Voltage Quality Regulation Clean Energy Regulators Initiative Roman Targosz Walter Hulshorst 13 February 2014
52
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Regulatory Guidelines to set up Voltage Quality Monitoring

Voltage Quality Regulation Clean Energy Regulators Initiative

Roman Targosz Walter Hulshorst 13 February 2014

Page 2: Regulatory Guidelines to set up Voltage Quality Monitoring

Agenda

Introduction

Voltage Quality aspects

Costs of poor voltage quality

Mitigation Measures

General guidelines for Voltage Quality Regulation

Conclusions

| VQ regulation, 2014

Roman Targosz Copperalliance

Walter Hulshorst DNV GL

Page 3: Regulatory Guidelines to set up Voltage Quality Monitoring

Introduction

Why voltage quality is important?

Difference between reliability and VQ.

| Presentation title and date

Page 4: Regulatory Guidelines to set up Voltage Quality Monitoring

Power Quality; reasons to address

• Energy sector undergoes market transformation. The liberalization of electricity market has brought a risk that quality of electricity supply may deteriorate. Energy regulators have a role to guard this quality.

• People in private life but also economy rely on continuous supply of electricity. More renewables or severe weather increase a risk of power blackout. Once the continuous supply is in place there is a concern about quality of this supply. End user equipment has certain immunity to voltage disturbances. This immunity and the performance of supply should create an overlap referred to as compatibility.

• The immunity of equipment can be increased as well. The crucial role here would be to define precisely the level of quality which will separate the responsibility. This concept is known as responsibility sharing. The increase in level of detail in IEC 61000 series standard or EN 50160 standard helps.

• When the responsibility for end user power quality problems lays a charge on suppliers, the crucial thing will be to solve the equation of how much investment is needed to compensate PQ cost to society. Technical measures are available but the knowledge on level of PQ impact is not satisfatory to move to the optimum societal cost balance point.

Page 5: Regulatory Guidelines to set up Voltage Quality Monitoring

QOS COMPONENTS

CEER identifies three aspects of Quality of Supply: • Continuity of supply (availability)engineering issue, a function

of network design, state of maintenance and investment Partially regulated

• Voltage Quality engineering issue, function of network impedance, load distribution and planning Standardised, not regulated

• Commercial Quality service response, customer relations, dispute resolution performance, price Regulated

Page 6: Regulatory Guidelines to set up Voltage Quality Monitoring

6

SERVICE QUALITY REGULATION MEANS MULTIDIMENSIONAL OUTPUT REGULATION

• VOLTAGE INVESTIGATIONS • VOLTAGE VARIATIONS • VOLTAGE DIPS / SWELLS • RAPID VOLTAGE CHANGES • FLICKER • HARMONICS • UNBALANCE

VOLTAGE QUALITY

COMMERCIAL QUALITY

• CALL CENTERS • BILLING • APPOINTMENTS • RECONNECTIONS AFTER

NON-PAYMENT DISCONNECTIONS

• READING • COMPLAINTS • NEW SUPPLY ESTIMATES • CONNECTIONS TO

NETWORK • PROVIDING SUPPLY • METER INVESTIGATIONS

CONTINUITY OF SUPPLY

• UNPLANNED SUPPLY INTERRUPTIONS (LONG AND SHORT)

• PLANNED (NOTIFIED) SUPPLY INTERRUPTIONS

ELECTRICITY

SERVICE

SUPPLY

GEN

ERATIO

N,

TRA

NSM

ISSION

AN

D

DISTR

IBU

TION

Page 7: Regulatory Guidelines to set up Voltage Quality Monitoring

7

PROMOTE QUALITY

IMPROVEMENT

• SET AND MAINTAIN OVERALL QUALITY STANDARDS

• LINK QUALITY AND REVENUES (TARIFFS)

