7/24/2019 Schedule-III-30-01-2013.xls
1/45
DEDICATED
Bi%%er Na'e A%%re##)
(Bidder shall quote prices for the following item
S*+
De#crip,io o i,e'# Ui,
. 2 /
A //0.. K1 Po"er Su-S,a,io
1
Nos.
2
Nos.
3
et
!
et
" #e$conductoring of e%isting 33& B b) panther conductor &m
* 33 + Bus connectors lot
3-&, 1-&, 1$ph /, 0etal o%ide with terminal connector complete in all respect et
tructure for 33 + / et
tructure for 33 + 4 et1- tructure for 33 + P4 et
11
Nos.
12
Nos.
13 +, 1-&, 1$ph /, 0etal o%ide with terminal connector complete in all respect et
1! tructure for 11&5 / et
3*+, -- (2"+ .. rating6, 3$ph double brea& centre rotating t)pe (without 7arth
witch6, 8ang 9perated, :solator along with upport :nsulators, 9perating 0echanism, Basehannel ;own Pipe, 4erminal connectors and all required accessories complete as per 4( Power 4ransformer (suitable for 3- ;tripping=closing coil and associated control6 along with #7?, 7=? > 9=, ;ifferential rela)s,tatic energ) meter (class -." with communication port6, 0imic ;iagram, oltmeter, mmeteretc. suitable for 1 mp numerical #ela)s
3* +, 1$P@, 2"+ (--$!--$2--= 1$1 $1 6 outdoor t)pe urrent 4ransformer, ha5ing threesecondar) cores (two protection >one metering6 along with terminal connectors, Aunction bo%and required accessories etc. complete as per applicable 4 (1 set 3 nos.6
3*+, 1$P@, 33+=11- , single core outdoor t)pe Potential 4ransformer along with terminalconnectors, Aunction bo% and required accessories etc. complete as per applicable 4 (1 et 3nos.6
1-0, 33=11 +, 3$Ph, "-@C, 9NN, u
7/24/2019 Schedule-III-30-01-2013.xls
2/45
1"
Nos.
1*
Nos.
1
et
1
et
1
Nos.
2-
et
21
et
22 11& B switch three pin t)pe, !--. Nos.23 Ba) e%tention of 11 + B
(a6 structure for 11& swing Bus. Nos.
(b6 8antr) olumn for 11&5 o=g feeder with / mounting arrangement Nos.
(c6 ;isc insulator (!" +N6 for 11& swing B structure. ets
(d6 11 + post :nsulator Nos.
(e6 11&5 Post insulator tructure Nos.
(f6 l. Pipe "- mm dia as per 4 0eter
(g6 11 + Bus connectors /ot
(h6 11&5 pin insulator with pin Nos.
(i6 Panther conductor &m
2! Plinth trengthening for transformer as per standard Nos.
2" New Plinth Nos.
2* 11 + tatic 4ri5ector 7nerg) 0eter and 11 + metering units et2 tructure for 11 + B witch Nos.
2 tructure for 11 + Potential 4ransformer et
2 tructure for 11 + 4 Nos.
3- tructure for 11 + metering units Nos.
31 :nsulators as per applicable 4
(a611+, !"+N ;isc :nsulator along with @ardware > ccessories all complete et
32/ead cid batter) along with suitable wooden rac& and all other accessories and connectors
(a6 1"D2.2 Batter)
12 +, -- (2"+ .. rating6, 3$ph double brea& centre rotating t)pe (without 7arthwitch6, 8ang 9perated, :solator along with upport :nsulators, 9perating 0echanism, Basehannel ;own Pipe, 4erminal connectors and all required accessories complete as per 4(
7/24/2019 Schedule-III-30-01-2013.xls
3/45
7/24/2019 Schedule-III-30-01-2013.xls
4/45
12 luminium Fointing slee5e for Bolts as per 4 +g
1" luminium P8 lamps for pin as per 4 et
Su-,o,a* o D
E (.. K1 Lie$- Raccoo or Truk Lie
2 P pole (mtr=!-- +g6 as per 4 Nos.
3 P pole (mtr=2-- +g6 as per 4 Nos.
! # #accoon conductor as per 4 +m.
"(a6 ;isc insulator (!" +N6 as per 4 et
(b64ension = uspension t)pe complete hardware fittings for disc insulator (cast luminium6 et
*(a6 Pin insulator as per 4 Nos.
