Top Banner

of 45

Schedule-III-30-01-2013.xls

Feb 23, 2018

Download

Documents

anupam789
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • 7/24/2019 Schedule-III-30-01-2013.xls

    1/45

    DEDICATED

    Bi%%er Na'e A%%re##)

    (Bidder shall quote prices for the following item

    S*+

    De#crip,io o i,e'# Ui,

    . 2 /

    A //0.. K1 Po"er Su-S,a,io

    1

    Nos.

    2

    Nos.

    3

    et

    !

    et

    " #e$conductoring of e%isting 33& B b) panther conductor &m

    * 33 + Bus connectors lot

    3-&, 1-&, 1$ph /, 0etal o%ide with terminal connector complete in all respect et

    tructure for 33 + / et

    tructure for 33 + 4 et1- tructure for 33 + P4 et

    11

    Nos.

    12

    Nos.

    13 +, 1-&, 1$ph /, 0etal o%ide with terminal connector complete in all respect et

    1! tructure for 11&5 / et

    3*+, -- (2"+ .. rating6, 3$ph double brea& centre rotating t)pe (without 7arth

    witch6, 8ang 9perated, :solator along with upport :nsulators, 9perating 0echanism, Basehannel ;own Pipe, 4erminal connectors and all required accessories complete as per 4( Power 4ransformer (suitable for 3- ;tripping=closing coil and associated control6 along with #7?, 7=? > 9=, ;ifferential rela)s,tatic energ) meter (class -." with communication port6, 0imic ;iagram, oltmeter, mmeteretc. suitable for 1 mp numerical #ela)s

    3* +, 1$P@, 2"+ (--$!--$2--= 1$1 $1 6 outdoor t)pe urrent 4ransformer, ha5ing threesecondar) cores (two protection >one metering6 along with terminal connectors, Aunction bo%and required accessories etc. complete as per applicable 4 (1 set 3 nos.6

    3*+, 1$P@, 33+=11- , single core outdoor t)pe Potential 4ransformer along with terminalconnectors, Aunction bo% and required accessories etc. complete as per applicable 4 (1 et 3nos.6

    1-0, 33=11 +, 3$Ph, "-@C, 9NN, u

  • 7/24/2019 Schedule-III-30-01-2013.xls

    2/45

    1"

    Nos.

    1*

    Nos.

    1

    et

    1

    et

    1

    Nos.

    2-

    et

    21

    et

    22 11& B switch three pin t)pe, !--. Nos.23 Ba) e%tention of 11 + B

    (a6 structure for 11& swing Bus. Nos.

    (b6 8antr) olumn for 11&5 o=g feeder with / mounting arrangement Nos.

    (c6 ;isc insulator (!" +N6 for 11& swing B structure. ets

    (d6 11 + post :nsulator Nos.

    (e6 11&5 Post insulator tructure Nos.

    (f6 l. Pipe "- mm dia as per 4 0eter

    (g6 11 + Bus connectors /ot

    (h6 11&5 pin insulator with pin Nos.

    (i6 Panther conductor &m

    2! Plinth trengthening for transformer as per standard Nos.

    2" New Plinth Nos.

    2* 11 + tatic 4ri5ector 7nerg) 0eter and 11 + metering units et2 tructure for 11 + B witch Nos.

    2 tructure for 11 + Potential 4ransformer et

    2 tructure for 11 + 4 Nos.

    3- tructure for 11 + metering units Nos.

    31 :nsulators as per applicable 4

    (a611+, !"+N ;isc :nsulator along with @ardware > ccessories all complete et

    32/ead cid batter) along with suitable wooden rac& and all other accessories and connectors

    (a6 1"D2.2 Batter)

    12 +, -- (2"+ .. rating6, 3$ph double brea& centre rotating t)pe (without 7arthwitch6, 8ang 9perated, :solator along with upport :nsulators, 9perating 0echanism, Basehannel ;own Pipe, 4erminal connectors and all required accessories complete as per 4(

  • 7/24/2019 Schedule-III-30-01-2013.xls

    3/45

  • 7/24/2019 Schedule-III-30-01-2013.xls

    4/45

    12 luminium Fointing slee5e for Bolts as per 4 +g

    1" luminium P8 lamps for pin as per 4 et

    Su-,o,a* o D

    E (.. K1 Lie$- Raccoo or Truk Lie

    2 P pole (mtr=!-- +g6 as per 4 Nos.

    3 P pole (mtr=2-- +g6 as per 4 Nos.

    ! # #accoon conductor as per 4 +m.

