ROOK I PROJECT DELIVERING CLEAN ENERGY OF THE FUTURE
15

Rook 1 Project · 2019. 5. 10. · NexGen is not only supporting local programs and facilitating initiatives but also developing training programs, infrastructure and employment opportunities

Feb 26, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Rook 1 Project · 2019. 5. 10. · NexGen is not only supporting local programs and facilitating initiatives but also developing training programs, infrastructure and employment opportunities

R O O K I P R O J E C TD E L I V E R I N G C L E A N E N E R G Y O F T H E

F U T U R E

Page 2: Rook 1 Project · 2019. 5. 10. · NexGen is not only supporting local programs and facilitating initiatives but also developing training programs, infrastructure and employment opportunities

NexGen Energy Ltd. recognizes the importance ofengaging with local and Indigenous communities,regulators and stakeholders to sustainablydevelop Rook I.

NEXGEN ENERGY LTD. | DELIVERING CLEAN ENERGY OF THE FUTURE 1

Page 3: Rook 1 Project · 2019. 5. 10. · NexGen is not only supporting local programs and facilitating initiatives but also developing training programs, infrastructure and employment opportunities

R O O K I

D E L I V E R I N G

CLEAN ENERGY FOR THE FUTURE

omprehensive report on a year. Annual reports are intended le information about the . They may be considered as grey s to prepare and disclose annual be filed at the company's registry. required to report at more

The Rook I Project ("Rook I") is a proposed new underground uranium mining and millingoperation located in the southwestern Athabasca Basin, Saskatchewan. The 100%-owned Rook I Project hosts the land-based Arrow Deposit. The Arrow Depositis located in competent basement rock, and a safe distance (600 m) from the closestshoreline. The fact that the technical setting of the Deposit is within competent, crystallinebasement rock, means that it lends itself to safe and cost-effective conventional miningtechniques utilized globally. The proposed project includes underground and surfacefacilities to support mining and milling operations. Rook I will consist of undergroundmining operations, a surface processing facility, an airstrip, waste rock storage facilities,water management and treatment infrastructure, and ancillary surface facilities tosupport operations. At peak production, Rook I will produce an average of 1,400 tonnes of ore per day withan annual production capacity of up to 31 million lbs U3O8. Both the mine and mill willutilize and exceed industry best practices and technologies to ensure the health andsafety of personnel and the protection of the environment. Rook I has an anticipated 24 year operating life with an additional 3 years ofconstruction, 5 years of active decommissioning, and 10 years of post-activedecommissioning monitoring.

NEXGEN ENERGY LTD. | DELIVERING CLEAN ENERGY OF THE FUTURE 2

Page 4: Rook 1 Project · 2019. 5. 10. · NexGen is not only supporting local programs and facilitating initiatives but also developing training programs, infrastructure and employment opportunities

R O O K I P R O J E C TD E L I V E R I N G T H E C L E A N E N E R G Y O F

T H E F U T U R E

NexGen Energy Ltd. is committed to achievingexcellence in the development of Rook I throughthe implementation of elite standards and bestpractices in environmental protection, tailingsmanagement, progressive reclamation and socio-economic well-being.

NEXGEN ENERGY LTD. | DELIVERING CLEAN ENERGY OF THE FUTURE 3

Page 5: Rook 1 Project · 2019. 5. 10. · NexGen is not only supporting local programs and facilitating initiatives but also developing training programs, infrastructure and employment opportunities

R O O K I

E N V I R O N M E N T A L E X C E L L E N C E

clean energy resourcesWater Management

NEXGEN ENERGY LTD. | DELIVERING CLEAN ENERGY OF THE FUTURE 4

Rook I will incorporate best-in-class water management practices to ensure fresh water

use is minimized and water quality is protected to the highest level. Maximizing

diversion of fresh water away from facilities and infrastructure and optimizing water

reuse and recycling ensures water resources are protected for generations to come.

 

Industry best practices include:

Collection and treatment of wastewater generated by site activities,

Treatment will consist of two stage treatment with capacity to effectively remove

any potential contaminants,

Treated water will be stored in lined ponds, analyzed in a verified on-site laboratory

to ensure environmental discharge criteria is met or exceeded.

Page 6: Rook 1 Project · 2019. 5. 10. · NexGen is not only supporting local programs and facilitating initiatives but also developing training programs, infrastructure and employment opportunities

R O O K I

E N V I R O N M E N T A L E X C E L L E N C E

NEXGEN ENERGY LTD. | DELIVERING CLEAN ENERGY OF THE FUTURE 5

Rook I is designed to operate in a manner that minimizes the generation of waste,

protects workers, the public, and the environment while meeting or exceeding all

regulatory requirements.

