    NNationalationalBBank ofank ofPPakistanakistan

    1

    Product Policy &Product Policy &

    ParametersParameters

  • 7/31/2019 Saibaan Comprehensive Presentation

    2/61

    NNationalationalBBank ofank ofPPakistanakistan

    2

    Home Purchase Loan : Financial assistance being acquiredunder the NBP Mortgage Financing for the purchase ofready residential property House or Apartment.

    Max. Loan amount: Rs. 35 Million

    Tenure : 3 to 20 years

    Debt to equity 85:15

    Home Construction Loan: Financial assistance beingacquired under the NBP Mortgage Financing by mortgagingself owned residential land, which may be open or partially

    constructed upon, for construction purposes leading toself-occupancy

    Max. Loan amount: Rs.35 Million

    Tenure: 3 to 20 years

    Debt to equity 85:15

  • 7/31/2019 Saibaan Comprehensive Presentation

    3/61

    NNationalationalBBank ofank ofPPakistanakistan

    3

    Home Improvement Loan: Financial assistance beingacquired under the NBP Mortgage Financing by mortgagingself owned & self occupied ready residential property -House or Apartment, for renovation purposes

    Max. Loan amount: Rs. 15 million

    Tenure : 3 to 15 years

    Debt to equity 70:30

    Balance Transfer Facility : Provide facility to those

    customers who have already availed housing finance fromsome other banks and they intend to switch their loans toNBP.

  • 7/31/2019 Saibaan Comprehensive Presentation

    4/61

    NNationalationalBBank ofank ofPPakistanakistan

    4

    PRICINGPRICING

    VARIABLE RATE (WITH INSU) 12.50%

    VARIABLE RATE (WITHOUT INSU.) 14.50%

    All applicants must be Pakistani resident nationals ,CNICAll applicants must be Pakistani resident nationals ,CNIC

    holder, having clean CIB/Data Check report andholder, having clean CIB/Data Check report and

    maintaining salary/current A/c (if not, then A/c to bemaintaining salary/current A/c (if not, then A/c to be

    opened at NBP branch before finance disbursement).opened at NBP branch before finance disbursement).

    ELIGIBILITYELIGIBILITY

  • 7/31/2019 Saibaan Comprehensive Presentation

    5/61

    NNationalationalBBank ofank ofPPakistanakistan

    5

    Type A:Ty

    pe A: Salaried Class (Further divided into Two Categories)Salaried Class (Further divided into Two Categories)

    First Category A1:First Categ

    ory A1:

    All permanent and confirmed employees of Federal, ProvincialAll permanent and confirmed employees of Federal, Provincial

    Govt., Semi-Govt., Autonomous, Semi-autonomous, Local andGovt., Semi-Govt., Autonomous, Semi-autonomous, Local and

    other bodies, whose salaries are/or shall be disbursed throughother bodies, whose salaries are/or shall be disbursed through

    NBP branches and whose employers are willing to giveNBP branches and whose employers are willing to give

    undertaking on NBPs prescribed format. These will also includeundertaking on NBPs prescribed format. These will also include

    permanent employees of NBP.permanent employees of NBP.

    TARGET MARKETTARGET MARKET

  • 7/31/2019 Saibaan Comprehensive Presentation

    6/61

    NNationalationalBBank ofank ofPPakistanakistan

    6

    Second Category A2:Second Categ

    ory A2:

    All other salaried class employees, including:All other salaried class employees, including:

    Permanent Employees of Multinational Companies,Permanent Employees of Multinational Companies,

    scheduled banks and reputed companies that have beenscheduled banks and reputed companies that have been

    approved by NBP for Saibaan.approved by NBP for Saibaan.Permanent employees of organizations other than thePermanent employees of organizations other than the

    approved list.approved list.

    Contractual employees of the above categories includingContractual employees of the above categories including

    NBP employees.NBP employees.Employees defined in category A1 but fail to qualifyEmployees defined in category A1 but fail to qualify

    because their employer is not willing to give the requiredbecause their employer is not willing to give the required

    undertaking or whose salary is or will not be disbursedundertaking or whose salary is or will not be disbursed

    through NBP branches or is requesting for mode ofthrough NBP branches or is requesting for mode of

    repayment other than deduction from salaryrepayment other than deduction from salary

    TARGET MARKETTARGET MARKET

  • 7/31/2019 Saibaan Comprehensive Presentation

    7/61

    NNationalationalBBank ofank ofPPakistanakistan

    7

    Applicants employment/business/profession shall not be partApplicants employment/business/profession shall not be part

    of Negative professions. Here profession means that theof Negative professions. Here profession means that the

    applicants main source of income is from these professions.applicants main source of income is from these professions.

    Approved organizations, corporate arrangements approved byApproved organizations, corporate arrangements approved by

    H.O., and where employer undertaking of Govt. and relatedH.O., and where employer undertaking of Govt. and related

    organizations (on NBP format for A-1 Category) is availableorganizations (on NBP format for A-1 Category) is available

    are exempt from the negative professions list.are exempt from the negative professions list.

    Secondly, relevant RBC can also recommend a customerSecondly, relevant RBC can also recommend a customer

    classified as employed in negative profession for the reviewclassified as employed in negative profession for the review

    and approval of the competent authorityand approval of the competent authority

    TARGET MARKETTARGET MARKET

  • 7/31/2019 Saibaan Comprehensive Presentation

    8/61

    NNationalationalBBank ofank ofPPakistanakistan

    8

    Type BType B

    Business PersonsBusiness Persons

    (Minimum Income:Net Take Home>=Rs 15,000)

    SelfEmployed ProfessionalSelfEmployed Professional

    (Minimum Income:Net Take Home>=Rs 15,000)

    1.1. Sole ProprietorSole Proprietor

    2.2. PartnerPartner

    3.3. Director of a reputedDirector of a reputedbusiness/companybusiness/company

    Doctor, Engineer, DesignerDoctor, Engineer, Designer

    Architect, Chartered AccountantArchitect, Chartered Accountant

    Cost & Management AccountantCost & Management Accountant

    TARGET MARKETTARGET MARKET

  • 7/31/2019 Saibaan Comprehensive Presentation

    9/61

    NNationalationalBBank ofank ofPPakistanakistan

    9

    Co-Applicants:Co-Applicants:

    Only spouse, parents & adult male children can beOnly spouse, parents & adult male children can beco-applicant. The co-applicants income may beco-applicant. The co-applicants income may be

    clubbed. In case where co-applicants income is beingclubbed. In case where co-applicants income is beingclubbed, then he / she should also fall in theclubbed, then he / she should also fall in the

    prescribed age bracket for his / her category. Theprescribed age bracket for his / her category. The

    upper age for co-applicant to be 65 years, at the timeupper age for co-applicant to be 65 years, at the time

    of the maturity of the finance, where co-applicant is aof the maturity of the finance, where co-applicant is a

    non-earning member.non-earning member.