FAVOUR AND TEST MARKET MECHANISMS

• PREFER CUSTOMER CHOICE WHENEVER POSSIBLE AND SAFE

PROTECT WORST-SERVED

CUSTOMERS

• SET AND MAINTAIN GUARANTEED QUALITY STANDARDS

• DETERMINE INDIVIDUAL COMPENSATIONS FOR STANDARD MISMATCHING

MAKE INFORMATION

AVAILABLE

• SET RELIABLE MEASUREMENT RULES FOR QUALITY FACTORS

• PUBLISH ACTUAL QUALITY LEVELS

OBJECTIVES OF SERVICE QUALITY REGULATION

REGULATION OF QUALITY

PREREQUISITE INCENTIVE QUALITY REGULATION (P.B.R.) COMPETITION

Page 8: Regulatory Guidelines to set up Voltage Quality Monitoring

CoS / VQ - changes

Continuity of Supply

• Customer is affected by every interruption

• Lack of relibility means costs for all customers

• Power interruptions are mainly caused in the network

Voltage Quality

• Customer is not affected until certain VQ level

• Different effects for different customers

• Voltage quality is largely influenced by (other) customers

Page 9: Regulatory Guidelines to set up Voltage Quality Monitoring

Reliability / VQ damage functions

Page 10: Regulatory Guidelines to set up Voltage Quality Monitoring

Interruption vs. dip

| Presentation title and date

UT(r.m.s.)

100%

0%tf ts tr t

Illustration of a supply interruption tf – the period of voltage drop; ts – the period with reduced voltage; tr – the period with building up voltage

UT(r.m.s.)

100%

0%tf ts tr t

40%

llustration of voltage dip; run r.m.s. values of voltage by 40% voltage dip; explanation of symbols like in Figure beside

Page 11: Regulatory Guidelines to set up Voltage Quality Monitoring

Voltage Quality aspects

Technical aspects as defined in EN 50160

| Presentation title and date

Page 12: Regulatory Guidelines to set up Voltage Quality Monitoring

EN 50160 – Actors

| Presentation title and date

Page 13: Regulatory Guidelines to set up Voltage Quality Monitoring

Power Quality disturbances

| VQ regulation 2014

100%+10%

-10%

The

supp

ly v

olta

ge U

RM

S

The

nom

inal

vol

tage

(dec

lare

d)

Sup

ply

vol

tage

varia

tions

Rap

id v

olta

gech

ange

s

Flic

ker s

ever

ity

Vol

tage

dip

Sho

rt s

uppl

yin

terr

uptio

n

Long

sup

ply

inte

rrup

tion

Ove

rvol

tage

s w

ithne

twor

k fr

eque

ncy

Tran

sien

t ove

rvol

tage

s

< ±

10 %

durin

g 95

% o

f a w

eek

< ±

5 %

, and

sev

eral

tim

esdu

ring

a da

y <

± 10

%

Plt <

= 1

durin

g 9

5% a

wee

k

5%

URMS<5%

UR

MS >

5%

and

< 9

0 %

> 3 min<= 3

min up

to fe

wse

cods

from

1 µ

s up

tofe

w s

econ

ds

up to the valueline-to-line voltage up to 6 kV

Page 14: Regulatory Guidelines to set up Voltage Quality Monitoring

EN 50160 Terms

Definitions concerning the normal (regular) state of the network operation Network operator – party responsible for operating, ensuring the maintenance of, and if necessary developing, the supply network in a given area and responsible for ensuring the long term ability of the network to meet reasonable demands for electricity supply. Network user – party being supplied by or supplying to an electricity supply network. Nominal voltage Un – is the voltage by which a supply network is designated or identified and to which certain operating characteristics are referred. Supply terminal – point in a public supply network designed as such and contractually fixed, at which electrical energy is exchanged between contractual partners. This point may differ from, for example, the electricity metering point or the point of common coupling. Point of common coupling [PCC abbreviation] – the point on a public power supply network, electrically nearest to a particular load, at which other loads are, or could be, connected. Supply voltage – is the r.m.s. value of the voltage at a given time at supply terminal, measured over a given interval. Declared supply voltage Uc – is the supply voltage Uc agreed by the network operator and the network user. Generally declared supply voltage Uc is the nominal voltage Un but it may be different according to the agreement between network operator and the network user. Reference voltage (for interruptions voltage dips and voltage swells evaluation) – a value specified as the base on which residual voltage, thresholds and other values are expressed in per unit or percentage terms. For the purpose of this standard, the reference voltage is the nominal or declared voltage of the supply system. Frequency of the supply voltage – repetition rate of the fundamental wave of the supply voltage measured over a given interval of time. Nominal frequency – is the nominal value of the frequency of the supply voltage. | Presentation title and date

