Top Banner
River Basin Management UNDP/GEF Danube Regional Project Final Seminar 21 – 22 February 2007, Bucharest (RO) Birgit Vogel ICPDR [email protected] Final Seminar of the UNDP/GEF Danube Regional Project River Basin Management - Birgit Vogel (ICPDR) Content Tasks and objectives RBM Planning in DRB Achieved objectives brief overview Summary and Synopsis
9

River Basin Management - undp-drp.org - Phase... · River Basin Management - Birgit Vogel (ICPDR) Summary & Synopsis ÖSupport was essential ÖFor RBM small & targeted interventions

Aug 02, 2018

Download

Documents

vuongphuc
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: River Basin Management - undp-drp.org - Phase... · River Basin Management - Birgit Vogel (ICPDR) Summary & Synopsis ÖSupport was essential ÖFor RBM small & targeted interventions

1

River BasinManagement

UNDP/GEF Danube Regional Project

Final Seminar

21 – 22 February 2007, Bucharest (RO)

Birgit Vogel

ICPDR

[email protected]

Final Seminar of the UNDP/GEF Danube Regional Project River Basin Management - Birgit Vogel (ICPDR)

Content

Tasks and objectives RBM Planning in DRB

Achieved objectives

brief overview

Summary and Synopsis

Page 2: River Basin Management - undp-drp.org - Phase... · River Basin Management - Birgit Vogel (ICPDR) Summary & Synopsis ÖSupport was essential ÖFor RBM small & targeted interventions

2

Final Seminar of the UNDP/GEF Danube Regional Project River Basin Management - Birgit Vogel (ICPDR)

EU Water Framework Directive

implementation = highest priority

all EU MS and EU Accession Countries implement

all other Danube states committed themselves

to implement (Sofia, December 2000)

Objectives Danube River Protection Convention

ICPDR –River Basin Management

Final Seminar of the UNDP/GEF Danube Regional Project River Basin Management - Birgit Vogel (ICPDR)

Part ARoof Level

Part BSub-Basin/

national Level

Part CSub-Unit Level

Competent authorities jointly coordinate Part A. Part C is coordinated on the national level

Common structure in all parts of the RBM Plan.

Details

Danube River Basin Management Plan

......has to be compiled by 2009/10good coordination mechanisms and a clear strategy including timelines are needed

Page 3: River Basin Management - undp-drp.org - Phase... · River Basin Management - Birgit Vogel (ICPDR) Summary & Synopsis ÖSupport was essential ÖFor RBM small & targeted interventions

3

Final Seminar of the UNDP/GEF Danube Regional Project River Basin Management - Birgit Vogel (ICPDR)

Coordination Mechanisms

ICPDR- Coordination

platform- Information

exchange- Development

strategy RBM Plan

- Harmonization of methods and mechanisms

UADE

AT

CZ

SK

HU

SI

HRBA

RS

BG

RO

MD

MK

AL

PL

CHIT

Bilateral agreements (examples)

Bilateral agreements (examples)

ICPDR

ME

CooperationRBM EG

Final Seminar of the UNDP/GEF Danube Regional Project River Basin Management - Birgit Vogel (ICPDR)

PHASE I: Identify Competent authorities

PHASE II: Danube River Basin Analysis

PHASE III: WFD compliant monitoring network

PHASE IV: Final RBM Plan

COMPLETED

COMPLETED

CURRENTLY PERFORMEDTO BE COMPLETED 12/2009

RBM Plan – 4 Phases

Page 4: River Basin Management - undp-drp.org - Phase... · River Basin Management - Birgit Vogel (ICPDR) Summary & Synopsis ÖSupport was essential ÖFor RBM small & targeted interventions

4

Final Seminar of the UNDP/GEF Danube Regional Project River Basin Management - Birgit Vogel (ICPDR)

Danube Basin Analysis

First comprehensive analysis of the entire Danube River Basin

Cooperation between all DCs

Basis for any future river basin management planning

Identification of significant water management issues

Contribution of UNDP/GEF DRP was crucial - very target oriented

support for evaluations/analyses, template evaluations, MONERIS, mapping, etc.

