Rehabilitate Runway 5L23R and Taxiway A Indianapolis International Airport IAA Project No. I14003 PreBid Meeting May 1, 2014 3:00 PM In Partnership With:
30

Runway 5L 23R and Taxiway A Indianapolis Airport IAA Project … · 01/05/2014  · Runway 5L ‐ 23R and Taxiway A CONSTRUCTION SAFETY AND PHASING – General (Cont’d) Weekly Construction

Oct 11, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Runway 5L 23R and Taxiway A Indianapolis Airport IAA Project … · 01/05/2014  · Runway 5L ‐ 23R and Taxiway A CONSTRUCTION SAFETY AND PHASING – General (Cont’d) Weekly Construction

Rehabilitate Runway 5L‐23R and Taxiway AIndianapolis International Airport

IAA Project No. I‐14‐003

Pre‐Bid MeetingMay 1, 2014  ‐ 3:00 PM

In Partnership With:

Page 2: Runway 5L 23R and Taxiway A Indianapolis Airport IAA Project … · 01/05/2014  · Runway 5L ‐ 23R and Taxiway A CONSTRUCTION SAFETY AND PHASING – General (Cont’d) Weekly Construction

INTRODUCTIONSRe

habilitate Ru

nway 5L‐23

R an

d Taxiway A Owner – Indianapolis Airport Authority

Engineer’s of Record: 

CHA Consulting, Inc. 

Infrastructure Engineering, Inc.

Attendee Introductions (Include Company Name, Prime or Subcontractor, and Identify XBE Status)

Page 3: Runway 5L 23R and Taxiway A Indianapolis Airport IAA Project … · 01/05/2014  · Runway 5L ‐ 23R and Taxiway A CONSTRUCTION SAFETY AND PHASING – General (Cont’d) Weekly Construction

Reha

bilitate Ru

nway 5L‐23

R an

d Taxiway A

BIDDING DOCUMENTS

Documents available through Reprographix, Inc. ePlanroom (www.reprographix.com)

Documents Consist of: 

Bid Proposal Packet

Specification Booklet

Construction Plan Set

Bids are due Thursday, May 22, 2014 @ 11:00 AM

Page 4: Runway 5L 23R and Taxiway A Indianapolis Airport IAA Project … · 01/05/2014  · Runway 5L ‐ 23R and Taxiway A CONSTRUCTION SAFETY AND PHASING – General (Cont’d) Weekly Construction

Reha

bilitate Ru

nway 5L‐23

R an

d Taxiway A

BID PROPOSAL

All bid proposals must be submitted in an opaque envelope marked with the following information:

Bidder’s Name

Project Name

Date and Time Bids Are Due

Arrangement of Bid Proposal and Construction Documents:

Base Bid – Rehabilitate Runway 5L‐23R

Base Bid Alternate – Rehabilitate Runway 5L‐23R and Taxiway A

Page 5: Runway 5L 23R and Taxiway A Indianapolis Airport IAA Project … · 01/05/2014  · Runway 5L ‐ 23R and Taxiway A CONSTRUCTION SAFETY AND PHASING – General (Cont’d) Weekly Construction

Reha

bilitate Ru

nway 5L‐23

R an

d Taxiway A

BID PROPOSAL – Continued 

Questions must be submitted in writing using the enclosed form (IB‐5) and emailed to [email protected]

Questions must be received no later than May 13, 2014

Mandatory items to be included with bid proposal:

Contractor’s Bid for Public Works (Form 96)

Contractor’s Financial Statement

Proposal Guaranty, Certified Check, or Bid Bond (5% of the Base Bid or Base Bid Alternate, whichever is greater)

Contract Signature Page

IAA Bid Proposal

Page 6: Runway 5L 23R and Taxiway A Indianapolis Airport IAA Project … · 01/05/2014  · Runway 5L ‐ 23R and Taxiway A CONSTRUCTION SAFETY AND PHASING – General (Cont’d) Weekly Construction

Reha

bilitate Ru

nway 5L‐23

R an

d Taxiway A

BID PROPOSAL – Continued 

Other items to be included with bid proposal:

Letter from bonding company certifying ability to provide performance and payment bonds

