Atchison Middle School Originally Constructed in 1908 Visit Us At www.restoration-waterproof.com The Kansas City, Kansas RWC office began work on an extensive three phase project at the Middle School, High School and Sports Complex in Atchison, Kansas, USD #409 in August of 2004. The general contractor, McPherson Contractors of Topeka, estimates completion will be in the summer of 2005. The Atchison Middle School original construction dates back to 1908, with additions and alterations being made in 1920, 1951 and 1954. RWC worked on the building in 1996 and is currently repairing and resurfacing the terra cotta, tuckpointing the masonry, replacing brick, cleaning and sealing the structure. An addition is being made to the existing high school. RWC is responsible for the waterproofing and caulking work to be completed on this phase of the project. A stone wall around the stadium seating of the Sports Complex was originally built as a WPA project by the local CCC camp. A total renovation of this wall is being done by RWC including stone restoration, replacement, repointing, cleaning and sealing. The architect on the project is Wilson & Company of Salina, Kansas. The Kansas City RWC office is proud to be a part of this project to preserve, restore and maintain these buildings that have served the community for so many years. RESTORATION & WATERPROOFING CONTRACTORS, INC. SPRING 2005 COVER Atchison Middle School, High School & Sports Complex See Improvements INSIDE Historic 1925 Murdock Bridge Gets TLC RWC Topeka Office to Have Busy Schedule Armed Forces Reserve Center Works in the Works! BACK Our Locations Our Services 1-800/297-3056 Headquarters PO Box 771137 Wichita, KS • 67277-1137 316.942.6602 Kansas City, KS 901 Scott Kansas City, KS • 66105-1219 913.321.6226 Topeka, KS 1416 S.W. Auburn Rd. Topeka, KS • 66615-1503 785.478.9538 www.restoration-waterproof.com MIDDLE SCHOOL, HIGH SCHOOL & SPORTS COMPLEX SEE IMPROVEMENTS Our Services • Balconies • Gunite/Shotcrete • Caulking • Painting • Cleaning • Special Coatings • Concrete Repairs • Tuckpointing • Epoxy Injection • Waterproofing Structures • Brick Buildings • Metal Buildings • Concrete Buildings • Parking Garages • Glass Buildings • More Topeka Office 1416 S.W. Auburn Road Topeka, Kansas 66615 (785) 478-9538 fax # (785) 478-9572 Kansas City Office 901 Scott Kansas City, Kansas 66105 (913) 321-6226 fax # (913) 321-6225 Visit Us At www.restoration-waterproof.com PRESORTED STANDARD US POSTAGE PAID WICHITA KS PERMIT NO. 1148 Restoration & Waterproofing Contractors, Inc. PO Box 771137 Wichita, KS • 67277-1137 RETURN SERVICE REQUESTED 1-800/297-3056 CORPORATE OFFICE Wichita Branch Office 2222 South Hoover Road P.O. Box 771137 (316) 942-6602 fax # (316) 942-6808 1-800-297-3056 Three Phase Project to be Completed Summer of 2005
2
Embed
RESTORATION & WATERPROOFING CONTRACTORS, … Spring05.pdf · The Topeka, Kansas RWC office is currently working on the Armed Forces Reserve Center in Topeka under the direction of
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Atchison Middle School Originally Constructed in 1908
Weather conditions in the Midwest are some of the harshest in the country. Heat, cold, ice and water conditions can have a dramatic impact on your buildings integrity. Call your local Restoration & Waterproofing Contractors office today to arrange for one of our experts to perform a detailed inspection of your building and check for any potential problems before they become serious. Scheduled inspections would take place twice a year and include a thorough interior and exterior inspection that will be documented in a written report for your records.
If problems are found, our experts will advise you of the most efficient and cost effective method of repairing, restoring and waterproofing to solve the problem. For more information on participating in the Guardian program, give us a call at 1-800-297-3056, we would be happy to work with you.
Get the protection you need! Join the Guardian program.