 

Plans for handling and disposing of domestic, industrial, hazardous, and radiologically

contaminated waste are being finalized as part of the Feasibility Study.  All domestic,

industrial, hazardous, and radiologically contaminated waste will be segregated, tracked

and managed according to classification and characterization after for safe

permanent disposal.

Waste Management

Waste Rock Management

Waste rock will be characterized, sorted based on project-specific environmental

criteria and stored safely.

Ore and other specific material will be stored on lined pads equipped with leak

detection and containment capacity to prevent releases during extreme precipitation

events. Ore will be processed in the mill. After a comprehensive analysis of tailings

management options, it is proposed that potentially environmentally sensitive material

be placed underground during on-going decommissioning in the Underground Tailings

Management Facility ("UGTMF").

Clean waste rock will be piled on surface and contoured (which will be well below the

topographical high in the area) in-place during operations and decommissioning. Some

clean waste rock will be utilized through-out the project life-cycle for construction or

site maintenance purposes.

Page 7: Rook 1 Project · 2019. 5. 10. · NexGen is not only supporting local programs and facilitating initiatives but also developing training programs, infrastructure and employment opportunities

R O O K I

E N V I R O N M E N T A L E X C E L L E N C E

Tailings Management

NexGen's commitment to environmental excellence is highlighted through its proposedplan to return all tailings underground for permanent storage. After a thorough review andanalysis of all options for tailings storage, tailings being processed into an engineered paste(cement-like substance), transferred underground, and placed in either mined-out cavitiesor a purpose-built UGTMF is being proposed. A first in the uranium mining industry in Canada but utilized in mining globally, the UGTMF isproposed to consist of chambers constructed in stable and strong basement rock,approximately 385 m below surface.  This leading-edge approach significantly reduces the surface disturbance footprint of theProject, reduces contaminant mobility and allows for tailings to be decommissioned duringoperations contributing to best-in class, long-term, environmental performance.

NEXGEN ENERGY LTD. | DELIVERING CLEAN ENERGY OF THE FUTURE 6

Decommissioning and Reclamation

Rook I has been designed with decommissioning in mind and progressivedecommissioning will occur throughout the operational phase of the Project including theplacement of tailings underground, contouring the clean waste rock pile below thetopographical high of the area during operations, and centralizing the location of surfaceinfrastructure to minimize land disturbance.  A financial assurance to cover the costs of decommissioning and reclamation will be inplace following the completion of the Environmental Assessment, and prior to projectconstruction.  Following the completion of operations, the site will be contoured and revegetated.Monitoring will verify that protection of land, water, air, wildlife, and human health ismaintained long-term. Following decommissioning it is envisioned that the site will bereturned to a state suitable for recreational and traditional land uses without any accessrestrictions. Visibly, it will be difficult to tell that a mine and mill ever operated in the area,especially with no tailings remaining on surface.

Page 8: Rook 1 Project · 2019. 5. 10. · NexGen is not only supporting local programs and facilitating initiatives but also developing training programs, infrastructure and employment opportunities

clean energy resources

"Our mandate is to empower all people associated withthe project.  Since discovery in 2014 we have been focusedon delivering a high quality world leading project for thebenefit of Northern Saskatchewan and beyond."

NEXGEN ENERGY LTD. | DELIVERING CLEAN ENERGY OF THE FUTURE 7

Leigh Curyer, Founder & CEO of NexGen Energy Ltd.

Page 9: Rook 1 Project · 2019. 5. 10. · NexGen is not only supporting local programs and facilitating initiatives but also developing training programs, infrastructure and employment opportunities

R O O K I

T H E I M P O R T A N C E O F E N G A G E M E N T

clean energy resources

ENGAGEMENT WITH STAKEHOLDERS

We recognize the importance of engaging with local and Indigenous Communities,regulators and stakeholders.  Engagement with neighbouring Public and Indigenous Communities began in the infancyof the Company's inception in 2013, before exploration drilling began. Engagement hasincluded formal meeting and site tours as well as informal involvement in the form ofparticipation in community events and NexGen facilitated initiatives. NexGen's community outreach initiatives have focused on the development of youth,including support for local school breakfast programs, a bursary program for post-secondary education, annual summer mentorships and youth sport programs. We are committed to meaningful engagement through all phases and stages of theProject and beyond.

