i
RE-ORGANIZATION OF PERI-URBAN RESIDENTIAL GROWTH
IN RUAKA.
MAINA JOSPHINE KARIMI
B65/0381/2006
A PLANNING DEVELOPMENT PROJECT SUBMITTED IN
PARTIAL FULFILMENT FOR THE REQUIREMENT FOR THE
BACHELOR OF ARTS DEGREE IN PLANNING, DEPARTMENT
OF URBAN AND REGIONAL PLANNING.
UNIVERSITY OF NAIROBI
JULY 2010.
ii
DECLARATION
This Planning development project is my original work and has not been presented for a
degree in any other University.
Signed……………………………………..Date……………………………………….
Maina Josphine Karimi
(Candidate)
This Planning research project has been submitted for examination with my approval as
University supervisor.
Signed…………………………………….Date……………………………………………
Mrs. Margaret Ng’ayu
(Supervisor)
iii
DEDICATION To my parents Mr. and Mrs. Leonard Maina and my sponsors Mr. and Mrs. David Schaal
for the moral and financial support.
iv
ACKNOWLEDGEMENTS I thank the almighty God for making me get this far in my Education.
To all my lecturers may God bless you so much for the great work for me to acquire new
knowledge and skills. Sincere acknowledgements go to my supervisor Mrs. Margaret
Ng’ayu for her support, guidance and responsible supervision.
Special thanks to my sponsors Mr. and Mrs. David Schaal for the continous
encouragement and positive comments.
v
ABSTRACT Today’s world is rapidly urbanising, with radical urban expansion in developing
countries. Increasing urbanisation impacts on the periurban in terms of changes in land
use, new forms of household composition, differential access to urban benefits (such as
health infrastructure and employment) and increased pressure on common natural
resources.
Peri-urban growth has become a major problem in developing countries. This has been
caused by the increasing population in these countries caused by high growth rates and
urbanization. This has in turn resulted to high demand for housing in these areas. These
areas are characterized by major land use changes from agriculture land use to residential
and commercial land uses.
Development in Ruaka is mostly uncoordinated and uncontrolled hence resulting to
haphazard growth. There is a lot of pressure on the available facilities due to the
increasing population. Demand for housing is also very high hence private developers
convert their land to residential land use. They are putting up these houses on very small
pieces of land hence there has been cases of 100% plot coverage leaving no space for
community facilities and causing a lot of pressure on the scarce land in the area.
There is need to reorganize and redevelop the growth in the area. This will be done
through application of the relevant planning standards and guidelines and the urban
design guidelines. This will be demonstrated using a map showing the preferred plan
after reorganization and redevelopment has taken place and three dimensional design
models to illustrate how residential development and the landscaping of the area will look
like once the plan has been completed.
vi
TABLE OF CONTENTS Declaration…………………………………………………………………………...........ii
Dedication ………………………………………………………………………………..iii
Acknowledgements……………………………………………………………………….iv
Abstract……………………………………………………………………………………v
List of Tables……………………………………………………………………………..ix
List of Figures…………………………………………………………………………….x
List of Charts……………………………………………………………………………..x
1.0 CHAPTER 0NE: INTRODUCTION………………………………………………1
1.1 Context of the development project…………………………………………………...1
1.2 The Research project .......……………………………………………………………..1
1.3 The main Recommendations of the planning research project …………………….....1
1.4 Rationale of the development project …………………………………………….…..2
Re-organisation of the residential growth is considered as the best approach in dealing with
problems of land use changes, congestion and the loss of asthetics in the area. In order to ensure
proper implementation and sustainability of reorganization of growth in this area, the following
aspects have to be considered. First there is need to educate the community about urban sprawl
and peri-urban growth and engage them in the project. There is need for supportive tools and
policies, the town council of Karuri needs to formulate policies that will provide for control of
residential redevelopment in the project area to ensure the approval and sustainability of the
proposed project. There is also need to involve the experts in developing alternative proposals
for reorganization of residential growth in the project area: who will apply their professional
expertise and carry out feasibility study and an environmental impact assessment to determine
the impacts of each proposal on the environment. There is also need for political support for the
proposed plan.
