to this STR.
7.4.1 Hardware‟s as per item no. 9 to 13 of clause 7.4 if not
manufactured by the supplier itself, shall be out sourced from
reputed brand / manufacturers to be declared in the QAP. (If
sources are not specified in the relevant drawings).
8.0 PROCESS OF MANUFACTURE:
8.1 Complete process flow chart covering all steps of process of
manufacture for an
individual product (or for a family of products, if the process
is same) shall be clearly enlisted as a part of QAP.
8.2 The following details of machines used for all the steps of
machining operations
shall be included:
Make and Model of the machine Accuracy. Details of machining
operations.
8.3 Machining process shall be such that all critical dimensions
are final machined on
CNC machining centers, preferably in single setting. 8.4 Details
of Jigs and Fixtures used during manufacture shall be furnished
along with
the manufacturing process, wherever used. 8.5 List of typical
machinery & plant (M&P) required for manufacture is
furnished in
Annexure- I. The list is for general guidance only and actual
manufacturing operations shall be submitted and got approved by the
firm as a part of QAP.
9.0 QUALITY ASSURANCE PROCESS – INSPECTION & TESTING
PLAN:
9.1 Complete inspection and testing chart covering all steps of
process of manufacture
for an individual product including final inspection shall be
clearly enlisted as a part of QAP.
9.2 The following details of measuring instruments / equipments
/ jigs / fixtures used for all the steps of measurement operations
shall be included: Make and Model of the measuring equipment
Accuracy Value to be measured and acceptable value range
9.3 Stage inspection detailing inspection procedure, inspection
parameters and method
of testing/ test procedure including sample sizes for
destructive and non-destructive
-
Page 11 of 22
testing. Record of test results of stage inspection shall be
available and furnished where needed.
9.4 The list of measuring machines / instruments & testing
facilities are furnished in
Annexure- II & III respectively for general guidance only.
However, the specific testing and measuring instruments, gauges
used by the firm will also form part of QAP, which shall be
submitted and got approved by the firm.
9.5 Dimensional measurements shall be made on three-dimensional
co-ordinate
measurement machines as mentioned in Annexure – II on prototype
& on sample lots. Periodicity of measurement shall be as
indicated in clause 17.0 (Sl. no.4) of the STR. Measurements shall
be included as a part of QAP.
10.0 CHEMICAL COMPOSITION:
The permissible variation in chemical composition and ladle
analysis of steel shall
conform to the respective requirements given in Clause 7.0 of
this STR.
11.0 MATERIAL SPECIFICATION:
11.1 General requirements relating to the supply of material
shall conform to IS: 1387-
1993 (Second Rev.) Reaffirmed-2018 or latest version „General
requirements for the supply of metallurgical materials‟, as per
Clause 5.1 (ii) of this STR.
11.2 The material used for cast or forged components shall be so
chosen that none of
the specified properties in this STR is compromised. 11.3 The
suspension tube shall only be manufactured from castings supplied
by RDSO
approved Class “A” foundries. 11.4 The suspension tube
components i.e. accessories or any other components shall be
manufactured from normalized carbon steel castings or forgings
as applicable & mentioned in Clause 7.0 of this STR.
11.5 In case the manufacturer proposes to supply forged
suspension tube components
instead of cast components, the same can be accepted only with
the prior approval of RDSO. The forging shall be manufactured from
killed steel produced by open hearth furnace, electric furnace or
any other approved process.
11.6 Rough machining of the forgings shall be carried out in
case of procurement of
forgings by the purchaser & forging shall be supplied to the
dimensions specified in the drawing of rough machined components to
be provided by the purchaser. Tube supplier shall collect the Test
Certificate from the raw material supplier and verify the same.
11.7 In case, finished component is procured by the purchaser,
machining shall be done
in suitable sequence approved by the purchaser.
-
Page 12 of 22
12.0 REQUIREMENT FOR CASTINGS:
12.1 It would be preferred that the approved sources of
suspension tubes & other cast
components shall have their own RDSO approved captive foundries
meeting Class „A‟ requirements as per IS:12117 – 1996 (First
revision)Reaffirmed 2017 or latest version and machining units.
