ROV Case Study Marubeni’s Challenge Delta SubSea’s Solutions DSS operated from Seacor Marine’s DPAHV Keith Cowan, a US- flagged anchor handling towing supply vessel After receiving the contract, DSS mobilized quickly and was ready for operations in less than 48 hours DSS delivered a Schilling HD™ 150hp ROV, Dynacon LARS system as well as a skilled crew with vast knowledge of the scope of work that needed to be done The ROV utilized torque tools, super grinders, and 15K intensifier unit Marubeni Oil & Gas and Noble Driller contacted Delta SubSea (DSS) with a serious need for plug and abandonment work done on its deepwater gas production infrastructure off the Gulf of Mexico The scope of work included the plugging and abandoning of GC 155, then removing assets from the field DSS was chosen by Marubeni Oil & Gas and Noble Driller because of quality of equipment and personnel well experienced with the scope of work DSS Onboard the Keith Cowan Deploying HD39
1

ROV Case Study Marubeni’s Challenge

May 27, 2022

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: ROV Case Study Marubeni’s Challenge

ROV Case Study

Marubeni’s Challenge

Delta SubSea’s Solutions •  DSS operated from Seacor Marine’s DPAHV Keith Cowan, a US-

flagged anchor handling towing supply vessel

•  After receiving the contract, DSS mobilized quickly and was ready for operations in less than 48 hours

•  DSS delivered a Schilling HD™ 150hp ROV, Dynacon LARS system as well as a skilled crew with vast knowledge of the scope of work that needed to be done

•  The ROV utilized torque tools, super grinders, and 15K intensifier unit

•  Marubeni Oil & Gas and Noble Driller contacted Delta SubSea (DSS) with a serious need for plug and abandonment work done on its deepwater gas production infrastructure off the Gulf of Mexico

•  The scope of work included the plugging and abandoning of GC 155, then removing assets from the field

•  DSS was chosen by Marubeni Oil & Gas and Noble Driller because of quality of equipment and personnel well experienced with the scope of work

DSS Onboard the Keith Cowan

Deploying HD39