  • 8/19/2019 Refarming Project 2013_V1_to Share

    1/54

    1 © Nokia Siemens Networks 2012

    Customer Confidential

    Indosat 2012 / Version 2-0 / Re-farming Project 2012

    Rollout and Re-farming U900

  • 8/19/2019 Refarming Project 2013_V1_to Share

    2/54

    2 © Nokia Siemens Networks 2012

    Customer Confidential

    Indosat 2012 / Version 2-0 / Re-farming Project 2012

    Re-farming Planning process

    Request for re-farming

    Step1: 2G spectrum allocation to 3G

    Step2: 2G and 3G zone setup

    Step3: 2G network analysis

    Step4: 2G network re-planning

    If 2G netwplanning rnot accepStep1 andcan be re

    Step5: Project Implementation

    Step6: Prelaunch andOptimization

    Step7 :Reporting

  • 8/19/2019 Refarming Project 2013_V1_to Share

    3/54

    3 © Nokia Siemens Networks 2012

    Customer Confidential

    Indosat 2012 / Version 2-0 / Re-farming Project 2012

    Spectrum Carving

  • 8/19/2019 Refarming Project 2013_V1_to Share

    4/54

    4 © Nokia Siemens Networks 2012

    Customer Confidential

    Indosat 2012 / Version 2-0 / Re-farming Project 2012

    Spectrum Allocation (Sandwich Model)recommended for efficient frequency re-farming

    • Closest frequencies at both sides of the WCDMA carrier can be optimally utilizfrequencies

    • Guard bands can be minimized with Flexi BTS 4.2 MHz filter and coordinadeployment

    = WCDMA/HSPA

    = Non-BCCH GSM, coordinated deployment

    = BCCH GSM, coordinated deployment

    = GSM, uncoordinated deployment

    WCDMA/HSPA

    4.2 MHz

    2.2 MHz

    2.4 MHz

    Other operator’s band 

    2.6 MHz

    Other o

  • 8/19/2019 Refarming Project 2013_V1_to Share

    5/545 © Nokia Siemens Networks 2012

    Customer Confidential

    Indosat 2012 / Version 2-0 / Re-farming Project 2012

    •  Spectrum Carving scenario

    • GSM spectrum allocation strategy :

    •  Ad-Hoc ( non group BCCH-TCH)

    2.2 MH

    2.4 M

    2.6 M

    Spectrum Allocation (Sandwich Model)recommended for efficient frequency re-farming 

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 4

    GSM UMTS 900

    Guard band / Joker G900 BCCH - TCH G900 TCH U900 U900 center freq.

  • 8/19/2019 Refarming Project 2013_V1_to Share

    6/546 © Nokia Siemens Networks 2012

    Customer Confidential

    Indosat 2012 / Version 2-0 / Re-farming Project 2012

    Zone Setup

  • 8/19/2019 Refarming Project 2013_V1_to Share

    7/547 © Nokia Siemens Networks 2012

    Customer Confidential

    Indosat 2012 / Version 2-0 / Re-farming Project 2012

    Zone setupGSM900 (with U2100 zone), Buffer zone, GSM900 with U900 zone

    • Core Zone - Limited GSM900 band area (re-farming area) - The limited GSM9together with 3G on U900 band.

    • Buffer zone - Buffer zone is having limited band for GSM900 (after re-farming2100 band. It is required to provide enough separation between the same freqGSM900 (full band) and UMTS900 (co-channel IF)

    • Common Zone - Full GSM900 band area - The whole available 900 band is uUMTS and U2100 band.

    GSM (Limited band) + U900

    4.2 MHz must be re-farmed

    and 4 Channels on the border

    should be used for non

    BCCH only

    GSM Limited band + U900

    4.2 MHz must be re-farmed

    and 2 Channels on the

    border should be used for

    non BCCH only

    GSM (Whole

    UMTS 2100

  • 8/19/2019 Refarming Project 2013_V1_to Share

    8/54

    8 © Nokia Siemens Networks 2012

    Customer Confidential

    Indosat 2012 / Version 2-0 / Re-farming Project 2012

    UMTS900 Interference Scenarios Interference Main Scenarios

    GSM site cosite UMTS900 site (CoordinatedScenario)

    UMTS900 site

    GSM site in Buffer Area (Uncoordinated Scenario with

     Adjacent Channels)

    GSM site in GSM Network Area

    (Uncoordinated Scenario Co-Channels)

    UMTS900 Area

    Buffer Area

    GSM900 Network Area

  • 8/19/2019 Refarming Project 2013_V1_to Share

    9/54

    9 © Nokia Siemens Networks 2012

    Customer Confidential

    Indosat 2012 / Version 2-0 / Re-farming Project 2012

    Network Analysis

  • 8/19/2019 Refarming Project 2013_V1_to Share

    10/54

    10 © Nokia Siemens Networks 2012

    Customer Confidential

    Indosat 2012 / Version 2-0 / Re-farming Project 2012

    Network Analysis (Planning inputs and outputs)

    Inputs from current network :

    • Re-farming strategy (site coordination, UMTS 900 site list, planning area etc..)