12.2 In case, where the firms don‟t have their captive
foundries, they shall fulfill the
following conditions:
They shall use castings from foundries certified Class „A‟ as
per IS: 12117 – 1996 (First revision)Reaffirmed 2017 or latest
version only. The certification of foundry shall be, by RDSO and
currently valid. The machinist firm shall furnish undertaking from
casting manufacturer
showing long term commitment to supply castings to the machinist
vendor. The Quality Assurance Plan (QAP) of the foundry shall
formulate part of
approval process for the individual machinist vendor.
12.3 The QAP of the component shall clearly include the
stipulation that “each cast component shall have individual
distinct number embossed by the foundry so as to ensure its
traceability”. A sample marking on suspension tube is given
below:
At least two letter initial of the foundry + Month & year of
manufacturing code + 4 digits of unique serial number + at least 2
digits of customer code for the foundry & Job Sr.No.(Example:
SMP/01/2006/3991/SMPL/01).
12.4 Stage inspection of all cast components shall be mandatory
by the Inspecting Authority at the foundry premises. The QAP of the
component shall clearly include such provision.
13.0 REQUIREMENT FOR FORGINGS:
13.1 Source of forging components shall be intimated to RDSO
with infrastructure details. Firms shall have to furnish it‟s
guidelines / standard regulations against which they have approved
the forging units as well as the units where manufacturing of the
subject components takes place.
13.2 Heat treatment:
Forgings shall be supplied in ‘As forged’ or ‘As forged
normalized’ condition (880ºC - 910ºC) to give the mechanical
properties as per respective specification given in Clause 7.0 of
this STR.
13.3 Freedom from defects:
The steel forgings shall be free from internal and surface
defects such as seams, laps and injurious imperfections etc.
14.0 INSPECTION:
-
Page 13 of 22
14.1 General inspection of the tube and components shall be in
accordance with IS: 1387 – 1993 (Second Rev.) „General requirements
for the supply of metallurgical materials.
14.2 Upon pre-arrangement, the purchaser shall have free entry
at all time when work on
the contract of the purchaser is being performed to all parts of
the manufacturer‟s works which concern the manufacture of the
material ordered under the specification. The manufacturer shall
afford the inspector, free of charge, all reasonable facilities and
necessary assistance to satisfy him that the material is being
furnished in accordance with referred specifications. Final
acceptance of all purchased material shall be made at purchaser‟s
premises.
15.0 SAMPLING FOR MECHANICAL TESTS:
15.1 Unless otherwise agreed, for the purpose of mechanical
tests, the sample shall be
tested for each cast and heat treatment batch. 15.2 If the
product is continuously heat treated, the sampling for mechanical
tests shall
be as agreed to between the purchaser and the manufacturer.
16.0 MECHANICAL TESTS:
The test piece after being heat treated as per Clause 13.2 shall
meet the following tests in the longitudinal direction upto a
ruling section of 300 mm. Properties for thicker sections shall be
subjected to agreement between the purchaser and the supplier.
16.1 Tensile Test:
The tensile test shall be carried out in accordance with IS:
1608(Part-1)- (Fourth revision) 2018 „Method for tensile testing of
steel products‟ or ASTM A370/05-19 or latest version.
16.2 Hardness:
The test pieces shall have Brinell hardness in accordance with
IS: 1500(Part-1)(Fifth revision)- 2019 or latest version „Method
for brinell hardness test for metallic materials (Second
Rev.)‟.
16.3 Charpy Impact Value (V-Notch):
The test pieces shall show the minimum Charpy Impact values when
tested as per IS: 1757(Part-1)- (Third revision)2014 or latest
version „Method for Charpy impact test (V-Notch) for metallic
materials‟.