  • 7/31/2019 Saibaan Comprehensive Presentation

    10/61

    NNationalationalBBank ofank ofPPakistanakistan

    10

    For Type A1 Salaried class category (Govt.For Type A1 Salaried class category (Govt.

    employees) minimum net take home income ofemployees) minimum net take home income of

    Rs.5,000. (Employer will ensure mode of repayment ofRs.5,000. (Employer will ensure mode of repayment of

    salary/installment transfer).salary/installment transfer). For rest of the salariedFor rest of the salaried

    class, minimum net take home income of Rs.10,000 willclass, minimum net take home income of Rs.10,000 will

    be required.be required. For Type B (Business Persons and Self-For Type B (Business Persons and Self-

    Employed) minimum net take home income required isEmployed) minimum net take home income required isRs.15,000Rs.15,000

    INCOME:INCOME:

  • 7/31/2019 Saibaan Comprehensive Presentation

    11/61

    NNationalationalBBank ofank ofPPakistanakistan

    11

    Application Processing Fee*Application Processing Fee*

    CategoryCategory FeesFees

    Government employeesGovernment employees Rs. 500/=*Rs. 500/=*

    For others, amount up toFor others, amount up toRs. 1 MillionRs. 1 Million

    Rs. 1,000/=*Rs. 1,000/=*

    For others, amountFor others, amountBetween Rs. 1 Million toBetween Rs. 1 Million to

    4 Million4 Million

    Rs. 3,000/=*Rs. 3,000/=*

    For others, amount moreFor others, amount morethan Rs. 4 Millionthan Rs. 4 Million

    Rs. 6,000/=*Rs. 6,000/=*

    *Above fees are market based and subject to change from time to time*Above fees are market based and subject to change from time to time*Above fees are market based and subject to change from time to time*Above fees are market based and subject to change from time to time

  • 7/31/2019 Saibaan Comprehensive Presentation

    12/61

    NNationalationalBBank ofank ofPPakistanakistan

    12

    External Agencies Fee*External Agencies Fee*

    *Above fees are market based and subject to change from time to time.*Above fees are market based and subject to change from time to time.**External Agencies Fee is only refundable if not utilized at any stage of the process.**External Agencies Fee is only refundable if not utilized at any stage of the process.

    Income Estimation Fee:**Income Estimation Fee:**

    Agency Name:M/s AnjumAgency Name:M/s AnjumAsim Shahid RehmanAsim Shahid Rehman

    Intl Credit Information LtdIntl Credit Information Ltd(ICIL)(ICIL)

    Loan AmountLoan AmountUptoUpto

    3 Lac to 15 M3 Lac to 15 M

    Fees*Fees*

    Rs. 2,500/=Rs. 2,500/=

    Lawyer Fee:**Lawyer Fee:**

    Agency Name: M/sAgency Name: M/sMandviwalla & ZafarMandviwalla & Zafar

    Ahmed & QaziAhmed & Qazi

    First Stage(DocumentFirst Stage(DocumentReview)SecondReview)SecondStage(Charge Registration,Stage(Charge Registration,etcetc

    Fees*Fees*

    Rs. 1,500/=Rs. 1,500/=

    Rs. 3,500Rs. 3,500

    Valuators Fee:**Valuators Fee:**

    Agency Name:M/s JosephAgency Name:M/s JosephLobo (Pvt) LtdLobo (Pvt) Ltd

    Purchase/ImprovementPurchase/ImprovementConstruction:(Initial fee)ForConstruction:(Initial fee)Forany further visitsany further visits

    Fees*Fees*Rs. 3,000/=Rs. 3,000/=

    Rs. 5,000/=Rs. 5,000/=

    Rs. 1,500/= (cost perRs. 1,500/= (cost pervisit)visit)

  • 7/31/2019 Saibaan Comprehensive Presentation

    13/61

    NNationalationalBBank ofank ofPPakistanakistan

    13

    LIST OF NEGATIVE PROFESSIONSLIST OF NEGATIVE PROFESSIONS LawyersLawyers Journalists (Publishers & Editors can be looked on case to case basis).Journalists (Publishers & Editors can be looked on case to case basis). Agriculturists unless where agriculture income is the main source of incomeAgriculturists unless where agriculture income is the main source of income Law enforcement personnelLaw enforcement personnel

    Commission based business e.g. stockbrokers, real estate agents,Commission based business e.g. stockbrokers, real estate agents,commodity brokers.commodity brokers.

    Business involved in rental business.Business involved in rental business. Business involved in giving away goods on loans or installments.Business involved in giving away goods on loans or installments. Speculative business i.e. property buying & selling, stock purchase andSpeculative business i.e. property buying & selling, stock purchase and

    selling.selling.

    Government contractors / suppliers dealing with or owing money to GoP.Government contractors / suppliers dealing with or owing money to GoP. Construction related business where there is no permanent office.Construction related business where there is no permanent office. Auto dealers / auto rentals.Auto dealers / auto rentals. Transporters.Transporters. People related to entertainment business.People related to entertainment business.

    Jewelers (smaller ones only)Jewelers (smaller ones only) Politicians or politically connected peoplePoliticians or politically connected people.

  • 7/31/2019 Saibaan Comprehensive Presentation

    14/61

    NNationalationalBBank ofank ofPPakistanakistan

    14

    Major Terms & ConditionsMajor Terms & Conditions

    AgeAge

    65 yrs at the time65 yrs at the time

    of loanof loan

    maturity.maturity.

    21 yrs to 62 yrs at21 yrs to 62 yrs at

    the time ofthe time of

    applying.applying.