    • Configuration analysis (Capacity)• Performance analysis

    • Parameter/feature analysis

    • Traffic analysis and Traffic forecast (traffic increase/decrease due to UMTS 900)

    Outputs :

    • New configuration plan (max configuration on re-farmed band)

    • New capacity plan (add 1800 sectors/move traffic to UMTS900/2100)

    • New frequency plan (Optimizer)

    • New HOC&POC plan

    • New feature implementations to maintain QoS of network

  • 8/19/2019 Refarming Project 2013_V1_to Share

    11/54

    11 © Nokia Siemens Networks 2012

    Customer Confidential

    Indosat 2012 / Version 2-0 / Re-farming Project 2012

    Step by Step GSM capacity Analysis

    List cells in core and

    buffer

    GSM cell >3 TRXs

    Downgrade to 3 TRXs

    Is 3 TRXs enough tohandle existing

    traffic

    Calculate traffic to be off

    Loaded

    yes

    No

     A

     Any

    collocated

    DCS

    Upgrade DCS TRX New Collo

    End

    End

    yes

    No

    yes

    No

    End

     A

  • 8/19/2019 Refarming Project 2013_V1_to Share

    12/54

    12 © Nokia Siemens Networks 2012

    Customer Confidential

    Indosat 2012 / Version 2-0 / Re-farming Project 2012

    Capacity planning - example

     Aim to ensure that excessive GSM 900 traffic (due to max configuration after refarming) will be p1800 band or UMTS

    Traffic increase (forecast) 10% The same Effective Frequency Load is assumed after re-farming

    Half rate ratio 40%

    ave. # of TSLs used for (E)GPRS 2

    # of TCHs on BCCH / TRX 6

    # of TCHs on nonBCCH / TRX 7

    Sum: 4533 14428 11869 2559 48516 53368 70872 79938 52740 9495 32654 25

       C   e   l   l   n   a   m   e

       #   o   f   T   R   X   s

       #   o   f   G   S   M    T

       R   X   s

       #   o   f   D   C   S   T   R   X   s

       B   H

       t   r   a   f   f   i   c   (   E   r   l .   )

       B   H

       t   r   a   f   f   i   c   f   o   r   e   c   a   s   t   (   E   r   l .   )

       #   o   f   r   e   q   u   i   r   e   d   T   S   L   s   w   i   t   h   F   R

       a   n   d   H   R

       #   o   f   r   e   q   u   i   r   e   d   T   S   L   s   w   i   t   h   G   S   M    F

       R

       a   n   d   H   R

       a   n   d   f   o   r   a   v   e .

       (   E   )   G   P   R   S   t   r   a   f   f   i   c

       #   o   f   r   e   q   u   i   r   e   d   D   C   S   T   S   L   s  -   1   T   R   X   s   o   n

       G   S   M

       #   o   f   r   e   q   u   i   r   e   d   D   C   S   T   R   X   s  -   1   T   R   X   s   o   n

       G   S   M

       o   r   t   r   a   f   f   i   c   v   o   l   u   m   e   n   e   e   d   e   d   t   o   b   e   r   e   a   l   l   o   c   a   t   e   d

       t   o   U   9   0   0   /   U   2   1   0   0

       #   o   f   r   e   q   u   i   r   e   d   D   C   S   T   S   L   s    2   T   R   X   s   f   o   r

    BT200321 1 1 0 0.64 0.71 3 5 -1 0 0.00BT200461 2 2 0 9.98 10.98 15 17 11 2 6.51

    BT200462 2 2 0 10.59 11.65 16 18 12 2 7.05

    BT200463 2 2 0 1.86 2.05 5 7 1 1 0.00

    BT200561 3 2 1 10.37 11.40 16 18 12 2 6.85

    BT200562 3 2 1 5.52 6.07 10 12 6 1 2.58

    Inputs on BTS level 1 TRX/cell on GSMCalculations based on inputs

  • 8/19/2019 Refarming Project 2013_V1_to Share

    13/54

    13 © Nokia Siemens Networks 2012

    Customer Confidential

    Indosat 2012 / Version 2-0 / Re-farming Project 2012

    Network re-planning

  • 8/19/2019 Refarming Project 2013_V1_to Share

    14/54

    14 © Nokia Siemens Networks 2012

    Customer Confidential

    Indosat 2012 / Version 2-0 / Re-farming Project 2012

    Why Network re-design

    Objectives :

    • To Modernize the network

    • Common standard

    • Expansion readiness

    • Feature readiness

    • Simplify network, easy to control.