(b6 8: pin for 11 + pin insulator Nos. uppl) and fabrication of sta) et
(a6 ta)
7/24/2019 Schedule-III-30-01-2013.xls
5/45
1-
+g
11 8uarding and /acing
(a68:
7/24/2019 Schedule-III-30-01-2013.xls
6/45
(b64ension = uspension t)pe complete hardware fittings for disc insulator (cast aluminium6 et
*(a6 Pin insulator as per 4 Nos.
(b6 8: pin for 11 + pin insulator Nos.
uppl) and fabrication of sta) et
(a6 ta)
7/24/2019 Schedule-III-30-01-2013.xls
7/45
(b6
Nos.
2 P pole (mtr=2-- +g6 as per 4 Nos.
3
+g
! 2-- mp ir Brea& witch with all accessories as per 4 et
" 2-- mp. @.8. ?use nit as per 4 (et of 3 unit6 et
* 11 + lightening rrester as per 4 Nos.
(a6 (i6Nos.
(ii6Nos.
(b6
7arthing for ;4's (2" +6with treatment (s per #7 onstruction manaul6 et(i6
(ii67arthing for ;4's (*3+6with treatment (s per #7 onstruction manaul6 et
Nuts > Bolts as per 4 +g
aution = ;anger board (2"-%2--mm6 Nos.
1-3."E12- qmm l conductor P :nsulated, P heathed unarmoured cable as per 4 0etre
11!- mm dia 8: Pipe with required hardware for installation of /4 cable as per 4 0etre
12 uppl) and fabrication of sta) et
(a6 ta)
7/24/2019 Schedule-III-30-01-2013.xls
8/45
(a6 ta) wire (=12 Bolts as per 4 +g
stone base plate Nos.
1- B cable Aointing +it et
Su-,o,a* o 7
K Pu'p Coec,io
1(i6
+m
(ii6
+m
2 8: wire 1- bolts etc. as per 4 Nos.
*et
Su-,o,a* o K
L Roa% Cro##i3 (.. K1$ Lie
1 13mtr=1-"lb. long #ail pole No
2 cross arm > bac& clamp et
3 4op brac&et > bac& clamp et
! 11& Pin insulator with pin as per 4 Nos.
"ta) et complete with 8: sta) wire gu) insulator and sta) base plate Nos.
Su-,o,a* o L8 Ri9er Cro##i3 ( ..k1 Lie$
1 13mtr=1-"lb. long #ail pole Nos.
2 11& Pin insulator with pin as per 4 Nos.
3 11& ;isc insulator with hardware fitting as per 4
!ta) et complete with 8: sta) wire gu) insulator and sta) base plate Nos.
"
+g
Su-,o,a* o 8
N Rai*"a5 Cro##i3 (.. k1$ Lie
1 #ail Pole 1-" lb, 13 meter Nos.2 3 ore 3-- qmm 11 & grade l conductor E/P7 cable as per 4 0eter
38: Pipe 12" mm dia (/ight guage6 for la)ing of cable o5er ;P structure 0eter
!
0eter
" Barbed wire (*- +g per crossing6 +g
*!- mm dia, 3 m long perforated earthing pipe as per 4 (* nos. per crossing6 et
! ore 1* qmm aluminium conductor P insulated, P sheathed weather proof cable asper 4 or suitable rating(1$1-hp6 per connection
! ore 2" qmm aluminium conductor P insulated, P sheathed weather proof cable asper 4 or suitable rating (1" and abo5e6 per connection
3$phse ! wire 7lectronic static 4ri5ector meterH 3 % 2!- olt, 1-$*- , ;/0 complient static7nerg) 0eter with 4emper proof meter bo% and 8P# 0odem compatable feature with #$2329ptical port.
@ardware items li&e 2- mm 8: Pipe ,P Pipe (306, 1-
7/24/2019 Schedule-III-30-01-2013.xls
9/45
et
;P hannel,lamp for ;P channel,ross Bracings and lamp nuts and bolts etc. +g
1-ta) et complete with 8: sta) wire preformed gu) and sta) base plate et
11 ;isc insulator (!" +N6 with hardwareas per 4 et
12 Pin insulator > pin as per 4 et
Su-,o,a* o N
O .. K1 u%er3rou% ca*i3 4ork0 Takeo Ca*e
1
(i63 % 3-- sq.mm for termination of cable on 11&5 line (;Ps or as per e%isting structure at site6 et
2
et
3 a
+m
3 b
+m
!Nos.