    "(a6 ;isc insulator (!" +N6 as per 4 et

    (b64ension = uspension t)pe complete hardware fittings for disc insulator (cast luminium6 et

    *(a6 Pin insulator as per 4 Nos.

    (b6 8: pin for 11 + pin insulator Nos. uppl) and fabrication of sta) et

    (a6 ta)

  • 7/24/2019 Schedule-III-30-01-2013.xls

    5/45

    1-

    +g

    11 8uarding and /acing

    (a68:

  • 7/24/2019 Schedule-III-30-01-2013.xls

    6/45

    (b64ension = uspension t)pe complete hardware fittings for disc insulator (cast aluminium6 et

    *(a6 Pin insulator as per 4 Nos.

    (b6 8: pin for 11 + pin insulator Nos.

    uppl) and fabrication of sta) et

    (a6 ta)

  • 7/24/2019 Schedule-III-30-01-2013.xls

    7/45

    (b6

    Nos.

    2 P pole (mtr=2-- +g6 as per 4 Nos.

    3

    +g

    ! 2-- mp ir Brea& witch with all accessories as per 4 et

    " 2-- mp. @.8. ?use nit as per 4 (et of 3 unit6 et

    * 11 + lightening rrester as per 4 Nos.

    (a6 (i6Nos.

    (ii6Nos.

    (b6

    7arthing for ;4's (2" +6with treatment (s per #7 onstruction manaul6 et(i6

    (ii67arthing for ;4's (*3+6with treatment (s per #7 onstruction manaul6 et

    Nuts > Bolts as per 4 +g

    aution = ;anger board (2"-%2--mm6 Nos.

    1-3."E12- qmm l conductor P :nsulated, P heathed unarmoured cable as per 4 0etre

    11!- mm dia 8: Pipe with required hardware for installation of /4 cable as per 4 0etre

    12 uppl) and fabrication of sta) et

    (a6 ta)

  • 7/24/2019 Schedule-III-30-01-2013.xls

    8/45

    (a6 ta) wire (=12 Bolts as per 4 +g

    stone base plate Nos.

    1- B cable Aointing +it et

    Su-,o,a* o 7

    K Pu'p Coec,io

    1(i6

    +m

    (ii6

    +m

    2 8: wire 1- bolts etc. as per 4 Nos.

    *et

    Su-,o,a* o K

    L Roa% Cro##i3 (.. K1$ Lie

    1 13mtr=1-"lb. long #ail pole No

    2 cross arm > bac& clamp et

    3 4op brac&et > bac& clamp et

    ! 11& Pin insulator with pin as per 4 Nos.

    "ta) et complete with 8: sta) wire gu) insulator and sta) base plate Nos.

    Su-,o,a* o L8 Ri9er Cro##i3 ( ..k1 Lie$

    1 13mtr=1-"lb. long #ail pole Nos.

    2 11& Pin insulator with pin as per 4 Nos.

    3 11& ;isc insulator with hardware fitting as per 4

    !ta) et complete with 8: sta) wire gu) insulator and sta) base plate Nos.

    "

    +g

    Su-,o,a* o 8

    N Rai*"a5 Cro##i3 (.. k1$ Lie

    1 #ail Pole 1-" lb, 13 meter Nos.2 3 ore 3-- qmm 11 & grade l conductor E/P7 cable as per 4 0eter

    38: Pipe 12" mm dia (/ight guage6 for la)ing of cable o5er ;P structure 0eter

    !