16.4 Bend Test:
Bend test shall be carried out in accordance with IS: 1599-
(fourth revision )2019 or latest version ‟Method for bend test for
steel products other than sheet, strip, wire and tube).‟
-
Page 14 of 22
17.0 OTHER SPECIAL TEST FOR SUSPENSION TUBE &
ACCESSORIES:
The tests to be carried out along with periodicity as mentioned
below for ALCo & DEMU as well as HHP (EMD) tube &
components; S. No. Testing Parameters Periodicity
Type test Acceptance
1 Radiography test Incoming Firm‟s to declare 10% (Min.)
Finished 100% Firm‟s to declare
2 Ultrasonic test Incoming Firm‟s to declare Firm‟s to
declare
Finished 100% 100%
3 Chemical analysis & Mechanical test
Incoming Firm‟s to declare 4% (Min.)
Finished 100% Firm‟s to declare
4 Dimensional measurements on CMM
Incoming Firm‟s to declare Firm‟s to declare
Finished 100% 20% (Min.)
5 MPI test & DP test Incoming Firm‟s to declare Firm‟s to
declare
17.1 Radiography test for Alco Loco & DEMU tube:
As per ASTM E446-15 or latest version, Level- III for Central
portion & Level- II for both side housing bore of tube & as
mentioned in the casting drg. no. 1/DCW/M/TM-397, Alt.- latest.
17.2 Radiography test for HHP (EMD) Loco tube:
As per ETI 827 mentioned in casting drawing no. 40075432.
17.3 Ultrasonic test (UT):
This test shall be conducted as per ASTM A388-19 or latest
version, 2007- for steel forgings & ASTM A609/ A609M-91-12
Reapproved 2018 for steel castings.
17.4 Magnaflux / Dye- Penetrant Test (DPT) shall be conducted by
the manufacturer/
supplier. 17.5 Magnetic Particle Inspection (MPI) shall be
conducted by the manufacturer/
supplier.
18.0 Type Test and Accetance Tests Formats
18.1 Type Test Format for conducting the detailed test on
Prototype is given at Annexure-IV.
18.2 ACCEPTANCE TEST: These test shall be conducted, during
purchase inspection by inspection agency against individual orders.
The inspection shall be done on sample of offered lot as per
IS:2500(Part-1)-3rd Revision -2000, Titled “Sample inspection
tables Part-I inspection by attributes and by count of defects at
AQL of 1 percent and Third level inspection as per Table 1 with
single sampling plans. Its inspection criteria of belows has been
mentioned on Annexure –V.
-
Page 15 of 22
18.3 TEST CERTIFICATES:
Three copies of test certificates shall be supplied unless
otherwise stated on the order. The following details shall be
furnished in the test certificate:
(i) Dimensional inspection (ii) Detail of heat treatment (iii)
Chemical composition (iv) Results of mechanical tests (v) Results
of additional tests as called in the relevant drawing / order.
19.0 MARKING:
As per clause 12.3
20.0 PACKING:
Suitably marked and finished MSU tube & components shall be
packed to prevent corrosion and damage during transit. Machined
surface shall be properly protected with anti-corrosive
compounds.
21.0 PREFERENCE TO MAKE IN INDIA:
The Government of India policy on “make in India “shall
apply.
22.0 VENDOR CHANGES IN APPROVED STATUS:
All the provisions contained in RDSO‟s ISO procedures laid down
in document no. QO-D-8.1-11, dated 01.07.2020(Titled “Vendor
–changes in approved status) and subsequent versions/amendments
thereof, shall be binding and applicable on the successful
vendor/vendors in the contracts floated by Railways to maintain
quality of products supplied to Railways.
23.0 FIELD TRIAL & PERFORMANCE FEEDBACK :
After successful completion of type tests, required nos. of the
equipment shall be subjected to field trials for specified time
period. The Quantity and Period for field trials shall be governed
by RDSO Document no. MP-M-8.1-1 A format for field trial
performance feed back is given in ANNEXURE VI.