" Foint mar&ers as per appro5ed design Nos.
Su-,o,a* o O
To,a* o E!-4ork# Price# (A:B:C:D:E:F:G:H:I:7:K:L:8:N:O$
PlaceH
;ateH
9utdoor heat shrin&able Aointing &it complete with all accessories including lugs suitable for 3ore 3-- qmm 11 & grade l conductor E/P7 cable as per 4
uppl) of cable end terminnation including connection of cable armouring and screen togrounding s)stem as per following detail
uppl) of 11 +, traight$through Aointing &it :. E/P7 (76 siCe 3%3-- q.mm including allaccessories as required for complete erection along with Aoint mar&ers.
Pa5ing, re$rolling of cable , /a)ing of 3 E 3-- 11& E/P7 (76 able in and around thepremises of 33=11 + power sub$station for rearrangement of 11 + feeders as per 4echnicalspecification.
/a)ing of cable through @;; method (horiContaldirectional drilling6 for main road crossing orat 5ulnerable location where digging of trench or la)ing of cable is not possible
able #oute mar&ers as e5er) 1-- 0eters > at turnings complete as per technicalspecifications.
No,e)
(.$+ Supp*5 a% Erec,io o .. k1 Truk *ie0 8ai *ie) ACSR Raccoo co%uc,or;(2$+ Supp*5 a% Erec,io o .. k1 Brac6 *ie< Spur Lie e,c+) ACSR 4ea#e* co%uc,or;
7/24/2019 Schedule-III-30-01-2013.xls
10/45
EEDER FOR AGRICULTURE IN 22 BLOCKS OF PATNA DISTRICT OF BIHAR
(Price Break-up o E!-"ork# Price#$
s. Prices of all accessories, components, parts etc. associated with these items are to be included in bidder's quoted prices.
=,5
> ? @ .
"
!"
!3
!"
3
3-
!"
!!
!2!"
2
"
!
"
8o%e o
Tra#ac,io(Direc, or
Bou36,-ou,i,e'$
Ui, E!-"ork#Price
o, ic*u%e% i ,6e price a, Co*u' (@$ i INR
E!ci#e Du,5
(INR 0 perui,$
Sa*e# Ta!01AT(INR 0per ui,$
O,6er Ta!e# ! .2$
To,a* Ui,
FOR De#,+Supp*5 Price#
"i,6 a** ,a!e#(INR0Ui,$
To,a* 9a*ue o #upp*5(INR$
Ui, I#uracec6ar3e# ic*+
a5 ,a! (INR0per ui,$
7/24/2019 Schedule-III-30-01-2013.xls
20/45
7/24/2019 Schedule-III-30-01-2013.xls
21/45
7/24/2019 Schedule-III-30-01-2013.xls
22/45
7/24/2019 Schedule-III-30-01-2013.xls
23/45
7/24/2019 Schedule-III-30-01-2013.xls
24/45
7/24/2019 Schedule-III-30-01-2013.xls
25/45
7/24/2019 Schedule-III-30-01-2013.xls
26/45
7/24/2019 Schedule-III-30-01-2013.xls
27/45
(ignature6
(Printed Name6
(;esignation6
(eal6
7/24/2019 Schedule-III-30-01-2013.xls
28/45
;7;:47; ?77;7# ?9# 8#:/4#7 :N 22 B/9
(Price Brea&$up of 7rection
er's Name > ddressH
(Bidder shall quote prices for the following items. Prices of all accessories, components, parts
l.
;escription of items
1 2
A.Di#'a,*i3 o ,6e o**o"i3 e!i#,i3 euip'e,# ic*u%i3 re,uri3 ack ,o BSPHCL #,ore
1 1." 0 Power 4ransformer from 33=11 + +anpa Power ub$station
2 1." 0 Power 4ransformer from 33=11 + Ba&hti)arpur Power ub$station
3 1.* 0 Power 4ransformer from 33=11 + +uranawada Power ub$station
! 3.1" 0 Power 4ransformer from 33=11 + PaliganA Power ub$station
" 3.1" 0 Power 4ransformer from 33=11 + Pareo Power ub$station
* 3.1" 0 Power 4ransformer from 33=11 + +husrupur Power ub$station
3.1" 0 Power 4ransformer from 33=11 + ;ani)awa Power ub$station
3.1" 0 Power 4ransformer from 33=11 + Biharibigha Power ub$station
" 0 Power 4ransformer from 33=11 + ampatcha& Power ub$station
1- 33 + line B witch
11 33 + line ircuit Brea&er
12 33 + urrent 4ransformer (line6
13 33 + /
1! 11 + 8roup B
1" 11 + 8roup 4
1* 11 + 8roup P4
1 11 + 8roup B witch
1
ub$total of 1
A //0.. K1 Po"er Su-S,a,io
1
2
3
;estringing and ;ismantling 33+ line (appro%. 3. &m length6 consisting, 1- mtr #ail pole, insulators,hardware fittings, ross rm, other fabricated material, > conductor accessories, Aumpering arrangement attension pole and stringing of guard wire (at road crossing onl)6 as per requirement complete in all respectincluding dismantling and depositing in Boards store.