    0eter

    " Barbed wire (*- +g per crossing6 +g

    *!- mm dia, 3 m long perforated earthing pipe as per 4 (* nos. per crossing6 et

    ! ore 1* qmm aluminium conductor P insulated, P sheathed weather proof cable asper 4 or suitable rating(1$1-hp6 per connection

    ! ore 2" qmm aluminium conductor P insulated, P sheathed weather proof cable asper 4 or suitable rating (1" and abo5e6 per connection

    3$phse ! wire 7lectronic static 4ri5ector meterH 3 % 2!- olt, 1-$*- , ;/0 complient static7nerg) 0eter with 4emper proof meter bo% and 8P# 0odem compatable feature with #$2329ptical port.

    @ardware items li&e 2- mm 8: Pipe ,P Pipe (306, 1-

  • 7/24/2019 Schedule-III-30-01-2013.xls

    9/45

    et

    ;P hannel,lamp for ;P channel,ross Bracings and lamp nuts and bolts etc. +g

    1-ta) et complete with 8: sta) wire preformed gu) and sta) base plate et

    11 ;isc insulator (!" +N6 with hardwareas per 4 et

    12 Pin insulator > pin as per 4 et

    Su-,o,a* o N

    O .. K1 u%er3rou% ca*i3 4ork0 Takeo Ca*e

    1

    (i63 % 3-- sq.mm for termination of cable on 11&5 line (;Ps or as per e%isting structure at site6 et

    2

    et

    3 a

    +m

    3 b

    +m

    !Nos.

    " Foint mar&ers as per appro5ed design Nos.

    Su-,o,a* o O

    To,a* o E!-4ork# Price# (A:B:C:D:E:F:G:H:I:7:K:L:8:N:O$

    PlaceH

    ;ateH

    9utdoor heat shrin&able Aointing &it complete with all accessories including lugs suitable for 3ore 3-- qmm 11 & grade l conductor E/P7 cable as per 4

    uppl) of cable end terminnation including connection of cable armouring and screen togrounding s)stem as per following detail

    uppl) of 11 +, traight$through Aointing &it :. E/P7 (76 siCe 3%3-- q.mm including allaccessories as required for complete erection along with Aoint mar&ers.

    Pa5ing, re$rolling of cable , /a)ing of 3 E 3-- 11& E/P7 (76 able in and around thepremises of 33=11 + power sub$station for rearrangement of 11 + feeders as per 4echnicalspecification.

    /a)ing of cable through @;; method (horiContaldirectional drilling6 for main road crossing orat 5ulnerable location where digging of trench or la)ing of cable is not possible

    able #oute mar&ers as e5er) 1-- 0eters > at turnings complete as per technicalspecifications.

    No,e)

    (.$+ Supp*5 a% Erec,io o .. k1 Truk *ie0 8ai *ie) ACSR Raccoo co%uc,or;(2$+ Supp*5 a% Erec,io o .. k1 Brac6 *ie< Spur Lie e,c+) ACSR 4ea#e* co%uc,or;

  • 7/24/2019 Schedule-III-30-01-2013.xls

    10/45

    EEDER FOR AGRICULTURE IN 22 BLOCKS OF PATNA DISTRICT OF BIHAR

    (Price Break-up o E!-"ork# Price#$

    s. Prices of all accessories, components, parts etc. associated with these items are to be included in bidder's quoted prices.

    =,5

    > ? @ .

    "

    !"

    !3

    !"

    3

    3-

    !"

    !!

    !2!"

    2

    "

    !

    "

