i RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN RUAKA. MAINA JOSPHINE KARIMI B65/0381/2006 A PLANNING DEVELOPMENT PROJECT SUBMITTED IN PARTIAL FULFILMENT FOR THE REQUIREMENT FOR THE BACHELOR OF ARTS DEGREE IN PLANNING, DEPARTMENT OF URBAN AND REGIONAL PLANNING. UNIVERSITY OF NAIROBI JULY 2010.
69

RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

Aug 18, 2018

Download

Documents

trancong
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

i

RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH

IN RUAKA.

MAINA JOSPHINE KARIMI

B65/0381/2006

A PLANNING DEVELOPMENT PROJECT SUBMITTED IN

PARTIAL FULFILMENT FOR THE REQUIREMENT FOR THE

BACHELOR OF ARTS DEGREE IN PLANNING, DEPARTMENT

OF URBAN AND REGIONAL PLANNING.

UNIVERSITY OF NAIROBI

JULY 2010.

Page 2: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

ii

DECLARATION

This Planning development project is my original work and has not been presented for a

degree in any other University.

Signed……………………………………..Date……………………………………….

Maina Josphine Karimi

(Candidate)

This Planning research project has been submitted for examination with my approval as

University supervisor.

Signed…………………………………….Date……………………………………………

Mrs. Margaret Ng’ayu

(Supervisor)

Page 3: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

iii

DEDICATION To my parents Mr. and Mrs. Leonard Maina and my sponsors Mr. and Mrs. David Schaal

for the moral and financial support.

Page 4: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

iv

ACKNOWLEDGEMENTS I thank the almighty God for making me get this far in my Education.

To all my lecturers may God bless you so much for the great work for me to acquire new

knowledge and skills. Sincere acknowledgements go to my supervisor Mrs. Margaret

Ng’ayu for her support, guidance and responsible supervision.

Special thanks to my sponsors Mr. and Mrs. David Schaal for the continous

encouragement and positive comments.

Page 5: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

v

ABSTRACT Today’s world is rapidly urbanising, with radical urban expansion in developing

countries. Increasing urbanisation impacts on the periurban in terms of changes in land

use, new forms of household composition, differential access to urban benefits (such as

health infrastructure and employment) and increased pressure on common natural

resources.

Peri-urban growth has become a major problem in developing countries. This has been

caused by the increasing population in these countries caused by high growth rates and

urbanization. This has in turn resulted to high demand for housing in these areas. These

areas are characterized by major land use changes from agriculture land use to residential

and commercial land uses.

Development in Ruaka is mostly uncoordinated and uncontrolled hence resulting to

haphazard growth. There is a lot of pressure on the available facilities due to the

increasing population. Demand for housing is also very high hence private developers

convert their land to residential land use. They are putting up these houses on very small

pieces of land hence there has been cases of 100% plot coverage leaving no space for

community facilities and causing a lot of pressure on the scarce land in the area.

There is need to reorganize and redevelop the growth in the area. This will be done

through application of the relevant planning standards and guidelines and the urban

design guidelines. This will be demonstrated using a map showing the preferred plan

after reorganization and redevelopment has taken place and three dimensional design

models to illustrate how residential development and the landscaping of the area will look

like once the plan has been completed.

Page 6: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

vi

TABLE OF CONTENTS Declaration…………………………………………………………………………...........ii

Dedication ………………………………………………………………………………..iii

Acknowledgements……………………………………………………………………….iv

Abstract……………………………………………………………………………………v

List of Tables……………………………………………………………………………..ix

List of Figures…………………………………………………………………………….x

List of Charts……………………………………………………………………………..x

1.0 CHAPTER 0NE: INTRODUCTION………………………………………………1

1.1 Context of the development project…………………………………………………...1

1.2 The Research project .......……………………………………………………………..1

1.3 The main Recommendations of the planning research project …………………….....1

1.4 Rationale of the development project …………………………………………….…..2

1.5 Location ………………..……………………………………………………………..3

1.6 Objectives …………..………………………………………………………………...3

1.7 Assumptions …………………………..……………………………………………....3

1.8 Scope of development project and organization of chapters……………………….....3

1.9 Research methodology………………………………………………………………...4

1.9.1 Data sources……………………………………………………………………....4

1.9.2 Methods of data collection……………………………………………………….4

1.9.3 Methods of Data Analysis and presentation……………………………………...5

1.9.4 Limitations………………………………………………………………………..5

1.9.5 Definition of key terms and concepts……………………………………………5

2.0 CHAPTER TWO: REVIEW OF POLICY GUIDELINES ……………………...7

2.1 Planning for peri-urban growth………………………………………………………..7

2.1.1 Previous planning Efforts in Ruaka……………………………………………..7

2.1.2 Residential development in peri urban areas: Policy Guidelines ………...…......8

Page 7: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

vii

2.2 Planning for residential development: Regulatory guidelines, planning and design

standards……………………………..................................................................................9

2.2.1 Matters for consideration in peri-urban areas .....................................................9

2.2.2 Planning Principles and Standards (Physical planning handbook) ………........12

2.3 Planning for new residential development: Case studies…………………………….17

2.4 Conceptual framework for the project……………………………………………….24

3.0 CHAPTER THREE: SITUATION ANALYSIS ……………….……………....26

3.1 Location context of the project area…………………………………………………26

3.2 Historical background of the study area………………………………………..........30

3.3 Physical and natural environmental characteristics………………………………….30

3.3.1 Climate……………………………………………………………………………30

3.3.2 Topography and slope analysis…………………………………………………...30

3.3.3 Hydrology and drainage systems…………………………………………………30

3.4 Population and demographic characteristics…………………………………………31

3.5 Land use analysis within the project area……………………………………………33

3.5.1 Housing….………………………………………………………………………33

3.5.2 Commercial………………...…………..………………………………………..34

3.5.3 Infrastructure……..…..…………………………………………………………34

3.6 Institutional, legal and financial issues of the project area…………………………..36

3.6.1 Town council of Karuri…………………………………………………………36

3.6.2 Other Actors in the planning process include…………………………………..37

3.6.3 Financial………………………………………………………………………...38

4.0 CHAPTER FOUR: PROJECT PLANNING, DESIGN AND

IMPLEMENTATION ………………………................................................................39 4.1 Planning and design of project……………………………………………………….39

4.1.1 Development of the spatial plans: Evaluation of alternatives plan proposals……..39

4.2 Site planning/design process stages………………………………………………….44

4.2.1 Detailed design formulation stage and the development of detailed action

plans……………………………………………………………………………………...42

Page 8: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

viii

4.2.2 Implementation strategies….………………………………………………….50

4.2.3 Implementation schedule………………………………………………………..51

5.0 CHAPTER FIVE: MONITORING AND EVALUATION………….................54

5.1 Expected outputs and outcomes of the project…..…………………………………..54

5.2 Monitoring and evaluation stages in the implementation of the project……………..55

5.3 Guidelines for the implementation process…..………………………………………56

5.4 Site/ Environmental Management plan………………………………………………57

Bibliography……………………………………………………………………………..58

LIST OF TABLES

Table 2.1 Land use allocations in residential neighbourhood development………….....12

Table 2.2 Recommended densities for residential development………………………...13

Table 2.3: Recommended minimum plot frontage by type of housing…………………13

Table 2.4 Recommended minimum Plot sizes for different housing schemes…………14

Table 2.5 Minimum plot coverage recommended………………………………………15

Table 2.6 Minimum setback of dwelling from plot lines………………………………..15

Table 2.7 Minimum street width per given number of plots……………………………16

Table 2.8 An overview of project timelines in Carlton…………………………………23

Table 3.1: Population of Ruaka Sublocation…………………………………………….30

Table 3.2: Projected population for the project area……………………………………..30

Table 3.3: The existing land use situation in the project area……………………………32

Table 4.1 Role of stakeholders in the implementation of the project…………………...48

Table 4.2 Phasing of the project…………………………………………………………49

Table 5.1 The expected Output and indicators of success………………………………51

LIST OF FIGURES

Fig. 2.1 Medium density multi-family residential design concepts……………………...18

Fig. 2.2 Multi-Family residential plan…………………………………………………...19

Page 9: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

ix

Fig. 2.3 Urban design guidelines in Lindbergh, San diego………………………………20

Fig. 2.4 Construction of houses in Carlton………………………………………………22

Fig 2.5 High-rise towers at Carlton housing redevelopment…………………………….22

Fig. 3.1 National context of the project area……………………………………………..26

Fig. 3.2 Location within the Town Council of Karuri…………………………………...26

Fig. 3.3 The neighbourhood context of the project area…………………………………27

Fig. 3.4 Detailed study area……………………………………………………………...28

Fig. 3.5 Existing land uses in the study area……………………………………………..35

Fig. 3.6 Administrative structure of the Town Council of Karuri……………………….37

Fig. 3.7 Opportunities and Constraints in the project area……………………………....39

Fig. 4.1 Alternative Plan one…………………………………………………………….41

Fig. 4.2 Design for the alternative one…………………………………………………..42

Fig. 4.3: Landscaping of Alternative plan one…………………………………………...43

Fig. 4.3 Preferred Plan for the project area……………………………………………....45

Fig. 4.4 Design of the preferred model…………………………………………………..46

Fig. 4.6 Detailed street design showing street design, pedestrianization and

landscaping………………………………………………………………………………49

LIST OF CHARTS Chart 3.1: Household sizes in the study area……………………………………………31

Chart 3.2: Reason for out-migration from the study area………………………………..32

Page 10: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

x

Page 11: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

1

CHAPTER ONE: INTRODUCTION

1.1 Context of the development project

This project has been based on the previous research project done in Ruaka on Impacts of land