List of subcontractors doing more than 5% of the work for the Base Bid and Base Bid Alternate

Statement of previous contracts

Certification of Non‐Segregated Facilities

Buy American Certification

Affidavit of Business Diversity Utilization Plan with Diverse Vendor (D/M/W/VBE) Statement of Intent to Perform Work 

Page 7: Runway 5L 23R and Taxiway A Indianapolis Airport IAA Project … · 01/05/2014  · Runway 5L ‐ 23R and Taxiway A CONSTRUCTION SAFETY AND PHASING – General (Cont’d) Weekly Construction

Reha

bilitate Ru

nway 5L‐23

R an

d Taxiway A

BID PROPOSAL – Continued 

Independent items required to support responsive proposal for the Base Bid and Base Bid Alternate:

Itemized Proposals – Pages BP‐5.1 through 5.6

Lists of Subcontractors

Affidavit of Business Diversity (D/M/W/VBE) Utilization Plan 

Diverse Vendor (D/M/W/VBE) Statement of Intent to Perform Work 

Page 8: Runway 5L 23R and Taxiway A Indianapolis Airport IAA Project … · 01/05/2014  · Runway 5L ‐ 23R and Taxiway A CONSTRUCTION SAFETY AND PHASING – General (Cont’d) Weekly Construction

Reha

bilitate Ru

nway 5L‐23

R an

d Taxiway A

BUSINESS DIVERSITY

XBE Participation Goals:

Disadvantaged Business Enterprise (DBE) – 14%

Minority‐Owned Business Enterprise (MBE) – 20%

Woman‐Owned Business Enterprise (DBE) – 10%

Veteran‐Owned Business Enterprise (DBE) – 3%

IAA Point of Contact for Business Diversity:

Holli HarringtonIAA Director of Supplier Diversity

[email protected]

Page 9: Runway 5L 23R and Taxiway A Indianapolis Airport IAA Project … · 01/05/2014  · Runway 5L ‐ 23R and Taxiway A CONSTRUCTION SAFETY AND PHASING – General (Cont’d) Weekly Construction

Reha

bilitate Ru

nway 5L‐23

R an

d Taxiway A

SCOPE OF WORK

Applies to both the Base Bid and Base Bid Alternate

Rehabilitation to include: Cleaning and resealing of:

longitudinal and transverse joints in concrete pavement

expansion joints in concrete pavement

Routing and sealing of cracks in bituminous and concrete pavements

Spall repair in concrete pavement

Replacement of isolated concrete shoulder pavement panels (8” depth), isolated concrete taxiway pavement panels (16” depth), isolated concrete runway pavement panels (18” depth)

Replacement of pavement condition sensors

Removal of pavement markings and rubber buildup

Application of new runway and taxiway pavement markings

Page 10: Runway 5L 23R and Taxiway A Indianapolis Airport IAA Project … · 01/05/2014  · Runway 5L ‐ 23R and Taxiway A CONSTRUCTION SAFETY AND PHASING – General (Cont’d) Weekly Construction

Reha

bilitate Ru

nway 5L‐23

R an

d Taxiway A

WORK LIMITS – BASE BID

Rehabilitation of concrete pavements for: Runway 5L‐23R including Blast Pads and Shoulders

Connector Taxiways A1, A2, A4, A5, A7, A11, and A12 within the Runway Safety Area (RSA)

Foxtrot Lane within the RSA

Connector Taxiways B1, B2, B5, B7, B11, and B12 within the RSA

Taxiway R within the RSA 

Work limits extend 25’ (1 row of panels) beyond RSA

Page 11: Runway 5L 23R and Taxiway A Indianapolis Airport IAA Project … · 01/05/2014  · Runway 5L ‐ 23R and Taxiway A CONSTRUCTION SAFETY AND PHASING – General (Cont’d) Weekly Construction

Reha

bilitate Ru

nway 5L‐23

R an

d Taxiway A

WORK LIMITS – BASE BID ALTERNATE

Rehabilitation of concrete pavements for: Runway 5L‐23R including Blast Pads and Shoulders

Taxiway A (between Taxiway A12 and Runway 14‐32)