Page 15: Regulatory Guidelines to set up Voltage Quality Monitoring

Normal operating conditions

Levels of voltage have been divided as follows: High voltage – voltage whose nominal r.m.s. value is 36 kV<Un<150 kV, Medium voltage – voltage whose nominal r.m.s. value is 1 kV<Un≤36 kV, Low voltage – voltage whose nominal r.m.s. value is Un≤ 1 kV. Because of existing network structures, in some countries the limit between MV and HV can be different. Normal operating condition – operating condition for an electricity network, where load and generation demands are met, system switching operations are made and faults are cleared by an automatic protection system, in the absence of exceptional circumstances, i.e.: • temporary supply arrangement; • in the case of non-compliance of a network user’s installation or equipment with relevant standards or with the

technical requirements for connection; • exceptional situations, such as:

• exceptional weather conditions and other natural disasters; • third party interference; • acts by public authorities; • industrial actions (subject to legal requirements); • force majeure; • power shortages resulting from external events.

| Presentation title and date

Page 16: Regulatory Guidelines to set up Voltage Quality Monitoring

Compatibility

| Presentation title and date

prob

abili

ty d

ensi

ty

prob

abili

ty d

ensi

ty

com

patib

ility

leve

lan

d a

risk

of d

amag

e of

equi

pmen

t

capital costsin a supply network

costs of productionof equipment

network operator

probability density to adherethe supply parameters

probability density of immunityof equpment on disturbances

(classes of electomagneticenvironment 1, 2, 3)

% ?

network user,manufacturer of equipment

(e.g. EN 61000-3-x,characteristic CBEMA)e.g. (EN 50160)

planninglevel immunity level

Page 17: Regulatory Guidelines to set up Voltage Quality Monitoring

17

Planning level

Equipment immunity level Compatibility level

Viaduct – Vehicle Analogy

Page 18: Regulatory Guidelines to set up Voltage Quality Monitoring

EN 50160

Parameter

For systems with synchronous connection to an interconnected system

Duration

For systems with no synchronous connection to an interconnected system (e.g. supply system on certain islands)

Duration

Power frequency

50 Hz ± 1 %

(i.e. 49,5 Hz ÷ 50,5 Hz)

during

99,5%

of a year

50 Hz ± 2 %

(i.e. 49 Hz ÷ 51 Hz)

during

95%

of a week 50 Hz + 4% / -6%

(i.e. 47 Hz ÷ 52 Hz)

during

100 %

of the time

50 Hz ± 15 %

(i.e. 42,5 Hz ÷ 57,5 Hz)

during

100 %

of the time Supply

voltage

Under normal operating conditions excluding the periods with interruptions

Un ± 10 %

• during each period of one week 95 % of the 10 min mean r.m.s.

value; • all 10 min mean r.m.s.

values of the supply voltage shall be within the range of Un +10%

/ -15%

also for special remote network users

Un + 10% / -15%.

Network users should be informed of the conditions.

In accordance with relevant product and installation standards, network users’ typically designed to tolerate supply

voltages of ±10% of Un.