    • High quality, secure, save

    • Nice esthetics

  • 8/19/2019 Refarming Project 2013_V1_to Share

    15/54

    15 © Nokia Siemens Networks 2012

    Customer Confidential

    Indosat 2012 / Version 2-0 / Re-farming Project 2012

    Re-design activities

    Massive site evaluation is takes time to evaluate thedesign manually.

    Using Automatic Cell Planning tool to evaluate thenetwork

    NSN uses ACORN as ACP tool.

     ACP tools mainly supports for Network configuration &optimization services - outcome:

    -  Heights-  Tilts (mechanical, electrical)

    -  Antenna Types

    -  Azimuth

    -  Power

     Automated Configuration & Optimization of Radio Net

  • 8/19/2019 Refarming Project 2013_V1_to Share

    16/54

    16 © Nokia Siemens Networks 2012

    Customer Confidential

    Indosat 2012 / Version 2-0 / Re-farming Project 2012

    Frequency re-planning / GFP Implementause Optimizer tool

  • 8/19/2019 Refarming Project 2013_V1_to Share

    17/54

    17 © Nokia Siemens Networks 2012

    Customer Confidential

    Indosat 2012 / Version 2-0 / Re-farming Project 2012

    Step by Step Optimizer (1)

    Define cells in core

    and buffer

     A

    Measurement > 14

    days ?

    Neighbor optimization

    yes

    No Any co-BCCH and

    co BSIC problem ?

    Define Frequency

     Allocation

    Retune co-BCCH and co-

    BSIC

     Analyze OSS measurementduration

    OSS

    yes

     A

    yes

    Recom

    frame

    -Minim

    -Maxim

    S b S O i i (2)

  • 8/19/2019 Refarming Project 2013_V1_to Share

    18/54

    18 © Nokia Siemens Networks 2012

    Customer Confidential

    Indosat 2012 / Version 2-0 / Re-farming Project 2012

    B

    Create Interference Matrix

    C

    Upload main KPI

    Neighbor Optimization

    Create Frequency Plan

    Verify optimization result

    GFP implementation

    KPI Evaluation

    KPI achieve ?

    END

    yes

    No

     

    Step by Step Optimizer (2)

    Plan approved by

    Isat ?

    C

    No

    yes

    Time frame B - C

    - Minimum 7 days

  • 8/19/2019 Refarming Project 2013_V1_to Share

    19/54

    19 © Nokia Siemens Networks 2012

    Customer Confidential

    Indosat 2012 / Version 2-0 / Re-farming Project 2012

    Pre Launch and Optimization(Layering Strategy)

    O ti i ti T ffi t i GSM DCS

  • 8/19/2019 Refarming Project 2013_V1_to Share

    20/54

    20 © Nokia Siemens Networks 2012

    Customer Confidential

    Indosat 2012 / Version 2-0 / Re-farming Project 2012

    Optimization - Traffic steering GSM DCS

    Objectives :

    Is to reduce interference on GSM 900 layer, due to limited GSM 900 spectrum acarve for UMTS900.

     Applying traffic steering strategy to offload GSM traffic into DCS, it reduces the spectrum.

    Parameter Control and performance monitoring must be check closely.

    O ti i ti L i GSM U900 U2100

  • 8/19/2019 Refarming Project 2013_V1_to Share

    21/54

    21 © Nokia Siemens Networks 2012

    Customer Confidential

    Indosat 2012 / Version 2-0 / Re-farming Project 2012

    Optimization - Layering GSM - U900 – U2100

    Objectives :

    The strategy is to use U900 sharing the traffic from U2100, where U2100 coverapoor. U900 is aiming for Deep Indoor Coverage and Cell border.

    U900: Cell Border and Deep Indoor Coverage (Coverage Layer)

    U2100 : Access and Main Data Layer (Capacity Layer)

    M lti i L i O i

  • 8/19/2019 Refarming Project 2013_V1_to Share

    22/54

    22 © Nokia Siemens Networks 2012

    Customer Confidential

    Indosat 2012 / Version 2-0 / Re-farming Project 2012

    Multicarrier Layering Overview

    • Hierarchical Cell Structure (HCS)

    • Measurement Power Offsets

    • Directed RRC Connection Setup

    • Common Channel Layering

    • HSPA Capability based Handover• Load and Service based Handover

    • Inter-Frequency Handover• Inter-System Handover

    Idle Mode, CELL_PCH,

    URA_PCH

    Transition to

    CELL_DCH

    Within CELL_DCH

    Cell Reselection

    Re-direction

    Handover

    • Requirement to balance traffic between network layers

    • While UMTS900 device penetration is relatively low then all

    UMTS900 devices should be pushed to UMTS900 layer

    • Traffic management can be applied in both Idle and

    Connected Mode states

    UMTS 900 UMTS 900

    UMTS 2100 (F1/F2)