3*+, -- (2"+ .. rating6, 3$ph double brea& centre rotating t)pe (without 7arth witch6, 8ang 9perated,:solator along with upport :nsulators, 9perating 0echanism, Base hannel ;own Pipe, 4erminal connectors andall required accessories complete as per 4 ( Power 4ransformer(suitable for 3- ; tripping=closing coil and associated control6 along with #7?, 7=? > 9=, ;ifferentialrela)s, tatic energ) meter (class -." with communication port6, 0imic ;iagram, oltmeter, mmeter etc.suitable for 1 mp numerical #ela)s
3* +, 1$P@, 2"+ (--$!--$2--= 1$1 $1 6 outdoor t)pe urrent 4ransformer, ha5ing three secondar) cores(two protection >one metering6 along with terminal connectors, Aunction bo% and required accessories etc.complete as per applicable 4 (1 set 3 nos.6
7/24/2019 Schedule-III-30-01-2013.xls
29/45
!
" #e$conductoring of e%isting 33& B b) panther conductor
* 33 + Bus connectors
3-&, 1-&, 1$ph /, 0etal o%ide with terminal connector complete in all respect
tructure for 33 + /
tructure for 33 + 4
1- tructure for 33 + P4
11
12
13 +, 1-&, 1$ph /, 0etal o%ide with terminal connector complete in all respect
1! tructure for 11&5 /
1"
1*
1
1
1
2-
21
22 11& B switch three pin t)pe, !--.
23 Ba) e%tention of 11 + B
(a6 structure for 11& swing Bus.
(b6 8antr) olumn for 11&5 o=g feeder with / mounting arrangement
(c6 ;isc insulator (!" +N6 for 11& swing B structure.
(d6 11 + post :nsulator
(e6 11&5 Post insulator tructure
(f6 l. Pipe "- mm dia as per 4
(g6 11 + Bus connectors
(h6 11&5 pin insulator with pin
(i6 Panther conductor
3*+, 1$P@, 33+=11- , single core outdoor t)pe Potential 4ransformer along with terminal connectors,Aunction bo% and required accessories etc. complete as per applicable 4 (1 et 3 nos.6
1-0, 33=11 +, 3$Ph, "-@C, 9NN, u ontrol Panel, 7=? > 9= rela)s, 0imic ;iagram,oltmeter, mmeter, tatic energ) meter (class -." 6 with communication port , nnunciation
7/24/2019 Schedule-III-30-01-2013.xls
30/45
2! Plinth trengthening for transformer as per standard
2" New Plinth
2* 11 + tatic 4ri5ector 7nerg) 0eter and 11 + metering units
2 tructure for 11 + B witch
2 tructure for 11 + Potential 4ransformer
2 tructure for 11 + 4
3- tructure for 11 + metering units
31 :nsulators as per applicable 4
(a6 11+, !"+N ;isc :nsulator along with @ardware > ccessories all complete
32/ead cid batter) along with suitable wooden rac& and all other accessories and connectors
(a6 1"D2.2 Batter)
(b6
33 3 ore Power able (luminum onductor6
(a6 ! E 1* q mm
(b6 3." E 3" q mm
(c6 3." E " q mm
(d6 2 E 1- q mm
3! ontrol able
(a6 2%2." mm sq.
(b6 "%2." mm sq.
(c6 1-%2." mm sq.
(d6 12%2." mm sq.