• during each period of one week 95 % of the 10 min mean r.m.s. value

±10% of Un; • all 10 min mean r.m.s.

values of the supply voltage shall be within

the range of Un +10% / -15% 1)

| Presentation title and date

Page 19: Regulatory Guidelines to set up Voltage Quality Monitoring

95 percentile – philosophy of EN 50160

| Presentation title and date

Odered diagram of long term flicker severity Plt

0,00

0,20

0,40

0,60

0,80

1,00

1,20

1,40

1,60

0 100 200 300 400 500 600 700 800 900 1000

number 10 min measurement over a week

Plt

95%

∆ Plt

Page 20: Regulatory Guidelines to set up Voltage Quality Monitoring

EN 50160 voltage dips

Residual voltage

U %

Duration

ms

10 ≤ t ≤ 200 200< t ≤500 500< t ≤1000 1000< t≤5000 5000<t ≤60000

90 > u ≥ 80 CELL A1 CELL A2 CELL A3 CELL A4 CELL A5

80 > u ≥ 70 CELL B1 CELL B2 CELL B3 CELL B4 CELL B5

70 > u ≥ 40 CELL C1 CELL C2 CELL C3 CELL C4 CELL C5

40 > u ≥ 5 CELL D1 CELL D2 CELL D3 CELL D4 CELL D5

5 > u CELL X1 CELL X2 CELL X3 CELL X4 CELL X5

| Presentation title and date

Page 21: Regulatory Guidelines to set up Voltage Quality Monitoring

Voltage dips immunity

| Presentation title and date

% U

t

n

0

100

200

300

375

1 µs 100 µs1 m

s

20 ms

1 s 1 min

Ran

ge o

f tol

erat

edvo

ltage

dist

urba

nces

Immunity limiton the overvoltages

Immunity limit on the voltage dips and short supply interruption

10 ms

1hr 1day

Type IIIType I Type II

Page 22: Regulatory Guidelines to set up Voltage Quality Monitoring

EN 50160 – harmonic limits

Odd harmonics Even harmonics

Not multiples of 3 Multiples of 3

Order

h

Relative amplitude

uh

Order

h

Relative amplitude

uh

Order

h

Relative amplitude

uh

5 6,0 % 3 5,0 % 2 2,0 %

7 5,0 % 9 1,5 % 4 1,0 %

11 3,5 % 15 0,5 % 6 … 24 0,5 %

13 3,0 % 21 0,5 % 17 2,0 % 19 1,5 % 23 1,5 % 25 1,5 %

| Presentation title and date

during each period of one week, 95% of the 10 min mean r.m.s. values

Page 23: Regulatory Guidelines to set up Voltage Quality Monitoring

Unbalance

| Presentation title and date

Under normal operation conditions, during each period of one week, 95% of the 10 min mean r.m.s. values of the negative phase sequence component (fundamental) of the supply voltage shall be within the range 0% to 2% of the positive phase sequence component (fundamental). In this European Standard only values for the negative sequence component are given because this component is the relevant one for the possible interference of appliances connected to the system. In some areas with partly single phase or two phase connected network users’ installations, unbalances up to about 3% at three-phase supply terminal occur.

Page 24: Regulatory Guidelines to set up Voltage Quality Monitoring

Measurement

CLASSES OF MEASUREMENT METHODS ACCORDING TO EN 61000-4-30:2009. Electromagnetic compatibility (EMC), Part 4-30: Testing and measurement techniques – Power quality measurement methods. For each parameter measured, three classes (A, S and B) are defined. For each class, measurement methods and appropriate performance requirements are included. • Class A • This class is used where precise measurements are necessary, for example for contractual applications, that

may require resolving disputes, verifying compliance with standards etc. • Any measurements of a parameter carried out with two different instruments complying with the requirements

of class A, when measuring the same signals, well produce matching results within the specified uncertainty for that parameter.

• Class S • This class is used for statistical applications such as surveys or power quality assessment, possibly with a

limited subset of parameters. Although it uses equivalent intervals of measurement as class A, class S processing requirements are lower.