    GSM

    DCS

    3G System

    2G System

    Intersystem Hand Ov

    Multicarrier Layering Strategic

  • 8/19/2019 Refarming Project 2013_V1_to Share

    23/54

    23 © Nokia Siemens Networks 2012

    Customer Confidential

    Indosat 2012 / Version 2-0 / Re-farming Project 2012

    Multicarrier Layering Strategic

    Generic parameter

  • 8/19/2019 Refarming Project 2013_V1_to Share

    24/54

    24 © Nokia Siemens Networks 2012

    Customer Confidential

    Indosat 2012 / Version 2-0 / Re-farming Project 2012

    Generic parameter

  • 8/19/2019 Refarming Project 2013_V1_to Share

    25/54

    25 © Nokia Siemens Networks 2012

    Customer Confidential

    Indosat 2012 / Version 2-0 / Re-farming Project 2012

    GSM 900 re-farming and UMTS 900, 2100NSN Solution

    Roll out Modernization and Re farming

  • 8/19/2019 Refarming Project 2013_V1_to Share

    26/54

    26 © Nokia Siemens Networks 2012

    Customer Confidential

    Indosat 2012 / Version 2-0 / Re-farming Project 2012

    Roll out, Modernization and Re-farming

    Project Scope (Implementation):

    1. Rollout and Modernization Swap / Modernization BTSs with Feeder less

    Swap Antennas (new triple bands antenna) and Aerial redesign (high, panning) TRX Upgrade – Downgrade ( GSM & DCS)

    New site (DCS)

    Implementation Band Pass Filter*

    2. Re-farming Spectrum re-arrangement (GFP with Optimizer)

    3. WCDMA Integration U900 & U2100

    * High Rejection for Co-site CDMA, Low Rejection Non Co-site CDMA.

    Roll out Modernization and Re-farming

  • 8/19/2019 Refarming Project 2013_V1_to Share

    27/54

    27 © Nokia Siemens Networks 2012

    Customer Confidential

    Indosat 2012 / Version 2-0 / Re-farming Project 2012

    Roll out, Modernization and Re-farming

    Project Scope (KPI Monitoring):

    1. Rollout and Modernization Swap / Modernization BTSs with Feeder less  KPI Maintain

    Swap Antennas (new triple bands antenna) and Aerial redesign (high, panning) TRX Upgrade – Downgrade ( GSM & DCS)

    New site (DCS)  KPI basic 

    Implementation Band Pass Filter for Co-site CDMA and Non Co-site CDMA.

    2. Re-farming Spectrum re-arrangement (GFP with Optimizer)  KPI Maintain 

    3.WCDMA Integration

    U900 & U2100  KPI basic

    4. Cluster optimization : Scope : Under Core Zone, Buffer Zone, and Common Zone

    KPI Methodology and KPI baseline & target : TBD

    Implementation process

  • 8/19/2019 Refarming Project 2013_V1_to Share

    28/54

    28 © Nokia Siemens Networks 2012

    Customer Confidential

    Indosat 2012 / Version 2-0 / Re-farming Project 2012

    Implementation process

    Site audit on re-farming area

    Final Plan Site release & BSS

     – RAN Parameter update

     Antenna Optimization

    with ACP tool

    NetAct

    Planneranalysis

    Project implementation

    Using mini Cluster Base

    Implementation V

    Performance MoniOptimizatio

    KPI Baseline taken

    1 . Define mini cluster

    (for implementation strategy,performance monitoring)

    2. Create Drive route

    Ru

    fo

     Amount of

     Antenna

    changes= SMALL

     Amount of

     Antenna

    changes

    = BiG

    Maintain using current

    parameters (bcch, bsic,neighbor, sc, etc)

    Zone setup(Core – Buffer)