    Businessperson /Businessperson /

    Self-EmployedSelf-Employed

    ProfessionalProfessional

    59 yrs and 6 mths59 yrs and 6 mths

    at the time ofat the time of

    loan maturity.loan maturity.

    22 yrs 56 yrs and22 yrs 56 yrs and

    6 mths at the6 mths at the

    time oftime of

    applying.applying.

    SalariedSalaried

    MaximumMaximumMinimumMinimum

  • 7/31/2019 Saibaan Comprehensive Presentation

    15/61

    NNationalationalBBank ofank ofPPakistanakistan

    15

    Major Terms & ConditionsMajor Terms & Conditions

    Maximum Loan Amount / TenorMaximum Loan Amount / Tenor

    Loan TenorLoan Tenor

    MaximumMaximum

    LoanLoan

    AmountAmount

    Rs. 15mRs. 15mRs. 35mRs. 35mRs. 35 mRs. 35 m

    3 15 Years3 15 Years3 20 Years3 20 Years3 203 20

    YearsYears

    HomeHome

    ImprovementImprovement

    HomeHome

    ConstructionConstruction

    HomeHome

    PurchasePurchase

  • 7/31/2019 Saibaan Comprehensive Presentation

    16/61

    NNationalationalBBank ofank ofPPakistanakistan

    16

    Major Terms & ConditionsMajor Terms & Conditions

    Debt Burden RatioDebt Burden Ratio

    Debt burden is defined as the sum total of external debt repaymentsDebt burden is defined as the sum total of external debt repayments

    divided by the net income:divided by the net income:

    Debt RepaymentDebt RepaymentDebt Burden = --------------------------------Debt Burden = --------------------------------

    Net take home salary (or NetNet take home salary (or Net

    Income)Income)

    Type A 1st Category:Type A 1st Category: Monthly instalment of all the loans deductibleMonthly instalment of all the loans deductible

    from the salary credited to account at NBP not to exceed 50% of thefrom the salary credited to account at NBP not to exceed 50% of thenet take home salary*.net take home salary*.

    Type A 2Type A 2ndnd Category:Category: Monthly instalment shall not exceed 50% of theMonthly instalment shall not exceed 50% of the

    net take home salary*.net take home salary*.

    Type B:Type B: Debts repayment (under the subject loan) not to exceedDebts repayment (under the subject loan) not to exceed

    50% of the net Income.50% of the net Income.

    Debt burden is defined as the sum total of external debt repaymentsDebt burden is defined as the sum total of external debt repayments

    divided by the net income:divided by the net income:

    Debt RepaymentDebt RepaymentDebt Burden = --------------------------------Debt Burden = --------------------------------

    Net take home salary (or NetNet take home salary (or Net

    Income)Income)

    Type A 1st Category:Type A 1st Category: Monthly instalment of all the loans deductibleMonthly instalment of all the loans deductible

    from the salary credited to account at NBP not to exceed 50% of thefrom the salary credited to account at NBP not to exceed 50% of thenet take home salary*.net take home salary*.

    Type A 2Type A 2ndnd Category:Category: Monthly instalment shall not exceed 50% of theMonthly instalment shall not exceed 50% of the

    net take home salary*.net take home salary*.

    Type B:Type B: Debts repayment (under the subject loan) not to exceedDebts repayment (under the subject loan) not to exceed

    50% of the net Income.50% of the net Income.

  • 7/31/2019 Saibaan Comprehensive Presentation

    17/61

    NNationalationalBBank ofank ofPPakistanakistan

    17

    Major Terms & ConditionsMajor Terms & Conditions

    Length of EmploymentLength of Employment

    Type A:Type A: Minimum 2 years with the same employer for all applicantsMinimum 2 years with the same employer for all applicantsof salaried classof salaried class

    If it is less than 2 years, then a past record of collective andIf it is less than 2 years, then a past record of collective andcontinuous employment of three (3) years should be made available.continuous employment of three (3) years should be made available.

    Type B:Type B: Length of occupation to be minimum three (3) year.Length of occupation to be minimum three (3) year.

    The customer should have service age remaining equal to the tenure of the loan and aThe customer should have service age remaining equal to the tenure of the loan and acushion period of six months (that is, 6 months beyond maturity of the loan).cushion period of six months (that is, 6 months beyond maturity of the loan).

  • 7/31/2019 Saibaan Comprehensive Presentation

    18/61

    NNationalationalBBank ofank ofPPakistanakistan

    18

    Major Terms & ConditionsMajor Terms & Conditions

    Property EligibilityProperty Eligibility

    Property should be an already constructed House or Apartment.

    Should be having a separate title document and a leased one.

    Title document must be clear and chain of documents complete.Property can be co-owned by family members (spouse, parents,and adult male children).

    The property should be purely residential and self occupied.

    Purchase of property from parents, siblings and spouse is notallowed.Special Conditions Related To Home Construction Finance:

    In order to be eligible for this product, the customer must be the owner of the land onwhich construction or/and extension is to take place.

  • 7/31/2019 Saibaan Comprehensive Presentation

    19/61

    NNationalationalBBank ofank ofPPakistanakistan

    19

    SecuritySecurity For security purposes, the property for the purchase / construction/

    renovation of which the financing is being provided, will be mortgaged.

    Mortgage will be created jointly in case of co owners. Joint ownership with

    other than spouse/ parent / adult male children not allowed.

    1 % token Registered of the finance amount and balance, as Equitable

    (reasonable) Mortgage will be created on the property. However, onlyEquitable Mortgage will be created on the properties financed at Karachi,

    Lahore, Islamabad & Rawalpindi.

    All the original property documents are to be reserved by the bank and

    charge to be created and registered with the Registrar of

    Documents/Assurance.

    The bank will also give three undated cheques in favour of NBP. Each check

    will amount to one finance instalment

    There should be no previous lien / claim on the property and Search

    Certificate to be obtained.