If all of the above requirements are met, the proposed re-organisation plan for the project area
will be sustainable. These will result into attractive aspects and improved aesthetics, reduced
congestion and improved linkages. Re-organization of residential growth will help control the
rate of land use changes hence the rate of development in the area. This will therefore enhance a
sustainable, vibrant and aesthetically attractive area.
25
CHAPTER THREE: SITUATION ANALYSIS
3.1 Location context of the project area
The project area covers the Ruaka sublocation in Kiambaa division in Kiambu East district . The
area falls under the town council of Karuri. Ruaka is located approximately 12 Km from the city
of Nairobi. The area is accessed via Limuru road. The area has an attitude of 1⁰12'0"S and
36⁰47'0"E. The altitude of the area is 1746 m above sea level. The study area covers an area of
approximately 4 hectares. There has been rapid development of residential and commercial
facilities in the study area leading to uncoordinated growth therefore re-organisation of these
developments is necessary in order to ensure orderly development.
Fig. 3.1 National context of the project area
Source: Survey of Kenya
Ruaka is found in central province in Kenya
26
Source: Town Council of Karuri.
Fig. 3.2 Location within the Town Council of Karuri
Position of Ruaka in the town council of Karuri.
27
Fig. 3.3 The neighbourhood context of the project area.
Legend
Source: Author, 2010
1. The project area borders
the ruaka police post to the
west, Ruaka shopping centre
to the south, the road
junction branching from
Limuru road to Muchatha is
on the East of the study area
and on the northern side are
other residential
developments.
2. Limuru road is adjacent to
the project area on the
south.
28
Fig. 3.4 Detailed Study Area
Housing development within the agricultural land
Small scale agricultural activities still present in the project area.
Limuru road adjacent to the site
Source: Author, 2010
29
3.2 Historical background of the study area
Ruaka is named after River Ruaka that flows across the area, where it is believed that women
used to bath. The land was owned communally where people began building huts. When
colonization began, the people were regrouped into villages. The first village was in Ruaka
shopping centre, where the people worked in the white settler’s coffee farms. Some shops
were built at the current Ruaka shopping centre. The land was therefore subdivided into
private plots where most people practiced agriculture as a main source of livelihood.
Urbanisation then caused there to be various land use changes where people have been
developing residential and commercial houses on their land.
3.3 Physical and environmental characteristics
3.3.1 Climate
The area receives an average of 900 mm of rainfall annually with a mean monthly average
temperature of 22⁰c and a maximum of 27⁰c. Precipitation is in two rainfall seasons i.e.
bimodal that is between March and May and between October and December, there are two
intervening dry seasons. Rainfall is influenced by relief. Winds are weak with the strongest
occurring during August and October (5-10m/s) and blowing from varying directions. The
annual precipitation rate is 1883 exceeding the precipitation rate. The hottest months are
December to March (27⁰c) and the coldest month is July (22⁰c). This presents a very
favourable climate for development of housing in the project area.
3.3.2 Topography and Slope Analysis
Ruaka area slopes eastwards towards the city of Nairobi. The area is characterized by rugged
and deeply incised landscape. Ruaka River is the major hydrological feature which forms the
boundary between Ruaka and Kiambaa sub-locations on the North-East while River Rueru
forms the boundary between Ruaka and Kihara location to the west. Since the area is gently
sloping, this area is very favourable for residential development with minimal costs, this has
been evidenced by the existing and increasing residential developments.
3.3.3 Hydrology and Drainage systems
The main hydrological features in the area are River Ruaka, River Rueru and Kandakomu
spring. The two rivers drain their water in Nairobi River. Other rivers in the river include
Kagongo River which drains its water into Karura River.
30
Manmade boreholes and wells are also other major sources of water in the area. Availability
of water in the area shows that there is great potential to serve the increasing population. The
area has problem which needs to be addressed, that is: it lacks storm water drains hence there
is poor drainage during the rainy season which could be a threat to people’s lives since it may
breed mosquitoes which may bring Malaria.
3.4 Population and demographic characteristics
The population of the project area is approximately 2,112 persons with a population growth
rate of 5%. The table below shows the projected population for the period of 15 years.