use changes on agriculture and livelihoods in the rural-urban fringe of Ruaka. It was found out

that there has been increasing demand for housing in the area due to the increasing population

caused mainly by in-migration into the area. It is for this reason that private developers are

converting their land from agricultural to residential in order to accommodate the population and

better their livelihoods. This has resulted to unplanned and uncoordinated peri-urban growth in

the area.

This development project is aimed at minimizing the unplanned growth and enhance some sense

of order in the area by re-organizing and redeveloping the residential developments. This will be

achieved through applying the right planning standards and guidelines and also looking at other

peri-urban areas that have been planned successfully in order to borrow ideas from that.

1.3 The Research project.

The goal of the research project was to investigate the impacts of land uses changes on

agriculture and livelihoods in Ruaka rural urban fringe. This was achieved by collecting and

analyzing both secondary and primary data on the issues of land use changes from agricultural to

residential and commercial and the impacts from the same on the agricultural land use and the

livelihoods. The results of the project included the fact that there is tremendous land conversion

from agricultural to residential and commercial with interspersed agricultural activities.

There has been an increase in demand demand for housing in the area. This demand has been

caused by the increasing population from the working population in Nairobi in search of cheap

accommodation. Another reason is that investments in real estate bring back higher returns than

agricultural activities hence more and more people prefer to invest there.

1.3 The main Recommendations of the planning research project

The main recommendations of the project was that there is need for comprehensive planning so

as to reorganize residential land use in the area. This is in order to reduce haphazard growth

through control of development. Projects should be undertaken in Ruaka to provide middle

income housing. This is mostly because of the already existing high level development of the

Page 12: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

2

residential function that has poised the area as a key location for residential development. Ruaka

being located very close to the city of Nairobi enhances its attractiveness as a possible settlement

area for city residents who may want to locate at Ruaka. There is need for properly developed

guidelines that indicate the basic requirements for a residential property. Developments should

be controlled especially of high rise development through zoning to enhance aesthetics of the

area. This could be achieved through re-planning of the area.

Other recommendations were: Restrictive urban growth policies especially population

distribution should be put in place by the government in order to reduce the rate of rural-urban

migration and policies must be directed at transforming the rural economy in order to slow down

the rate of urban sprawl. Comprehensive land use planning and revision of planning standards

and administrative procedures should be applied in Ruaka in order to manage the rate of urban

growth in the area. A land use model should be prepared in order to incorporate all land uses in

the area and enhance compatibility.

1.4 Rationale for the development project

Ruaka has been experiencing high rates of growth which has been uncontrolled due to lack of a

planning framework in the area. There has been rapid land use changes from agricultural land

use to residential and commercial land uses where developers have not been following the

planning standards and regulations leading to uncontrolled and uncordinated residential growth.

There is very high demand for residential developments hence there is need to avoid haphazard

growth and enhance good aesthetics of the area and also in order to reduce cases of congestion

which could breed other problems of pollution. There has been intense residential developments

which lack the necessary infrastructural facilities to support growth for example sewerage

networks, drainage facilities and there is poor accessibility into the area. Therefore there is need

to develop a planning framework that integrates all the land uses in a coherent manner. The study

aims to re-organise and redevelop the area in order to achieve some sense of order and also

observe all the planning standards and regulations.

Page 13: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

3

1.5 Location

The study area is located in Ruaka sublocation within the Town Council of Karuri. This is in

Kiambu East district. The project area is a cluster of Ruaka bordering the Ruaka shopping centre

on the south east and Ruaka police post on the northern side. This area is part of the peri-urban

fringes of the city of Nairobi to the North West.

1.6 Objectives

To prepare a spatial strategy for peri-urban residential development .

To develop a strategy that incorporates the relevant planning standards and regulations to

residential buildings in the peri-urban areas.

To promote a monitoring and evaluation implementation strategy for the project.

1.7 Assumptions

The development project has been carried out with the following assumptions.

That agricultural land use will give way to residential land use in the near future hence the need

to plan for residential purposes.

That the planning authorities will provide support for this new planning strategy because the

implementation of this project will fully address the problems of uncontrolled and un-

coordinated growth in the project area and the project can be further adopted to solve problems

faced in other peri-urban areas. That the stakeholders are willing to participate in the

implementation of this project.

That the continued uncontrolled growth of Ruaka will result into haphazard development hence

congestion in Ruaka. If proper guidelines and standards are followed to redevelop and reorganize

peri-urban growth, there will be harmonized growth in Ruaka.

1.8 Scope of development project and organization of chapters

The scope of the project is to come up with designs and models for reorganization of residential

land use in Ruaka. The project covers an area of 4.0 hectares.

The project is organized into five chapters. Chapter one introduces the study by reviewing the

findings of the research project, the recommendations made, the area of coverage, the objectives,

assumptions, justification, scope of the study, the methodology of the project and the limitations

Page 14: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

4

to the project. Chapter two reviews relevant literature related to the study, this includes the

relevant policies, relevant design standards, relevant case studies, regulatory guidelines

handbooks and manuals related to the study. Chapter three gives the situation analysis of the

project study area. This includes the background of the study area, the location, historical

background, site analysis, population and demographic characteristics and land use analysis and

their effects on peri-urban growth. Chapter four deals with the actual design of the proposed

projects which entails alternative plan proposals. The chapter also outlines the implementation

strategies and schedule of the project in terms of programmes, actors/agencies and costing of the

project. Chapter five discusses the monitoring and evaluation aspects and the site management

plan for the project.

1.9 Research methodology

The study will refer to relevant case studies on peri-urban residential growth and replanning or

reorganization of the same, also the project will refer to standards and guidelines in the physical

planning handbook, existing policies and government acts, which include the physical planning

Act (1996) and the Local government act (1998). The study will also refer to guidelines

regarding peri-urban growth observed in other countries.

1.9.1 Data sources

Data from both primary and secondary sources will be used. Primary data will be sourced from

field survey which includes the physical and natural environmental aspects, existing residential

developments and economic aspects. This will be in form of photographs.

Secondary data will be obtained from the library books and journals and the internet.

1.9.2 Methods of data collection

Data will be collected using both primary (these are the photographs that were taken on the

specific site for the development project) and secondary methods. Various instruments will be

used including questionnaires, interview schedules, photography, mapping, key informants and

focused group discussions.

Page 15: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

5

1.9.3 Methods of Data Analysis and presentation

The collected data will be harmonized for analysis of the problems. The instruments used for

analysis include photographs and maps. The final presentation will be in form of text reports,

photographs, maps, two dimensional plans and models.

1.9.4 Limitations

Some limitations and difficulties may be faced in the successful implementation of this project.

These difficulties include: The project requires huge amounts of funds which may not be readily

available as well as limited time frame for implementation.

1.9.5 Definition of key terms and concepts

Peri-urban area

A peri-urban area refers to a transition or interaction zone, where urban and rural activities are

juxtaposed, and landscape features are subject to rapid modifications, inducing by human

activities (Douglas, 2006). McGranahan et al. (2004) observed that peri–urban zones are often

far more environmentally unstable than either urban or rural settings. From ecosystem’s point of

view, physical, chemical and biological factors generally interact among themselves, and are

interrelated with socioeconomic forces. These factors have their own functions, which can be

enhanced or reduced depending on the conditions of other factors in the same system (Fang et

al., 2005).

A peri-urban area is not only a zone of direct impact experiencing the immediate impacts of land

demands from urban growth and pollution, but is also a wider market-related zone of influence

that is recognizable in terms of the handling of agricultural and natural resource products (Simon

et al., 2006)..

