Top Banner
PROJECT PORTFOLIO SACHIN DAVANGERE ELECTRICAL DESIGN & BIM ENGINEER [email protected] +919945726970
20

sachin portfolio

Apr 13, 2017

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: sachin portfolio

PROJECT PORTFOLIO

SACHIN DAVANGERE

ELECTRICAL DESIGN & BIM

ENGINEER

[email protected]

+919945726970

Page 2: sachin portfolio

PROJECT OVERVIEW

Building type : OFFICE

Location: BANGALURU

Area: 5009 sq ft.

Floors: STILT+GROUND FLOOR+4 FLOORS

Design occupancy: 200

Building operating schedule:12×5

Air distribution system: VAV SINGLE DUCT

Page 3: sachin portfolio

ARCHITECTURE MODELS

3D VIEW OF BUILDING

Page 4: sachin portfolio

ELECTRICAL SYSTEM

TOTAL AREA : 2115m²

CONSIDERING AS PER NBC LIGHTING POWER : 10.8W/m²

DIVERSITY FACTOR : 0.7

TOTAL LIGHTING LOAD: 15.98KW

LIGHT RENDERING IMAGE

Page 5: sachin portfolio

ARTIFICIAL LIGHT RENDER RENDER FOR SUN ONLY

Light Rendering

Page 6: sachin portfolio

SECTIONAL VIEW

8’-6”

8’-6”

Lighting fixtures

Page 7: sachin portfolio

Cont….

Mirror lamp

Ceiling light

Page 8: sachin portfolio

ELECTRICAL LAYOUT

cable

Lighting fixture

Dis

trib

uti

on

bo

x

Wires are selected based on the load using standard catalogues.

Ladder type cable trays are used.

Page 9: sachin portfolio

DIALux Lighting Simulation

Page 10: sachin portfolio

Sectional view

Page 11: sachin portfolio

LOAD CALCULATION

Page 12: sachin portfolio

HVAC SYSTEM

Page 13: sachin portfolio

Sectional View

Page 14: sachin portfolio

PLUMBING

Floor plan view

Section view

Y bends for sanitary pipes.

1% slope maintained for zero pressure flow.

Page 15: sachin portfolio

3D view plumbing system

Page 16: sachin portfolio

INTERFERENCE/CLASH REPORT

Clashes between the MEP systems .

Clashes are indicated by ID in report.

Using ID clashes are solved.

Page 17: sachin portfolio

CLASH FREE MODEL FOR CLASH FREE COORDINATE

HVAC ducts & air terminals Electrical cable trays

Plumbing sanitary and supply water pipes

Page 18: sachin portfolio

BILL OF QUANTITIES BOQ are used for the estimation of cost.

Scheduling is used to get the details of equipment of whole project.

Page 19: sachin portfolio

FAMILIES Designing Equipment with project specifications.

Designing labels with specified details.

Annotations

Page 20: sachin portfolio