Table 3.2: Projected population for the project area
Year 1999 2010 2015 2020 2025 Population 1235 2112 2695 3440 4391
No. of households 247 422 539 688 878
Source: Author, 2010
Average Household Sizes
The average size of a house hold in the study area is 4-5 members per household.
Chart 3.1: Household sizes in the study area
Source: Field work, 2010.
Social cultural characteristics
The area is mostly inhabited by the Kikuyu who value their land, and being entrepreneurs
they put their land in the most profitable ventures. There has been influx of people from other
areas and ethnic backgrounds who come into the area to rent houses.
31
Migration trends
There is high immigration of people into this area resulting to high rate of population growth.
This has led to very high demand for housing hence more development of residential houses
to accommodate the population. The main reasons contributing to people moving into this
area are :- Cheaper housing in the area than major urban areas, search for employment e.t.c.
Most of the people who migrated into the project area intend to permanently live here. This is
because the area is close to Nairobi where they can access goods and other services easily.
Also most of them are employed in Nairobi where they access easily due to a good transport
network. There are also few cases of outmigration whose main reasons are: holidays, visits
and employment. Holiday here refers to the movement of people annually to their ancestral
homes, this factor is greatest especially for those whose ancestral home is not in the project
area.
Chart 3.2: Reason for out-migration from the project area
Source: Field work, 2010
3.5 Land use analysis within the project area.
The main land use in the study area is currently residential, others include commercial
activities, open spaces, urban agriculture and infrastructural and transportation facilities. The
private developers have fully developed the land into residential houses for rental purposes to
the working population in Nairobi. There is need to re-organize what is existing in order to
achieve orderly development.
32
Table 3.3: The existing land use situation in the project area
Land use Percentage Residential 60% Commercial (Economic activities) 5% Open spaces (Vegetation) 20% Agriculture (mainly urban agriculture) 5% Infrastructural and transportation 10%
Source: Field survey, 2010.
3.5.1 Housing
This is the major land use in the area taking about 60% of the land. There are mainly middle
income housing in the project area. The construction of these houses have eliminated the
initial land use which was agricultural. There has been emergence of highrise (flats) houses in
the area where building standards and building codes are not well adhered to. The rental
charges for the apartments and bungalows range from 8,000 for single dwelling units and
20,000 for double dwelling units. The increasing development of these housing has led to
congestion and loss of open spaces in the area. This has hence led to lack of aesthetic value in
the study area. There is therefore need for redevelopment in order to instill order in this area.
3.5.2 Commercial
There are numerous unplanned commercial activites taking place along the roads. This has
led to congestion on the road lanes and has also hindered accessibility into the interior. There
has been high competition for road use. This activities include retail shops, informal open air
markets, jua kali artisans, welding and maize roasting.
3.5.3 Infrastructure
Water supply
The increased residential and commercial activities have led to increase on the water demand
in the area. Some residents who live in bungalows also harness rain water through roof
catchment. Water is supplied by the City Council of Nairobi and Karuri water and sanitation
company.
33
Storm water drainage
There is a problem of storm water drains especially during the rainy season. This is because
there are no adequate storm water drainage systems in this area. The town council council
where Ruaka falls has not addressed to the problem for storm water drainage.
Sewerage disposal
The project area lacks a sewerage network hence most residential households use septic tanks
and conservancy tanks especially in the high-rise buildings. Others use pit latrines especially
those living in bungalows. The septic tanks are emptied by private exhausters every three
months. There are plans by the Athi waters board to buy exhausters. The lack of sewerage
systems for sewage disposal poses health risks and other environmental concerns like
pollution and air borne diseases.
34
Figure 3.5 Existing land uses in the study area
Legend
35
3.6 Institutional, legal and financial issues of the project area.
3.6.1 Town Council of Karuri
This is the major planning agency in the project area. According to the local government Act
and the physical planning Act, it has the following functions: To prohibit or control the use
and development of land and buildings in the interests of proper development of its area of
jurisdiction, also to consider and approve all development applications and grant all
development permissions (according to the P.P.A section 29). The town council formulate
by-laws to guide development activities in the area. The council plays a role in development
control through approval of submitted development proposals.