Peri-urbanisation

Peri-urbanization refers to a process where urban grows disorderedly and sprawls to peri-urban

area. Peri-urbanization can be regarded both as a driver and an effecter of global environmental

changes. Observing land use and land cover change over time can perceive effects and impacts

of urbanization on peri-urban areas.

Page 16: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

6

Re-organization

Re-organization means to organize again or anew. It may also refer to undergo or effect changes

in organization or to change the way (something) has been organized.

Page 17: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

7

CHAPTER TWO: REVIEW OF POLICY GUIDELINES

2.1 Planning for Peri-urban growth:

Peri-urban areas are located on spaces that act as changing margins of cities and towns. With the

principle of encroachment that all cities portray, peri-urban areas have different values to

different groups of people: They are places to build cheap shelter and occupy land for

agriculture. They are potential residential zones for the middle-class, they are the sites of various

valuable protected areas for conservationists e.t.c.

Ruaka being a peri-urban area face numerous challenges which often include: Rapid land-cover

and land use changes, Increasing population, Uncoordinated residential growth, Water shortages,

Lack of waste disposal systems and increased pollution.

2.1.1 Previous planning Efforts in Ruaka

Town Council of Karuri strategic plan

Town Council has prepared a Strategic Plan for the period 2007-2012 which is aimed at enabling

efficient and effective delivery of services to the people within its jurisdiction.

There are various documented constraints to planning and implementation at the local level and

they include: Lack of human capacity- This is mainly of professional/technical staff e.g.

planners, engineers, High turnover of Local Authority officers- This is mainly of politicians.

Planning periods often do not correspond to the electoral terms of politicians and this turnover in

between planning periods constrains plan implementation, Low management capacity- This

often attributed to the low education levels of politicians which in turn impede both the plan-

making and implementation stages, Unstable financial status of the local authorities- In most

local authorities, the larger proportion of revenue is used for recurrent expenditure and thus only

small amounts are allocated for development purposes and Lack of political goodwill- There is

often lack of political goodwill without which plan implementation becomes just a dream that

continues to gather dust until its period expires.

Page 18: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

8

2.1.2 Residential development in Peri-urban areas: Policy Guidelines

Housing policy

This policy is intended to arrest the deteriorating housing conditions countrywide and to bridge

the shortfall in housing stock arising from demand that far surpasses supply particularly in urban

and peri-urban areas. The situation has been exacerbated by population explosion, rapid

urbanization, widespread poverty, and escalating costs of providing housing. The shortage in

housing is manifested in overcrowding, slums and proliferation of informal settlements

especially in peri-urban areas. In the rural areas the shortage manifests itself in the poor quality

of the housing fabric. The policy aims at: Enabling the poor access housing and basic services,

Promote and fund research aimed at development of low cost building materials, Facilitate

increased investment by the private sector in the creation of low cost housing, Create a housing

development Fund to be financed through budgetary allocations and financial support from

development partners.

Vision 2030: Housing and Urbanisation

Given the current demographic trends, Kenya will be a predominantly urban country by 2030.

Following the current population trends, more than half of our nation’s population is likely to be

residing in urban areas at that time. This need not imply that agriculture will matter less or that

the quality of life will be lower. But Kenya will need to plan for decent and high quality urban

livelihoods for her population. The 2020 vision for housing and urbanization is “an adequately

and decently housed nation in a sustainable environment”. The medium-term goal for 2012 is to

increase the annual production of housing units from the current 35,000 annually to over

200,000. In addition, an initiative for high quality urban planning will be undertaken. Kenya’s

cities and towns are now poorly planned and that must change. There is an acute need, therefore,

for an effective capacity for regional and urban development planning starting with adequate

housing for those now living in slums. In addition, there will be better development of and access

to affordable and adequate housing for the rest of the population, enhanced access to adequate

finance for developers and buyers, and targeted key reforms to unlock the potential of the

housing sector through private public partnerships. Kenya’s new nationwide urban planning and

development campaign will start with her major cities and towns. But rural settlements will be

Page 19: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

9

catered for as well. This calls for a rapid build-up of her urban planning an implementation

capacity, and this is part of the commitments under Vision 2030.

Nairobi Metro 2030: Urban redevelopment strategy

The Nairobi Metropolitan region currently has no urban redevelopment strategy in place to guide

regeneration, densification and utilization of inner development potential. The need for

redevelopment is evident in areas of Eastlands, Westlands, the CBD, Kikuyu town, Karuri

(Project area), Machakos and ruiru. There will be a comprehensive Urban regeneration and

renewal plan; implementation of targeted housing incentives for the middle and lower income

households and facilitating increased supply of serviced urban land. This will be implemented

under the aegis of the Metropolitan Housing and quality of Life working group.

2.2 Planning for residential development: Regulatory guidelines, standards and regulations

2.2.1 Matters for consideration in peri-urban areas (when assessing development)

The physical characteristics of the land including slope, aspect, topography, land capability,

drainage, vegetation and landscape attributes; The implications to the development on the future

pattern of land use, including likely future road networks in the locality; The relationship of the

development to the existing and likely future urban use of land in the locality; The availability of

an adequate water supply; The availability of facilities for the removal or disposal of sewage

effluent and wastes including, where necessary and appropriate, the ability of the land to

accommodate on-site disposal; The availability of other public utility services and social

facilities, having services or facilities and the cost of their provision; The siting and design of

any buildings, structures or works proposed; The need for all-weather vehicular access to the

development; The risk from flooding, bushfire or other natural hazard, and the adequacy of any

measures proposed for the prevention or mitigation or risk; The demand for development of the

land; and To provide appropriate controls to maintain and enhance the physical characteristics,

environmental qualities and scenic qualities of fringe urban lands; To permit limited

development which is in keeping with the existing character of the locality and compatible with

the likely future use of the land for urban or other purposed as determined by the Council;

To ensure that future urban land is not fragmented or developed in such a way as to make urban

development more costly or difficult; and To ensure that development does not create an

Page 20: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

10

unreasonable or uneconomic demand for the provision of or extension of public amenities or

services.

Subdivision design and Site Analysis

Subdivision is the first stage of development and consequently determines where structures can

be built and how the land can be utilized. The subdivision (boundaries) should work with the

land, not against it. The Council will require evidence that the applicant has conducted a basic

site analysis to determine each site’s opportunities and constraints, for example:

Site Opportunities

There are various opportunities that could encourage residential development. These include:

Topography i.e. gentle slopes and suitable building sites, Vehicle access to points to public road,

Surrounding catchment area for water collections, and views across the city or hillside areas.

Site Constraints

The various constraints to development include: Steep slopes with high potential for erosion or

instability, Sites in exposed positions (to major roads or clearly visible from the City), Areas of

vegetation which may constitute a fire risk, or may have environmental significance, areas

remote from a sealed public road, particularly where long, dead end private roads are required,

areas containing power line, water, sewerage or other easements, areas which may be subject to

noise and/or odour from the garbage pits, and areas required for future drainage lines or

infrastructure routes.

Allotment sizes for residential purposes

Within the Urban Fringe zone, the minimum allotment size for residential purposes is 2000m2 –

where reticulated water and reticulated sewerage is available, and 3 hectares – where reticulated

sewerage is not available.

Building envelopes and House design

The nominating of a building envelope is aimed at ensuring that buildings are adequately

separated and appropriately placed according to the basic site analysis. Every application for a

Page 21: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

11

residential subdivision is to be accompanied by a building envelope - which will also incorporate

outbuildings. Building envelopes on adjoining allotments are to be a minimum of 250 metres

apart. The design of the house and the building envelope location should take into account the

following factors: 1. Locating the house away from steep slopes which may be highly visible

from a public road or exposed against the hillside or skyline. 2. Minimising vegetation loss and

maximising the use of existing vegetation for house screening purposes. 3. Adopting a roof form

and colour which blends-in with the surrounding land features.

Roads and Access roads

The following should be considered in designing for roads within the peri-urban area: Vehicular

access should be to a local road, not a collector or arterial road. Access roads are to have all

weather construction and are to be located along contour lines or across gentle slopes. Steep

slopes, drainage lines and areas requiring excessive cut and fill are to be avoided. Dwellings are

to be set back a minimum of 15 metres from the roads.

Water supply

Subdivision and/or new dwellings within the Urban Fringe zone are to be provided with an

adequate water supply at a preferred pressure of 30 metres head and a minimum pressure of 20

metres head at peak instantaneous demand. The location of water any tanks should be included

within the building envelope and should not be in exposed or highly visible areas.

