Route 495 Rehabilitation Project – Stage 9 – East End – SB Ramp closed Westbound: - Two right lanes shifted to north onto new deck - Left lane/XBL remains in current position, however, construction barrier will be placed on north side creating a cattle chute - 31st Street Ramp detoured to Paterson Plank Rd Eastbound: No changes to current configuration 31st Street Ramp Detoured to Paterson Plank Road NJ Transit access ramp open 6am to 1pm Work Zone (Typ.) NB Ramp to Paterson Plank Road Open SB Ramp to Route 1&9 Closed Construction Barrier (Typ.)