There are various challenges faced by the council in development control. These include:
Resistance by the public, lack of capacity to inspect all construction works from the approved
plans, lack of technical staff, insecurity, and political interference.
Therefore, there is need for strict measures to be put in place regarding development by the
Town Council of Karuri in order to ensure that all planning standards and regulations are
adhered to by developers.
36
Fig. 3.6 Administrative structure of the Town Council of Karuri
3.6.2 Other Actors in the planning process include:
Ministry of Lands
This is the overall government agency that approves land uses changes on land in the area.
Therefore this makes it a major Actor in the implementation of this project.
Ministry of Roads
The ministry of roads will also be involved in the implementation of the project in the
reorganization of the road network in the area. The ministry will help in the construction of
the new proposed roads.
Membership: Councilors The Chairman: Formulate policies for the council and approves all decisions
Committee1: Finance Staff and General Purposes
Committee 2: Works and Town Planning
Committee 3: Education, Social Services and Housing
Committee 4: Public Health and Environment
Town Clerk Chief Executive
Departments
Town Clerks Department
Treasury Department Town Treasurer
Works Department Town Engineer
Planning Department
Public Health Department
37
Community development fund
Community development fund (CDF) will be used to fund the implementation of the project.
The private sector
The private sector is also included in the financing and implementation of development
activities in the area. These can provide housing facilities together with the necessary
facilities to the community.
Community leaders
The aim of community leaders is to ensure conformity to the planning regulations by the
community hence sustainability of the project. The community leaders should be involved in
all the development stages of the plan making to implementation.
3.6.3 Financial
The project will require a lot of money for its implementation. The town council of Karuri
should review its policies that will help in directing enough funds for the implementation of
the project. The planning standards and regulations should also be reviewed in order to
reduce the cost of developing the residential houses, provision of infrastructural facilities and
community facilities.
The community based organizations in the area can also lobby for funds from development
agencies willing to engage in the implementation of this project i.e. both local and
international agencies such as U.N Agencies and the World Bank.
38
Fig. 3.7 Opportunities and Constraints in the project area.
Source:Author,2010
Opportunities
• The Nairobi northern By-pass will help reduce traffic congestion, increase accessibility and promote urban growth.
• Proximity to Nairobi will this will spur growth in Ruaka.
• The proposed Nairobi metropolitan region is likely to bring some trickling Bdown effects from the city.
• Heavy development in housing for rental purposes is a source of income for the residents.
• Availability of building materials. • The high land prices in the area
present an opportunity for major urban residential developments.
Constraints
• Non-adherence to building codes by developers.
• Poor zoning and land uses. • Lack of a functioning sewerage and
drainage systems exhibited. • High rates of land subdivision.
Legend
39
CHAPTER FOUR: PROJECT PLANNING, DESIGN AND IMPLEMENTATION
Overview
This chapter will deal with the aspects of developing plan proposals for the project area and
implementation of the preferred plan. There are various alternative designs for peri-urban
residential development for harmonious growth. The adoption of the plan by the town council
of Karuri will help to manage the haphazard residential growth in their area of jurisdiction.
4.1 Planning and design of project
The re-organised peri-urban growth plan for housing developments will bring about a vibrant
and sustainable project in the area. Housing blocks will be provided following the required
planning standards. There will be adequate accessibility within the study area and also with
the neighboring areas. This will provide a compact neighbourhood which is sufficient in all
ways where people can interact and socialize with others freely. There will be enhanced
linkages with the periphery of this area and the city of Nairobi.
The compatibility of the residential land use with other land uses in the area will enhance
healthy interactions and control of development in the area. There will be provision of
various housing typologies in order to promote a variety of choice among different
households. Provision of housing will observe the required standards and building by-laws.
4.1.1 Development of the spatial plans: Evaluation of alternatives plan proposals
The Existing situation
The project area is currently characterized by multiple storey residential buildings where the
planning standards and regulations have not been adhered to properly. For instance,
developers develop upto 100% plot coverage. This has led to haphazard development in this
area. Ruaka also lacks a planning framework which could also be the cause for the
uncoordinated growth. There is therefore need for a planning framework in the area in order
to control growth.