• Class B • This class is defined in order to avoid making many existing instruments designs obsolete. • Class B methods are not recommended for new designs.

| Presentation title and date

Page 25: Regulatory Guidelines to set up Voltage Quality Monitoring

Costs of poor voltage quality

| Presentation title and date

Page 26: Regulatory Guidelines to set up Voltage Quality Monitoring

PQ cost summary

Industry Services Total

Sector

0

20

40

60

80

100

PQ

co

st b

ln €

8528,0%

1,50,5%

86,528,5%

4,61,51% 1,8

0,6%

6,42,11%

0,20,06%

1,10,35%

1,30,41%

51,216,89%

2,10,71%

53,417,6%

4,11,36%

00,02%

4,21,38%

Dips_and_short_interruptionsLong_interruptionsHarmonicsSurges_and_transientsFlicker_unbalance_earthing_and_EMC

PQ cost in EU >150 bln €

Dips 52,5 € bln Short inter. 34 €bln

Industry Services Total

Sector

0

10

20

30

40

50

60

70

PQ

cos

t bln

€1,40,45%

0,90,28%

2,20,73%

41,313,62%

3,31,08%

44,614,69%

3611,85%

20,65%

37,912,5%

63,620,97%

0,40,13%

6421,1%

2,90,94% 0,1

0,04%

30,98%

LaborWIPProcess_slowdownEquipmentOther_cost

Page 27: Regulatory Guidelines to set up Voltage Quality Monitoring

PQ cost conclusion from LPQI survey

• To arrive at a statistically significant and acceptable model the survey sample was divided into two sub-samples - “Industry” and “Services”.

• The cost of wastage caused by poor PQ for EU-25 according to this analysis exceeds €150bn. “Industry” accounts for over 90% of this wastage.

• Industry is hardest hit • Dips, short interruptions, surges and transients account for 80-90% of the €150bn

financial costs/ wastage • Equipment damage and operational waste (unrecoverable work in progress &

underperformance) account for similar proportions of the totals identified • For the most sensitive industrial sectors representing €3,63 trillion (or 20% of EU25 overall

turnover) PQ costs amounts about 4% of their turnover. • The apparently insignificant contribution of “Services” to total PQ costs (0,142% of

turnover) may result from certain cost underestimation as this sector often experience problems in an office environment where correctly distinguishing between a PQ cause and other root cause may be difficult.

Page 28: Regulatory Guidelines to set up Voltage Quality Monitoring

0

20

40

60

80

100

120

PQ DisturbancePower Outage

The Cost of PQ and Reliability to the U.S. Economy

Total Annual Cost of Power Outages and PQ Disturbances by Business Sector

Cost of:

$14.3 $6.2

$34.9

$66.6-135.6

Source: Primen Study: The Cost of Power Disturbances to Industrial & Digital Economy Companies Digital

Economy Continuous Process Mfg.

Fabrication & Essential Services

Other US Industry

$Billion

TOTAL $119 - $188 Billion

40% GDP 60% GDP

EPRI IntelliGrid

Page 29: Regulatory Guidelines to set up Voltage Quality Monitoring

Costs from Unmitigated PQ Phenomena EPRI IntelliGrid Study – Average Costs Across All Businesses

Page 30: Regulatory Guidelines to set up Voltage Quality Monitoring

Italian Study (2007) about impact of voltage dips on industry

• Politecnico di Milano (400 kW - 31 MW): mediana and (mean)

• full sample: 10.7 €/kW (61.7 €/kW) • excl. „0” direct cost: 21.3 €/kW (74.6 €/kW)

• CESI Ricerca, 2004 (20 kW - 160 MW): mean of PQ disturbances together: 6 €/kW

Page 31: Regulatory Guidelines to set up Voltage Quality Monitoring

PQ cost – historical examples (1)

T. Andersson and D. Nilsson, in "Test and evaluation of voltage dip immunity," STRI AB and Vatenfall AB 27 Novenber 2002,

Sensitivity of different industries to voltage dips expressed in estimated dips cost per industry. The highest position in this ranking is occupied by semiconductor industry which, according to some other sources, experience the highest level of voltage dips cost compared to electricity bill or company turnover of any sector.