    Reporting

    Implementation process

  • 8/19/2019 Refarming Project 2013_V1_to Share

    29/54

    29 © Nokia Siemens Networks 2012

    Customer Confidential

    Indosat 2012 / Version 2-0 / Re-farming Project 2012

    Implementation process

    Incase the mini cluster

    Performance experience

    severe degradation, then runoptimizer tool

    Continue ProjectImplementation for next mini

    ClusterB

    Performance Monitoring andFine Tuning

    Spectrum Carving by

    Optimizer toolPerformance Monitoring and

    Fine Tuning

    Spectrum Scanning 900 Mhz

    on CORE Zone

    Spectrum

    on refar

    are

    U900 Integration Performance Monitoring andFine Tuning

    U900 Spectrum Scanning onBuffer zone

    SpectOversh

    Continue Optimization and

    Performance stabilizationFinal Acceptance

    Clustering Semarang area

  • 8/19/2019 Refarming Project 2013_V1_to Share

    30/54

    30 © Nokia Siemens Networks 2012

    Customer Confidential

    Indosat 2012 / Version 2-0 / Re-farming Project 2012

    Clustering Semarang area

    Dept. / Author / Date

    Clustering Semarang + Jogjakarta

  • 8/19/2019 Refarming Project 2013_V1_to Share

    31/54

    31 © Nokia Siemens Networks 2012

    Customer Confidential

    Indosat 2012 / Version 2-0 / Re-farming Project 2012

    Clustering Semarang + Jogjakarta

    Dept. / Author / Date

    Clustering Jogjakarta

  • 8/19/2019 Refarming Project 2013_V1_to Share

    32/54

    32 © Nokia Siemens Networks 2012

    Customer Confidential

    Indosat 2012 / Version 2-0 / Re-farming Project 2012

    Clustering Jogjakarta

    Dept. / Author / Date

    Roll out, Modernization and Re-farming

  • 8/19/2019 Refarming Project 2013_V1_to Share

    33/54

    33 © Nokia Siemens Networks 2012

    Customer Confidential

    Indosat 2012 / Version 2-0 / Re-farming Project 2012

    Roll out, Modernization and Re farming

    Project Activities:

    1. Spectrum Allocation Plan for 2G  A part of available GSM frequency band is reallocated to U900.

    2. Zone area setup Core Zone : The limited GSM900 band is used together with 3G on U900 band.

    Buffer Zone : Having limited band of GSM900 after re-farming together with 3G on U2100to provide enough separation between the same frequencies of GSM900 (full band) and

    Common Zone : Full 900 band used together  

    3. Site Audit TSSR report

    Update site database on Tools (NetAct Planner, NetAct Optimizer)

    4. GSM + DCS +U2100 Analysis (Coverage, Capacity)  ACP tool to evaluate the antenna optimization

    Comparison Coverage plot prediction (G900, G1800, U2100)  Identify coverage risk, a

    Check Radio resource, & Transport capacity dimensioning

    Ensure GSM 900 capacity dimensioning per site is 3/3/3

    Ensure NO

    REPEATER

    integrated aBuffer Zone

    Roll out, Modernization and Re-farming

  • 8/19/2019 Refarming Project 2013_V1_to Share

    34/54

    34 © Nokia Siemens Networks 2012

    Customer Confidential

    Indosat 2012 / Version 2-0 / Re-farming Project 2012

    , g

    5. Site data plan and BSS Plan Final site configuration (BTS Capacity, aerial setting, etc)

    Final Site drawing

    Propose new sites incase existing site could not absorb the traffic BSS feature for Capacity and performance enhancement if available

    6. Define mini clusters on Core zone, and Buffer Zone Mini cluster defined is for project controlling (integration, performance monitoring and KP

    Each cluster contain 10 – 15 sites (resources dependency)

    Define Drive Test route, and OSS KPI baseline time frame agreed between NSN – Indos

    7. KPI Performance Baseline For acceptance Cluster base is preference  Mini cluster Drive test and OSS performance baseline report (mini cluster base)

    Drive test and KPI baseline report

    Roll out, Modernization and Re-farming

  • 8/19/2019 Refarming Project 2013_V1_to Share

    35/54

    35 © Nokia Siemens Networks 2012

    Customer Confidential

    Indosat 2012 / Version 2-0 / Re-farming Project 2012

    , g

    8. Provide BSS - RAN data Parameter (PES) PES shall be deliver to Project team 5 days before implementation date.

    PES shall be complete and Correct before Integration date ,Incase any error during integ

    proper parameter value, correction shall be made on Immediate basis. BSS - RAN parameter update (BCCH, SC, Handover..etc)

    9. Capacity expansions implementation (HW & SW) Ensure BSS- RAN PES implemented as Plan

    Ensure the scope KPI basic for new DCS

    Update Network Performance reporting (main KPI, Quality statement, SSV, DT reporting

    10. Swap and replaced to new antenna system (triple bands with feeder less) Ensure Aerial Setting, RET Calibrated, Filter are implemented as plan, as well as radio pa

    Ensure the scope activity on swap modernization (DT)

    Update Network Performance and Capacity Report (main KPI, Quality statement, SSV, D

    NetAct Optimizer site Database Update

    Running NetAct Optimizer for new Frequency, SC allocation, if optimization is required. Tdone when each cluster execution is completed.