    No Certified True Copies of Title documentsNo Certified True Copies of Title documents

  • 7/31/2019 Saibaan Comprehensive Presentation

    20/61

    NNationalationalBBank ofank ofPPakistanakistan

    20

    Turnaround Time (TAT)

    Solicitation {Documentation} Not Applicable

    Submission and Processing 2 days (Pre-approval)

    Processing and Region(EAMU) 10 days

    Credit Review & Approval at HO 7 days

    Disbursal Processing 3 days

  • 7/31/2019 Saibaan Comprehensive Presentation

    21/61

    NNationalationalBBank ofank ofPPakistanakistan

    21

    LAWYER FEE

    M/s Mandviwalla & Zafar / M/s Hashmat Law Associates /

    M/S Sardar Law Associates / Noor Muhammad Chandia

    First Stage (Document Review) Rs. 1,500/=

    Second Stage(Charge Registration, etc) Rs. 3,500/=

    *Above fees are market based and subject to change from time to time

  • 7/31/2019 Saibaan Comprehensive Presentation

    22/61

    NNationalationalBBank ofank ofPPakistanakistan

    22

    INCOME ESTIMATORS FEE

    M/s Anjum Asim Shahid Rehman

    Fees*

    Rs. 2,500/=

    M/s International Credit Information Ltd.

    Fees*

    Rs. 2,500/=

    Note:- If Finance amount is more than 15 M both income estimation

    companies will appraise the income.

    *Above fees are market based and subject to change from time to time

  • 7/31/2019 Saibaan Comprehensive Presentation

    23/61

    NNationalationalBBank ofank ofPPakistanakistan

    23

    VALUATORS FEE

    M/s Surval / NPM / Projects

    Service Fees*

    Purchase/Improvement Rs. 3,000/=

    Construction (Initial fee) Rs. 2,000/=

    For any further visit Rs. 1,000/=

    *Above fees are market based and subject to change from time to time

  • 7/31/2019 Saibaan Comprehensive Presentation

    24/61

    NNationalationalBBank ofank ofPPakistanakistan

    24

    Insurance Companys Fee

    EFU Insurance Company (Property Insurance)

    0.055% of the Loan Amount

    ALICO

    0.525% of the outstanding loan amount.

  • 7/31/2019 Saibaan Comprehensive Presentation

    25/61

    NNationalationalBBank ofank ofPPakistanakistan

    25

    EARLY REPAYMENTThe customer, at any point of time, may use the right to fully or partially

    pay the finance

    Customer will provide a written request for early repayment to the

    concerned Hub Branch that will be sent to the HO, subject to early

    repayment penalty in line with

    a)Partial Redemption (Balloon Payment) / Full Redemption within

    5 years - 2% of the amount being prepaid

    b)Full/Partial Redemption beyond 5 years - 0%

    A balloon payment case will be directed to the HO for amendmentsthat may be required in the repayment schedules. The HO will

    approve a revised system generated repayment schedule and send to

    the concerned Retail Officer/Branch Manager at the Hub Branch, who

    will obtain signed customer acceptance

  • 7/31/2019 Saibaan Comprehensive Presentation

    26/61

    NNationalationalBBank ofank ofPPakistanakistan

    26

    E. POLICY DEVIATION:

    Hub Branches and Regions are required to forward,

    along with their recommendations, all those cases which

    have issues relating to policy deviation. If Hub Branch or

    Region does not favor recommendation, they still have to

    send these cases to Head Office along with the reasons for

    not recommending the case. Only Head Office has the

    authority to approve or disapprove any case with policy

    deviations.

  • 7/31/2019 Saibaan Comprehensive Presentation

    27/61

    NNationalationalBBank ofank ofPPakistanakistan

    27

    Forwarding of Cases to Head OfficeForwarding of Cases to Head Office

    In those cases where the legal, valuation and physicalIn those cases where the legal, valuation and physical

    verification reports are satisfactory, the Hubverification reports are satisfactory, the Hub

    branches/Regional EAMUs are required to send thosebranches/Regional EAMUs are required to send thosecases immediately to Head Office even some othercases immediately to Head Office even some other

    formalities such asformalities such as NIC, Utility Bills, Credit Card BillsNIC, Utility Bills, Credit Card Bills

    etc have not been fulfilled by the customer. However,etc have not been fulfilled by the customer. However,

    these formalities and including others should bethese formalities and including others should becompleted before the disbursement of the loan.completed before the disbursement of the loan.

  • 7/31/2019 Saibaan Comprehensive Presentation

    28/61

    NNationalationalBBank ofank ofPPakistanakistan

    28

    Concept of Hub & Referral Branches:

    All NBP branches throughout Pakistan will act as referralbranches and can refer their NBP-Saibaan cases to Hub

    branches however, the property has to be located in the

    cities where NBP-Saibaan is being offered through Hub

    branches.

  • 7/31/2019 Saibaan Comprehensive Presentation

    29/61

    NNationalationalBBank ofank ofPPakistanakistan

    29

    2. Employer Undertaking:2. Employer Undertaking:As per IC # 11/2004 dated 20-01-2004 employer undertakingAs per IC # 11/2004 dated 20-01-2004 employer undertaking

    is must for A-1 category and those applicants of A-2is must for A-1 category and those applicants of A-2

    category who are employed with Multi-national andcategory who are employed with Multi-national and

    approved companies.approved companies.

    Now this requirement of undertaking is being relaxed.Now this requirement of undertaking is being relaxed. ThatThat

    is, those applicants of A-1 category who are unable tois, those applicants of A-1 category who are unable to

    provide their employer undertaking will be treated in A-2provide their employer undertaking will be treated in A-2

    category as mentioned above in the Target Market.category as mentioned above in the Target Market.However, salaries of A-1 category should be disbursedHowever, salaries of A-1 category should be disbursed

    through NBPthrough NBP, if not, then they will be treated in A-2 as, if not, then they will be treated in A-2 as

    mentioned above in Target Market.mentioned above in Target Market.

  • 7/31/2019 Saibaan Comprehensive Presentation

    30/61

    NNationalationalBBank ofank ofPPakistanakistan

    30

    PROPERTY LOCATION:

    The property being financed has to be located in the city where

    the Hub Branch is located this must be strictly ensured.

    However, release is allowed only between following Regions:

    1.Between Karachi South & Karachi West2.Between Lahore Central & Lahore East

    For example, a salary account holder of Margalla Road

    Branch, Islamabad is purchasing a house in Rawalpindi, in this

    case, although the property is located in Rawalpindi, but theloan can be booked at any Hub Branch of Islamabad Region

    i.e. at the customers option.