NEXGEN ENERGY LTD. | DELIVERING CLEAN ENERGY OF THE FUTURE 8

Page 10: Rook 1 Project · 2019. 5. 10. · NexGen is not only supporting local programs and facilitating initiatives but also developing training programs, infrastructure and employment opportunities

R O O K I

C O M M U N I T Y I N I T I A T I V E S

NEXGEN ENERGY LTD. | DELIVERING CLEAN ENERGY OF THE FUTURE 9

NexGen is not only supporting local programs and facilitating initiatives but alsodeveloping training programs, infrastructure and employment opportunities that createa sustainable and lasting legacy.  NexGen is changing the way companies and communities work together to createmeaningful and positive change for generations to come.

Page 11: Rook 1 Project · 2019. 5. 10. · NexGen is not only supporting local programs and facilitating initiatives but also developing training programs, infrastructure and employment opportunities

R O O K I

C O M M U N I T Y I N I T I A T I V E S

NexGen facilitates an annualSummer Student InternshipProgram that providesstudents northernSaskatchewan with anopportunity to gain vitalexperience and a broaderunderstanding of possiblecareer options upon thecompletion of their high-school education. The program has two distinctcomponents: one tailored tohigh-school students; theother geared towards post-secondary students. Since theprogram was initiated over 30students have completed theProgram with many returningas full time employees andmentors

NEXGEN ENERGY LTD. | DELIVERING CLEAN ENERGY OF THE FUTURE 10

The NexGen bursary aidsstudents who are without aprimary source of funding fortheir post- secondaryeducation but who haveexhibited communityleadership and academiceffort. For many students, theNexGen bursary meansgetting the chance to attend apost-secondary institution andcomplete their studiesenabling them to become theleaders of the future. Four students have gonethrough the program and areactively pursuing their post-secondary programs.

In 2017, through an alliancewith the Breakfast Club ofCanada (BCC), NexGenpartnered with three localschools in La Loche to providebreakfast to over 1,1oostudents daily. Through thisprogram eight cooks areemployed from the localcommunity. Healthybreakfasts improve studentconcentration, focus andenables a more effectivelearning experience for allinvolved – including students,teachers and administrators.

Breakfast Program Summer Mentorship Program Bursary Program

Page 12: Rook 1 Project · 2019. 5. 10. · NexGen is not only supporting local programs and facilitating initiatives but also developing training programs, infrastructure and employment opportunities

R O O K I

C O M M U N I T Y I N I T I A T I V E S

NEXGEN ENERGY LTD. | DELIVERING CLEAN ENERGY OF THE FUTURE 10

In partnership with the Meadow Lake Humane Society, NexGen has established a Dog FosteringProgram at the Rook I site. NexGen has fostered over 30 dogs while they await adoption by their'forever' families. This program allows the dogs to enjoy the great outdoors and gain vital socialskills until they transition to a permanent home.

Dog Fostering Program

Page 13: Rook 1 Project · 2019. 5. 10. · NexGen is not only supporting local programs and facilitating initiatives but also developing training programs, infrastructure and employment opportunities

D E L I V E R I N G T H E C L E A N E N E R G Y O FT H E F U T U R E

NEXGEN ENERGY LTD. | DELIVERING CLEAN ENERGY OF THE FUTURE 11

EXCITED ABOUT THE FUTURE

Page 14: Rook 1 Project · 2019. 5. 10. · NexGen is not only supporting local programs and facilitating initiatives but also developing training programs, infrastructure and employment opportunities

R O O K I

G L O B A L D E M A N D

The World Needs Clean Energy

NexGen is committed to the sustainable development of Rook I and to delivering the

clean energy of the future.

Uranium is a critical part of the future global energy mix. As the world moves towards

low-carbon energy sources, the uranium extracted as part of the Rook I project will only

be used for peaceful purposes fuelling nuclear reactors and produce reliable, low cost,

and clean source of electricity.

Nuclear energy is expected to remain an important part of the global energy supply mix

for the future to come. It is estimated that by 2040 the demand will have grown by 90

percent (source: World Energy Outlook 2018).

The development of Rook I will aid in supplying the demands of the future and

significantly help in cleaning the air for the next generations.

NEXGEN ENERGY LTD. | DELIVERING CLEAN ENERGY OF THE FUTURE 12

Page 15: Rook 1 Project · 2019. 5. 10. · NexGen is not only supporting local programs and facilitating initiatives but also developing training programs, infrastructure and employment opportunities

R O O K I

Please contact us with any questions at:

 1-833-333-8895 or by emailing

[email protected].

NEXGEN ENERGY LTD. | DELIVERING CLEAN ENERGY OF THE FUTURE 14