80 Million Construction Man-hours Without a Lost Time Incident Client: Saudi Aramco in JV with Dow Chemical Company Location: Al-Jubail, KSA Scope: Pre-FEED, FEED (Process Units), PMC (including support for construction management and CS&U) Status: Ongoing – Awarded 2007 Details: • The Sadara Chemical Project is currently in the construction phase for what will be the world’s largest chemical complex ever built in a single phase. With 26 integrated world- scale manufacturing plants that will produce more than three milliontons of products every year, it is anticipated that Sadara will become a Fortune 500 company within the first year of full operation. • KBR has executed the project feasibility and pre-FEED for the entire complex, as well as the FEED scopes of several major assets. KBR is also a licensor of its Aniline technology for the project. KBR is currently the project management contractor (PMC) and has about 660 specialized personnel at the Jubail site. • KBR will continue its long-standing partnership with Sadara throughout the upcoming commis- sioning and operations phases of the project as Sadara’s “Engineering Contractor of Choice.” Safety Highlights: • In August 2015, the Sadara Chemical Project achieved 80 million construction man-hours without a Lost Time Incident (LTI). • The project has an impressive OSHA Total Recordable Incident Rate (TRIR) of 0.035. • KBR’s culture of Zero Harm requires a full commitment by every employee throughout the organization. The KBR on-site team performed hundreds of joint safety walkthroughs with the Project Management Team (PMT) and their construction contractors. Continued on following page Sadara Project Al-Jubail, Saudi Arabia