  • 7/31/2019 Saibaan Comprehensive Presentation

    31/61

    NNationalationalBBank ofank ofPPakistanakistan

    31

    9. Execution of Sales Deed:

    In case of Home Purchase the Sale Deed to be

    executed should not be less than the official

    property value of that area as prescribed by thegovernment. Same is applicable for Home

    Construction cases where land / partial structures

    for construction is being purchased.

  • 7/31/2019 Saibaan Comprehensive Presentation

    32/61

    NNationalationalBBank ofank ofPPakistanakistan

    32

    Customer Request LetterCustomer Request Letter

    To be submitted in case the Loan is declined and the applicant stillTo be submitted in case the Loan is declined and the applicant still

    insists to process the case.insists to process the case.

    A letter (A letter (Annexure BAnnexure B) has been developed to) has been developed tosafeguard and indemnify NBP from any futuresafeguard and indemnify NBP from any future

    claims by the applicant for refund of fees of theclaims by the applicant for refund of fees of the

    External Agency, if his/her application is declinedExternal Agency, if his/her application is declined

    due to the following and he/she still insist to forwarddue to the following and he/she still insist to forwardthe case to Head Office for special consideration:the case to Head Office for special consideration:

    http://var/www/apps/conversion/current/Farhad/Office/SALARY%20FACTORING/Presentations%20for%207%20to%2017%20September%202005/Annexure-B.dochttp://var/www/apps/conversion/current/Farhad/Office/SALARY%20FACTORING/Presentations%20for%207%20to%2017%20September%202005/Annexure-B.dochttp://var/www/apps/conversion/current/Farhad/Office/SALARY%20FACTORING/Presentations%20for%207%20to%2017%20September%202005/Annexure-B.doc
  • 7/31/2019 Saibaan Comprehensive Presentation

    33/61

    NNationalationalBBank ofank ofPPakistanakistan

    33

    Data Check is negative.Data Check is negative.CIB (SBP) is negative.CIB (SBP) is negative.

    Medical Report is not satisfactory.Medical Report is not satisfactory.Legal Opinion states that the property is notLegal Opinion states that the property is not

    mortgagable or other reasons etc.mortgagable or other reasons etc.

    Valuation is negative.Valuation is negative.

    Income Estimation states that the applicant isIncome Estimation states that the applicant isunable to come up with the required installments.unable to come up with the required installments.

    >>>In such scenarios and circumstances Loan>>>In such scenarios and circumstances Loan

    approval will be subject to Competent Authoritysapproval will be subject to Competent Authoritys

    decision on the case.decision on the case.

    Customer Request LetterCustomer Request Letter

    To be submitted in case the Loan is declined and the applicant stillTo be submitted in case the Loan is declined and the applicant stillinsists to process the case.insists to process the case.

  • 7/31/2019 Saibaan Comprehensive Presentation

    34/61

    NNationalationalBBank ofank ofPPakistanakistan

    34

    Purchase of Land for ConstructionPurchase of Land for Construction

    Financing for both, Purchase of land or partially constructed houseFinancing for both, Purchase of land or partially constructed house

    as well as Construction on it.as well as Construction on it.

    Currently, NBP is offering financing for purchase,Currently, NBP is offering financing for purchase,construction and renovation of homes. Many banksconstruction and renovation of homes. Many banks

    in Pakistan have also started financing for bothin Pakistan have also started financing for both

    purchase of land and construction on it. In order topurchase of land and construction on it. In order to

    stay competitive, it has been decided thatstay competitive, it has been decided that NBP willNBP will

    now offer financing for this with maximumnow offer financing for this with maximum

    Debt/Equity ratio of 70:30.Debt/Equity ratio of 70:30.

  • 7/31/2019 Saibaan Comprehensive Presentation

    35/61

    NNationalationalBBank ofank ofPPakistanakistan

    35

    In this connection,In this connection, the sanctioned loan limit,the sanctioned loan limit,

    assessed on the basis of repayment capacity of theassessed on the basis of repayment capacity of the

    borrower, value of land / plot and cost ofborrower, value of land / plot and cost of

    construction on it etc.,construction on it etc., should be disbursed inshould be disbursed in

    tranches, with up to a maximum of 50% of the loantranches, with up to a maximum of 50% of the loan

    limit can be disbursed for the purchase of land /limit can be disbursed for the purchase of land /

    plot, and the remaining amount be disbursed forplot, and the remaining amount be disbursed for

    construction there-upon.construction there-upon.

    Purchase of Land for ConstructionPurchase of Land for Construction

    Financing for both, Purchase of land or partially constructed houseFinancing for both, Purchase of land or partially constructed house

    as well as Construction on it.as well as Construction on it.

  • 7/31/2019 Saibaan Comprehensive Presentation

    36/61

    NNationalationalBBank ofank ofPPakistanakistan

    36

    Purchase of Land for ConstructionPurchase of Land for Construction

    Financing for both, Purchase of land or partially constructed houseFinancing for both, Purchase of land or partially constructed house

    as well as Construction on it.as well as Construction on it.

    As noted above, 50% of the approved financeAs noted above, 50% of the approved finance

    amount will be disbursed initially for the purchaseamount will be disbursed initially for the purchase

    of the land with the banks charge on the propertyof the land with the banks charge on the property

    to be created immediately.to be created immediately. The remaining balanceThe remaining balance

    for construction on the same plot will be disbursedfor construction on the same plot will be disbursedin 4 (four) tranches as currently being followed inin 4 (four) tranches as currently being followed in

    Home Construction cases:Home Construction cases:

  • 7/31/2019 Saibaan Comprehensive Presentation

    37/61

    NNationalationalBBank ofank ofPPakistanakistan

    37

    StageStage Construction StatusConstruction Status Finance DisbursementFinance Disbursement

    ScheduleSchedule

    11 FoundationFoundation 20% (of remaining 50%)20% (of remaining 50%)

    22 Ground & Upper FloorGround & Upper Floor

    ConstructionConstruction40% (of remaining 50%)40% (of remaining 50%)

    33 Electric, Plumbing &Electric, Plumbing &

    Wood WorkWood Work20% (of remaining 50%)20% (of remaining 50%)

    44 FinishingFinishing 20% (of remaining 50%)20% (of remaining 50%)

    Purchase of Land for ConstructionPurchase of Land for Construction

    Financing for both, Purchase of land or partially constructed houseFinancing for both, Purchase of land or partially constructed house

    as well as Construction on it.as well as Construction on it.