Connector Taxiways A1, A2, A4, A5, A7, A11, and A12

Connector taxiways at: 

Indianapolis Maintenance Center

Eagle Hub Apron

FedEx East and West Maintenance Facilities

Foxtrot Lane within the RSA

Connector Taxiways B1, B2, B5, B7, B11, and B12 within the RSA (Work limits extend 25’ (1 row of panels) beyond RSA)

Taxiway R within the RSA (Work limits extend 25’ (1 row of panels) beyond RSA)

Taxiway N within ±135 of Taxiway A Intersection

Page 12: Runway 5L 23R and Taxiway A Indianapolis Airport IAA Project … · 01/05/2014  · Runway 5L ‐ 23R and Taxiway A CONSTRUCTION SAFETY AND PHASING – General (Cont’d) Weekly Construction

Reha

bilitate Ru

nway 5L‐23

R an

d Taxiway A

SITE LOGISTICS – BASE BID AND BASE BID ALTERNATE

Primary site access through Gate 30C (near North Midfield Service Road and West Perimeter Road)

Equipment staging and material laydown area located adjacent to gate

Equipment and materials must be stored at the staging area when not in use (Maximum Height of 25’)

Field Office collocated with staging area

Gate Guard Required

Primary Haul Route – North Tug Road

Construction Traffic Shall Not Use Col. H. Weir Cook Memorial Drive or North High School Road as a Haul Route

Page 13: Runway 5L 23R and Taxiway A Indianapolis Airport IAA Project … · 01/05/2014  · Runway 5L ‐ 23R and Taxiway A CONSTRUCTION SAFETY AND PHASING – General (Cont’d) Weekly Construction
Page 14: Runway 5L 23R and Taxiway A Indianapolis Airport IAA Project … · 01/05/2014  · Runway 5L ‐ 23R and Taxiway A CONSTRUCTION SAFETY AND PHASING – General (Cont’d) Weekly Construction

Reha

bilitate Ru

nway 5L‐23

R an

d Taxiway A

CONSTRUCTION SAFETY AND PHASING ‐ General

Safety and Phasing Compliance Document (SPCD) Required per FAA Advisory Circular 150/5370‐2F

Work Hours and General Work Items Daily Closures – 0730 hours to 1730 hours

Clean and Reseal Joints and In‐Pavement Lighting

Spall and  Popout Repairs

Weekend Closures – Friday 0730 hours to Monday 2000 hours

Clean and Reseal Joints and In‐Pavement Lighting

Spall and  Popout Repairs

Isolated Full Slab Replacements

IAA Reserves the right to temporarily stop work due to: Inclement weather (Visibility below 1,800’ RVR)

Operational need or other unforeseen conditions

Page 15: Runway 5L 23R and Taxiway A Indianapolis Airport IAA Project … · 01/05/2014  · Runway 5L ‐ 23R and Taxiway A CONSTRUCTION SAFETY AND PHASING – General (Cont’d) Weekly Construction

Reha

bilitate Ru

nway 5L‐23

R an

d Taxiway A

CONSTRUCTION SAFETY AND PHASING – General (Cont’d)

Weekly Construction Meetings (SP‐17) Thursdays at 1000 hours – Field Office

Moratoriums Labor Day – August 25, 2014 through September 1, 2014 Tuesdays – Each Work Week

Project Security Resources (SP‐19) General Provision GP 70‐23 – approved vendors Requirements for number of Crew Guards, Escorts, and 

Flaggers Gate Guard required whenever Gate 30C is open

Construction Management and Resources The Contractor shall have at all times, a project representative 

capable of adjusting prime and subcontractor resources as necessary to complete the work within any given phase.