Textile industry

Plastics industry

Glass industry

Paper industry

Steel industry

Semiconductor industry

Different types of industries

cost [€]

€1 000 €10 000 €100 000 €1 000 000 €10 000 000

Page 32: Regulatory Guidelines to set up Voltage Quality Monitoring

PQ cost – historical examples (3)

Industry Duration Cost/sag

UK steel work 30% For 3.5 cycles

£250k

US glass plant Less than 1 s $200k

US computer centre 2 second $600k

US car plant Annual exposure $10M

South Africa Annual exposure $3B

Voltage dips cost per event based on study carried out in the University of Manchester former UMIST by J. V. Milanovic and N. Jenkins, "Power quality cost for manufacturing industries," presented on EdF workshop in Paris, 2003.

Financial losses caused by voltage sags taken from D.Chapman, "The cost of poor power quality," Copper Development Association November 2001

Industry Typical financial loss per event (€)

Semiconductor production 3,800,000

Financial trading 6,000,000 per hour

Computer centre 750,000

Telecommunications 30,000 per minute

Steel works 350,000

Glass industry 250,000

Page 33: Regulatory Guidelines to set up Voltage Quality Monitoring

The reasons for investigating the cost of poor PQ

• Building awareness of the potential magnitude of PQ costs which may largely affect the productivity of the company

• While statistics and indicatory values are helpful, no two companies, even when operating in the same sector, will be equally vulnerable to PQ disturbances. Individual surveys are needed

• As PQ becomes more and more the subject to contract between a user and a supplier, the cost of PQ needs to be quantified to establish a measure of a value of improved PQ for which the user is going to pay a premium price or receive compensation if PQ is inadequate

• In case of failure caused by a PQ event for which the supplier is contractually liable, the amount of compensation will need to be determined. PQ survey will allow a prompt and accurate determination of the amount of PQ loss.

• Awareness of the cost of PQ will help to minimise it. Once the PQ cost is known many small and simple incremental improvements are easily justified and possible.

• Finally PQ cost knowledge is a tool for regulators to set incentives for suppliers. The benefit should retain for the whole society

Page 34: Regulatory Guidelines to set up Voltage Quality Monitoring

Leonardo ENERGY

Page 35: Regulatory Guidelines to set up Voltage Quality Monitoring

Leonardo Academy http://www.leonardo-academy.org/

Page 36: Regulatory Guidelines to set up Voltage Quality Monitoring

Thank you

| Presentation title and date

[email protected]

Page 37: Regulatory Guidelines to set up Voltage Quality Monitoring

DNV GL © 2013 13 feb 2014 SAFER, SMARTER, GREENER DNV GL © 2013

13 feb 2014 W. Hulshorst

ENERGY

REGULATORY GUIDELINES IN SETTING UP A VOLTAGE QUALITY MONITORING FRAMEWORK

38

Page 38: Regulatory Guidelines to set up Voltage Quality Monitoring

DNV GL © 2013 13 feb 2014

Agenda

Introduction

Voltage Quality aspects

Costs of poor voltage quality

Mitigation Measures

General guidelines for Voltage Quality Regulation

Conclusions

39

Page 39: Regulatory Guidelines to set up Voltage Quality Monitoring

DNV GL © 2013 13 feb 2014

Mitigation measures (technical)

Since most of the power quality problems are cost related this justifies the investments in mitigation technologies by the power company or the customer. A wide range of technology is available to make this possible. In general, technical solutions that increase voltage quality can be at 4 levels: The choice for a mitigation method depends on: The nature of the disturbance generated and / or to be prevented, The required level of performance, The financial consequences of malfunction, The time required for a return on the investment, Practices, regulation and limits on disturbance set at the grid operator. 40

Page 40: Regulatory Guidelines to set up Voltage Quality Monitoring

DNV GL © 2013 13 feb 2014

Mitigation measures

Premium contracts:

– The availability of sophisticated and sensitive net technologies has led customers to demand higher levels of power quality. To meet these needs, some utility companies have set up premium power quality contracts for their customers

Labelling:

– In most countries Minimum Standards are defined for voltage quality. This anticipates the issue that if a minimum level of quality is met, the customer is not interested in better quality. Some customers need higher quality than the minimum standards.

