SAN DIEGO COMMUNITY COLLEGE DISTRICT Gymnasium Daylighting Retrofit Gymnasium Daylighting Retrofit COMMUNITY COLLEGE DISTRICT Harry West Gym Harry West Gym – SD City College SD City College UC/CSU/CCC Sustainability Conference UC/CSU/CCC Sustainability Conference June 22 2009 June 22 2009 UC/CSU/CCC Sustainability Conference UC/CSU/CCC Sustainability Conference - June 22, 2009 June 22, 2009 David Umstot, PE David Umstot, PE Vice Chancellor Vice Chancellor 1 Vice Chancellor Vice Chancellor Facilities Management Facilities Management
20
Embed
San Diego City College Harry West Gymnasium Daylighting Retrofit
On September 23, 2004, the San Diego Community College District Board of Trustees approved a City College recommendation that the new Indoor Physical Education Facility be named the Harry West Gymnasium in memory of the late Athletic Director who envisioned and championed the building. The Harry West Gymnasium was completed in Oct. of 2005, located at the San Diego City College, the facility has seating for up to 2,000 spectators.
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
SAN DIEGOCOMMUNITY COLLEGE DISTRICT
Gymnasium Daylighting RetrofitGymnasium Daylighting RetrofitCOMMUNITY COLLEGE DISTRICT
y y g gy y g gHarry West Gym Harry West Gym –– SD City College SD City College
The learner will identify meansyto correct lighting illumination deficiencies with daylight harvestingdeficiencies with daylight harvestingand energy efficient lighting.
2
San Diego City College
San Diego City College is uniquely situated t t th h t f d t S Dinext to the heart of downtown San Diego,
with close proximity to freeway access, public transportation and residential neighborhoodstransportation and residential neighborhoods
3
San Diego City CollegeHarry West GymnasiumHarry West Gymnasium
The Harry West Gym first opened in October 2005. It h th l ti b k tb ll t i b d i thas three regulation basketball courts, six badmintoncourts, and three volleyball courts. It can accommodate up to 2 000 spectatorsup to 2,000 spectators.
4
Harry West GymnasiumExisting ConditionsExisting Conditions
The footcandle lighting at the floor level was half of whatwas needed for collegiate sports.
5
Harry West GymnasiumProposed CorrectionsProposed Corrections
To achieve recommended lighting levels, a daylightingretrofit was proposed to replace 400-watt High Intensity Discharge (HID) fixtures with six-bulb T-5 High Outputfi t d i t ll t l d li ht h ti fi tfixtures and install natural daylight harvesting fixtures.
6
Harry West GymnasiumProposed CorrectionsProposed Corrections
Daylighting Project
Remove 40 750-watt HID fixtures
Replace with 20 six-bulb T-5 fixtures and 20 daylight harvestingdaylight harvesting fixtures
Annual kWh Savings
116 316 kWh
7
116,316 kWh
Harry West GymnasiumRetrofit AdvantagesRetrofit Advantages
Savings of between $17 – 18K annually for electricity
Significantly improve lighting levels and lighting quality during both daytime and evening hours
Reduction of replacement costs for materials and labors by approximately 50%
Ability to take advantage of$12K in incentive rebates offered by San Diego Gas & Electric for this energy efficient solution
8
energy-efficient solution
Harry West GymnasiumDaylighting RetrofitDaylighting Retrofit
Retrofit efforts began in November 2008 with installationof the T-5 lights and electronic ballasts.
9
Harry West GymnasiumDaylighting RetrofitDaylighting Retrofit
The installation of 20 skylights was completed in April 2009.
10
Harry West GymnasiumRetrofit Energy SavingsRetrofit Energy Savings
11
Harry West GymnasiumLighting LevelsLighting Levels
Pre-existing lighting conditions using 400-watt HighIntensity Discharge (HID) fixtures
12
Harry West GymnasiumLighting LevelsLighting Levels
Footcandle reading using daylight harvest fixtures only
13
Harry West GymnasiumLighting LevelsLighting Levels
Footcandle reading after retrofit of 6L-T5 fixtures only
14
Harry West GymnasiumLighting LevelsLighting Levels
How do they compare?Pre-existing levels Daylight Harvest Retrofit of T5 fixtures
15
Harry West GymnasiumCost of ImplementationCost of Implementation
16
Harry West GymnasiumProjected Cost Savings AnnuallyProjected Cost Savings Annually
17
Harry West GymnasiumCO2 SavingsCO2 Savings
Estimated 261,427 lbs. of CO2 reduced annuallyThat’s the equivalent of removing 22 cars from San Diego
roads every year, or about 440 cars over the 20-year life-cycle of each daylight harvesting fixturelife-cycle of each daylight harvesting fixture
18
Copyright Materials
This presentation is protected by US and International Copyright laws.
Reproduction, distribution, display and use of the presentation without written permission of the speaker is prohibited.