    8o%e o

    Tra#ac,io(Direc, or

    Bou36,-ou,i,e'$

    Ui, E!-"ork#Price

    o, ic*u%e% i ,6e price a, Co*u' (@$ i INR

    E!ci#e Du,5

    (INR 0 perui,$

    Sa*e# Ta!01AT(INR 0per ui,$

    O,6er Ta!e# ! .2$

    To,a* Ui,

    FOR De#,+Supp*5 Price#

    "i,6 a** ,a!e#(INR0Ui,$

    To,a* 9a*ue o #upp*5(INR$

    Ui, I#uracec6ar3e# ic*+

    a5 ,a! (INR0per ui,$

  • 7/24/2019 Schedule-III-30-01-2013.xls

    20/45

  • 7/24/2019 Schedule-III-30-01-2013.xls

    21/45

  • 7/24/2019 Schedule-III-30-01-2013.xls

    22/45

  • 7/24/2019 Schedule-III-30-01-2013.xls

    23/45

  • 7/24/2019 Schedule-III-30-01-2013.xls

    24/45

  • 7/24/2019 Schedule-III-30-01-2013.xls

    25/45

  • 7/24/2019 Schedule-III-30-01-2013.xls

    26/45

  • 7/24/2019 Schedule-III-30-01-2013.xls

    27/45

    (ignature6

    (Printed Name6

    (;esignation6

    (eal6

  • 7/24/2019 Schedule-III-30-01-2013.xls

    28/45

    ;7;:47; ?77;7# ?9# 8#:/4#7 :N 22 B/9

    (Price Brea&$up of 7rection

    er's Name > ddressH

    (Bidder shall quote prices for the following items. Prices of all accessories, components, parts

    l.

    ;escription of items

    1 2

    A.Di#'a,*i3 o ,6e o**o"i3 e!i#,i3 euip'e,# ic*u%i3 re,uri3 ack ,o BSPHCL #,ore

    1 1." 0 Power 4ransformer from 33=11 + +anpa Power ub$station

    2 1." 0 Power 4ransformer from 33=11 + Ba&hti)arpur Power ub$station

    3 1.* 0 Power 4ransformer from 33=11 + +uranawada Power ub$station

    ! 3.1" 0 Power 4ransformer from 33=11 + PaliganA Power ub$station

    " 3.1" 0 Power 4ransformer from 33=11 + Pareo Power ub$station

    * 3.1" 0 Power 4ransformer from 33=11 + +husrupur Power ub$station

    3.1" 0 Power 4ransformer from 33=11 + ;ani)awa Power ub$station

    3.1" 0 Power 4ransformer from 33=11 + Biharibigha Power ub$station

    " 0 Power 4ransformer from 33=11 + ampatcha& Power ub$station

    1- 33 + line B witch

    11 33 + line ircuit Brea&er

    12 33 + urrent 4ransformer (line6

    13 33 + /

    1! 11 + 8roup B

    1" 11 + 8roup 4

    1* 11 + 8roup P4

    1 11 + 8roup B witch

    1

    ub$total of 1

    A //0.. K1 Po"er Su-S,a,io

    1

    2

    3

    ;estringing and ;ismantling 33+ line (appro%. 3. &m length6 consisting, 1- mtr #ail pole, insulators,hardware fittings, ross rm, other fabricated material, > conductor accessories, Aumpering arrangement attension pole and stringing of guard wire (at road crossing onl)6 as per requirement complete in all respectincluding dismantling and depositing in Boards store.

    3*+, -- (2"+ .. rating6, 3$ph double brea& centre rotating t)pe (without 7arth witch6, 8ang 9perated,:solator along with upport :nsulators, 9perating 0echanism, Base hannel ;own Pipe, 4erminal connectors andall required accessories complete as per 4 ( Power 4ransformer(suitable for 3- ; tripping=closing coil and associated control6 along with #7?, 7=? > 9=, ;ifferentialrela)s, tatic energ) meter (class -." with communication port6, 0imic ;iagram, oltmeter, mmeter etc.suitable for 1 mp numerical #ela)s

    3* +, 1$P@, 2"+ (--$!--$2--= 1$1 $1 6 outdoor t)pe urrent 4ransformer, ha5ing three secondar) cores(two protection >one metering6 along with terminal connectors, Aunction bo% and required accessories etc.complete as per applicable 4 (1 set 3 nos.6

  • 7/24/2019 Schedule-III-30-01-2013.xls

    29/45

    !

    " #e$conductoring of e%isting 33& B b) panther conductor

    * 33 + Bus connectors

    3-&, 1-&, 1$ph /, 0etal o%ide with terminal connector complete in all respect

    tructure for 33 + /

    tructure for 33 + 4

    1- tructure for 33 + P4

    11

    12

    13 +, 1-&, 1$ph /, 0etal o%ide with terminal connector complete in all respect

    1! tructure for 11&5 /

    1"

    1*

    1

    1

    1

    2-

    21

    22 11& B switch three pin t)pe, !--.

    23 Ba) e%tention of 11 + B

    (a6 structure for 11& swing Bus.