    U900 sites “must no

    at this phase (NO PE

    send to project team

    Roll out, Modernization and Re-farming

  • 8/19/2019 Refarming Project 2013_V1_to Share

    36/54

    36 © Nokia Siemens Networks 2012

    Customer Confidential

    Indosat 2012 / Version 2-0 / Re-farming Project 2012

    , g

    11. Swap / Modernization + Upgrade BTS plus / Ultrasite Ensure PES implemented as Plan

    Ensure the scope activity on swap modernization (DT, KPIs)

    Update Network Performance reporting (main KPI, Quality statement, SSV, DT reporting

    12. New DCS implementation Ensure PES implemented as Plan

    Ensure the scope KPI basic for new DCS

    Update Network Performance reporting (main KPI, Quality statement, SSV, DT reporting

    13. Traffic steering Management (GSM DCS)

    Containment on DCS as much as possible, obtain the cell performance with no degrading Urban area: drive the traffic into DCS band in idle and dedicated mode

    Suburban and rural area where: drive to GSM band in idle mode only

    DT is to ensure RX level and Quality

    14. Performance and Capacity Monitoring : Main KPIs, Traffic (Voice and data), Capacity resources (Traffic and signaling)

    Roll out, Modernization and Re-farming

  • 8/19/2019 Refarming Project 2013_V1_to Share

    37/54

    37 © Nokia Siemens Networks 2012

    Customer Confidential

    Indosat 2012 / Version 2-0 / Re-farming Project 2012

    g

    15. Provide BSS data Parameter (PES) PES for Down Grading GSM 900 Capacity with detail HW Identification

    16. Downgrading G900 Ensure Capacity downgrading as plan

    Ensure quality and resource utilization

    17. Network Performance stabilization Network Performance Monitoring and Fine tuning

    Define the KPI baseline

    18. GFP (G900 + G1800) preparation use OPTIMIZER tool

    Optimizer Data Collection & measurement Post processing GFP plan review (sanity check, Netact Planner C/I, C/A coverage plot)

    Interference matrix

    GFP Proposal to Indosat to obtain the approval

    19. Drive test (idle & dedicated for GSM only) before GFP

    Roll out, Modernization and Re-farming

  • 8/19/2019 Refarming Project 2013_V1_to Share

    38/54

    38 © Nokia Siemens Networks 2012

    Customer Confidential

    Indosat 2012 / Version 2-0 / Re-farming Project 2012

    g

    20. GSM 900 & GSM 1800 GFP (Optimizer) GFP Implementation (automatic by network or Manual)  TBD

    Ensure parameter implemented as plan

    DT verification (functionality test) Performance monitoring and parameters fine tuning

    21. Drive test (idle & dedicated for GSM only) after GFP

    22. Spectrum scanning 900 MHz (allocated for U900) Scan (GSM ARFCN) focus at CORE ZONE, by using Scanner box (SEEGULL) not Mob

    Scan report GSM per ARFCN in core zone with limit Level -155 dB (U900 Isolation)  T

     Analysis & Reporting

    Physical tuning if necessary

    Submit scanning Report to Indosat

    23. Fine tuning cell by cell (parameter & Physical) HOC - POC parameter tuning optimization

    Note:

    • Data for analysis and performance monitoring must be use from “Busy Hour Busy Day” • Any performance issue due to congestion or high utilization, implementation of capacity expansion is a m

    Roll out, Modernization and Re-farming

  • 8/19/2019 Refarming Project 2013_V1_to Share

    39/54

    39 © Nokia Siemens Networks 2012

    Customer Confidential

    Indosat 2012 / Version 2-0 / Re-farming Project 2012

    24. RAN data Parameter (PES)

    25. U900 on service Ensure parameter, feature implemented as plan

    Update Network Performance reporting (main KPI, Quality statement, SSV, DT reportin

    Ensure the scope activity (DT, KPI basic, included Intersystem HO, Inter Freq HO)

    Ensure Load balance capacity among multiband technology (GSM 900 – DCS 1800 – U

    26. Spectrum scanning 900 MHz Scan UARFCN focus at BUFFER ZONE, by using Scanner box (SEEGULL) not Mobile

    Scan report GSM per ARFCN in core zone with limit Level -155 dB (U900 Isolation)  T

     Analysis & Reporting

    Submit scanning Report to Indosat

    27. Performance Monitoring: GSM 900 Interference band check

    U900 KPI basic (included Intersystem HO, Inter Freq HO)

    28. Final KPI Acceptance

    Note:

    • Data for analysis and performance monitoring must be use from “Busy Hour Busy Day” • Any performance issue due to congestion or high utilization, implementation of capacity expansion is a m