Page 5: River Basin Management - undp-drp.org - Phase... · River Basin Management - Birgit Vogel (ICPDR) Summary & Synopsis ÖSupport was essential ÖFor RBM small & targeted interventions

5

Final Seminar of the UNDP/GEF Danube Regional Project River Basin Management - Birgit Vogel (ICPDR)

organic p.

nutrient p.

haz.subst.p.

hydromorph.

2780 2600 2400 2200 2000 1800 1600 1400 1200 1000 800 600 400 200 0 rkm

at risk possibly at risk not at risk

pressures / impacts from DE AT

SK/ HU HR - CS BG/ROHU ROCS/RO

*

organic p.

nutrient p.

haz.subst.p.

hydromorph.

2780 2600 2400 2200 2000 1800 1600 1400 1200 1000 800 600 400 200 0 rkm

at risk possibly at risk not at riskat risk possibly at risk not at risk

pressures / impacts from DE AT

SK/ HU HR - CS BG/ROHU ROCS/RO

*Risk due to

hydro-morphological

alterations

nutrients

hazardous substances

organic pollution

Identification Significant Water Management Issues

Final Seminar of the UNDP/GEF Danube Regional Project River Basin Management - Birgit Vogel (ICPDR)

Sub-Basin Activities

RBM Plans for sub-basins

Tisza Basin

Sava Basin

Prut Basin

Danube Delta

More detailed scale than DRBM Plan

UNDP/GEF DRP support towards these RBM plans – focus Basin

Analysis (Sava, Tisza)

Page 6: River Basin Management - undp-drp.org - Phase... · River Basin Management - Birgit Vogel (ICPDR) Summary & Synopsis ÖSupport was essential ÖFor RBM small & targeted interventions

6

Trans National Monitoring Network - TNMN

TNMN

Has been

adapted to

WFD

requirements

and will be

sent to EC by

March 2007

UNDP/GEF DRP support regarding development of WFD compliant surveillance monitoring

Final Seminar of the UNDP/GEF Danube Regional Project River Basin Management - Birgit Vogel (ICPDR)

Intercalibration Exercise

R-E1

R-E2

R-E3

R-E4

R-E6

Comparison of national class boundaries among countries according to WFD

Basis for water status assessment

Enables comparability of results

Completed end 2006

high

moderate

good

UNDP/GEF DRP support of overall process (analyses,

workshop, etc.)

high

moderate

good

Page 7: River Basin Management - undp-drp.org - Phase... · River Basin Management - Birgit Vogel (ICPDR) Summary & Synopsis ÖSupport was essential ÖFor RBM small & targeted interventions

7

Final Seminar of the UNDP/GEF Danube Regional Project River Basin Management - Birgit Vogel (ICPDR)

Training Courses –WFD Compliance

Final Seminar of the UNDP/GEF Danube Regional Project River Basin Management - Birgit Vogel (ICPDR)

Danube Geographic Information System

Serves facilitation ofproduction of mapstransboundary data managementdata harmonisationcreating common tools for RBM planning on all levels/scales

UNDP/GEF DRP support regarding the development of the

Danube GIS Prototype

Page 8: River Basin Management - undp-drp.org - Phase... · River Basin Management - Birgit Vogel (ICPDR) Summary & Synopsis ÖSupport was essential ÖFor RBM small & targeted interventions

8

Final Seminar of the UNDP/GEF Danube Regional Project River Basin Management - Birgit Vogel (ICPDR)

Summary & Synopsis

Support was essential

For RBM small & targeted interventions helped to achieve overall objectives

NOW way towards the final Danube RBM Plan

based on previous findings

a lot of operational steps have to be developed and completed

within upcoming 3 years

Summary & SynopsisRBM Issues 2007-2009

Development of joint management tasks and environmental objectives for each Significant Water Management IssueJoint Programme of Measures

translation of national measures to DRB scaletemplate development and evaluations

Basin wide economic considerations (approach development)Further development of GIS to visualise and analyse collected informationContinuation Intercalibration ExerciseHarmonisation of assessment methods in the DRB as basis for sound river basin management (further practical training)

Page 9: River Basin Management - undp-drp.org - Phase... · River Basin Management - Birgit Vogel (ICPDR) Summary & Synopsis ÖSupport was essential ÖFor RBM small & targeted interventions

9

THANKS TO UNDP GEF/DRP FOR THE SUPPORT & COOPERATIONIN DANUBE RBM PLANNING!