-
Page 16 of 22
ANNEXURE - I
MACHINERY & PLANT (M&P) FOR MANUFACTURING The following
is the list of typical machining facilities mandatory with the
firm: 1. The manufacturer shall have CNC Horizontal Machining
Center (HMC) and CNC
turning center of requisite accuracy suitable for the suspension
tube & components as per drawings mentioned in clause 7.0
2. Marking / measuring table of suitable size.
-
Page 17 of 22
ANNEXURE - II
LIST OF MEASURING MACHINES & INSTRUMENTS:
The following is the mandatory list of measuring facilities to
be available with the firm:
1. Calibration of the Testing / Measuring Equipments shall
mandatorily be done at least once in a year unless stated otherwise
for Vernier Calipers, Micrometers, Inside & Outside Calipers
and all other Gauges required during matching operations and
dimensional checks.
2. It shall be mandatory for the new manufacturers to have open
bridge type Co-
ordinate Measuring Machine (CMM) of requisite accuracy in
accordance with the dimensions of the jobs i.e. suspension tube
& components etc. to be measured in a single set up. However,
the existing manufacturers can continue with the facilities as
available at the time of prototype test.
3. Micrometer (outside).
4. Bore Micrometer (one meter inside).
5. Bore Dial Gauge.
6. Vernier Height Gauge.
7. Thread plug gauges for checking threading portion duly
calibrated.
8. Hard and ground pins to check accuracy of hole dia. of pole
shoes fixing bolts.
9. Fixtures shall be available (mandatory):
Facilitate to check accuracy of GWE & RWE side bores,
co-axiality, parallelity, perpendicularity in respect of rotor
fixing end shields bore along with GWE & RWE side bores.
Facilitate to check and prove that air-gap has been maintained
for all the pole faces. The fixture shall be fitted along with a
dial gauge to prove the same in respect of GWE side and RWE side
bore.
Facilitate to check clearance between the bore of suspension
tube and diameter of axle ( To avoid fitment problem during
assembly at workshop ( M/s SMPL supplied 47 nos suspension tube was
rejected by DLW due to infringement problem seen during their
assembly). The fixture shall be fitted along with a dial gauge to
prove the same in respect of GWE side and RWE side bore.The gauges
shall be hard and ground to avoid any lapses of accuracy.
10. Calibrated template to check the centre of both poles.
11. Infra-red thermometer for checking temperature of material
at standard room before dimensional checking.
-
Page 18 of 22
ANNEXURE – III
LIST OF TESTING FACILITIES:
1.0 Calibration of the Testing / Measuring Equipments shall be
done at least once in a year, unless stated otherwise.
2.0 Inspection Staff conducting non-destructive testing shall be
adequately trained and
qualified by recognized agency and shall have adequate
experience. 3.0 Staff conducting tests like Chemical Analysis and
Mechanical Properties shall have
adequate skill & competence and shall have under gone
sufficient training. Skill of such staff shall periodically be
qualified by making them carry out tests on blind samples.
4.0 Following testing facilities shall be available with the
firm; alternately the test can
also be conducted through NABL or Govt. approved lab. This same
shall be indicated in the QAP.
4.1 METALLURGICAL AND CHEMICAL LABORATORY:
1. Availability of Emission Spectrometer with necessary standard
and automatic printer shall be preferred for verification of
chemical composition of material.
2. Suitable Radiography / Ultrasonic testing facilities. 3.
Magnaflux / Dye-Penetrant Test (DPT) facilities for checking of
surface cracks. 4. Magnetic Particle Inspection (MPI) facilities
for checking sub-surface flaws. 5. Metallurgical Microscope with
magnification power upto 500x & metallographic
sample preparation facilities with appropriate accessories to
take photographs of slides.
4.2 PHYSICAL LABORATORY:
1. Universal Testing Machine of 40 tonne capacity with graphical
recording facilities for conducting tensile tests.
2. Direct reading Hardness Tester of capacity 95-500 BHN. 3.
Impact Testing Machine (Charpy V- Notch) of 0-300 Joules capacity
for
conducting impact test with facilities for notch cutting and
undertaking this test at sub-zero temperatures as per the specified
standard.