    (b6 8antr) olumn for 11&5 o=g feeder with / mounting arrangement

    (c6 ;isc insulator (!" +N6 for 11& swing B structure.

    (d6 11 + post :nsulator

    (e6 11&5 Post insulator tructure

    (f6 l. Pipe "- mm dia as per 4

    (g6 11 + Bus connectors

    (h6 11&5 pin insulator with pin

    (i6 Panther conductor

    3*+, 1$P@, 33+=11- , single core outdoor t)pe Potential 4ransformer along with terminal connectors,Aunction bo% and required accessories etc. complete as per applicable 4 (1 et 3 nos.6

    1-0, 33=11 +, 3$Ph, "-@C, 9NN, u ontrol Panel, 7=? > 9= rela)s, 0imic ;iagram,oltmeter, mmeter, tatic energ) meter (class -." 6 with communication port , nnunciation

  • 7/24/2019 Schedule-III-30-01-2013.xls

    30/45

    2! Plinth trengthening for transformer as per standard

    2" New Plinth

    2* 11 + tatic 4ri5ector 7nerg) 0eter and 11 + metering units

    2 tructure for 11 + B witch

    2 tructure for 11 + Potential 4ransformer

    2 tructure for 11 + 4

    3- tructure for 11 + metering units

    31 :nsulators as per applicable 4

    (a6 11+, !"+N ;isc :nsulator along with @ardware > ccessories all complete

    32/ead cid batter) along with suitable wooden rac& and all other accessories and connectors

    (a6 1"D2.2 Batter)

    (b6

    33 3 ore Power able (luminum onductor6

    (a6 ! E 1* q mm

    (b6 3." E 3" q mm

    (c6 3." E " q mm

    (d6 2 E 1- q mm

    3! ontrol able

    (a6 2%2." mm sq.

    (b6 "%2." mm sq.

    (c6 1-%2." mm sq.

    (d6 12%2." mm sq.

    3" 7arthing of substation

    (a6 9utdoor equipment (earth mat6=:ndoor equipment

    3* i5il wor&s for 33=11 + ub tation

    (a6

    3tation /ighting )stem complete for switch)ard, ontrol room, building, 0ain$gate

    (a6waged t)pe 0eter teel 4ubular pole(!1- P$316 for lighting in ubstation as per : 213(1-6

    (b6

    (c6

    (d6 eiling ?ans 1!-- mm swp with regulator

    ub$total of

    B // K1 Lie Re-co%uc,ori3) ACSR 4o* Co%uc,or

    1 #oute sur5e)

    2 #ail Pole 1-" lb, 13 meter

    3 tringing of #

  • 7/24/2019 Schedule-III-30-01-2013.xls

    31/45

    (b6 ta) :nsulator

    (c'6 ta) #od assembl)

    (d6 1"-D1"-D* mm 8: plate.=stone sta) plate

    2."0 long, !-mm dia. perforated 8: pipe with accessories for pipe earthing as per 4

    7arthing coil made of bac& clamp

    3 4op brac&et > bac& clamp! 33& Pin insulator with pin as per 4

    " ta) et complete with 8: sta) wire gu) insulator and sta) base plate

    ub$total of

    ; Rai*"a5 Cro##i3 ( // K1 Lie$

    1 #ail Pole 1-" lb, 13 meter

    2 3 ore !-- q.mm. 33 & grade l conductor E/P7 cable as per 4

    3 8: Pipe 12" mm dia (/ight guage6 for la)ing of cable o5er ;P structure

    !

    " Barbed wire (*- +g per crossing6

    * !- mm dia, 3 m long perforated earthing pipe as per 4 (* nos. per crossing6

    ;P hannel lamp for ;P channel, ross Bracings and lamp nuts and bolts etc.

