San Diego, CA March 22, 2013 Black River Generation – Retrofit Project Biomass Power Association Annual Conference
16

San Diego, CA March 22, 2013 Black River Generation – Retrofit Project Biomass Power Association Annual Conference.

Mar 31, 2015

Download

Documents

Damon Brading
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: San Diego, CA March 22, 2013 Black River Generation – Retrofit Project Biomass Power Association Annual Conference.

San Diego, CA March 22, 2013

Black River Generation – Retrofit Project

Biomass Power Association Annual Conference

Page 2: San Diego, CA March 22, 2013 Black River Generation – Retrofit Project Biomass Power Association Annual Conference.

Fast Facts

• Inside the fence at U.S. Army installation Fort Drum, near Watertown, NY

• 60 MW generating capacity

• Idled coal-burning facility• Purchased by ReEnergy December 2011• Selected to sell RECs through 10-year

contract with NYSERDA

• Supported by local governments with PILOT

2

Page 3: San Diego, CA March 22, 2013 Black River Generation – Retrofit Project Biomass Power Association Annual Conference.

Fast Facts

• Priority project of North Country Regional Economic Development Council, which approved $30M tax-exempt bond volume cap

• Site visits by Governor Cuomo and Assistant Secretary of Army Hammack

• Eligible for 1603 grant program• Partnered with SUNY ESF in USDA grant to

commercialize shrub willow project• Goal to secure PPA with Army for 100% of Fort

Drum’s energy needs

3

Page 4: San Diego, CA March 22, 2013 Black River Generation – Retrofit Project Biomass Power Association Annual Conference.

Economic Benefits

• 178 construction jobs• 33 full-time jobs at facility• Approximately 145 jobs in the forest• Additional spin-off jobs

4

Page 5: San Diego, CA March 22, 2013 Black River Generation – Retrofit Project Biomass Power Association Annual Conference.

Environmental Benefits

• Reduced emissions compared to prior use• New cooling tower to reduce water use and

thermal discharge into Black River

• Reduce limestone usage

• SFI fiber sourcing certification

5

Page 6: San Diego, CA March 22, 2013 Black River Generation – Retrofit Project Biomass Power Association Annual Conference.

Fuel Supply

• $11 million/year in green wood purchases• Expansion of innovative equipment

leasing program• Integration of alternative fuels

6

Page 7: San Diego, CA March 22, 2013 Black River Generation – Retrofit Project Biomass Power Association Annual Conference.

Retrofit

• $34 million invested• Commenced Summer 2012• General Contractor: Cianbro Corporation• Daily on-site head count as high as 190

7

Page 8: San Diego, CA March 22, 2013 Black River Generation – Retrofit Project Biomass Power Association Annual Conference.

Retrofit: New Fuel Receiving/Handling Equipment

8

Page 9: San Diego, CA March 22, 2013 Black River Generation – Retrofit Project Biomass Power Association Annual Conference.

Retrofit:Construction of Cooling Tower

9

• Addition of the Cooling TowerReduces withdrawal from the Black RiverFrom 30,000gpm to <5,000gpmReduces thermal discharge back to riverReduces environmental footprintLess disruptive to local ecosystem

Page 10: San Diego, CA March 22, 2013 Black River Generation – Retrofit Project Biomass Power Association Annual Conference.

Retrofit:Control Room Upgrades

10

• $1.5 million DCS upgrade• Latest technology – Invensys/Foxboro DCS

System• More centralized control of entire facility• Updated trending and monitoring systems

Page 11: San Diego, CA March 22, 2013 Black River Generation – Retrofit Project Biomass Power Association Annual Conference.

Retrofit:Boilers

11

• Three Pyropower/Ahlstrom circulating fluidized bed boilers• Upgraded emission controls• Upgraded flue gas path• Upgraded bottom ash system• Addition of vortex finders in CFBs• Complete overhaul of entire unit and all

associated auxiliary components

Page 12: San Diego, CA March 22, 2013 Black River Generation – Retrofit Project Biomass Power Association Annual Conference.

Retrofit: Turbine Generator

12

• Complete overhaul of unit and all associated auxiliary components

Page 13: San Diego, CA March 22, 2013 Black River Generation – Retrofit Project Biomass Power Association Annual Conference.

Retrofit:Site Work

13

• Previous delivery of coal fuel was by rail• Deliveries of biomass by truck• New signal light to be installed to improve traffic

flow

• New roadways

• New weigh system

Page 14: San Diego, CA March 22, 2013 Black River Generation – Retrofit Project Biomass Power Association Annual Conference.

14

• Existing coal bins modified to accept biomass wood chips

• Center screw reclaimer system inside modified coal bins

• New drag cain conveyor and rotary valve feed system

Retrofit:Fuel Feed System

Page 15: San Diego, CA March 22, 2013 Black River Generation – Retrofit Project Biomass Power Association Annual Conference.

15

Timetable

• Fuel deliveries began in February• Boiler tests to begin week of March 25th • Commercial operations in late April