If reticulated water is available to the property or within a reasonable distance the Council may

permit the installation of a break-pressure tank system supplied by a low flow line from the

Council’s infrastructure. This method of water supply is preferred as it is likely to remove the

need for large water tanks being located higher on the land than the dwelling (and in potentially

exposed positions).

2.2.2 Physical planning handbook (Planning Principles and Standards)

Residential areas: Land Allocation:

Residential areas are seen as integral parts of the overall built-up area (dwelling plots) together

with day-to-day services, recreation and communication network. The following guidelines may

Page 22: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

12

be used as a guide in planning for residential estates and reasonable variations may be permitted

depending on local conditions.

Table 2.1. Land use allocations in residential neighbourhood development

Number Land use Percentage of developed area

High density Medium density Low density

1. Dwelling plots 40-60 64-74 80-90

2. Recreation 21-29 7-16 __

3. Community

Facilities

5-20 9-10 0.1-1

4. Roads

Streets

4-15

1-7

6-7

3-4

8-8.8

0-2.2

Table 2.2 Recommended densities for residential development

Type of dwelling No. of dwelling per hectare Space allocation per

dwelling (m squared)

Bungalow detached

(ii) Medium density

(iii) High density

16

35

500

285

Semi detached/Row housing

(ii) Medium density

(iii) High density

32

70

333

250

Multi – Family dwellings

(ii) Medium density

(iii) High density

60

70

167.6

142.8

Page 23: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

13

Site Planning

The following controls should be observed: -

Plot Frontage:

All plots on which residential buildings are to be erected should have proper and sufficient

frontage to a street, such a street not being a sanitary lane or passage. The recommended

minimum frontages of residential plots are given below.

Table 2.3: Recommended minimum plot frontage by type of housing

Type of residential

development

Minimum frontage in metres

Detached%

Semi detached%

Row housing%

1. Low cost housing

2. Normal housing

development

70

60

75

60

75

70

Plot Areas (Sizes):

The minimum plot size should, generally, be determined by the user, type of waste disposal,

availability of water and the level of building technology applied. The table below gives the

recommended minimum plot sizes in the different cases of types of residential development.

Page 24: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

14

Table 2.4 Recommended minimum Plot sizes for different housing schemes

Type of housing

Minimum Plot sizes in square Metres

Detached

Semi detached

Row housing

1. Low cost housing

2. Normal housing

development

334.8

465

223.2

309.7

167.4

232.5

Plot Coverages:

Plot coverage as applied to a building means the portion of horizontal area of the site of the

building permitted to be built. The essence of fixing plot coverages is to ensure a healthy

environment and allow for expansion and improvement of infrastructural facilities and social

amenities. The minimum plot coverage recommended are shown in Table below

Table 2.5 Minimum plot coverage recommended

Type of residential

development

Maximum percentage plots coverage

Detached housing Semi detached Row housing

1. Low cost housing 50 60 65

2. Normal housing 40 50 60

Building lines (set back lines):

The principle value of building lines is either to achieve a visual effect or reserve a certain access

of area of ground. It is not necessary to set uniform lines, they maybe flexibly drawn to produce

spatial coherence and variegated character. In prime locations, it may be necessary to set

minimum as well as maximum line. The minimum distance of a house or an ancillary structure

from the plot line (boundary line) may be indicated as shown in the table below.

Page 25: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

15

Table 2.6 Minimum setback of dwelling from plot lines

Type of residential

development

Minimum set-back in metres

Front

Side

Rear

Low cost housing

Normal housing

3

4.5

1.5

3

4.5

6

Distance Between Buildings:

The distance between any two dwellings, front to front, across a street, walk or common area

shall be not less than 2 times the total height of the taller buildings.

Street Width:

It is recommended that the width of streets or access lane in a residential area be determined by

the number of dwelling units or plots to be served. The minimum street width for given number

of plots may be indicated as shown in the table below. It is further recommended that the street

network be hierarchical so that in the future urban areas will have a high rise urban morphology

even in residential areas

Table 2.7 Minimum street width per given number of plots

Number of plots Street width

1 -20 9m

21 -50 12m

Dead-end Streets (Culs-de-sac):

A dead-end street should be aligned such that it shall give access to not more than 8 to 10

residential plots. It should not exceed 60m in length and shall have a turning radius of at least

15m at the inner end

Page 26: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

16

2.3 Planning for new residential development: Case studies

Case 1: Redevelopment and designation of residential land use in Lindbergh, San diego

Objectives

Provide a variety of housing opportunities for persons of all ages and income levels, and retain

and enhance the physical conditions of existing neighborhoods through rehabilitation and/or

redevelopment. Preserve and upgrade existing residential areas which have developed at medium

and medium-high densities. Promote the availability of low- and moderate-income housing units

within market rate residential projects. Minimize negative impacts resulting from more intensive

land use activities. Limit the intensity of residential development in those areas subject to high

community noise levels. Require new residential projects to provide adequate recreational

opportunities for residents.

Medium-Density

Rezone areas designated for medium-density residential use to a multifamily residential zone

which permits a maximum of 29 dwelling units per net residential area.

Rezone the Orchard Apartment area from Commercial (C-l) to R-1500. Although the

Orchard Apartment complex has a higher density as a senior housing project, the base density of

the C-l Zone currently applied to the property is 29 units to an acre.

Rezone the Gateway Village complex to multifamily residential zone which permits a maximum

of 29 dwelling units per net residential acre, to allow for a medium-density residential project to

be built adjacent to the future canal. Apply a medium-density designation to the Sports Arena

site, including surrounding City-owned land (approximately 69 acres total), to provide for a

residential community to be built following eventual relocation of the Sports Arena. Designation

of the properties to the north of the Sports Arena site and the three privately-owned Sports Arena

outparcels (approximately three acres) for residential use should be re-evaluated upon

redevelopment of the Sports Arena site and in consideration of the pending Lindbergh. Field

Master Plan. Also apply the CPIOZ—Type B to ensure that the property is redeveloped as an

exemplary, comprehensive project that provides quality residential development which conforms

to the design recommendations of this community plan.

Page 27: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

17

Application of CPIOZ—Type B will also facilitate the dedication of the necessary right of- way

and comprehensive review of overall site design to accommodate: (1) the bay-to bay canal; (2) a

school site in accordance with standards of the San Diego Unified School District; and (3) the

integration of ancillary neighborhood commercial development, either as vertical mixed-used

consisting of up to 100,000 commercial square feet, or as one or two neighborhood commercial

centers encompassing up to three acres, as needed to support the residential development.

As part of the comprehensive redevelopment process described above, and concurrent with

approval of any development project(s), the Sports Arena site and all surrounding residentially

designated properties should be rezoned to a multifamily residential zone which permits a

maximum of 29 dwelling units per net residential acre.

Medium-High Density

Apply a multifamily residential zone which permits a maximum of 43 dwelling units per net

residential acre to areas designated as suitable for medium-high density. Designate the following

areas for medium-high density residential use:

The Cauby Street area is currently zoned R-400 and R-1000. The properties in this area are

developed at or close to the maximum allowable density within the R-1000 Zone.

Retain the R-1000 Zone and medium-high designation of the Kemper Court area.

This element also establishes development guidelines for any new residential development, the

rehabilitation of existing structures, and the possible development of mixed-use projects. The

following guidelines have been developed with special emphasis on the aesthetic and functional

qualities of individual projects. Improvement in the quality of individual residential projects will

promote a desirable living environment for residents and contribute to the overall improvement

of the community.

Page 28: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

18

Fig. 2.1 Medium density multi-family residential design concepts

Author: Internet.

Page 29: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

19

Fig. 2.2 Multi-Family residential plan

Source: Internet

Development Criteria

Rehabilitation of existing housing should be encouraged and accomplished through private

and/or any available City, state, or federal subsidy programs.

Promote pride of ownership and the spirit of neighborhood revitalization efforts by encouraging

the development of cooperative housing projects, neighborhood associations and homeowner

organizations. Maintain and repair existing rentals and owner occupied housing units through

private efforts, as well as public programs administered through the Housing Commission, such

as Community Development Block Grants and Housing and Urban Development Funds.

Isolated substandard residential uses in heavy commercial and industrial areas should be

redeveloped with appropriate uses as designated by this plan.

Page 30: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

20

Urban Design Guidelines

Incorporate defensible space techniques into the design of multifamily projects by providing

architectural detailing and individual unit features which will promote pride of ownership and

delineate public, semiprivate and private space. The visual and spatial orientation of recreational

and open space areas should be linked to specific residential units within the project. Projects

should provide adequate lighting in all areas, avoid hidden “pockets” within landscaped areas,

and eliminate long, narrow hallways or passageways. Parking areas, pedestrian pathways and

entrances should be well-marked and open to visual surveillance.