Alternative Plan one: Medium density single storey buildings
There will be rezoning of the current multiple storey housing into development of uniform
type of housing that is single storey buildings in the study area each on its own piece of land
and serving only one household. These houses will all be similar in terms of design and
provided with all infrastructural facilities like sewerage facilities. There will be no
commercial facilities provided in the type of development. Construction for such housing will
40
observe the planning standards for medium density type of development. In this type of
development there will be relocating of the people currently residing in the area in order to
redevelop this area which is an expensive process to undertake. The main advantage of this
alternative is that it promote a unique neighbourhood character as well as preserve the
aesthetic characteristics of the area. The disadvantage to this type of development will is that
there is need for a large piece of land which is not available in the area where it has been
subdivided into very small pieces. It is also a very expensive undertaking and also this type of
development will not be able to accommodate the increasing population in the study area.
41
Fig. 4.1 Alternative Plan one map.
Source: Author, 2010.
Legend
42
Fig. 4.2 Design for the alternative one
Source:Author,2010
• Uniform type of housing that is single storey buildings
• Houses similar in terms of design • There are no commercial facilities
provided • Construction for such housing will
observe the planning standards for medium density type of development
43
Fig. 4.3: Landscaping of Alternative plan one
Source: Author, 2010
44
Alternative plan two: High density multi-storey buildings
In this intervention measure, the area will be designated for purely high density multifamily
residential zone. Where possible there will be rehabilitation of the existing structures which
have followed the required guidelines in order to conform with the redevelopment plan. In
this alternative it will provide multi-storey buildings where the ground floors of buildings
facing the road are used for commercial purposes while the upper floors are used for
residential purposes. This will enhance optimum utilization of the available land for
development. This measure works well in areas where there is limited developable land like
the case in the project area.
The advantages of this alternative are that there will be various uses in the same building and
also will help accommodate the increasing population in the project area. This will also help
create a very good skyline in the project area. This type of development should be well
integrated with the existing neighbouring land uses.
Preferred plan
The most preferred plan for the area is the high density multi-storey buildings.
This is because 1) It will blend well with the existing residential development in the area
which is multi-storey buildings, 2) Land available for development is limited in the project
area and there is high population growth rate, where it has also been increasing due to high
rates of in migration into the area, 3) This type of development will ensure optimal use of the
available land in the project area. The local authority where this area falls (the town council
of Karuri) will also be able to collect more revenue from this development. This is because is
there will be guidelines to enhance inspection of approved buildings by the council hence no
housing will be constructed without approval.
Urban design Guidelines
The residential redevelopment should be well linked with visual and spatial orientation of
recreational and open space areas.
Adequate lighting should be provided in all areas to avoid hidden “pockets” within
landscaped areas.
Provide recreational facilities specifically designed for the residents of the project, e.g.
benches, footpaths e.t.c.
Improve neighborhood streetscapes by preserving significant street trees and landscape
patterns.
45
4.2 Site planning/design process stages
4.2.1 Detailed design formulation stage and the development of detailed action plans
• Existing area of land for the project area =4.0 Ha
• Current population = 2112
• Projected population for 15 years= 4391
• Current number of households= 422
• No. of households after 15 years= 878
• Two bedroomed units will occupy 100 sq. metres
• Three bedroomed units will occupy 120sq. metres
• The ratio of two bedroomed houses to three bedroomed houses will be 3:1
• The total no. of two bedroom units will be 1500
• The total o. of three bedromed units will be 500
• The total area to be occupied by two bedroomed units will be
1500×100=150000sq metres or 15 ha
• The total area to be occupied by three bedroomed units will be
500×120=60000 sq. metres or 6 ha
• Total area of the land required to accommodate the projected population in 15 years
time
15 ha+ 6 ha= 21 ha
• Proposed ground coverage= 50%
• No. of floors
21ha/4.0 ha= 5 floors
Detailed Action Plans
Development of high density multi-storey houses will be adopted in the project area. In 15
years time the number of houses will be higher than the current situation due to the increase
in population. There will be about 4391 persons in 15 years in the project area therefore 878
households. There will be 1500 two bedroomed houses and 500 three bedroomed houses in
the plan. This is because most people living in this area are middle income earners. This
development will have two clusters, one for the two bedroom houses and the other for the
three bedroom houses. The cluster for two bedroom houses will be the one fronting the road.