  • 7/31/2019 Saibaan Comprehensive Presentation

    38/61

    NNationalationalBBank ofank ofPPakistanakistan

    38

    Purchase of Land for ConstructionPurchase of Land for Construction

    Financing for both, Purchase of land or partially constructed houseFinancing for both, Purchase of land or partially constructed house

    as well as Construction on it.as well as Construction on it.

    Construction should start within 6 months afterdisbursement of first 50% of the approved finance

    amount. The total construction period should not

    exceed 15 months inclusive of the initial 6 months.

    During this period i.e. 15 months, customer will onlybe paying mark-up on the amount disbursed.

  • 7/31/2019 Saibaan Comprehensive Presentation

    39/61

    NNationalationalBBank ofank ofPPakistanakistan

    39

    Full installment payment complete of Principle payment will

    start from the 16th month or completion of construction,whichever is earlier. In order to assess the value of

    construction, which will form an integral part of loan

    assessment, customer will be required to submit a realistic

    Bills of Quantity (BOQ) on the Banks approved format, at

    the time of applying for the finance which will be duly

    approved by the Banks Valuator. Each subsequent tranche

    will be disbursed only after receiving satisfactory valuation

    report (Example).

    Purchase of Land for ConstructionPurchase of Land for Construction

    Financing for both, Purchase of land or partially constructed house as well asFinancingfor both, Purchase of land or partially constructed house as well as

    Construction on it.Construction on it.

    http://var/www/apps/conversion/current/Farhad/Office/SALARY%20FACTORING/Presentations%20for%207%20to%2017%20September%202005/Example.dochttp://var/www/apps/conversion/current/Farhad/Office/SALARY%20FACTORING/Presentations%20for%207%20to%2017%20September%202005/Example.doc
  • 7/31/2019 Saibaan Comprehensive Presentation

    40/61

    NNationalationalBBank ofank ofPPakistanakistan

    40

    Purchase of Land for ConstructionPurchase of Land for Construction

    Financing for both, Purchase of land or partially constructed house as well asFinancingfor both, Purchase of land or partially constructed house as well as

    Construction on it.Construction on it.

    Additionally, the bank will also finance partially constructed

    structures with maximum Debt/Equity ratio of 70 : 30. Loanassessment in these cases will include value of land, cost of

    current partial structure and the further cost required to

    complete the property. BoQ submission is also required here

    to project remaining construction cost.

  • 7/31/2019 Saibaan Comprehensive Presentation

    41/61

    NNationalationalBBank ofank ofPPakistanakistan

    41

    Initiating for Legal Opinion, Property ValuationInitiating for Legal Opinion, Property Valuation

    and Income Estimationand Income EstimationHub Branch to perform some of the functions of Regional EAMU Office.Hub Branch to perform some of the functions of Regional EAMU Office.

    It has been decided thatIt has been decided that apart from already assignedapart from already assigned

    functions as per above mentioned circulars, Hub Branchfunctions as per above mentioned circulars, Hub Branch

    will also do some of the functions of Regional EAMUwill also do some of the functions of Regional EAMU

    Office which are outlined below:Office which are outlined below:

  • 7/31/2019 Saibaan Comprehensive Presentation

    42/61

    NNationalationalBBank ofank ofPPakistanakistan

    42

    1.1. Generate request for Data Check and e-CIB to Head Office.Generate request for Data Check and e-CIB to Head Office.

    2.2. Initiation of Life & Disability Insurance request.Initiation of Life & Disability Insurance request.

    3.3. Generate letters to Regional EAMU Office for Physical &Generate letters to Regional EAMU Office for Physical &Telephonic Verifications.Telephonic Verifications.

    4.4. Generate request for Legal Opinion from the authorizedGenerate request for Legal Opinion from the authorized

    BLA for NBP-Saibaan.BLA for NBP-Saibaan.

    5.5. Generate request for Property Valuation from theGenerate request for Property Valuation from the

    authorized valuator for NBP-Saibaan.authorized valuator for NBP-Saibaan.6.6. Generate request for Income Estimation from theGenerate request for Income Estimation from the

    authorized income estimator (where applicable).authorized income estimator (where applicable).

    Initiating for Legal Opinion, Property Valuation andInitiating for Legal Opinion, Property Valuation and

    Income EstimationIncome EstimationHub Branch to perform some of the functions of Regional EAMU Office.Hub Branch to perform some of the functions of Regional EAMU Office.

  • 7/31/2019 Saibaan Comprehensive Presentation

    43/61

    NNationalationalBBank ofank ofPPakistanakistan

    43

    Initiating for Legal Opinion, Property Valuation

    and Income Estimation

    Hub Branch to perform some of the functions of Regional EAMU

    Office.

    Copies of all above letters / correspondence are also to

    be provided to Regional EAMU office. The Regional

    EAMU office will enter the triggering dates of these

    tasks into the CAMS. Both the Hub Branch and theRegional EAMU office will follow-up with the agencies

    for the timely receipt of reports.

    N B P

  • 7/31/2019 Saibaan Comprehensive Presentation

    44/61

    NNationalationalBBank ofank ofPPakistanakistan

    44

    The external agencies are to send the original reportsto concerned Hub Branch with a copy to the EAMU-

    Head, National Bank of Pakistan, Retail Banking

    Group, 11th Floor, Head Office, I.I. Chundrigar

    Road, Karachi. In this regard it is the responsibilityof each RHQ and the Hub Branch to inform its

    external agencies about the change in the process as

    mentioned above.

    Initiating for Legal Opinion, Property Valuation

    and Income Estimation

    Hub Branch to perform some of the functions of Regional EAMU

    Office.

    N B P

  • 7/31/2019 Saibaan Comprehensive Presentation

    45/61

    NNationalationalBBank ofank ofPPakistanakistan

    45

    Initiating for Legal Opinion, Property Valuation andInitiating for Legal Opinion, Property Valuation and

    Income EstimationIncome Estimation

    Hub Branch to perform some of the functions of Regional EAMU Office.Hub Branch to perform some of the functions of Regional EAMU Office.