    1- ta) et complete with 8: sta) wire preformed gu) and sta) base plate

    11 ;isc insulator (- +N6 with hardware as per 4

    12 Pin insulator > pin as per 4

    ub$total of ;

    E (.. K1 Lie$- Raccoo or Truk Lie

    1 #oute sur5e)

    2 P pole (mtr=!-- +g6 as per 4

    3 P pole (mtr=2-- +g6 as per 4

    ! # #accoon conductor as per 4

    uppl) of gal5inaCised fabricated of 0 painted pole 4op brac&et $ross arm,Bac& lamp for 5 ross arm ; Pchannel ,; P channe clamp sta) ,clamp angle ,sta) clamps side,;P cross bracing ,;P bracing clamps.

    ast :ron spun pipe of 1"-mm dia in Pcs of ".* 0 and abo5e long as per 4 to be laid for nder ground 33 &able below #ailwa) trac& at crossing

    9utdoor heat shrin&able Aointing &it complete with all accessories including lugs suitable for 3 ore 3-- qmm33 & grade l conductor E/P7 cable as per 4

  • 7/24/2019 Schedule-III-30-01-2013.xls

    32/45

    "(a6 ;isc insulator (!" +N6 as per 4

    (b64ension = uspension t)pe complete hardware fittings for disc insulator (cast luminium6

    *(a6 Pin insulator as per 4

    (b6 8: pin for 11 + pin insulator

    uppl) and fabrication of sta) et

    (a6 ta)

  • 7/24/2019 Schedule-III-30-01-2013.xls

    33/45

    11 8uarding and /acing

    (a68:

  • 7/24/2019 Schedule-III-30-01-2013.xls

    34/45

    (b64ension = uspension t)pe complete hardware fittings for disc insulator (cast aluminium6

    "(a6 Pin insulator as per 4

    (b6 8: pin for 11 + pin insulator

    * uppl) and fabrication of sta) et

    (a6 ta)

  • 7/24/2019 Schedule-III-30-01-2013.xls

    35/45

    1 Pole mounted sign board as per 4

    1 P8 lamps suitable for connection to # bac& clamp

    3 4op brac&et > bac& clamp

    ! 11& Pin insulator with pin as per 4

    " ta) et complete with 8: sta) wire gu) insulator and sta) base plate

    ub$total of /

    8 Ri9er Cro##i3 ( ..k1 Lie$

    ! ore 1* qmm aluminium conductor P insulated, P sheathed weather proof cable as per 4 or suitablerating(1$1-hp6 per connection

    ! ore 2" qmm aluminium conductor P insulated, P sheathed weather proof cable as per 4 or suitablerating (1" and abo5e6 per connection

    3$phse ! wire 7lectronic static 4ri5ector meterH 3 % 2!- olt, 1-$*- , ;/0 complient static 7nerg) 0eter with

    4emper proof meter bo% and 8P# 0odem compatable feature with #$232 9ptical port.

    @ardware items li&e 2- mm 8: Pipe ,P Pipe (306, 1-

  • 7/24/2019 Schedule-III-30-01-2013.xls

    36/45

    1 13mtr=1-"lb. long #ail pole

    2 11& Pin insulator with pin as per 4

    3 11& ;isc insulator with hardware fitting as per 4

    ! ta) et complete with 8: sta) wire gu) insulator and sta) base plate

    "

    ub$total of 0

    N Rai*"a5 Cro##i3 (.. k1$ Lie

    1 #ail Pole 1-" lb, 13 meter

    2 3 ore 3-- qmm 11 & grade l conductor E/P7 cable as per 4

    3 8: Pipe 12" mm dia (/ight guage6 for la)ing of cable o5er ;P structure

    !

    " Barbed wire (*- +g per crossing6

    * !- mm dia, 3 m long perforated earthing pipe as per 4 (* nos. per crossing6

    ;P hannel,lamp for ;P channel,ross Bracings and lamp nuts and bolts etc.

    1- ta) et complete with 8: sta) wire preformed gu) and sta) base plate

    11 ;isc insulator (!" +N6 with hardwareas per 4

    12 Pin insulator > pin as per 4

    ub$total of N

    O .. K1 u%er3rou% ca*i3 4ork0 Takeo Ca*e

    1

    2

    (i63 % 3-- sq.mm for termination of cable on 11&5 line (;Ps or as per e%isting structure at site6

    3

    I! a

    I! b

    "able #oute mar&ers as e5er) 1-- 0eters > at turnings complete as per technical specifications.

