Results of the ASIC Test New Developments Next Steps Project Meeting
13

Results of the ASIC Test New Developments Next Steps Project Meeting.

Dec 15, 2015

Download

Documents

Sky Queen
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Results of the ASIC Test New Developments Next Steps Project Meeting.

Results of the ASIC Test

New Developments

Next Steps

Project Meeting

Page 2: Results of the ASIC Test New Developments Next Steps Project Meeting.

DESY FEC | Project Meeting at MPI/HLL | 1.07.2014 | Page 2

Results of the ASIC Test

• Delivery Date of ASIC: 14. August 2014

• Delivery Date of Hybrid Board: 27. August 2014

• Start Measurements: 1. September

• Check of all Functionalities

• Timing Fast Trigger

• Slow Trigger of 1. Row

• Readout Hit Matrix

• Using Test Pads

vvvv

Page 3: Results of the ASIC Test New Developments Next Steps Project Meeting.

DESY FEC | Project Meeting at MPI/HLL | 1.07.2014 | Page 3

Test Setup

Installation and Preparation of Test Software was done by the summer student Alessio Borgheresi (22.07.-11.09.)

Mainboard

Hybrid-Boardwith Test ASIC

Page 4: Results of the ASIC Test New Developments Next Steps Project Meeting.

DESY FEC | Project Meeting at MPI/HLL | 1.07.2014 | Page 4

Loading of the Status Control Register via NI Labview

Possibility for Enabling the individual Pixel to stimulate the Sensors Output

Page 5: Results of the ASIC Test New Developments Next Steps Project Meeting.

DESY FEC | Project Meeting at MPI/HLL | 1.07.2014 | Page 5

Timing Test Concept

Trigger

Latch

Reset

FF Out

FF Out Dummy

TestInFF

FF-Dummy

DUT

TestIn

Latch

Trigger

Latch

n∙∆t

td

td

∆tN∙∆t

0.5

1

0

Event histogram of FF Out and FF Out Dummy

Ent

ries

(a.u

.)

Page 6: Results of the ASIC Test New Developments Next Steps Project Meeting.

DESY FEC | Project Meeting at MPI/HLL | 1.07.2014 | Page 6

Timing Test Results, randomly activated Pixels

0 50 100 150 200 250 3001.76

1.78

1.8

1.82

1.84

1.86

1.88

1.9

1.92

1.94

measured

simulated

Number of active Pixels

De

lay

Tim

e (

ns

)

VDD = 1.2 VVDD2 = 3.3 V

?

Page 7: Results of the ASIC Test New Developments Next Steps Project Meeting.

DESY FEC | Project Meeting at MPI/HLL | 1.07.2014 | Page 7

Timing Test Results, Variation of Supply Voltages

0 50 100 150 200 250 3001.65

1.7

1.75

1.8

1.85

1.9

1.95

2

1,2 V1,2 V simulated1,3 V1,4 V1,1 V

Number of active Pixels

De

lay

Tim

e (

ns

)

0 50 100 150 200 250 3001.76

1.78

1.8

1.82

1.84

1.86

1.88

1.9

1.92

1.94

3,3 V3,3 V simulated3,4 V

Number of active Pixels

Page 8: Results of the ASIC Test New Developments Next Steps Project Meeting.

DESY FEC | Project Meeting at MPI/HLL | 1.07.2014 | Page 8

Timing Test Results, Corner Variation (simulated, 1.2 V)

0 50 100 150 200 250 3001.2

1.4

1.6

1.8

2

2.2

2.4

2.6

ff

tt

ss

Number of active Pixels

De

lay

Tim

e (

ns

)

Page 9: Results of the ASIC Test New Developments Next Steps Project Meeting.

DESY FEC | Project Meeting at MPI/HLL | 1.07.2014 | Page 9

Timing Test Results, extending Circle

0 2 4 6 8 10 12 141.78

1.8

1.82

1.84

1.86

1.88

1.9

measured

simulated

Radius

De

lay

Tim

e (

ns

)

VDD = 1.2 VVDD2 = 3.3 V

Page 10: Results of the ASIC Test New Developments Next Steps Project Meeting.

DESY FEC | Project Meeting at MPI/HLL | 1.07.2014 | Page 10

Timing Test Results, extending Point

0 2 4 6 8 10 121.78

1.8

1.82

1.84

1.86

1.88

1.9

measured

simulated

Radius

De

lay

Tim

e (

ns

)

VDD = 1.2 VVDD2 = 3.3 V

Page 11: Results of the ASIC Test New Developments Next Steps Project Meeting.

DESY FEC | Project Meeting at MPI/HLL | 1.07.2014 | Page 11

New Developments

> Timing Improvements in the Front-End Electronics Faster by 250 ps

>Design of global Blocks (Sequencer, Controller and Multiplexer) Digital approach

External Signals: Bunch Clock, System Clock, Start/Select

> Improvements on Slow-Trigger performance Consideration of all process corners via extra Switch

Page 12: Results of the ASIC Test New Developments Next Steps Project Meeting.

DESY FEC | Project Meeting at MPI/HLL | 1.07.2014 | Page 12

Next Steps

> ASIC + (SiMPI-)Sensor Test

Space for 6x6 mm² Sensor Chip

> Sending ASICs to PacTech

Page 13: Results of the ASIC Test New Developments Next Steps Project Meeting.

DESY FEC | Project Meeting at MPI/HLL | 1.07.2014 | Page 13

End

> Thank you!

Project Wiki-Page: fec-sipm.desy.de