    Upon receipt of external agency reports, Hub BranchUpon receipt of external agency reports, Hub Branch

    will forward the same along with the complete case filewill forward the same along with the complete case fileto its respective Regional EAMU office,to its respective Regional EAMU office, where thesewhere these

    reports will be entered into the CAMS and the case willreports will be entered into the CAMS and the case will

    be processed further.be processed further. Regional EAMU office will alsoRegional EAMU office will also

    sign off on these reports along with the Hub Branch.sign off on these reports along with the Hub Branch.The TAT of external agencies will need to be monitoredThe TAT of external agencies will need to be monitored

    by both the Hub Branch and the Regional EAMU office,by both the Hub Branch and the Regional EAMU office,

    ensuring that the time frame provided in the instructionensuring that the time frame provided in the instruction

    circulars is not hindered.circulars is not hindered.

    N B P

  • 7/31/2019 Saibaan Comprehensive Presentation

    46/61

    NNationalationalBBank ofank ofPPakistanakistan

    46

    The function of Physical and Telephonic VerificationThe function of Physical and Telephonic Verification

    will remain the responsibility of the Regional EAMUwill remain the responsibility of the Regional EAMUOffice.Office. Similarly, the Data Check and CIB will stillSimilarly, the Data Check and CIB will still

    be the responsibility of Head Officebe the responsibility of Head Office; however, the; however, the

    request will be generated by the concernedrequest will be generated by the concerned HUBHUB

    BranchBranch. In this regard, the Hub Branch will send a. In this regard, the Hub Branch will send arequest to its Regional EAMU office for initiatingrequest to its Regional EAMU office for initiating

    these verifications. Hub Branch will generate thesethese verifications. Hub Branch will generate these

    requests on the same day or before it initiates therequests on the same day or before it initiates the

    case for external agencies.case for external agencies.

    Initiating for Legal Opinion, Property Valuation andInitiating for Legal Opinion, Property Valuation and

    Income EstimationIncome Estimation

    Hub Branch to perform some of the functions of Regional EAMU Office.Hub Branch to perform some of the functions of Regional EAMU Office.

    NN BB PP

  • 7/31/2019 Saibaan Comprehensive Presentation

    47/61

    NNationalationalBBank ofank ofPPakistanakistan

    47

    Charge on the PropertyCharge on the Property

    1% Registered Mortgage of the Finance amount and remaining1% Registered Mortgage of the Finance amount and remaining

    balance as Equitable Mortgagebalance as Equitable Mortgage.

    With immediate effect it has been decided that inWith immediate effect it has been decided that inKarachi, Lahore, Islamabad & Rawalpindi for securityKarachi, Lahore, Islamabad & Rawalpindi for security

    purposes, property is to be 1% token registered (ofpurposes, property is to be 1% token registered (of

    finance amount) and balance as equitable mortgage.finance amount) and balance as equitable mortgage.

    However, RHQs at these cities will have concern toHowever, RHQs at these cities will have concern tohave the property on 100% equitable mortgage subjecthave the property on 100% equitable mortgage subject

    to approval by Head Office.to approval by Head Office.

    NN BB PP

  • 7/31/2019 Saibaan Comprehensive Presentation

    48/61

    NNationalationalBBank ofank ofPPakistanakistan

    48

    Recently,Recently, SBP has removed the maximum perSBP has removed the maximum per

    party limit of Rs. 10 millionparty limit of Rs. 10 million in respect of housingin respect of housing

    finance. Therefore, it is decided that the maximumfinance. Therefore, it is decided that the maximum

    per party limit of Rs. 10 million under NBP per party limit of Rs. 10 million under NBP Saibaan to be removed with immediate effect andSaibaan to be removed with immediate effect and

    be capped at Rbe capped at Rs. 35.00 million EXCEPT for Homes. 35.00 million EXCEPT for Home

    Improvement which is to be capped at 15 M.Improvement which is to be capped at 15 M.

    However, all home financing facilities above Rs. 10However, all home financing facilities above Rs. 10

    M will be subject to a maximum of debt to equityM will be subject to a maximum of debt to equity

    ratio of 80 : 20ratio of 80 : 20

    Removal of Per Party Limit: -Removal of Per Party Limit: -

    NN BB PP

  • 7/31/2019 Saibaan Comprehensive Presentation

    49/61

    NNationalationalBBank ofank ofPPakistanakistan

    49

    Government Employees Minimum Net TakeGovernment Employees Minimum Net TakeHome Salary to be Rs. 5,000/=: -Home Salary to be Rs. 5,000/=: -

    In order to facilitate all government employees,In order to facilitate all government employees,

    it has been decided that minimum net take homeit has been decided that minimum net take home

    salary requirement be made Rs. 5,000/-salary requirement be made Rs. 5,000/-

    irrespective of whether they are willing toirrespective of whether they are willing to

    provide required employer undertaking or not.provide required employer undertaking or not.However, their salary A/c has to be maintainedHowever, their salary A/c has to be maintained

    with NBP and their salary to be directlywith NBP and their salary to be directly

    credited to their salary A/c.credited to their salary A/c.

    NN BB PP

  • 7/31/2019 Saibaan Comprehensive Presentation

    50/61

    NNationalationalBBank ofank ofPPakistanakistan

    50

    It is decided that life & disability insurance be made

    an optional feature instead of the current status of

    being compulsory. However, in cases where theapplicant does not opt for life & disability insurance: -

    The debt to equity ratio to be 80:20 instead of 85:15

    Markup rate to be raised by 2%.

    Making Life & Disability Insurance Optional:Making Life & Disability Insurance Optional:

    NN i l BB k f PP ki

  • 7/31/2019 Saibaan Comprehensive Presentation

    51/61

    NNationalationalBBank ofank ofPPakistanakistan

    51

    All financing facilities of Rs. 15 Million and above will

    be required to have two income estimation reports

    from two different agencies and the cost will be borne

    by the customer.

