Dec 17, 2015
Present By;Mohd Fahmi Adli
Bin Salahuddin
M 0001Management Trainee
Dynac Sdn Bhd
Research & Development
Contents of Presentation
1. Research & Development (R&D) On Department Involved
2. Analysis Of Research & Development (R&D) Data
3. Planning For Continuous Research & Development Progress
4. Current Status Of Research & Development Progress
5. Q & A
6. Acknowledgement
7. End
Research & Development (R&D) On Department Involved
Research & Development (R&D) On Department Involved
: Previous Research & Development Progress
Quality Department
DYNAC
Content
Previous Research & Development Progress: Quality Department
Problem Statement
Average of punch list for 6 units of KPOC AHU System (NA 6701A/B, NA 6702 A, NA 6702 B, NA 6703 A & NA 6703 B) is 25.
Objective of Task
To find the root caused of punch list that occurred in KPOC(AHU) project.
Business Benefits
To achieve customer satisfaction on the product and company.
To reduce the cost for rework process.
Previous Research & Development Progress: Quality Department-cont
Control Element
Do punch list analysis for every project after completed.
Create a specific team to analysis every punch list for eachproject based on 5W 1H (What, Who, Where, When, Why &How) or another process analysis that suitable.
Periodical welder assessment test to verify the ability ofwelder.
Continuous training for understanding on quality processand their application.
Provide the visual aid (e.g: welding process, fit upprocedure etc) at the working place.
Monthly progress meeting to update for current issuesoccur for each of project.
R&D Progress
Previous Research & Development Progress: Fabrication Department
Problem Statement
Number of punch list for FLNG LAB 1101 (Duty) is 12.
Objective of Task
To find the root caused of punch list that occurred in FLNG LAB1101 (Duty) project.
To find any improvement that can be implemented regardingto the AHU production process flows.
Business Benefits
To achieve customer satisfaction on the product and company.
To reduce the cost for rework process.
Previous Research & Development Progress: Fabrication Department-cont
Control Element
Centralization for information of project progress infabrication department and inter-department in Dynac SdnBhd.
Analysis and improvement in term of resources in order toensure the fabrication process and progress going smoothly.
Continuous assessment on quality and viability of workers andan award may be gifted to the chosen worker based on theirperformance.
Do analysis (e.g SWOT) for every project before and after ofcompletion.
Implementation of Key Performance Index (KPI) to enhancethe productivity and performance of resources.
R&D Progress
Previous Research & Development Progress: Procurement Department
Problem Statement
Our store division faced problem about the traceability of aproduct/material in term of time consume to find theproduct/material AND the ability to know about the status ofreceiving or delivering for material/product either forconsumable or project.
Objective of Task
To find the root of caused of traceability problem thatoccurred in Store Division.
To find any improvement that can be implemented regardingto the process flow and instruction of process for StoreDivision.
Business Benefits
To eliminate the unnecessary time consumed for thetraceability process.
To centralize the information between the department due tothe material/product received in the store.
To ensure that the out-standing progress work/planning dueto the fabrication or another department regarding to theresources of product or material is reduced or out of order.
Previous Research & Development Progress: Procurement Department-cont
Control Element
Centralization for information of status for product/materialfor procurement department (store division) and inter-department in Dynac Sdn Bhd.
Analysis and improvement in term of process flow of work toensure that the progress and process for procurementdepartment (store division) going smoothly.
Implementation of annually audit for store division.
Continuously training session to improve understanding aboutthe requirement and proper procedure for store management.
Previous Research & Development Progress: Procurement Department-cont
R&D Progress
Analysis Of R&D Data
Analysis Of R&D Data
DepartmentAnalysis Of Control Element By Category
Analysis Assessment Training ImplementationCentralization Of
Information
Quality
Do punch list analysis for everyproject after completed.
Periodical welder assessmenttest to verify the ability of welder.
Continuous training forunderstanding on qualityprocess and theirapplication.
Provide the visual aid(e.g: welding process, fit upprocedure etc) at theworking place.
Monthly progressmeeting to update forcurrent issues occur foreach of project.
Create a specific team toanalysis every punch list for eachproject based on 5W 1H (What,Who, Where, When, Why &How) or another process analysisthat suitable.
Fabrication
Analysis and improvement interm of resources in order toensure the fabrication processand progress going smoothly.
Continuous assessment onquality and viability of workers andan award may be gifted to thechosen worker based on theirperformance.
Centralization forinformation of projectprogress in fabricationdepartment and inter-department in Dynac SdnBhd.
Do analysis (e.g SWOT) forevery project before and after ofcompletion.
Implementation of KeyPerformance Index (KPI) toenhance the productivity andperformance of resources.
Procurement
Analysis and improvement interm of process flow of work toensure that the progress andprocess for procurementdepartment (store division)going smoothly.
Continuously trainingsession to improveunderstanding about therequirement and properprocedure for storemanagement.
Implementation ofannually audit for storedivision.
Centralization forinformation of status forproduct/material forprocurement department(store division) and inter-department in Dynac SdnBhd.