Page 16: Runway 5L 23R and Taxiway A Indianapolis Airport IAA Project … · 01/05/2014  · Runway 5L ‐ 23R and Taxiway A CONSTRUCTION SAFETY AND PHASING – General (Cont’d) Weekly Construction

Reha

bilitate Ru

nway 5L‐23

R an

d Taxiway A

CONSTRUCTION SAFETY AND PHASING – General (Cont’d)

Haul Route Signage and Wayfinding Light plants required for weekends

Foreign Object Debris (FOD) Reduction (SP‐9) Vacuum and Broom Trucks Continuously Cleaning Allow sufficient time and resources prior to opening pavement 

At least 2 hours for daily closures

At least 6 hours for weekend closures

Runway Closure Crosses  Owner‐furnished/Contractor maintained

Taxiway Closure Crosses Contractor‐furnished and maintained

Page 17: Runway 5L 23R and Taxiway A Indianapolis Airport IAA Project … · 01/05/2014  · Runway 5L ‐ 23R and Taxiway A CONSTRUCTION SAFETY AND PHASING – General (Cont’d) Weekly Construction

Reha

bilitate Ru

nway 5L‐23

R an

d Taxiway A

CONSTRUCTION SAFETY AND PHASING – General (Cont’d)

Low‐Profile Construction Barricades Contractor‐furnished and maintained Can be either:

Water‐filled, or

A‐frame

Delineation of Slab Replacement Limits Standard Reflective Traffic Barrels – Weekend Closures Only 

Test Section for Panel Replacement IAA to designate location on Old Terminal Apron 

Page 18: Runway 5L 23R and Taxiway A Indianapolis Airport IAA Project … · 01/05/2014  · Runway 5L ‐ 23R and Taxiway A CONSTRUCTION SAFETY AND PHASING – General (Cont’d) Weekly Construction

Reha

bilitate Ru

nway 5L‐23

R an

d Taxiway A

CONSTRUCTION SAFETY AND PHASING – Base Bid

Five (5) Phases Phase 1 through 4 – Daily and Weekend Closures

Panel Replacements reserved for Weekends Only

Phases 5A and 5B – Weekend Closure Only

Pavement marking removal and replacement (including rubber removal)

Total contract time – 36 Working Days Anticipated Construction NTP – August 4, 2014 Anticipated Substantial Completion – September 29, 

2014

Page 19: Runway 5L 23R and Taxiway A Indianapolis Airport IAA Project … · 01/05/2014  · Runway 5L ‐ 23R and Taxiway A CONSTRUCTION SAFETY AND PHASING – General (Cont’d) Weekly Construction
Page 20: Runway 5L 23R and Taxiway A Indianapolis Airport IAA Project … · 01/05/2014  · Runway 5L ‐ 23R and Taxiway A CONSTRUCTION SAFETY AND PHASING – General (Cont’d) Weekly Construction

Reha

bilitate Ru

nway 5L‐23

R an

d Taxiway A

CONSTRUCTION SAFETY AND PHASING – Base Bid Alternate

Eight (8) Phases Phase 1 and 2 – Weekend Closure Only 

Phases 3 through 6 – Daily and Weekend Closures

Panel Replacements reserved for Weekends Only

Phase 7A – Daily Closures Only

To facilitate access to the Ground Run‐Up Enclosure

Phase 7B – Weekend Closure Only

To facilitate access to the Ground Run‐Up Enclosure

Phases 8A through 8C – Weekend Closure Only

Pavement marking removal and replacement (including rubber removal)

Total contract time – 51 Working Days Anticipated Construction NTP – August 4, 2014 Anticipated Substantial Completion – October 27, 2014

Page 21: Runway 5L 23R and Taxiway A Indianapolis Airport IAA Project … · 01/05/2014  · Runway 5L ‐ 23R and Taxiway A CONSTRUCTION SAFETY AND PHASING – General (Cont’d) Weekly Construction
Page 22: Runway 5L 23R and Taxiway A Indianapolis Airport IAA Project … · 01/05/2014  · Runway 5L ‐ 23R and Taxiway A CONSTRUCTION SAFETY AND PHASING – General (Cont’d) Weekly Construction

Reha

bilitate Ru

nway 5L‐23

R an

d Taxiway A

LIQUIDATED DAMAGE SCHEDULE – BASE BIDSchedule Liquidated Damages Cost Allowed Construction Time1 Hour 2 Hours > 2 Hours

Phase 1 $3,500 $4,500 $10,000

August 5, 2014 – August 7, 2014 (0730 Hours ‐1730 Hours Daily) 

August 8, 2014 (0730 Hours) – August 11, 2014 (2000 Hours)