41

Page 41: Regulatory Guidelines to set up Voltage Quality Monitoring

DNV GL © 2013 13 feb 2014

Guidelines for voltage quality regulation

When setting up a voltage quality regulation framework, there are a number of basic issues that need to be considered first. This understanding is crucial in order to make the right choices in order to arrive at an effective voltage quality regulatory system.

The main issues to be considered during this process are identified:

1. develop a good understanding of what voltage quality is and how it can be measured.

2. clearly defining the objective one would like to pursue with respect to the voltage quality and

3. choosing the appropriate quality control in order to achieve the defined objectives

42

Page 42: Regulatory Guidelines to set up Voltage Quality Monitoring

DNV GL © 2013 13 feb 2014

Measuring of voltage quality

The ability to measure voltage quality clearly is a precondition for setting up an effective voltage quality regulatory framework.

But before measuring, of even more importance is the need to clearly define “voltage quality” and develop suitable indicators. Quality measurement is the fundament for any quality regulation system. It is of utmost importance that the data that feeds into the quality control is accurate. These data forms the input of the regulatory process. Clearly, if the underlying data is wrong, so will be the outcome.

43

Page 43: Regulatory Guidelines to set up Voltage Quality Monitoring

DNV GL © 2013 13 feb 2014

CEER conclusions on voltage quality monitoring (1)

Voltage quality monitoring are use full tools for regulation:

There are sufficient applications with advantages that in the end fall to the network user to justify having a voltage-quality monitoring program. A monitoring program can be fully under the control of the regulator, or, installed and operated by the network operator with the regulator getting access to the data.

Diversification of indices and methods is to be avoided:

A number of voltage quality monitoring programs are already in place in different countries. There are large differences between these programs – this makes it difficult to compare the results and exchange knowledge and experience – harmonisation is needed! (choice of monitor locations, types of disturbances monitored, characteristics recorded, indices calculated)

44

Page 44: Regulatory Guidelines to set up Voltage Quality Monitoring

DNV GL © 2013 13 feb 2014

CEER conclusions on voltage quality monitoring (2)

Voltage quality monitoring programs should be funded through network tariffs:

The most common way of funding such a program is through the network tariffs. This can however vary between countries based on the local tariff structure and regulation.

Making results available is important:

Publication of the results (including compliance with voltage quality

regulation and important trends) and making data available in other

ways are important parts of a voltage-quality monitoring program.

Keep other applications in mind

45

Page 45: Regulatory Guidelines to set up Voltage Quality Monitoring

DNV GL © 2013 13 feb 2014

CEER conclusions on voltage quality monitoring (3)

Keep other applications in mind:

When setting up a voltage quality monitoring program, it is important to consider all possible applications. Even if the purpose of a program is initially limited, small changes to the set-up of a program or to the kind of parameters recorded or calculated, can allow future applications at no or very small extra effort (setting up of such a program should be done in close cooperation between NRAs and network operators).

46

Page 46: Regulatory Guidelines to set up Voltage Quality Monitoring

DNV GL © 2013 13 feb 2014

Define the objective

Once a clear measure of voltage quality has been defined and the relevant indicator to be measured has been identified, the next step is to establish what the quality objective is:

1. the existing level of performance should be quantified and possibly, compared with respect to of international best practice.

2. the quality level that one ideally would like to achieve needs to be defined.