    Pre Launch and Optimization

  • 8/19/2019 Refarming Project 2013_V1_to Share

    40/54

    40 © Nokia Siemens Networks 2012

    Customer Confidential

    Indosat 2012 / Version 2-0 / Re-farming Project 2012

    40 © Nokia Siemens Networks 2012

    Customer Confidential

    Indosat 2012 / Version 2-0 / Re-farming Project 2012

    Optimization Strategy and Process

    Optimization Strategy

  • 8/19/2019 Refarming Project 2013_V1_to Share

    41/54

    41 © Nokia Siemens Networks 2012

    Customer Confidential

    Indosat 2012 / Version 2-0 / Re-farming Project 2012

    Optimization Strategy

    Accessibility

    Improvement

    Retain-ability

    ImprovementSystem Integrity

    Improvement

    (E)GPRS/R99 /

    HSDPA

    Analysis and

    Improvement

    Traffic &

    Capacity

    Management

    Frequency

    OptimizationHan

    Opt

    Signaling

    Analysis and

    Improvement

    Coverage

    Assessment

    Transport

    Network

    Audit

    Optimization Strategy

  • 8/19/2019 Refarming Project 2013_V1_to Share

    42/54

    42 © Nokia Siemens Networks 2012

    Customer Confidential

    Indosat 2012 / Version 2-0 / Re-farming Project 2012

    NETWORK AUDIT

    - Parameter & Neighbor audit

    - Site Configuration

    - Capacity audit

    WORST PERFORMANCECELL

    CBCCH & ANTENNA GRID ALLIGNMENT

    TRAFFIC MANAGEMENT

    PARAMETER

    OPTIMIZATIONTRANSPORTOPTIMIZATION

    CAPACITY OPTIMIZATION

    FEATURE OPTIMIZATION

    (E)GPRS, R99, HSDPAOPTIMIZATION

     AMR OPTIMIZATION

    COVERAGE A

    & OPTIMIZATIHARDWARE FMONITORING ESCALATION

    STRATEGIC FPLANNING &OPTIMIZATION

    VIP CUSTOMECOMPLAINT H

    2G & 3G RADIO NETWORK PERFORMANCE & OPTIMIZATION

    KPI EVALUATION - ACCESSIBILITY

  • 8/19/2019 Refarming Project 2013_V1_to Share

    43/54

    43 © Nokia Siemens Networks 2012

    Customer Confidential

    Indosat 2012 / Version 2-0 / Re-farming Project 2012

    By Delivering this activities :

    Improve the Network Accessibility as per Our KPI Comm

    Detail Investigate of All Resources that impacting Netwothe root cause of Congestion Issue.

    Review the process and Methodology of Network Capa

    Objective

     Accessibility Performance in Wireless Network is the Key Performance is an indication of the Ability of the Network toall offered services.

     Accessibility is measured as the successful Signalling (RR

    RAB Establishment.

    Background

    Main Activities Regional RNC Accessibility Performance Review Accessibility Performance Drops Distribution Analysis & In

     Accessibility Performance Drops Improvements and Reso

     Accessibility Performance Parameters Optimization

    KPI EVALUATION - RETAINABILITY

  • 8/19/2019 Refarming Project 2013_V1_to Share

    44/54

    44 © Nokia Siemens Networks 2012

    Customer Confidential

    Indosat 2012 / Version 2-0 / Re-farming Project 2012

    By Delivering this activities :

    Improve the Network Retain-ability Performance as per

    Detail Investigate of All Macro Areas that impacting to proot cause of Drop Call Issue.

    Review the impact of current Network Strategy to the RPerformance.

    Objective

    Retaianability Performance is also the Key Factor as Retaof the Network Ability to serve the user to retain the requedesired duration.

    Reatainability is measured per Service or RAB (CS, PS, CInteractive, PS Streaming, PS R99 or PS HS)

    Background

    Main Activities Regional BSC/RNC Accessibility Performance ReviewRetainability Performance Drops Distribution Analysis & I

    Retainability Performance Drops Improvements and Res

    Retainability Performance Parameters Optimization

    Handover and Soft Handover performance analysis

    KPI EVALUATION - MOBILITY

  • 8/19/2019 Refarming Project 2013_V1_to Share

    45/54

    45 © Nokia Siemens Networks 2012

    Customer Confidential

    Indosat 2012 / Version 2-0 / Re-farming Project 2012

    By Delivering this activities :

    Improve the Network Integrity Performance as per Our KP

    Detail Investigate of all the issue that impacting to Netwoto find the root cause of Low Network Integrity Performan

    Review the impact of current Network Strategy to the NetPerformance

    Objective

     Another important aspect in Wireless Network Service is SPerformance as This KPI is an indication of Quliaty Level oThis Activity, 3 Main KPI are used to measured the 3G NetPerformance i.e.

    Soft Handover Success Rate Performance

    Inter Radio Access Technology Handover Success Rate

    HSDPA Cell Throughput Performance.