Fig. 2.3 Urban design guidelines in Lindbergh, San diego

Source: Internet

Provide recreational facilities specifically designed for the residents of the project, e.g.,

playgrounds, benches, pools, Jacuzzis, barbecue areas, passive recreational areas and recreational

meeting rooms. Recreational design features should focus on the usability and functionality of

the space provided, i.e., benches facing interesting street scenes for the elderly, secure play areas

or tot lots in housing which accommodates families with young children, etc.

Discretionary permits should limit the amount of signage visible from the public right-of-way.

Signs should readily identify the project, incorporate landscaping, and be architecturally

integrated into the scale and style of the surrounding neighborhood.

Page 31: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

21

Improve neighborhood streetscapes by preserving significant street trees and landscape patterns.

If a street tree pattern does not exist, new trees should be located between the sidewalk and the

curb.

Development of housing on and around the Sports Arena site should be designed around off-

shoots or “finger” canals to maximize the amount of waterfront property and make the canal

amenity available to many residents. The main channel should be designed as described in the

bay-to-bay element (as a navigable link), but the off-shoots may be narrower and shallower.

Dwelling unit types that are permitted in this area are townhouses, row houses, courtyard

buildings and apartments. Buildings should orient to the streets or around central courtyards,

with entrances on the street side and garages internal. Parking should be underground or

structured. Parking lots, driveways and garage doors are not permitted along the canal.

Pedestrian access to the canal should be frequent, convenient and well-defined. Streets shall be

designed as numerous small facilities, rather than major streets and cul-de-sacs. A grid system

should be designed, and all streets shall be public. Individual residential projects should

incorporate private recreational facilities to serve the needs of residents.

Case 2: Carlton Housing Redevelopment

The redevelopment delivered the largest and most environmentally sustainable social and

private housing redevelopment in Victoria's history. The project spans 7.5 hectares across three

Carlton sites: Lygon/Rathdowne precinct, Keppel/Cardigan precinct and Elgin/Nicholson

precinct. These major areas of Carlton were revitalised into vibrant community precincts with

new public parks, community gardens and pedestrian and bicycle pathways. The high-rise towers

near Lygon and Elgin Streets were retained and were progressively upgraded to significantly

improve accommodation, security and sustainability of the high-rise towers. The first stage of

construction commenced on the $260 million Carlton Housing Redevelopment to replace 192

old, walk up flats with 246 new social housing apartments and 550 new private apartments. It

also included new public parks and landscaping. A health and aged care facility and retirement

living precinct was proposed.

Page 32: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

22

Fig. 2:4 Construction of houses in Carlton

Source: The internet Safety and accessibility

The newly redeveloped streets and buildings of the Carlton Housing Estate provide an enhanced

sense of personal safety and security for all residents. The project provides an interconnected

system of public parks, pathways, and local streets that are clearly defined and well lit at night.

Building frontages are designed to be visually appealing and to allow for casual surveillance

from windows and balconies onto the adjoining streets and public spaces. The new housing

apartments have secure entry foyers and intercom systems. Accessible pathways, open space, car

parking, building entries and lift serviced apartments will be designed for people with mobility

impairment or disabilities.

Community Garden

Landscaping works of the new development will include a community garden which is currently

under construction and due for completion. Cultivating Community will manage this site, which

will provide 58 plots as well as a wood fired oven, tables and chairs, soft fall for children, water

tanks, shelter and potting benches for the use of public housing tenants.

Fig. 2.5 High-rise towers at Carlton Housing

redevelopment

Page 33: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

23

Relocation and demolition

Some tenants at the Lygon/Rathdowne and the Elgin/Nicholson precincts were relocated as part

of the project. Residents have been regularly consulted about the stages of relocation in

preparation for demolition of the walk up buildings.

Community Consultation

Community consultation is an important element of the project. The Carlton Community Liaison

Committee was established in July 2006, and includes local tenants, residents, representatives

from community agencies and local businesses to provide a forum for the community to be

involved in the project. A series of workshops are being held with public housing tenants.

Project Timelines

Table 2.8 An overview of project timelines

Activity Timeframe

Planning Scheme Amendment March 2007

Tender for developers Sep - Dec 2007

Development Agreement Jun - Dec 2008

Stage 1 Planning Permit (174 units) December 2009

Start of construction Stage 1 January 2010

Relocation and demolition (Stage 3 - Elgin/Nicholson) 2010 - 2011

2.4 Conceptual framework for the project

The major problem in the project area is the changing land uses with its related effects. Land use

changes in the area is manifested in the diminishing agricultural land and congestion of highrise

buildings in the area, increased businesses along the road and construction of schools in open

spaces i.e. encroachment. The increasing land use changes necessitate planning intervention in

order to control peri-urban residential growth and enhance development control.

Page 34: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

24

Re-organisation of the residential growth is considered as the best approach in dealing with

problems of land use changes, congestion and the loss of asthetics in the area. In order to ensure

proper implementation and sustainability of reorganization of growth in this area, the following

aspects have to be considered. First there is need to educate the community about urban sprawl

and peri-urban growth and engage them in the project. There is need for supportive tools and

policies, the town council of Karuri needs to formulate policies that will provide for control of

residential redevelopment in the project area to ensure the approval and sustainability of the

proposed project. There is also need to involve the experts in developing alternative proposals

for reorganization of residential growth in the project area: who will apply their professional

expertise and carry out feasibility study and an environmental impact assessment to determine

the impacts of each proposal on the environment. There is also need for political support for the

proposed plan.

If all of the above requirements are met, the proposed re-organisation plan for the project area

will be sustainable. These will result into attractive aspects and improved aesthetics, reduced

congestion and improved linkages. Re-organization of residential growth will help control the

rate of land use changes hence the rate of development in the area. This will therefore enhance a

sustainable, vibrant and aesthetically attractive area.

Page 35: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

25

CHAPTER THREE: SITUATION ANALYSIS

3.1 Location context of the project area

The project area covers the Ruaka sublocation in Kiambaa division in Kiambu East district . The

area falls under the town council of Karuri. Ruaka is located approximately 12 Km from the city

of Nairobi. The area is accessed via Limuru road. The area has an attitude of 1⁰12'0"S and

36⁰47'0"E. The altitude of the area is 1746 m above sea level. The study area covers an area of

approximately 4 hectares. There has been rapid development of residential and commercial

facilities in the study area leading to uncoordinated growth therefore re-organisation of these

developments is necessary in order to ensure orderly development.

Fig. 3.1 National context of the project area

Source: Survey of Kenya

Ruaka is found in central province in Kenya

Page 36: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

26

Source: Town Council of Karuri.

Fig. 3.2 Location within the Town Council of Karuri

Position of Ruaka in the town council of Karuri.

Page 37: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

27

Fig. 3.3 The neighbourhood context of the project area.

Legend

Source: Author, 2010

1. The project area borders

the ruaka police post to the

west, Ruaka shopping centre

to the south, the road

junction branching from

Limuru road to Muchatha is

on the East of the study area

and on the northern side are

other residential

developments.

2. Limuru road is adjacent to

the project area on the

south.

Page 38: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

28

Fig. 3.4 Detailed Study Area

Housing development within the agricultural land

Small scale agricultural activities still present in the project area.

Limuru road adjacent to the site

Source: Author, 2010

Page 39: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

29

3.2 Historical background of the study area

Ruaka is named after River Ruaka that flows across the area, where it is believed that women

used to bath. The land was owned communally where people began building huts. When

colonization began, the people were regrouped into villages. The first village was in Ruaka

shopping centre, where the people worked in the white settler’s coffee farms. Some shops

were built at the current Ruaka shopping centre. The land was therefore subdivided into

private plots where most people practiced agriculture as a main source of livelihood.

Urbanisation then caused there to be various land use changes where people have been

developing residential and commercial houses on their land.

3.3 Physical and environmental characteristics

3.3.1 Climate

The area receives an average of 900 mm of rainfall annually with a mean monthly average

temperature of 22⁰c and a maximum of 27⁰c. Precipitation is in two rainfall seasons i.e.

bimodal that is between March and May and between October and December, there are two

intervening dry seasons. Rainfall is influenced by relief. Winds are weak with the strongest

occurring during August and October (5-10m/s) and blowing from varying directions. The

annual precipitation rate is 1883 exceeding the precipitation rate. The hottest months are

December to March (27⁰c) and the coldest month is July (22⁰c). This presents a very

favourable climate for development of housing in the project area.