3" 7arthing of substation
(a6 9utdoor equipment (earth mat6=:ndoor equipment
3* i5il wor&s for 33=11 + ub tation
(a6
3tation /ighting )stem complete for switch)ard, ontrol room, building, 0ain$gate
(a6waged t)pe 0eter teel 4ubular pole(!1- P$316 for lighting in ubstation as per : 213(1-6
(b6
(c6
(d6 eiling ?ans 1!-- mm swp with regulator
ub$total of
B // K1 Lie Re-co%uc,ori3) ACSR 4o* Co%uc,or
1 #oute sur5e)
2 #ail Pole 1-" lb, 13 meter
3 tringing of #
7/24/2019 Schedule-III-30-01-2013.xls
31/45
(b6 ta) :nsulator
(c'6 ta) #od assembl)
(d6 1"-D1"-D* mm 8: plate.=stone sta) plate
2."0 long, !-mm dia. perforated 8: pipe with accessories for pipe earthing as per 4
7arthing coil made of bac& clamp
3 4op brac&et > bac& clamp! 33& Pin insulator with pin as per 4
" ta) et complete with 8: sta) wire gu) insulator and sta) base plate
ub$total of
; Rai*"a5 Cro##i3 ( // K1 Lie$
1 #ail Pole 1-" lb, 13 meter
2 3 ore !-- q.mm. 33 & grade l conductor E/P7 cable as per 4
3 8: Pipe 12" mm dia (/ight guage6 for la)ing of cable o5er ;P structure
!
" Barbed wire (*- +g per crossing6
* !- mm dia, 3 m long perforated earthing pipe as per 4 (* nos. per crossing6
;P hannel lamp for ;P channel, ross Bracings and lamp nuts and bolts etc.
1- ta) et complete with 8: sta) wire preformed gu) and sta) base plate
11 ;isc insulator (- +N6 with hardware as per 4
12 Pin insulator > pin as per 4
ub$total of ;
E (.. K1 Lie$- Raccoo or Truk Lie
1 #oute sur5e)
2 P pole (mtr=!-- +g6 as per 4
3 P pole (mtr=2-- +g6 as per 4
! # #accoon conductor as per 4
uppl) of gal5inaCised fabricated of 0 painted pole 4op brac&et $ross arm,Bac& lamp for 5 ross arm ; Pchannel ,; P channe clamp sta) ,clamp angle ,sta) clamps side,;P cross bracing ,;P bracing clamps.
ast :ron spun pipe of 1"-mm dia in Pcs of ".* 0 and abo5e long as per 4 to be laid for nder ground 33 &able below #ailwa) trac& at crossing
9utdoor heat shrin&able Aointing &it complete with all accessories including lugs suitable for 3 ore 3-- qmm33 & grade l conductor E/P7 cable as per 4
7/24/2019 Schedule-III-30-01-2013.xls
32/45
"(a6 ;isc insulator (!" +N6 as per 4
(b64ension = uspension t)pe complete hardware fittings for disc insulator (cast luminium6
*(a6 Pin insulator as per 4
(b6 8: pin for 11 + pin insulator
uppl) and fabrication of sta) et
(a6 ta)
7/24/2019 Schedule-III-30-01-2013.xls
33/45
11 8uarding and /acing
(a68:
7/24/2019 Schedule-III-30-01-2013.xls
34/45
(b64ension = uspension t)pe complete hardware fittings for disc insulator (cast aluminium6
"(a6 Pin insulator as per 4
(b6 8: pin for 11 + pin insulator
* uppl) and fabrication of sta) et
(a6 ta)
7/24/2019 Schedule-III-30-01-2013.xls
35/45
1 Pole mounted sign board as per 4
1 P8 lamps suitable for connection to # bac& clamp
3 4op brac&et > bac& clamp
! 11& Pin insulator with pin as per 4
" ta) et complete with 8: sta) wire gu) insulator and sta) base plate
ub$total of /
8 Ri9er Cro##i3 ( ..k1 Lie$
! ore 1* qmm aluminium conductor P insulated, P sheathed weather proof cable as per 4 or suitablerating(1$1-hp6 per connection
! ore 2" qmm aluminium conductor P insulated, P sheathed weather proof cable as per 4 or suitablerating (1" and abo5e6 per connection
3$phse ! wire 7lectronic static 4ri5ector meterH 3 % 2!- olt, 1-$*- , ;/0 complient static 7nerg) 0eter with
4emper proof meter bo% and 8P# 0odem compatable feature with #$232 9ptical port.