    * Foint mar&ers as per appro5ed design

    ub$total of 9

    To,a* o E!-4ork# Price# (A.:A:B:C:D:E:F:G:H:I:7:K:L:8:N:O$

    PlaceH

    ;ateH

    ?abrication and uppl) of 0.. 8al5anised items$ Pole 4op Brac&et,8aurding cross arm, pole top brac&et and

    8aurd cross arm, ; P hannel, ; P hannel clamp, ta) clamps angle, ta) clamps side, ; P cross bracing etc.

    ast :ron spun pipe of 1"-mm dia in Pcs of ".* 0 and abo5e long as per 4 to be laid for nder ground 11 &able below #ailwa) trac& at crossing

    9utdoor heat shrin&able Aointing &it complete with all accessories including lugs suitable for 3 ore 3-- qmm

    11 & grade l conductor E/P7 cable as per 4

    Ph)sical 5erification and optimisation of route of la)ing the underground cable, identif)ing the critical location,critical features, identif)ing the #9< for la)ing the cable in underground trenches, compl)ing with :7 rules >mar&ing on the la)out drawing with all feature

    7rection of cable end terminnation including connection of cable armouring and screen to grounding s)stem asper following detail

    erection of 11 +, traight$through Aointing &it :. E/P7 (76 siCe 3%3-- q.mm including all accessories asrequired for complete erection along with Aoint mar&ers.

    Pa5ing, re$rolling of cable , /a)ing of 3 E 3-- 11& E/P7 (76 able in and around the premises of 33=11 +power sub$station for rearrangement of 11 + feeders as per 4echnical specification.

    /a)ing of cable through @;; method (horiContaldirectional drilling6 for main road crossing or at 5ulnerablelocation where digging of trench or la)ing of cable is not possible

    NoteH

    (16. uppl) and 7rection of 11 & 4run& line= 0ain lineH # #accoon conductorJ(26. uppl) and 7rection of 11 & Branch line, pur /ine etc.H #

  • 7/24/2019 Schedule-III-30-01-2013.xls

    37/45

    + 9? P4N ;:4#:4 9? B:@#

    charges6

    chedule $ 3 B

    tc. associated with these items are to be included in bidder's quoted prices.

    nit Kt)

    3 ! " * (" G *6 ( % !6

    Nos. 1

    Nos. 1

    Nos. 1

    Nos. 1

    Nos. 1

    Nos. 2

    Nos. 1

    Nos. 1

    Nos. 2

    Nos.

    et

    et *

    et 2

    et

    et

    et 2

    Nos. *

    /ot 1

    Nos. "

    Nos. !"

    et !3

    nit 7rectioncharges

    er5ice 4a% pernit

    nit 7rectioncharges

    includingser5ice ta%

    4otal 5alue of erectionincluding er5ice 4a%

  • 7/24/2019 Schedule-III-30-01-2013.xls

    38/45

    et !"

    &m 3

    lot 3-

    et !"

    et !!

    et !2

    et !"

    Nos. 2

    Nos. "

    et !

    et "

    Nos. *!

    Nos. 3"

    et 3"

    et 3!

    Nos. **

    et **

    et

    Nos. 132

    Nos. !!

    Nos. *3

    ets 3

    Nos. !-2

    Nos. 3*

    0eter 323

    /ot *3

    Nos. 23

    &m 3

  • 7/24/2019 Schedule-III-30-01-2013.xls

    39/45

    Nos. 1"

    Nos. 1

    et **

    Nos. 1*!

    et 1--

    Nos. 1--

    Nos. **

    et 21

    et

    et

    0eter 1--

    0eter 1--

    0eter --

    0eter 11-

    0eter 3*-

    0eter !!"-

    0eter 2!-

    0eter 3--

    Nos. 3-

    q ?t. 2---

    Nos. 12

    et 12

    et "-

    Nos. 2

    +m !

    Nos. "

    +m. 12

    et !"

    set !"

    Nos. 2"!

    et 23

  • 7/24/2019 Schedule-III-30-01-2013.xls

    40/45

    Nos. 23

    et 23

    Nos. 23

    Nos.