There will be provision of infrastructural facilities into these buildings i.e. water and sewer
system and also adequate accessibility means.
46
Fig. 4.4 Preferred Plan for the project area.
Source: Author, 2010.
Legend
47
Fig. 4.5 Design of the preferred model
Source:Author,2010
Two bedroom and three bedroom flats. Flats have Five floors each Provides a good skyline. 50% plot coverage Good landscaping with trees. Adequate space for community facilities Six metres access road
48
Infrastructure facilities
Adequate infrastructure will be provided to cater for the population. Drainage channels will
be constructed and integrated with the footpaths A sewerage network will be provided to
cater for foul water and waste water from the houses. Also proper methods of solid waste
disposal will be adopted to enhance hygiene.
Access roads and pedestrianization
A six metre wide access road will be provided in order to serve pedestrians, and cyclists.
Pedestrianization will improve the linkages within the neighborhood. Other facilities like
trees, benches, street lights and garbage bins, sidewalks and foot paths will be designed for
the area to link with other parts within and outside the project area.
Landscaping
Trees will be planted along Limuru road to act as a buffer and also within the area so as to
maintain a good landscape. There will also be flowers at the compounds of these houses to
improve on aesthetic value.
Peri-Urban agriculture
To ensure that agriculture is not completely phased out of the area, there will be small
gardens to practice small-scale peri-urban agriculture like planting of vegetables.
49
Fig. 4.6 Detailed street design, pedestrianization and landscaping
Source: Author,2010.
• A six metre access road • A street with various infrastructural facilities like
open water drains. • Street lighting is provided. • A footpath is provided. • Trees planted for landscaping purposes together
with benches
50
4.2.2 Implementation strategies
Problem Strategies Programmes Actors High demand for housing due to increasing population.
Provide enough housing for the increasing population in the area. Provide buildings to accommodate and curb the increasing demand for housing.
Build five storeyed apartments to accommodate the population.
The Town Council of Karuri
Increasing land use changes from agricultural land use to residential land use.
Ensure that the land use changes are approved by the Town Council of Karuri. Inspection and follow up by the council.
The Town council of Karuri to approve all developments in the area and the do a follow up during construction.
Town Council of Karuri Private developers
Development of housing without following planning standards.
Ensure construction of buildings adhering to the required planning standards
Provide the planning standards to developers at the time of approval of buildings
Town Council of karuri Private developers.
Congestion due to emergence of unplanned residential growth.
Re-plan and redevelop for residential growth in the area. Co-ordinate residential growth by applying the required standards during development.
Redevelop the residential housing observing a 50% plot coverage.
Town Council of Karuri Private developers
Lack of infrastructure facilities like sewerage network
Provide a sewerage network in the area.
Consruct a high capacity sewerage network, water and drainage systems
Athi Water Company The Town Council of Karuri.
Source: Author, 2010
51
4.2.3 Implementation schedule
Role of stakeholders
Various stakeholders are involved in the project in order to ensure its success and
sustainability. Their roles are outlined in the table below.
Table 4.1 Role of stakeholders in the implementation of the project
Stakeholders Roles Town Council of Karuri • Provide housing for the area and other
community facilities.
• Provide infrastructural facilities like
water, sewerage and solid waste
management
• Provide guidelines and planning
standards for residential development.
• Finance the project and provide the
technical expertise during
implementation.
• Regulate monitoring of the project for
sustainability.
Private sector • Finance the project.
• Provision of services Community leaders • Enforcement of regulations and planning
standards during implementation.
• Management of the project area.