@ardware items li&e 2- mm 8: Pipe ,P Pipe (306, 1-
7/24/2019 Schedule-III-30-01-2013.xls
36/45
1 13mtr=1-"lb. long #ail pole
2 11& Pin insulator with pin as per 4
3 11& ;isc insulator with hardware fitting as per 4
! ta) et complete with 8: sta) wire gu) insulator and sta) base plate
"
ub$total of 0
N Rai*"a5 Cro##i3 (.. k1$ Lie
1 #ail Pole 1-" lb, 13 meter
2 3 ore 3-- qmm 11 & grade l conductor E/P7 cable as per 4
3 8: Pipe 12" mm dia (/ight guage6 for la)ing of cable o5er ;P structure
!
" Barbed wire (*- +g per crossing6
* !- mm dia, 3 m long perforated earthing pipe as per 4 (* nos. per crossing6
;P hannel,lamp for ;P channel,ross Bracings and lamp nuts and bolts etc.
1- ta) et complete with 8: sta) wire preformed gu) and sta) base plate
11 ;isc insulator (!" +N6 with hardwareas per 4
12 Pin insulator > pin as per 4
ub$total of N
O .. K1 u%er3rou% ca*i3 4ork0 Takeo Ca*e
1
2
(i63 % 3-- sq.mm for termination of cable on 11&5 line (;Ps or as per e%isting structure at site6
3
I! a
I! b
"able #oute mar&ers as e5er) 1-- 0eters > at turnings complete as per technical specifications.
* Foint mar&ers as per appro5ed design
ub$total of 9
To,a* o E!-4ork# Price# (A.:A:B:C:D:E:F:G:H:I:7:K:L:8:N:O$
PlaceH
;ateH
?abrication and uppl) of 0.. 8al5anised items$ Pole 4op Brac&et,8aurding cross arm, pole top brac&et and
8aurd cross arm, ; P hannel, ; P hannel clamp, ta) clamps angle, ta) clamps side, ; P cross bracing etc.
ast :ron spun pipe of 1"-mm dia in Pcs of ".* 0 and abo5e long as per 4 to be laid for nder ground 11 &able below #ailwa) trac& at crossing
9utdoor heat shrin&able Aointing &it complete with all accessories including lugs suitable for 3 ore 3-- qmm
11 & grade l conductor E/P7 cable as per 4
Ph)sical 5erification and optimisation of route of la)ing the underground cable, identif)ing the critical location,critical features, identif)ing the #9< for la)ing the cable in underground trenches, compl)ing with :7 rules >mar&ing on the la)out drawing with all feature
7rection of cable end terminnation including connection of cable armouring and screen to grounding s)stem asper following detail
erection of 11 +, traight$through Aointing &it :. E/P7 (76 siCe 3%3-- q.mm including all accessories asrequired for complete erection along with Aoint mar&ers.
Pa5ing, re$rolling of cable , /a)ing of 3 E 3-- 11& E/P7 (76 able in and around the premises of 33=11 +power sub$station for rearrangement of 11 + feeders as per 4echnical specification.
/a)ing of cable through @;; method (horiContaldirectional drilling6 for main road crossing or at 5ulnerablelocation where digging of trench or la)ing of cable is not possible
NoteH
(16. uppl) and 7rection of 11 & 4run& line= 0ain lineH # #accoon conductorJ(26. uppl) and 7rection of 11 & Branch line, pur /ine etc.H #
7/24/2019 Schedule-III-30-01-2013.xls
37/45
+ 9? P4N ;:4#:4 9? B:@#
charges6
chedule $ 3 B
tc. associated with these items are to be included in bidder's quoted prices.
nit Kt)
3 ! " * (" G *6 ( % !6
Nos. 1
Nos. 1
Nos. 1
Nos. 1
Nos. 1
Nos. 2
Nos. 1
Nos. 1
Nos. 2
Nos.
et
et *
et 2
et
et
et 2
Nos. *
/ot 1
Nos. "
Nos. !"
et !3
nit 7rectioncharges
er5ice 4a% pernit
nit 7rectioncharges
includingser5ice ta%
4otal 5alue of erectionincluding er5ice 4a%
7/24/2019 Schedule-III-30-01-2013.xls
38/45
et !"
&m 3
lot 3-
et !"
et !!
et !2
et !"
Nos. 2
Nos. "
et !
et "
Nos. *!
Nos. 3"
et 3"
et 3!
Nos. **
et **
et
Nos. 132
Nos. !!