3.3.2 Topography and Slope Analysis

Ruaka area slopes eastwards towards the city of Nairobi. The area is characterized by rugged

and deeply incised landscape. Ruaka River is the major hydrological feature which forms the

boundary between Ruaka and Kiambaa sub-locations on the North-East while River Rueru

forms the boundary between Ruaka and Kihara location to the west. Since the area is gently

sloping, this area is very favourable for residential development with minimal costs, this has

been evidenced by the existing and increasing residential developments.

3.3.3 Hydrology and Drainage systems

The main hydrological features in the area are River Ruaka, River Rueru and Kandakomu

spring. The two rivers drain their water in Nairobi River. Other rivers in the river include

Kagongo River which drains its water into Karura River.

Page 40: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

30

Manmade boreholes and wells are also other major sources of water in the area. Availability

of water in the area shows that there is great potential to serve the increasing population. The

area has problem which needs to be addressed, that is: it lacks storm water drains hence there

is poor drainage during the rainy season which could be a threat to people’s lives since it may

breed mosquitoes which may bring Malaria.

3.4 Population and demographic characteristics

The population of the project area is approximately 2,112 persons with a population growth

rate of 5%. The table below shows the projected population for the period of 15 years.

Table 3.2: Projected population for the project area

Year 1999 2010 2015 2020 2025 Population 1235 2112 2695 3440 4391

No. of households 247 422 539 688 878

Source: Author, 2010

Average Household Sizes

The average size of a house hold in the study area is 4-5 members per household.

Chart 3.1: Household sizes in the study area

Source: Field work, 2010.

Social cultural characteristics

The area is mostly inhabited by the Kikuyu who value their land, and being entrepreneurs

they put their land in the most profitable ventures. There has been influx of people from other

areas and ethnic backgrounds who come into the area to rent houses.

Page 41: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

31

Migration trends

There is high immigration of people into this area resulting to high rate of population growth.

This has led to very high demand for housing hence more development of residential houses

to accommodate the population. The main reasons contributing to people moving into this

area are :- Cheaper housing in the area than major urban areas, search for employment e.t.c.

Most of the people who migrated into the project area intend to permanently live here. This is

because the area is close to Nairobi where they can access goods and other services easily.

Also most of them are employed in Nairobi where they access easily due to a good transport

network. There are also few cases of outmigration whose main reasons are: holidays, visits

and employment. Holiday here refers to the movement of people annually to their ancestral

homes, this factor is greatest especially for those whose ancestral home is not in the project

area.

Chart 3.2: Reason for out-migration from the project area

Source: Field work, 2010

3.5 Land use analysis within the project area.

The main land use in the study area is currently residential, others include commercial

activities, open spaces, urban agriculture and infrastructural and transportation facilities. The

private developers have fully developed the land into residential houses for rental purposes to

the working population in Nairobi. There is need to re-organize what is existing in order to

achieve orderly development.

Page 42: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

32

Table 3.3: The existing land use situation in the project area

Land use Percentage Residential 60% Commercial (Economic activities) 5% Open spaces (Vegetation) 20% Agriculture (mainly urban agriculture) 5% Infrastructural and transportation 10%

Source: Field survey, 2010.

3.5.1 Housing

This is the major land use in the area taking about 60% of the land. There are mainly middle

income housing in the project area. The construction of these houses have eliminated the

initial land use which was agricultural. There has been emergence of highrise (flats) houses in

the area where building standards and building codes are not well adhered to. The rental

charges for the apartments and bungalows range from 8,000 for single dwelling units and

20,000 for double dwelling units. The increasing development of these housing has led to

congestion and loss of open spaces in the area. This has hence led to lack of aesthetic value in

the study area. There is therefore need for redevelopment in order to instill order in this area.

3.5.2 Commercial

There are numerous unplanned commercial activites taking place along the roads. This has

led to congestion on the road lanes and has also hindered accessibility into the interior. There

has been high competition for road use. This activities include retail shops, informal open air

markets, jua kali artisans, welding and maize roasting.

3.5.3 Infrastructure

Water supply

The increased residential and commercial activities have led to increase on the water demand

in the area. Some residents who live in bungalows also harness rain water through roof

catchment. Water is supplied by the City Council of Nairobi and Karuri water and sanitation

company.

Page 43: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

33

Storm water drainage

There is a problem of storm water drains especially during the rainy season. This is because

there are no adequate storm water drainage systems in this area. The town council council

where Ruaka falls has not addressed to the problem for storm water drainage.

Sewerage disposal

The project area lacks a sewerage network hence most residential households use septic tanks

and conservancy tanks especially in the high-rise buildings. Others use pit latrines especially

those living in bungalows. The septic tanks are emptied by private exhausters every three

months. There are plans by the Athi waters board to buy exhausters. The lack of sewerage

systems for sewage disposal poses health risks and other environmental concerns like

pollution and air borne diseases.

Page 44: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

34

Figure 3.5 Existing land uses in the study area

Legend

Page 45: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

35

3.6 Institutional, legal and financial issues of the project area.

3.6.1 Town Council of Karuri

This is the major planning agency in the project area. According to the local government Act

and the physical planning Act, it has the following functions: To prohibit or control the use

and development of land and buildings in the interests of proper development of its area of

jurisdiction, also to consider and approve all development applications and grant all

development permissions (according to the P.P.A section 29). The town council formulate

by-laws to guide development activities in the area. The council plays a role in development

control through approval of submitted development proposals.

There are various challenges faced by the council in development control. These include:

Resistance by the public, lack of capacity to inspect all construction works from the approved

plans, lack of technical staff, insecurity, and political interference.

Therefore, there is need for strict measures to be put in place regarding development by the

Town Council of Karuri in order to ensure that all planning standards and regulations are

adhered to by developers.

Page 46: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

36

Fig. 3.6 Administrative structure of the Town Council of Karuri

3.6.2 Other Actors in the planning process include:

Ministry of Lands

This is the overall government agency that approves land uses changes on land in the area.

Therefore this makes it a major Actor in the implementation of this project.

Ministry of Roads

The ministry of roads will also be involved in the implementation of the project in the

reorganization of the road network in the area. The ministry will help in the construction of

the new proposed roads.

Membership: Councilors The Chairman: Formulate policies for the council and approves all decisions

Committee1: Finance Staff and General Purposes

Committee 2: Works and Town Planning

Committee 3: Education, Social Services and Housing

Committee 4: Public Health and Environment

Town Clerk Chief Executive

Departments

Town Clerks Department

Treasury Department Town Treasurer

Works Department Town Engineer

Planning Department

Public Health Department

Page 47: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

37

Community development fund

Community development fund (CDF) will be used to fund the implementation of the project.

The private sector

The private sector is also included in the financing and implementation of development

activities in the area. These can provide housing facilities together with the necessary

facilities to the community.

Community leaders

The aim of community leaders is to ensure conformity to the planning regulations by the

community hence sustainability of the project. The community leaders should be involved in

all the development stages of the plan making to implementation.

3.6.3 Financial

The project will require a lot of money for its implementation. The town council of Karuri

should review its policies that will help in directing enough funds for the implementation of

the project. The planning standards and regulations should also be reviewed in order to

reduce the cost of developing the residential houses, provision of infrastructural facilities and

community facilities.

The community based organizations in the area can also lobby for funds from development

agencies willing to engage in the implementation of this project i.e. both local and

international agencies such as U.N Agencies and the World Bank.

Page 48: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

38

Fig. 3.7 Opportunities and Constraints in the project area.

Source:Author,2010

Opportunities

• The Nairobi northern By-pass will help reduce traffic congestion, increase accessibility and promote urban growth.

• Proximity to Nairobi will this will spur growth in Ruaka.

• The proposed Nairobi metropolitan region is likely to bring some trickling Bdown effects from the city.

• Heavy development in housing for rental purposes is a source of income for the residents.

• Availability of building materials. • The high land prices in the area

present an opportunity for major urban residential developments.

Constraints

• Non-adherence to building codes by developers.

• Poor zoning and land uses. • Lack of a functioning sewerage and

drainage systems exhibited. • High rates of land subdivision.

Legend

Page 49: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

39

CHAPTER FOUR: PROJECT PLANNING, DESIGN AND IMPLEMENTATION

Overview

This chapter will deal with the aspects of developing plan proposals for the project area and

implementation of the preferred plan. There are various alternative designs for peri-urban

residential development for harmonious growth. The adoption of the plan by the town council

of Karuri will help to manage the haphazard residential growth in their area of jurisdiction.

4.1 Planning and design of project

The re-organised peri-urban growth plan for housing developments will bring about a vibrant

and sustainable project in the area. Housing blocks will be provided following the required

planning standards. There will be adequate accessibility within the study area and also with

the neighboring areas. This will provide a compact neighbourhood which is sufficient in all

ways where people can interact and socialize with others freely. There will be enhanced

linkages with the periphery of this area and the city of Nairobi.