    Nos. "2

    +8 1!2

    04 1

    04 1

    Nos. 12

    +g 1

    +g 111

    Nos. !"/ !

    Nos. "

    +g !

    Nos. "

    Nos. "

    Nos. 2

    et 2

    et 2Nos. *

    Nos. !

    Nos. !

    0eter 3--

    0eter 3-

    0eter 2-

    +g *-

    et *

    et !

    +g 1--

    et 1*

    et 12

    et *

    +m 1-!1

    Nos. 2-!

    Nos. 1!1!

    +m. 31!"

  • 7/24/2019 Schedule-III-30-01-2013.xls

    41/45

    et *-

    et *-

    Nos. !"3!

    Nos. !"3!

    et *-Nos. *-

    et *-

    Nos. *-

    Nos. 2-!

    Nos. 1!1!

    +g !-32!"

    04 2

    04 -

    Nos. 3-"

    +g *

    +g 3-2!

    Nos. *-

    / 1-!1

    no 1*1*2

    Nos. 23!

    +m 1*-

    Nos. 312

    Nos. 22-*3

    +m. !

    et !

    et !

    Nos. -"-Nos. -"-

    et !

    Nos. !

    et !

    Nos. !

    Nos. 312

    Nos. 22-*3

    +g *2"1

  • 7/24/2019 Schedule-III-30-01-2013.xls

    42/45

    04 132

    04 1--

    Nos. !""

    +g *

    +g !2!!

    Nos. !

    / 1*-

    no 2"21!

    +m 1"23

    Nos. 3-1-

    Nos. 2-"

    +m. !*32

    et *2

    et *2

    Nos. **3

    Nos. **3

    et *2

    Nos. *2

    et *2

    Nos. *2

    Nos. 3-1-

    Nos. 2-"

    +g ""-*2

    04 123

    04

    Nos. !!+g *

    +g !!**-

    Nos. *2

    / 1"23

    no 233!

    Nos. 1*2

    +g 13"3

    Nos. 1!

    et !!

  • 7/24/2019 Schedule-III-30-01-2013.xls

    43/45

    Nos. !!

    Nos. 2!!2

    Nos. 2!!2

    et !!

    Nos. !!et !!

    Nos. !!

    Nos. 1*2

    +g *

    Nos. 1!

    Nos. 1*2

    +g !--

    Nos. 1*2

    Nos. *1

    Nos. 31""

    Nos. 1*!

    +g 233""--

    et 3!2

    et !1

    Nos. 2-2*

    Nos. *1

    Nos. 31""

    et *1

    et 31""

    +g !3*

    Nos. 1*!

    0etre 2-2*-

    0etre 3!2-

    et "*-"2

    Nos. "*-"2

    et "*-"2

    Nos. "*-"2

    Nos. 2-2*

    Nos. 2-2*

    Nos. 1*!

    +g **

  • 7/24/2019 Schedule-III-30-01-2013.xls

    44/45

    Nos. 3!2

    Nos. 2-2*

    Nos. !3*

    Nos. *1

    Nos. 31""

    Nos. 1*!

    Nos. *1

    Nos. 31""

    +m "*

    Nos. 1313*

    +m 32-"

    +m 2*

    Nos. *3331

    Nos. !3

    et ""*

    et ""*

    Nos. ""*

    Nos. !*-*"

    +g 2-2

    Nos. 1313*

    et 11"!2

    +m !

    +m 1-

    +m 3

    Nos. *-1!

    Nos. *-1!

    Nos. *-1!

    et *-1!

    No *!

    et *!

    et *!

    Nos. 1!!

    Nos. 12*

  • 7/24/2019 Schedule-III-30-01-2013.xls

    45/45

    Nos. 1*!

    Nos. 2!*

    !2

    Nos. !2

    +g !1--

    Nos. 11*

    0eter --

    0eter

    0eter 33-

    +g 1!-

    et 1!

    et 11*

    +g 1"--

    et 2!-

    et 1-

    et -

    +m 11."

    et !*

    et !*

    +m 1-.12

    +m 2."3

    Nos. 11"

    Nos. !*

    (ignature6

    (Printed Name6

    (;esignation6