47

Quality

Network Costs

Interruption Costs

Total Social Costs

Optimum

Page 47: Regulatory Guidelines to set up Voltage Quality Monitoring

DNV GL © 2013 13 feb 2014

Appropriate quality control to achieve the objectives

Once the regulator has identified the appropriate quality indicator, is able to measure it, and has an idea about what performance level should be achieved, the next step is to choose a suitable regulatory control to help achieve that objective.

There is however a second criteria that also need to be taken into account namely whether the quality control can actually be implemented or not. Generally speaking, three types of quality controls can be distinguished:

1. under performance monitoring, the regulator monitors the performance of the network company and where applicable makes this information available to the public.

2. the regulator can apply a minimum standard. Here, a minimum level of performance is prescribed; not meeting this standard leads to a penalty.

3. under a quality incentive scheme, a more continuous relationship between quality performance and financial outcome can be imposed.

48

Page 48: Regulatory Guidelines to set up Voltage Quality Monitoring

DNV GL © 2013 13 feb 2014

1 Performance monitoring

Performance monitoring is relatively simple to implement and requires limited regulatory involvement. The basic idea is to require the network company to report on its voltage quality performance to the regulator.

The regulator can then decide to make this information available to the public

Performance monitoring is the weakest form of quality control as it only provides indirect incentives to the utility. However, it is also the simplest to implement as it requires relatively little effort by the regulator.

Also, in terms of data requirements, performance monitoring can be limited to a number of strategic locations within the network thus eliminating the need for measuring extensively throughout the network or, in the extreme case, at each individual customer connection point.

49

Page 49: Regulatory Guidelines to set up Voltage Quality Monitoring

DNV GL © 2013 13 feb 2014

2 minimum standards

Minimum standards dictate a minimum level to be achieved for a certain performance aspect. In case of not meeting this standard, the utility can be penalized financially or otherwise.

In the case that the regulator aims at increasing performance, minimum standards provide clear guidelines about what quality network operators should aim at.

They set quantitative targets for the companies to achieve. If combined with financial incentives for not meeting the standards, minimum standards can be very effective quality controls.

The minimum standard can be derived directly from standards which are already adopted and used within the power sector industry. For example, in Europe, the European Standard EN 50160 has been generally considered as a reasonable starting point to establish voltage quality regulation systems

50

Page 50: Regulatory Guidelines to set up Voltage Quality Monitoring

DNV GL © 2013 13 feb 2014

3 Incentive scheme

An incentive scheme can be considered as an extended minimum standard. Under a minimum standard, the utility pays a penalty in case it does not meet a certain prescribed level. Under an incentive scheme, a more continuous relation is imposed between price and quality. Each performance level results in a financial incentive, which varies with the gap between actual performance level and the target level.

An incentive scheme extends the minimum standards and makes the financial incentive (being a penalty or a reward) a direct function of actual performance..

Incentive schemes are useful if one is aiming at maintaining existing levels of performance or improve the performance.

But even though theoretically superior, incentive schemes have serious practical limitations:

– it is difficult to exactly measure customer costs due to lack of quality.

– the collection of adequate and high-quality data.

51

Page 51: Regulatory Guidelines to set up Voltage Quality Monitoring

DNV GL © 2013 13 feb 2014

Conclusions

It is crucial that the objectives of quality regulation are clearly defined. This helps to increase the effectiveness of the regulatory system and reduce the risks of adverse effects

The definition of the voltage quality objective follows logically from the perceived difference between current and desired levels of voltage quality. Socio-economic analysis identified the optimal quality level as being a desirable objective.

Three types of quality controls can be distinguished:

– Performance monitoring

– A minimum standard

– An incentive scheme

Typically, the European Standard EN 50160 is used as the basis for setting minimum standards. Where needed, regulators may choose to go beyond the minimum limits imposed by the EN 50160

52

Page 52: Regulatory Guidelines to set up Voltage Quality Monitoring

DNV GL © 2013 13 feb 2014

SAFER, SMARTER, GREENER

www.dnvgl.com

Thanks

53

More information needed? [email protected] +3126 356 24 32