    2 Income Estimation for facilities above 15.00M2 Income Estimation for facilities above 15.00M

    NN i l BB k f PP ki

  • 7/31/2019 Saibaan Comprehensive Presentation

    52/61

    NNationalationalBBank ofank ofPPakistanakistan

    52

    NN i li l BB k fk f PP kiki

  • 7/31/2019 Saibaan Comprehensive Presentation

    53/61

    NNationalationalBBank ofank ofPPakistanakistan

    53

    As per current policy at the time ofAs per current policy at the time of

    disbursement (handing of payment order)disbursement (handing of payment order)

    Bank/BLA has to take the original propertyBank/BLA has to take the original property

    documents in its custody.documents in its custody. This works fine in aThis works fine in a

    normal case of housing finance, however, thenormal case of housing finance, however, the

    said practice does not hold true in cases ofsaid practice does not hold true in cases ofBalance Transfer Facility (BTF).Balance Transfer Facility (BTF).

    Background: -Background: -

    NN i li l BB k fk f PP kiki

  • 7/31/2019 Saibaan Comprehensive Presentation

    54/61

    NNationalationalBBank ofank ofPPakistanakistan

    54

    The reason for this is that in BTF cases theThe reason for this is that in BTF cases the

    original property documents are already in theoriginal property documents are already in the

    possession of a Bank for which BTF has beenpossession of a Bank for which BTF has been

    approved and the concernedapproved and the concerned Bank takes someBank takes some

    time (due to internal process) intime (due to internal process) in

    releasing/delivery of the original documentsreleasing/delivery of the original documents

    after receiving the pay order on behalf of theafter receiving the pay order on behalf of the

    borrowerborrower

    Background: -Background: -

    NN i li l BB k fk f PP kiki

  • 7/31/2019 Saibaan Comprehensive Presentation

    55/61

    NNationalationalBBank ofank ofPPakistanakistan

    55

    To streamline the process of BTF, theTo streamline the process of BTF, the

    following four steps are to be followed : -following four steps are to be followed : -

    1)1) Documents requirements from theDocuments requirements from the

    customers.customers.

    2)2) Inspection of Original title documents.Inspection of Original title documents.

    3)3) Letter from the institutions.Letter from the institutions.

    4)4) Handing over the Payorder to theHanding over the Payorder to the

    concernedconcerned institution.institution.

    Procedure: -Procedure: -

    NN i lti l BB k fk f PP kiki t

  • 7/31/2019 Saibaan Comprehensive Presentation

    56/61

    NNationalationalBBank ofank ofPPakistanakistan

    56

    1. Documents requirements from the customers1. Documents requirements from the customers

    While processing the BTF cases NBP mustWhile processing the BTF cases NBP must

    require following from the customer/borrower:require following from the customer/borrower:

    Duly attested copy(ies) of title document(s)Duly attested copy(ies) of title document(s)

    from the bank that is holding such documents.from the bank that is holding such documents.

    A copy of acknowledgement of receiving theA copy of acknowledgement of receiving the

    title documents from the customertitle documents from the customer

    that he/shethat he/she

    would have obtained from the bank whilewould have obtained from the bank while

    depositing title documents with that bank.depositing title documents with that bank.

    A copy of Letter to Releasing BankA copy of Letter to Releasing Bank

    NN i lti l BB k fk f PP kiki t

  • 7/31/2019 Saibaan Comprehensive Presentation

    57/61

    NNationalationalBBank ofank ofPPakistanakistan

    57

    2) Inspection of Original title documents.2) Inspection of Original title documents.

    The risk for not inspecting the original titleThe risk for not inspecting the original title

    documents previous to disbursement must bedocuments previous to disbursement must be

    moderate by having the genuineness ofmoderate by having the genuineness of thethephotocopies of the title documents that the customerphotocopies of the title documents that the customer

    would have submitted to NBP, independentlywould have submitted to NBP, independently

    confirmed from the relevant offices.confirmed from the relevant offices.

    Regions will be responsible for getting theRegions will be responsible for getting the

    genuineness of the documents verified from thegenuineness of the documents verified from the

    BLA through relevant offices.BLA through relevant offices.

    NN ti lti l BB k fk f PP ki tki t

  • 7/31/2019 Saibaan Comprehensive Presentation

    58/61

    NNationalationalBBank ofank ofPPakistanakistan

    58

    Kindly note that acceptance of the said pay orderKindly note that acceptance of the said pay order

    by you will be treated by us as confirmation thatby you will be treated by us as confirmation that

    photocopy(ies) of title documents(s) that werephotocopy(ies) of title documents(s) that wereprovided to us by our customer (and copies ofprovided to us by our customer (and copies of

    which are attached with this letter) is/are truewhich are attached with this letter) is/are true

    copy(ies) of the original document(s) that is/arecopy(ies) of the original document(s) that is/are

    in your possession.in your possession.

    Letter Format:Letter Format:

    NN ti lti l BB k fk f PP ki tki t

  • 7/31/2019 Saibaan Comprehensive Presentation

    59/61

    NNationalationalBBank ofank ofPPakistanakistan

    59

    If NOT, you must return the pay orderIf NOT, you must return the pay order

    immediately inform us to enable us to protectimmediately inform us to enable us to protect

    our bank from any potential fraud.our bank from any potential fraud.

    Yours truly,Yours truly,

    ____________________________

    Authorized SignerAuthorized Signer

    Letter Format:Letter Format:

    NN ti lti l BB k fk f PP ki tki t

  • 7/31/2019 Saibaan Comprehensive Presentation

    60/61

    NNationalationalBBank ofank ofPPakistanakistan

    60

    Additionally, it may also beAdditionally, it may also beensured that BTF cases of onlyensured that BTF cases of only

    reputable commercial banks willreputable commercial banks will

    be accepted.be accepted.

    NOTE: -NOTE: -

    NN ti lti l BB k fk f PP ki tki t

  • 7/31/2019 Saibaan Comprehensive Presentation

    61/61

    NNationalationalBBank ofank ofPPakistanakistan

    COMPETITIVE ADVANTAGESCOMPETITIVE ADVANTAGES

    LOWEST MARKUP RATE.LOWEST MARKUP RATE.

    LOWEST PROCESSING FEE.LOWEST PROCESSING FEE.

    HIGHEST DEBT EQUITY RATIO.HIGHEST DEBT EQUITY RATIO.

    LOWEST MINIMUM REQUIREMENT.LOWEST MINIMUM REQUIREMENT.

    HIGHEST NUMBER OF POSITIVE AREASHIGHEST NUMBER OF POSITIVE AREAS