TNT Express EuroHub (LGG) Air Cargo Handling System for TNT Express EuroHub, at Liège Airport (LGG), Belgium Airport: System description: Liège Airport (LLG) ULD handling system Project Place: Start date: Liège 2007, October Project Country: Commissioning date: Belgium 2008, June Included components: • 20 Airside interfaces (dolly docks) with hydraulic side shift • 28 Workstations for building/breaking of ULD's with integrated weighing system • 87 Right angle decks (RAD) • 2 Turntables with integrated RAD • 2 Hinged roller decks (bridge) with hydraulic lift • 4 Truck docks with pop-up ball transfer units winch • Castor deck area for manual ULD manoeuvring • Two-phase delivery, installation, commissioning, training Control system: • Overall PLC control system