Phase 2 $3,500 $4,500 $10,000August 13, 2014 – August 14, 2014 (0730 Hours ‐1730 Hours Daily) 

August 15, 2014 (0730 Hours) – August 18, 2014 (2000 Hours)

Phase 3 $3,500 $4,500 $10,000

September 2, 2014 – September 4, 2014 (0730 Hours ‐1730 Hours Daily) 

September 5, 2014 (0730 Hours) – September 8, 2014 (2000 Hours)

Phase 4 $3,500 $4,500 $10,000

September 10, 2014 – September 11, 2014 ; September 17, 2014 –September (0730 Hours ‐1730 Hours Daily) 

September 12, 2014 (0730 Hours) – September 15, 2014 (2000 Hours)

Phase 5A $3,500 $4,500 $10,000September 19, 2014 (0730 Hours) – September 22, 2014 (2000 Hours)

Phase 5B $3,500 $4,500 $10,000September 26, 2014 (0730 Hours) – September 29, 2014 (2000 Hours)

Page 23: Runway 5L 23R and Taxiway A Indianapolis Airport IAA Project … · 01/05/2014  · Runway 5L ‐ 23R and Taxiway A CONSTRUCTION SAFETY AND PHASING – General (Cont’d) Weekly Construction

Reha

bilitate Ru

nway 5L‐23

R an

d Taxiway A

LIQUIDATED DAMAGE SCHEDULE – BASE BID ALTERNATESchedule

Liquidated Damages CostAllowed Construction Time1 Hour 2 Hours > 2 Hours

Phase 1 $3,500 $4,500 $10,000 August 8, 2014 (0730 Hours) – August 11, 2014 (2000 Hours)

Phase 2 $3,500 $4,500 $10,000 August 15, 2014 (0730 Hours) – August 18, 2014 (2000 Hours)

Phase 3 $3,500 $4,500 $10,000September 2, 2014 – September 4, 2014 (0730 Hours ‐1730 Hours Daily) 

September 5, 2014 (0730 Hours) – September 8, 2014 (2000 Hours)

Phase 4 $3,500 $4,500 $10,000

September 10, 2014 – September 11, 2014 (0730 Hours ‐1730 Hours Daily) 

September 12, 2014 (0730 Hours) – September 15, 2014 (2000 Hours)

Phase 5 $3,500 $4,500 $10,000

September 17, 2014 – September 18, 2014 (0730 Hours ‐1730 Hours Daily) 

September 19, 2014 (0730 Hours) – September 22, 2014 (2000 Hours)

Phase 6 $3,500 $4,500 $10,000

September 24, 2014 – September 25, 2014 (0730 Hours ‐1730 Hours Daily) 

September 26, 2014 (0730 Hours) – September 29, 2014 (2000 Hours)

Phase 7A $3,500 $4,500 $10,000 October 1, 2014 – October 2, 2014 (0730 Hours ‐1730 Hours Daily) 

Phase 7B $3,500 $4,500 $10,000 October 3, 2014 (0730 Hours) – October 6, 2014 (2000 Hours)

Phase 8A $3,500 $4,500 $10,000 October 10, 2014 (0730 Hours) – October 13, 2014 (2000 Hours)

Phase 8B $3,500 $4,500 $10,000 October 17, 2014 (0730 Hours) – October 20, 2014 (2000 Hours)

Phase 8C $3,500 $4,500 $10,000 October 24, 2014 (0730 Hours) – October 27, 2014 (2000 Hours)

Page 24: Runway 5L 23R and Taxiway A Indianapolis Airport IAA Project … · 01/05/2014  · Runway 5L ‐ 23R and Taxiway A CONSTRUCTION SAFETY AND PHASING – General (Cont’d) Weekly Construction

Reha

bilitate Ru

nway 5L‐23

R an

d Taxiway A

SPECIFICATIONS

Key Technical Provisions to Note: M‐362 – Silicone Joint and Crack Sealants for PCCP

Requirements for joint and crack cleaning and sealing

M‐564 – Repair of Pavement Distresses in PCCP

Requirements for spall repairs and isolated slab removal

P‐501 – Portland Cement Concrete Pavement (PCCP)