The compatibility of the residential land use with other land uses in the area will enhance

healthy interactions and control of development in the area. There will be provision of

various housing typologies in order to promote a variety of choice among different

households. Provision of housing will observe the required standards and building by-laws.

4.1.1 Development of the spatial plans: Evaluation of alternatives plan proposals

The Existing situation

The project area is currently characterized by multiple storey residential buildings where the

planning standards and regulations have not been adhered to properly. For instance,

developers develop upto 100% plot coverage. This has led to haphazard development in this

area. Ruaka also lacks a planning framework which could also be the cause for the

uncoordinated growth. There is therefore need for a planning framework in the area in order

to control growth.

Alternative Plan one: Medium density single storey buildings

There will be rezoning of the current multiple storey housing into development of uniform

type of housing that is single storey buildings in the study area each on its own piece of land

and serving only one household. These houses will all be similar in terms of design and

provided with all infrastructural facilities like sewerage facilities. There will be no

commercial facilities provided in the type of development. Construction for such housing will

Page 50: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

40

observe the planning standards for medium density type of development. In this type of

development there will be relocating of the people currently residing in the area in order to

redevelop this area which is an expensive process to undertake. The main advantage of this

alternative is that it promote a unique neighbourhood character as well as preserve the

aesthetic characteristics of the area. The disadvantage to this type of development will is that

there is need for a large piece of land which is not available in the area where it has been

subdivided into very small pieces. It is also a very expensive undertaking and also this type of

development will not be able to accommodate the increasing population in the study area.

Page 51: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

41

Fig. 4.1 Alternative Plan one map.

Source: Author, 2010.

Legend

Page 52: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

42

Fig. 4.2 Design for the alternative one

Source:Author,2010

• Uniform type of housing that is single storey buildings

• Houses similar in terms of design • There are no commercial facilities

provided • Construction for such housing will

observe the planning standards for medium density type of development

Page 53: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

43

Fig. 4.3: Landscaping of Alternative plan one

Source: Author, 2010

Page 54: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

44

Alternative plan two: High density multi-storey buildings

In this intervention measure, the area will be designated for purely high density multifamily

residential zone. Where possible there will be rehabilitation of the existing structures which

have followed the required guidelines in order to conform with the redevelopment plan. In

this alternative it will provide multi-storey buildings where the ground floors of buildings

facing the road are used for commercial purposes while the upper floors are used for

residential purposes. This will enhance optimum utilization of the available land for

development. This measure works well in areas where there is limited developable land like

the case in the project area.

The advantages of this alternative are that there will be various uses in the same building and

also will help accommodate the increasing population in the project area. This will also help

create a very good skyline in the project area. This type of development should be well

integrated with the existing neighbouring land uses.

Preferred plan

The most preferred plan for the area is the high density multi-storey buildings.

This is because 1) It will blend well with the existing residential development in the area

which is multi-storey buildings, 2) Land available for development is limited in the project

area and there is high population growth rate, where it has also been increasing due to high

rates of in migration into the area, 3) This type of development will ensure optimal use of the

available land in the project area. The local authority where this area falls (the town council

of Karuri) will also be able to collect more revenue from this development. This is because is

there will be guidelines to enhance inspection of approved buildings by the council hence no

housing will be constructed without approval.

Urban design Guidelines

The residential redevelopment should be well linked with visual and spatial orientation of

recreational and open space areas.

Adequate lighting should be provided in all areas to avoid hidden “pockets” within

landscaped areas.

Provide recreational facilities specifically designed for the residents of the project, e.g.

benches, footpaths e.t.c.

Improve neighborhood streetscapes by preserving significant street trees and landscape

patterns.

Page 55: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

45

4.2 Site planning/design process stages

4.2.1 Detailed design formulation stage and the development of detailed action plans

• Existing area of land for the project area =4.0 Ha

• Current population = 2112

• Projected population for 15 years= 4391

• Current number of households= 422

• No. of households after 15 years= 878

• Two bedroomed units will occupy 100 sq. metres

• Three bedroomed units will occupy 120sq. metres

• The ratio of two bedroomed houses to three bedroomed houses will be 3:1

• The total no. of two bedroom units will be 1500

• The total o. of three bedromed units will be 500

• The total area to be occupied by two bedroomed units will be

1500×100=150000sq metres or 15 ha

• The total area to be occupied by three bedroomed units will be

500×120=60000 sq. metres or 6 ha

• Total area of the land required to accommodate the projected population in 15 years

time

15 ha+ 6 ha= 21 ha

• Proposed ground coverage= 50%

• No. of floors

21ha/4.0 ha= 5 floors

Detailed Action Plans

Development of high density multi-storey houses will be adopted in the project area. In 15

years time the number of houses will be higher than the current situation due to the increase

in population. There will be about 4391 persons in 15 years in the project area therefore 878

households. There will be 1500 two bedroomed houses and 500 three bedroomed houses in

the plan. This is because most people living in this area are middle income earners. This

development will have two clusters, one for the two bedroom houses and the other for the

three bedroom houses. The cluster for two bedroom houses will be the one fronting the road.

There will be provision of infrastructural facilities into these buildings i.e. water and sewer

system and also adequate accessibility means.

Page 56: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

46

Fig. 4.4 Preferred Plan for the project area.

Source: Author, 2010.

Legend

Page 57: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

47

Fig. 4.5 Design of the preferred model

Source:Author,2010

Two bedroom and three bedroom flats. Flats have Five floors each Provides a good skyline. 50% plot coverage Good landscaping with trees. Adequate space for community facilities Six metres access road

Page 58: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

48

Infrastructure facilities

Adequate infrastructure will be provided to cater for the population. Drainage channels will

be constructed and integrated with the footpaths A sewerage network will be provided to

cater for foul water and waste water from the houses. Also proper methods of solid waste

disposal will be adopted to enhance hygiene.

Access roads and pedestrianization

A six metre wide access road will be provided in order to serve pedestrians, and cyclists.

Pedestrianization will improve the linkages within the neighborhood. Other facilities like

trees, benches, street lights and garbage bins, sidewalks and foot paths will be designed for

the area to link with other parts within and outside the project area.

Landscaping

Trees will be planted along Limuru road to act as a buffer and also within the area so as to

maintain a good landscape. There will also be flowers at the compounds of these houses to

improve on aesthetic value.

Peri-Urban agriculture

To ensure that agriculture is not completely phased out of the area, there will be small

gardens to practice small-scale peri-urban agriculture like planting of vegetables.

Page 59: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

49

Fig. 4.6 Detailed street design, pedestrianization and landscaping

Source: Author,2010.

• A six metre access road • A street with various infrastructural facilities like

open water drains. • Street lighting is provided. • A footpath is provided. • Trees planted for landscaping purposes together

with benches

Page 60: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

50

4.2.2 Implementation strategies

Problem Strategies Programmes Actors High demand for housing due to increasing population.

Provide enough housing for the increasing population in the area. Provide buildings to accommodate and curb the increasing demand for housing.

Build five storeyed apartments to accommodate the population.

The Town Council of Karuri

Increasing land use changes from agricultural land use to residential land use.

Ensure that the land use changes are approved by the Town Council of Karuri. Inspection and follow up by the council.

The Town council of Karuri to approve all developments in the area and the do a follow up during construction.

Town Council of Karuri Private developers

Development of housing without following planning standards.

Ensure construction of buildings adhering to the required planning standards

Provide the planning standards to developers at the time of approval of buildings

Town Council of karuri Private developers.

Congestion due to emergence of unplanned residential growth.

Re-plan and redevelop for residential growth in the area. Co-ordinate residential growth by applying the required standards during development.

Redevelop the residential housing observing a 50% plot coverage.

Town Council of Karuri Private developers

Lack of infrastructure facilities like sewerage network

Provide a sewerage network in the area.

Consruct a high capacity sewerage network, water and drainage systems

Athi Water Company The Town Council of Karuri.

Source: Author, 2010

Page 61: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

51

4.2.3 Implementation schedule

Role of stakeholders

Various stakeholders are involved in the project in order to ensure its success and

sustainability. Their roles are outlined in the table below.

Table 4.1 Role of stakeholders in the implementation of the project

Stakeholders Roles Town Council of Karuri • Provide housing for the area and other

community facilities.

• Provide infrastructural facilities like

water, sewerage and solid waste

management

• Provide guidelines and planning

standards for residential development.

• Finance the project and provide the

technical expertise during

implementation.

• Regulate monitoring of the project for

sustainability.

Private sector • Finance the project.

• Provision of services Community leaders • Enforcement of regulations and planning

standards during implementation.