4. Shadow graph facilities for assuring correct notch profile
and dimension for impact test
specimen.
-
Page 19 of 22
ANNEXURE – IV FORMAT FOR TYPE TEST
1. Reference documents: STR No. MP.STR.EM.01.01.12 (Rev.02)
.
2. Date of Inspection :
3. Firm Name :
4. PO No., Date & PO Qty. :
5. Expiry date of DP :
6. Offered no. of Sample for type test : :
7. ID marks on offered Samples :
8. Check availability of specification /Drgs available with firm
: 9. Internal test and dimensional check report:
10. Calibration record of gauges, measuring instruments/devices
& test equipment
S No
Parameter/Description Value Specified/Ref. Type test
Observations
Remarks
1.0 VISUAL INSPECTION The Casting / forging shall be free from
any
types of internal , external & surface
defects such as pin holes , blow holes
warpage , cracks. Seams,Laps & injurious
imperfection .
2.0 DIMENSINAL / TOLERANCE
PARAMETERS
As per relevant drawing as enclosed list of
drawings, mensioned in clause 7.1, 7.2,
7.3 & 7.4 drawing list.
3.0 MATERIAL TEST Given in clause 5,6,7, 11, 12 & 13
4.0 BILL OF MATERIAL As per clause 6
5.0 MECHANICAL TEST
As per clause 16 for following test
Tensile test,
Hardness test,
Charpy impact test
Bend test)
6.0 SPECIAL TEST As per clause 17 .0 for
Radiography test, Ultrasonic test
Chemical analysis & Mechanical test
Dimensional measurements on CMM
MPI & DP Test for crack detection
7.0 TEST CERTIFICATES
Collect from vendor during type
test (inhosue labe or from NABL
accrediated Lab.
TC of Raw material, from supplier
TC verification at firm end
Mechanical tests Reports
Detail of heat treatment process with date.
Results of additional Special tests as called in the relevant
drawings / order
Overall dimensions check report of offered lot.
Remarks on inspection :
-
Page 20 of 22
ANNEXURE – V
FORMAT FOR ACCEPTANCE TEST
2. Reference documents: STR No. MP.STR.EM.01.01.12 (Rev.02)
.
2. Date of Inspection :
3. Firm Name :
4. PO No., Date & PO Qty. :
5. Expiry date of DP :
6. Offered no. of Sample for Acceptance test : :
7. ID marks on offered Samples :
8. Internal test and dimensional check report:
9. Calibration record of gauges, measuring instruments/devices
& test equipment
S No
Parameter/Description Value Specified/Ref. Type test
Observations
Remarks
1. VISUAL INSPECTION The Casting / forging shall be free from
any
types of internal , external & surface defects
such as pin holes , blow holes warpage ,
cracks. Seams,Laps & injurious Imperfection
DIMENSINAL /
TOLERANCE
PARAMETERS
As per enclosed list of drawing as
mensioned in clause 7.0 attched drawing
list.
MATERIAL TEST Given in clause 5 & clause 10
Bill of material As per clause 6
MECHANICAL TEST
for Tensile test, Hardness test, Charpy impact value (v-notch)
test & Bend test) according to clause 16
SPECIAL TEST (i.e. ) As per clause 17.0
Dimensional measurements on CMM
Ultrasonic ,MPI & DP Test
i) TC from Raw material supplier
ii) TC verification at firm end(Chemical composition)
iii) Mechanical tests Reports
iv) Detail of heat treatment process with date.
v) Overall dimensions check report
vi) Results of additional Special tests as called in the
relevant drawings / order.
Remarks on inspection :
-
Page 21 of 22
ANNEXURE – VI
FORMAT FOR FIELD TRIAL & PERFORMANCE FEEDBACK :
Format for performance feed back of suspension tube
SN Shed/ Rly
Loco No Make TM location
Date of fitment
Type of failure IF
taken place
Remarks on performance