• Settle the disputes in the area. The households/Community • Contribute to the design of buildings
• Provide voluntary labour
• Management and mainteinance of the
project to ensure sustainability
Source: Author, 2010
52
Phasing of the project and the Time Frame
The project shall require a phasing plan that describes and illustrates the format of implementation of the proposed plan when development is
anticipated to occur in multiple phases over a number of years. The phasing plan will show how the project is to be incrementally developed.
Table 4.2 Phasing of the project
Phase 1 Time Frame Cost(Kshs) Phase 2 Time frame Cost (Kshs) Compensate the land owners for their
land for redevelopment
Identifying a temporary site to
relocate the displaced population.
Acquisition of required materials for
construction.
Layout of infrastructural facilities
Construction of flats
6 months
6 months
1 year
1 year
3 years
500 million
1 million
50 million
10 million
500 million
Landscaping and pedestrianization
Tree planting
Relocation of the displaced population
Regular inspection and monitoring to
ensure sustainability
2 months
3 months
5 months
100 million
50, 000
Source: Author, 2010
53
Resource requirements
Land resource
Land is the major component in the implementation of this project. The land is not readily
available since the ownership of land in the area is private and the land has been subdivided
into very small pieces. There will be compensation to the owners of land in order to
redevelop the area.
Financial resources
The project requires huge amounts of financial resources. The Town council of Karuri will be
the main financier of the project. Other stakeholders will include; the private developers and
other development agencies.
Human resources
Human labour will be needed in the construction, supervision, management and mainteinance
of the project. The town council of Karuri will provide the technical support and supervision
of the project. The community members will provide casual labour which will be a form of
employment for them.
54
CHAPTER FIVE: MONITORING AND EVALUATION
Overview
This chapter articulates the expected outcomes from the project as well as the indicators.
5.1 Expected outputs and outcomes of the project
The re-organised residential growth plan is expected to reduce the cases of congestion in the
study area and enhance aesthetic characteristics, that will present a well organized residential
developments in Ruaka. There will be reduced haphazard development in the area and
therefore present an orderly sense of development in the area. There will be increased
accessibility within and outside the area to enhance the interactions between the people.
Adequate space for commercial facilities will be provided in order to enhance the peoples
livelihoods in this area.
Table 5.1 The expected Output and indicators of success.
Expected outcomes Indicators
Spatial implications • A well organized
residential
development
• Reduced haphazard
development
• A well maintained
neighbourhood.
• Increased
accessibility of the
area.
• Increased linkages
(exrenal and internal).
• Controlled
development
• Easier movement
• Improved aesthetic
characteristics
Social implications • Improved living
standards of the
residents.
• Improved livelihoods
of the residents.
• Good housing
• Improved way of life
of the community
55
conditions
Economic implications • Increased revenue for
the town council of
Karuri.
• Increased incomes
from investment in
residential
development
• Increased
employment
opportunities for the
community especially
the youth
• Optimal use of land
• Increased revenue
base i.e surplus.
• Improved way of life.
• Creation of
employment
opportunities.
Environmental implications • A well maintained
neighbourhood
• A cleaner
environment
• Proper waste
management
• A cleaner
environment
• Improved aesthetic
components
5.2 Monitoring and evaluation stages in the implementation of the project
There is need for community participation and constant monitoring and evaluation
mechanisms in order for the project to become a success and to ensure that the expected
outputs are realized. Monitoring is an essential part of the planning process. Monitoring of
the project ensures that there is a base to measure the success of the plans.
56
The success of the project will be ensured by the provision of training programmes and
community sensitization forums. The community based organizations as well as the
community members will be at the fore front in the management and the monitoring the level
of success of the project. The indicators as illustrated in the table above will serve as the
measure of the general success of the project.
Goal achievement matrix
This reflects the expectations of the stakeholders in terms of the goals and the
recommendations they have made. It will reflect the achieved goals and whether they have
been achieved within the proposed time limits. The goals not achieved within the stated time
limit should be devised on how they would be achieved
Site performance inventory
Regular site visits and monitoring will be done after the construction process to access
general performance of the project. This is to check whether there are any negative impacts as
well as the intended goals and objectives have been met.
5.3 Guidelines for the implementation process
The harmonization of the project will be ensured by a guideline that will act as an
organization structure for the entire project, which shall include various steps and procedures.