• Management of the project area.

• Settle the disputes in the area. The households/Community • Contribute to the design of buildings

• Provide voluntary labour

• Management and mainteinance of the

project to ensure sustainability

Source: Author, 2010

Page 62: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

52

Phasing of the project and the Time Frame

The project shall require a phasing plan that describes and illustrates the format of implementation of the proposed plan when development is

anticipated to occur in multiple phases over a number of years. The phasing plan will show how the project is to be incrementally developed.

Table 4.2 Phasing of the project

Phase 1 Time Frame Cost(Kshs) Phase 2 Time frame Cost (Kshs) Compensate the land owners for their

land for redevelopment

Identifying a temporary site to

relocate the displaced population.

Acquisition of required materials for

construction.

Layout of infrastructural facilities

Construction of flats

6 months

6 months

1 year

1 year

3 years

500 million

1 million

50 million

10 million

500 million

Landscaping and pedestrianization

Tree planting

Relocation of the displaced population

Regular inspection and monitoring to

ensure sustainability

2 months

3 months

5 months

100 million

50, 000

Source: Author, 2010

Page 63: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

53

Resource requirements

Land resource

Land is the major component in the implementation of this project. The land is not readily

available since the ownership of land in the area is private and the land has been subdivided

into very small pieces. There will be compensation to the owners of land in order to

redevelop the area.

Financial resources

The project requires huge amounts of financial resources. The Town council of Karuri will be

the main financier of the project. Other stakeholders will include; the private developers and

other development agencies.

Human resources

Human labour will be needed in the construction, supervision, management and mainteinance

of the project. The town council of Karuri will provide the technical support and supervision

of the project. The community members will provide casual labour which will be a form of

employment for them.

Page 64: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

54

CHAPTER FIVE: MONITORING AND EVALUATION

Overview

This chapter articulates the expected outcomes from the project as well as the indicators.

5.1 Expected outputs and outcomes of the project

The re-organised residential growth plan is expected to reduce the cases of congestion in the

study area and enhance aesthetic characteristics, that will present a well organized residential

developments in Ruaka. There will be reduced haphazard development in the area and

therefore present an orderly sense of development in the area. There will be increased

accessibility within and outside the area to enhance the interactions between the people.

Adequate space for commercial facilities will be provided in order to enhance the peoples

livelihoods in this area.

Table 5.1 The expected Output and indicators of success.

Expected outcomes Indicators

Spatial implications • A well organized

residential

development

• Reduced haphazard

development

• A well maintained

neighbourhood.

• Increased

accessibility of the

area.

• Increased linkages

(exrenal and internal).

• Controlled

development

• Easier movement

• Improved aesthetic

characteristics

Social implications • Improved living

standards of the

residents.

• Improved livelihoods

of the residents.

• Good housing

• Improved way of life

of the community

Page 65: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

55

conditions

Economic implications • Increased revenue for

the town council of

Karuri.

• Increased incomes

from investment in

residential

development

• Increased

employment

opportunities for the

community especially

the youth

• Optimal use of land

• Increased revenue

base i.e surplus.

• Improved way of life.

• Creation of

employment

opportunities.

Environmental implications • A well maintained

neighbourhood

• A cleaner

environment

• Proper waste

management

• A cleaner

environment

• Improved aesthetic

components

5.2 Monitoring and evaluation stages in the implementation of the project

There is need for community participation and constant monitoring and evaluation

mechanisms in order for the project to become a success and to ensure that the expected

outputs are realized. Monitoring is an essential part of the planning process. Monitoring of

the project ensures that there is a base to measure the success of the plans.

Page 66: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

56

The success of the project will be ensured by the provision of training programmes and

community sensitization forums. The community based organizations as well as the

community members will be at the fore front in the management and the monitoring the level

of success of the project. The indicators as illustrated in the table above will serve as the

measure of the general success of the project.

Goal achievement matrix

This reflects the expectations of the stakeholders in terms of the goals and the

recommendations they have made. It will reflect the achieved goals and whether they have

been achieved within the proposed time limits. The goals not achieved within the stated time

limit should be devised on how they would be achieved

Site performance inventory

Regular site visits and monitoring will be done after the construction process to access

general performance of the project. This is to check whether there are any negative impacts as

well as the intended goals and objectives have been met.

5.3 Guidelines for the implementation process

The harmonization of the project will be ensured by a guideline that will act as an

organization structure for the entire project, which shall include various steps and procedures.

The implementation stages of this project should be a participatory process of the town

council of Karuri, the community, developers and other development agencies, this is in order

to enhance the ownership of the project hence its sustainability. The community should be

actively involved from the decision making stage to the implementation.

The town council of Karuri needs to observe the following:

• Reviewing of by-laws in order to provide for the peri-urban residential re-organisation

and redevelopment in Ruaka.

• Formulation of cross sectoral framework for project implementation.

• Negotiations and meetings between different stakeholders for a partnership and

participation plan formulation

• Commencement of the community training programmes.

Page 67: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

57

• Enforcement of the appropriate legal framework in regards to construction or

development of the area, ie. Getting development permission by the town council of

Karuri as per the local government Act and the physical planning Act of 1996.

• Implementation of the proposed policies for peri-urban residential growth to enhance

the sustainability of the project.

• When these guidelines are in place implementation sequence will begin with less

technical phases of the project implementation as outlined in the table.

5.4 Site/ Environmental Management plan

Construction activities on the sites need to be strictly regulated to ensure that all projects are

developed and implemented according to sound environmental standards and norms.

To ensure that the project proceeded with minimum distractions on the physical environment

and the public, an environmental management plan which prescribes specific actions that

should be undertaken during planning, construction and operation of an approved

development will be prepared.

The main objectives are: 1) To come up with cost effective measures to prevent or reduce

significant negative impacts of development to minimum levels. 2) To understand the degree

of the impacts when considering compensation to affected parties. 3) To minimize noise

during construction.

Page 68: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

58

Bibliography

• Arbury Joshua, From Urban Sprawl to Compact City – An Analysis of Urban growth

management in Auckland.

• Andersen Jorgen, Department of Human Settlements, School of Architecture,

Copenhagen, Meanings and perceptions of the built environment in peri-urban areas

of Maputo, Mozambique.

• Chirisa Innocent, Peri-urban dynamics and regional planning in Africa: Implications

for building healthy cities.

• Dávila D. Julio with, A review of policies and strategies affecting the peri-urban

interface.

• Heimlich E. Ralph and Anderson D. William, Development at the urban fringe and

beyond: Impacts on agriculture and rural land.

• Ikhwan Hakim, and Parolin Bruno, Spatial Structure and Spatial Impacts of the

Jakarta Metropolitan Area: a Southeast Asian EMR Perspective.

• John Friedmann-University of british Columbia, The peri-urban: the unfolding drama

of china’s city-regions.

• Kithia Shadrack, Land use changes and their effects on sediment transport and soil

erosion within the Athi drainage basin, Kenya.

• Kjell Nilsson & Thomas S. Nielsen, Peri-urban land use relationships – Strategies and

sustainability assessment tools for urban-rural linkages

• Ministry of Nairobi metropolitan Development, Nairobi Metro 2030; A vision for a

world class Metropolis, First and foremost in Africa and the world.

• On the Edge of Sustainability: Perspectives on Peri-urban Dynamics

• Professor-Emeritus Helen Armstrong-Centre for Cultural Research, University

of Western Sydney, Post-Urban/Suburban Landscapes: Design and Planning

the Centre, Edge and In-between.

• Republic of Kenya (2002-2008) Kiambu district development plan. Government

printer Nairobi.

• Republic of Kenya, Kiambu District Strategic Plan, 2005 - 2010 for implementation

of the national population policy for sustainable development, government Printer.

• Republic of Kenya, County Council of Kiambu Strategic Plan, 2008 to 2013,

government Printer.

Page 69: RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH IN ... - Urban planningurbanplanning.uonbi.ac.ke/sites/default/files/cae/artsdesign... · through application of the relevant planning

59

• Rijksuniversiteit Groningen, Peri-urban Planning in Indonesia Contexts, approaches

and institutional capacity.

• Socio-economic transitions;changing livelihoods in the peri-urban area. A

comparative study of Kotwi and Tikrom in the Atwima Kwawoma. District and the

Ejisu Municipality of Ghana respectively.

• Stergios Jim, Rehabbing Urban Redevelopment

• The Peri-Urban Interface in Developing Areas: Approaches to sustainable natural and

human resource use Developing Areas Research Group

• Urban Fringe Management and Role of Good Governance: Integrating Stakeholders

in Land Management Process Fahria MASUM, Germany