TOTAL 5 3 2 2 3
Based on the Analysis of Control Element By Category, itshows that the category of Analysis is the highest for theelement control which is 5 item, follow by element ofAssessment and Centralization Of Information which is 3item also with Training and Implementation which is 2item.
Since the category for Training and Centralization OfInformation is one of the element based on the previousResearch & Development analysis, it will be continuedfurther for the continuous planning for Research &Development Progress.
Analysis Of R&D Data
Content
Planning For Continuous Research &
Development Progress
Planning For Continuous Research & Development Progress
Analysis of control element by category that hadbeen chosen are;
Training
Centralization Of Information (Will be discussfurther on next chapter of presentation slide)
Content
Based on my previous presentation, I had suggest that oneof the training that could be made are team work alsounderstanding about obligation as a Muslim and worker.
Based on the objective of program, a program forfabrication department joined with Dynac Engineering willbe made on 22-23 February 2014.
Planning For Continuous Research & Development Progress: Training
Plan
Planning For Continuous Research & Development Progress: Centralization Of Information-Ultimate Goal Of R&D
DYNAC will able to know the status of progress, able to estimate the duration of a project progress based on the previous experienced
AND able to produce a goodquality of product based on
duration of time given1. Research & Development
(R&D) On Department
Involved
2. Analysis Of R&D Data
3. Project Progress Status Server (PPSS)-Trial
4. Analysis of Project Progress
Status Server-Trial
5. Decision On Implementation Of
PPSS-Trial
Plan
Current Status Of Research &
Development Progress
Current Status Of Research & Development Progress
Research & Development
(R&D) On Department
Involved
Analysis Of R&D Data
Project Progress Status Server (PPSS) -Trial
Analysis of Project Progress
Status Server-Trial
Decision On Implementation
Of PPSS-Trial
Content
In this section, the analysis will be focused on the processflow of Project Progress Status Server (PPSS).
Current Status Of Research & Development Progress: Analysis of R&D Data
Received progress report from department
Transfer data to progress report status
Merge the report with another department based
on a specific project
Data will be collect and published in Score Card
Dashboard
Current Status Of Research & Development Progress: Analysis of R&D Data- Process Flow
Status
Project Progress Status Server;
It used as a medium to share information especially about,the current progress of project include with project fromDynac Kuala Lumpur, Dynac United Kingdom & DynacTanjung Langsat which is the fabrication process is occurredon Dynac Tanjung Langsat.
It consist of the progress of each project due to thefabrication.
Current Status Of Research & Development Progress: Project Progress Status Server-Trial
Explanation about location of server;
Current Status Of Research & Development Progress: Project Progress Status Server-Trial
cont
Display Of Server
Server for Project Progress Status:- PPS
Current Status Of Research & Development Progress: Project Progress Status Server-Trial
cont
Display of folder which are divided to four folder, consist of ADD, KL, TGL & UK. It also consist with Master Project List
Specification of folderMaster Project List
Current Status Of Research & Development Progress: Project Progress Status Server-Trial
cont
Folder is divided based on the project
Arrangement of folder by project
Current Status Of Research & Development Progress: Project Progress Status Server-Trial
cont
Each of department involved will have their own folder
Arrangement of folder by department for example; Permas Project
Permas Master Progress Report
Current Status Of Research & Development Progress: Project Progress Status Server-Trial
cont
Sample of progress report for fabrication
Arrangement of progress report based on Permas Project for example: Fabrication Progress Report
Status
Based on the server that had been created, several analysishad been done to ensure the server is effective andstructured such as;
1. Each of project folder will be divided based on theincoming of project. Such as Guntong project fromDynac KL.
2. Each of project will be given a code of project such asH0003 for Permas.
3. Each of folder stage will have their own score card andprogress report card for example;
a. Master Project List
b. Master Progress Report
c. Department Progress Report
Current Status Of Research & Development Progress: Analysis of Project Progress Status
Server-Trial
Status
Current Status Of Research & Development Progress: Analysis of Project Progress Status
Server-Trial cont
Sample of Master Project List
Analysis
Current Status Of Research & Development Progress: Analysis of Project Progress Status
Server-Trial cont
Sample of Master Progress Report for Permas
Analysis
Current Status Of Research & Development Progress: Analysis of Project Progress Status
Server-Trial cont
Sample of Progress Report By Department
Current Status Of Research & Development Progress: Analysis of Project Progress Status
Server-Trial cont
Analysis
Sample of Progress Report By
Department
Content
Acknowledgement
Tuan Hj Allam Tawfiq Said
Technical Director
Madam Razita Binti A.Rajak @ Atan
Human Resources
Mr Shahrul Anuar Bin Mohd Yunos
Senior Project Manager
Mr Sheikh Ayub Bin Sheikh Abd Rahim
Group Quality Manager
Mr Roshaizad Bin Johar
Procurement Manager
Mr Mohd Salleh Bin Hasan
Mechanical Design Manager
Mr Mohd Rozaiham Bin Abd Jalil
E&I Design Manager
Mr Mohd Ilham Bin Sukimon
IT Analyst
Mr Tawfiq Allam Said
Production Coordinator
Content