The implementation stages of this project should be a participatory process of the town
council of Karuri, the community, developers and other development agencies, this is in order
to enhance the ownership of the project hence its sustainability. The community should be
actively involved from the decision making stage to the implementation.
The town council of Karuri needs to observe the following:
• Reviewing of by-laws in order to provide for the peri-urban residential re-organisation
and redevelopment in Ruaka.
• Formulation of cross sectoral framework for project implementation.
• Negotiations and meetings between different stakeholders for a partnership and
participation plan formulation
• Commencement of the community training programmes.
57
• Enforcement of the appropriate legal framework in regards to construction or
development of the area, ie. Getting development permission by the town council of
Karuri as per the local government Act and the physical planning Act of 1996.
• Implementation of the proposed policies for peri-urban residential growth to enhance
the sustainability of the project.
• When these guidelines are in place implementation sequence will begin with less
technical phases of the project implementation as outlined in the table.
5.4 Site/ Environmental Management plan
Construction activities on the sites need to be strictly regulated to ensure that all projects are
developed and implemented according to sound environmental standards and norms.
To ensure that the project proceeded with minimum distractions on the physical environment
and the public, an environmental management plan which prescribes specific actions that
should be undertaken during planning, construction and operation of an approved
development will be prepared.
The main objectives are: 1) To come up with cost effective measures to prevent or reduce
significant negative impacts of development to minimum levels. 2) To understand the degree
of the impacts when considering compensation to affected parties. 3) To minimize noise
during construction.
58
Bibliography
• Arbury Joshua, From Urban Sprawl to Compact City – An Analysis of Urban growth
management in Auckland.
• Andersen Jorgen, Department of Human Settlements, School of Architecture,
Copenhagen, Meanings and perceptions of the built environment in peri-urban areas
of Maputo, Mozambique.
• Chirisa Innocent, Peri-urban dynamics and regional planning in Africa: Implications
for building healthy cities.
• Dávila D. Julio with, A review of policies and strategies affecting the peri-urban
interface.
• Heimlich E. Ralph and Anderson D. William, Development at the urban fringe and
beyond: Impacts on agriculture and rural land.
• Ikhwan Hakim, and Parolin Bruno, Spatial Structure and Spatial Impacts of the
Jakarta Metropolitan Area: a Southeast Asian EMR Perspective.
• John Friedmann-University of british Columbia, The peri-urban: the unfolding drama
of china’s city-regions.
• Kithia Shadrack, Land use changes and their effects on sediment transport and soil
erosion within the Athi drainage basin, Kenya.
• Kjell Nilsson & Thomas S. Nielsen, Peri-urban land use relationships – Strategies and
sustainability assessment tools for urban-rural linkages
• Ministry of Nairobi metropolitan Development, Nairobi Metro 2030; A vision for a
world class Metropolis, First and foremost in Africa and the world.
• On the Edge of Sustainability: Perspectives on Peri-urban Dynamics
• Professor-Emeritus Helen Armstrong-Centre for Cultural Research, University
of Western Sydney, Post-Urban/Suburban Landscapes: Design and Planning
the Centre, Edge and In-between.
• Republic of Kenya (2002-2008) Kiambu district development plan. Government
printer Nairobi.
• Republic of Kenya, Kiambu District Strategic Plan, 2005 - 2010 for implementation
of the national population policy for sustainable development, government Printer.
• Republic of Kenya, County Council of Kiambu Strategic Plan, 2008 to 2013,
government Printer.
59
• Rijksuniversiteit Groningen, Peri-urban Planning in Indonesia Contexts, approaches
and institutional capacity.
• Socio-economic transitions;changing livelihoods in the peri-urban area. A
comparative study of Kotwi and Tikrom in the Atwima Kwawoma. District and the
Ejisu Municipality of Ghana respectively.
• Stergios Jim, Rehabbing Urban Redevelopment
• The Peri-Urban Interface in Developing Areas: Approaches to sustainable natural and
human resource use Developing Areas Research Group
• Urban Fringe Management and Role of Good Governance: Integrating Stakeholders