Alkali‐Silica Reactivity Testing and Associated Lead Times

Test Section Requirements

Early Strength Gain Requirements (see SP‐26)

400 PSI Flexural @ 12 hours

725 PSI Flexural @ 28 days

Flexural and Compressive Testing Requirements 

Pavement Damage Definitions (see SP‐26)

Page 25: Runway 5L 23R and Taxiway A Indianapolis Airport IAA Project … · 01/05/2014  · Runway 5L ‐ 23R and Taxiway A CONSTRUCTION SAFETY AND PHASING – General (Cont’d) Weekly Construction

Reha

bilitate Ru

nway 5L‐23

R an

d Taxiway A

SPECIFICATIONS ‐ Continued

Key Special Provisions to Note: SP‐7 – Operational Safety on Airport During Construction

SP‐8 – Undistributed Quantities

SP‐9 – Pavement Cleaning Operations

Critical item associated with reopening pavements to aircraft

SP‐19 – General Provision 70

Unit pricing for project security to allow use of any approved vendor

SP‐21 – M‐102 Maintenance of Traffic

Requirements for SPCD

SP‐24 – M‐105 Maintenance of Traffic

Shop drawing and job mix formula(s) submittal and review timeline

SP‐26 – P‐501 PCCP

Project‐specific alternations

Page 26: Runway 5L 23R and Taxiway A Indianapolis Airport IAA Project … · 01/05/2014  · Runway 5L ‐ 23R and Taxiway A CONSTRUCTION SAFETY AND PHASING – General (Cont’d) Weekly Construction

Reha

bilitate Ru

nway 5L‐23

R an

d Taxiway A

SPECIFICATIONS ‐ Continued

Key Special Provisions to Note (continued): SP‐37 – Pavement Marking and Rubber Removal

SP‐38 – INDOT Material References

Undistributed quantities for base course repair/replacement

SP‐39 – Clean and Reseal In‐Pavement Lights 

SP‐40 – Pavement Sensor Replacement

Includes cost of commissioning

SP‐41 – Installation of Airport Lighting Systems

Undistributed Quantities to be on‐site prior to start of construction

No payment for installation of items as a result of Contractor damage

IAA to purchase uninstalled items at contract unit price

Page 27: Runway 5L 23R and Taxiway A Indianapolis Airport IAA Project … · 01/05/2014  · Runway 5L ‐ 23R and Taxiway A CONSTRUCTION SAFETY AND PHASING – General (Cont’d) Weekly Construction

Reha

bilitate Ru

nway 5L‐23

R an

d Taxiway A

NEXT STEPS

Bidder Questions Received until 5:00 PM on Tuesday, May 13, 2014

Sealed Bids Received until 11:00 AM on Thursday, May 22, 2014 – Public Bid Opening

Anticipated IAA Board Approval to award the contract – June 20, 2014

Preconstruction Activities – July 2014 Performance and Payment Bonds within 10 days of executing 

contract

Furnish certificate of insurance – See General Provision 70‐11

Additional named insureds

Submit construction schedule within 10 days of award

Preconstruction Meeting

Page 28: Runway 5L 23R and Taxiway A Indianapolis Airport IAA Project … · 01/05/2014  · Runway 5L ‐ 23R and Taxiway A CONSTRUCTION SAFETY AND PHASING – General (Cont’d) Weekly Construction

Reha

bilitate Ru

nway 5L‐23

R an

d Taxiway A

NEXT STEPS ‐ Continued

Preconstruction Activities – July 2014 (Continued) Shop Drawing and Job Mix Formula Review – Complete 

before August 4, 2014

Safety and Phasing Compliance Document (SPCD)

File IAA Work Permit

All other permitting – Responsibility of Contractor

Conduct Test Section

Anticipated Construction Notice to Proceed –August 4, 2014 Contingent upon completion of Rehabilitate Taxiway D 

project

Page 29: Runway 5L 23R and Taxiway A Indianapolis Airport IAA Project … · 01/05/2014  · Runway 5L ‐ 23R and Taxiway A CONSTRUCTION SAFETY AND PHASING – General (Cont’d) Weekly Construction

Reha

bilitate Ru

nway 5L‐23

R an

d Taxiway A

QUESTIONS