    Background

    Main Activities SHO Success Rate Improvement IRAT Success Rate Improvement

    HSDPA Cell Throughput Improvement

    Pre Launch and Optimization(Network Statistic)

  • 8/19/2019 Refarming Project 2013_V1_to Share

    46/54

    46 © Nokia Siemens Networks 2012

    Customer Confidential

    Indosat 2012 / Version 2-0 / Re-farming Project 2012

    46 © Nokia Siemens Networks 2012

    Customer Confidential

    Indosat 2012 / Version 2-0 / Re-farming Project 2012

    (Network Statistic)

    Network Statistics

  • 8/19/2019 Refarming Project 2013_V1_to Share

    47/54

    47 © Nokia Siemens Networks 2012

    Customer Confidential

    Indosat 2012 / Version 2-0 / Re-farming Project 2012

    Network statistics is one of the tool to monitoring and that is the one of indicaperformance. Deliverable shall be delivered to indosat representative as :

    OSS Data

    Nokia Siemens Networks collect and ensure the availability of OSS data which is accessib

    of tools arranged in chapters Tool.  Daily Statistic Reports

     Weekly Performance Reports

     Monthly Executive Performance Report

    KPI Achievement

     At the end of each stage and project, Nokia Siemens Networks provides a complete and cPerformance report in the form of Executive Summary Report and Technical Report. The racceptance requirement.

    KPI Acceptance

  • 8/19/2019 Refarming Project 2013_V1_to Share

    48/54

    48 © Nokia Siemens Networks 2012

    Customer Confidential

    Indosat 2012 / Version 2-0 / Re-farming Project 2012

    KPI Acceptance Method

    The following methods are applied on acceptance process:

     Acceptance will be based on KPI Achievement

    Week of KPI Achievement is one week of the last optimization stage week.

    KPI Achievement week shall be agreed by Indosat and Nokia Siemens Networks.

    KPI Achievement is measured by accumulate used counters of 1 week data (7x24 hoto Sunday. The measurement data is based on hourly data. If any different data betwIndosat, the value will be verified using hourly data.

    KPI formula to be used in the calculation are based on KPI formula defined by Indosa

     Acceptance will be based on “Reward or Deduction” Scoring Systems. 

    Nokia Siemens Networks shall submit a complete and comprehensive acceptance reReporting chapter before the acceptance.

    Indosat will issue the acceptance certificate if the target score is achieved.

    Pre Launch and Optimization(Drive Test)

  • 8/19/2019 Refarming Project 2013_V1_to Share

    49/54

    49 © Nokia Siemens Networks 2012

    Customer Confidential

    Indosat 2012 / Version 2-0 / Re-farming Project 2012

    49 © Nokia Siemens Networks 2012

    Customer Confidential

    Indosat 2012 / Version 2-0 / Re-farming Project 2012

    (Drive Test)

    Drive Test

  • 8/19/2019 Refarming Project 2013_V1_to Share

    50/54

    50 © Nokia Siemens Networks 2012

    Customer Confidential

    Indosat 2012 / Version 2-0 / Re-farming Project 2012

    Drive Test is performed for the following circumstance:

    Verification Drive Test due to Project implementation activities

    Verification Drive Test after the global parameter change

    Verification Drive Test for RF troubleshooting

    The following rules apply in performing Drive Test:

    The Drive Test data shall be recorded

     All problems occured during drive test shall be logged for further analysis

    The scope of drive test is limited for outdoor site

    The drive test route shall be proposed to Indosat prior the execution

    Reporting

  • 8/19/2019 Refarming Project 2013_V1_to Share

    51/54

    51 © Nokia Siemens Networks 2012

    Customer Confidential

    Indosat 2012 / Version 2-0 / Re-farming Project 2012

    51 © Nokia Siemens Networks 2012

    Customer Confidential

    Indosat 2012 / Version 2-0 / Re-farming Project 2012

    Project Progress & reporting

  • 8/19/2019 Refarming Project 2013_V1_to Share

    52/54

    52 © Nokia Siemens Networks 2012

    Customer Confidential

    Indosat 2012 / Version 2-0 / Re-farming Project 2012

    RF Planning (AOP):

    Weekly progress AOP

    Weekly progress KPI Basic (PLO)

    Monthly progress AOP

    Optimization:

    Weekly Report (activity & KPI performance)

    Monthly Report (activity & KPI performance)

    Quarterly Report (KPI Achievement & ATP)

     Activities

  • 8/19/2019 Refarming Project 2013_V1_to Share

    53/54

    53 © Nokia Siemens Networks 2012

    Customer Confidential

    Indosat 2012 / Version 2-0 / Re-farming Project 2012

    RF Planning (AOP):

      Detail coverage & capacity planning

      Parameter planning

      Abis Mapping

      Review of RNP Criteria (Swap/modernization)

      RNP Translation (Swap/modernization)

      Databuild creation for RF (PES, NDB)

  • 8/19/2019 Refarming Project 2013_V1_to Share

    54/54