WICHITA OFFICE
Iola Water Treatment Plant Iola, KS
Larned State Hospital Larned, KS
Marcus Welcome Center Wichita State University Wichita, KS
St. Elizabeth Catholic Church Wichita, KS
Big Brothers & Big Sisters Wichita, KS
Kansas Aviation Museum Wichita, KS
Farm Credit Bank Wichita, KS
Value Place Oklahoma City, OK
Winfield USD #465 Winfield, KS
TOPEKA OFFICE
Armed Forces Reserve Ct. Topeka, KS
Our Lady of Guadalupe Topeka, KS
Mulvane Art Museum Washburn University Topeka, KS
USD #501-Topeka HS Gym Topeka, KS
Wamego - USD #320 Wamego, KS
Combined Arms Collective Training Facility Ft. Riley, KS
KANSAS CITY OFFICE
Shawnee Copy Center Shawnee, KS
Ray Marsh Elementary Shawnee, KS
Franklin Cty. Courthouse Ottawa, KS
Olathe Elementary Olathe, KS
Hy-Vee Weitz Construction Kansas City, MO
USD #233 Olathe, KS
Independence Aquatic Ctr. Independence, MO
Historic 1925 Murdock Bridge Gets TLC
Restoration & Waterproofing Contractors, Inc., Wichita, Kansas office is currently under subcontract to Wildcat Construction of Wichita to complete epoxy injection crack repair, bridge rail repair and water repellent at the Murdock Bridge located between Waco and Central Riverside Park over the Little Arkansas River in Wichita. This historically significant bridge was constructed in 1925.
The total project involves over 1300 l.f. of pre-stress concrete beams, approximately 81,000 pounds of reinforcing steel, 100 l.f. of retaining wall, 40 s.y. of sod, 130 l.f. of curb and gutters, 240 s.y. of concrete pavement, lighting, sidewalk construction, and light poles.
The architectural firm on the project is Professional Engineering Consultants of Wichita. The work will continue into May of 2005.
Murdock Bridge Located Between Waco and Central Riverside Park - Wichita, KS
RWC Topeka Office To Have Busy Spring Schedule
"WORKS IN THE WORKS"
RWC Work in Progress:
C A L L 1 - 8 0 0 / 2 9 7 - 3 0 5 6
Murdock Bridge Repairs to continue into May of 2005
The Topeka office branch of RWC is gearing up for a busy spring with work to be done on the following projects:
The Bio-Security Research Center at Kansas State Universi-ty in Manhattan, Kansas. RWC’s work on this new construction project will consist of waterproofing, dampproofing and joint sealant. The project is scheduled for completion in the spring of 2006.
The Residence Inn in Joplin, Missouri. RWC’s work will in-volve waterproofing, dampproofing, traffic coating, and joint sealant with completion in the fall of 2005.
Blue Cross & Blue Shield has subcontracted with RWC to complete the waterproofing on their new facility to be locat-ed in Topeka. The general contractor on the project is Farrell Construction Company. Completion should be in the spring of 2006.
Restoration & Waterproofing Contractors of Topeka is cur-rently working on Sigma Phi Epsilon Fraternity House in Man-hattan, Kansas. The stone and brick structure is being cleaned and tuckpointed as needed. A coating of water repellent sealer will then be applied. RWC is working under the general contractor Harmon Construction, Inc. of Shawnee, Kansas. The architect is Mantel & Teter Architects, Inc. of Kansas City, Missouri. The RWC portion of the work should be done in the summer of 2005.
Under the direction of Fogel-Anderson Con-struction of Kansas City, the Topeka RWC office will be responsible for the furnishing and install-ing of epoxy joint filler at the interior slab on grade control and construction joints and joint sealant at various locations of the new Wal-Mart Super-store to be constructed in Maryville, Kansas. It is anticipated the opening date will be in the spring of 2005.
Armed Forces ReserveCenter - Topeka
Armed Forces Reserve Center - Topeka, KS
The Topeka, Kansas RWC office is currently working on the Armed Forces Reserve Center in Topeka under the direction of the general contractor, Kansas Building Systems, Inc.
The work being performed by RWC includes sheet membrane waterproofing, dampproofing behind stone veneer, water repellents and joint sealants. It is estimated the project will be completed some time in the fall of 2005.