Nos. *3
ets 3
Nos. !-2
Nos. 3*
0eter 323
/ot *3
Nos. 23
&m 3
7/24/2019 Schedule-III-30-01-2013.xls
39/45
Nos. 1"
Nos. 1
et **
Nos. 1*!
et 1--
Nos. 1--
Nos. **
et 21
et
et
0eter 1--
0eter 1--
0eter --
0eter 11-
0eter 3*-
0eter !!"-
0eter 2!-
0eter 3--
Nos. 3-
q ?t. 2---
Nos. 12
et 12
et "-
Nos. 2
+m !
Nos. "
+m. 12
et !"
set !"
Nos. 2"!
et 23
7/24/2019 Schedule-III-30-01-2013.xls
40/45
Nos. 23
et 23
Nos. 23
Nos.
Nos. "2
+8 1!2
04 1
04 1
Nos. 12
+g 1
+g 111
Nos. !"/ !
Nos. "
+g !
Nos. "
Nos. "
Nos. 2
et 2
et 2Nos. *
Nos. !
Nos. !
0eter 3--
0eter 3-
0eter 2-
+g *-
et *
et !
+g 1--
et 1*
et 12
et *
+m 1-!1
Nos. 2-!
Nos. 1!1!
+m. 31!"
7/24/2019 Schedule-III-30-01-2013.xls
41/45
et *-
et *-
Nos. !"3!
Nos. !"3!
et *-Nos. *-
et *-
Nos. *-
Nos. 2-!
Nos. 1!1!
+g !-32!"
04 2
04 -
Nos. 3-"
+g *
+g 3-2!
Nos. *-
/ 1-!1
no 1*1*2
Nos. 23!
+m 1*-
Nos. 312
Nos. 22-*3
+m. !
et !
et !
Nos. -"-Nos. -"-
et !
Nos. !
et !
Nos. !
Nos. 312
Nos. 22-*3
+g *2"1
7/24/2019 Schedule-III-30-01-2013.xls
42/45
04 132
04 1--
Nos. !""
+g *
+g !2!!
Nos. !
/ 1*-
no 2"21!
+m 1"23
Nos. 3-1-
Nos. 2-"
+m. !*32
et *2
et *2
Nos. **3
Nos. **3
et *2
Nos. *2
et *2
Nos. *2
Nos. 3-1-
Nos. 2-"
+g ""-*2
04 123
04
Nos. !!+g *
+g !!**-
Nos. *2
/ 1"23
no 233!
Nos. 1*2
+g 13"3
Nos. 1!
et !!
7/24/2019 Schedule-III-30-01-2013.xls
43/45
Nos. !!
Nos. 2!!2
Nos. 2!!2
et !!
Nos. !!et !!
Nos. !!
Nos. 1*2
+g *
Nos. 1!
Nos. 1*2
+g !--
Nos. 1*2
Nos. *1
Nos. 31""
Nos. 1*!
+g 233""--
et 3!2
et !1
Nos. 2-2*
Nos. *1
Nos. 31""
et *1
et 31""
+g !3*
Nos. 1*!
0etre 2-2*-
0etre 3!2-
et "*-"2
Nos. "*-"2
et "*-"2
Nos. "*-"2
Nos. 2-2*
Nos. 2-2*
Nos. 1*!
+g **
7/24/2019 Schedule-III-30-01-2013.xls
44/45
Nos. 3!2
Nos. 2-2*
Nos. !3*
Nos. *1
Nos. 31""
Nos. 1*!
Nos. *1
Nos. 31""
+m "*
Nos. 1313*
+m 32-"
+m 2*
Nos. *3331
Nos. !3
et ""*
et ""*
Nos. ""*
Nos. !*-*"
+g 2-2
Nos. 1313*
et 11"!2
+m !
+m 1-
+m 3
Nos. *-1!
Nos. *-1!
Nos. *-1!
et *-1!
No *!
et *!
et *!
Nos. 1!!
Nos. 12*
7/24/2019 Schedule-III-30-01-2013.xls
45/45
Nos. 1*!
Nos. 2!*
!2
Nos. !2
+g !1--
Nos. 11*
0eter --
0eter
0eter 33-
+g 1!-
et 1!
et 11*
+g 1"--
et 2!-
et 1-
et -
+m 11."
et !*
et !*
+m 1-.12
+m 2."3
Nos. 11"
Nos. !*
(ignature6
(Printed Name6
(;esignation6